24‐09‐2013
1
Creative Steel Solutions
QUATRON STEEL JOINT STOCK COMPANY
QUATRON STEEL JSC
• A GRIRO‐ROMANIA ASSOCIATE
• A UNIT OF TAHER INVEST GROUP
Chairman: Fathi Taher
Vice Chairman: David Thai (Highlands Coffee)
QUATRON’S ROOTSTAHER INVEST GROUP
EDUCATION REAL ESTATE HEAVY INDUSTRY
GRIRO (Heavy Pressure Vessels)
ELECTROPUTERE (Electrical Transmission &
Switchgear)QUATRON STEEL
Steel Structures
LAMINATE (Hot Rolled Beams,
Channels, Angles & Rods)
INFRASTRUCTURE INVESTMENT HOTELS & RESORTS
HRSG Boilers
Ducting, Casing , Stack & Structures)
Exhaust System
Furnaces
Industrial Fans
PRODUCTSQuatron Steel specializes in heavy and special steel design,fabrication and erection. Our products range includes :
Mid & high‐rise building up to 60 storey.
Power plant.
Petrochemical plants.
Steel rolling mills.
HRSGHRSG.
Process structure
Industrial projects.
Oil & gas plant.
Airport & multi storey car parks.
Sport stadiums.
….. And many others
24‐09‐2013
2
ENGINEERING.Quatron Steel powered by TEKLA
Quatron Steel possesses in house engineering expertise to dodesign as well as detailing for any steel structure within thescope of the company. In‐house as well as tie ups with firstclass engineering firms gives Quatron the flexibility as well asthe ability to do the most complex steel or Steel/ConcreteComposite type of construction for added economy at times.
APPLY TEKLA TO DESIGN
APPLY TEKLA TO DESIGN PROJECT DEPARTMENT
24‐09‐2013
3
PROJECT DEPARTMENT PRODUCTION DEPARTMENT
PPC DEPARTMENT PPC DEPARTMENT
24‐09‐2013
4
QC DEPARTMENT QC DEPARTMENTTRAINING BEFORE PROJECT START
MACHINERY
CNC fully automatic drill lines complete with drills, band saws & CNC coping.
Fully automatic Flux core Arc welding line.
CNC fully automatic plate drilling machines.
Overhead cranes, totaling 23 sets with capacities ranging from 10 to 20 & h k h h b & & k l fton & hook height between 8m & 10m &can pick up single piece of 40
tons.
CNC fully automatic angle line with capacity up to 200x200x20 mm angle size.
CNC torch cutting facility ( bed size 15m ).
CNC plasma cutting facility ( bed length 15m ).
M
MIG & Stud welding machines.
Fully automatic shot blasting machines dimension : 1.5m x 2.5m x 20m.
Automatic shot blasting machine and manual auto‐recycling steel shot blasting chamber with 18m length x 8m width x 6m height.
PT, UT testing equipment for weld quality verification.
MACHINERY
PT, UT testing equipment for weld quality verification.
Shearing & Bending & Rolling machines
Automated container loading facilities for the export products.
Geka iron workers
……and others.
24‐09‐2013
5
MACHINERY DETAIL
CNC MACHINE AUTOMATIC WELDING
MACHINERY DETAIL
SHEARING MACHINE ROLLING MACHNE
MACHINERY DETAIL
BAND SAW MACHINE IRON WORKERS
MACHINERY DETAIL
HEAVY DUTY SUBMERGED ARC WELDING MACHINE
24‐09‐2013
6
MACHINERY DETAIL
AUTOMATIC SHOT BLASTING MANUAL BLASTING CHAMBER
QUALITY Assurance/ Control
Quality is always the key for Quatron’s success. Whether it is request by customer or not, we carry out stringent inspection and testing program: Visual Examination, Non‐destructive testing ( MT, PT, UT & X‐ ray as need).
“ there is no compromise when it comes to quality” there is no compromise when it comes to quality
The inspection and test plan ( ITP ) will be submitted to clients for approval before fabrication starts and followed throughout the production process.
QUALITY CONTROL
PT TESTING UT TESTING
KICK‐OFF MEETING ‐ NEW PROJECT
24‐09‐2013
7
RAW MATERIAL
Steel Pipes Beams & Hollow Sections
RAW MATERIAL
Material delivery at Warehouse QC checking
MATERIAL
MAIN MATERIAL • NIPPON STEEL ‐ JAPAN.
• Stockiest: OKAYA ‐JAPAN.
• HYUNDAI ‐ KOREA.
• Stockiest: HYOSUNG ‐ KOREA
CONSUMNABLE MATERIAL• FCAW WIRE ‐ HYUNDAI
• FLUX for SAW‐ HOBART
• SOLID WIRE for SAW‐ KUANG TAI
• Stockiest: HYOSUNG ‐ KOREA.
• SOME MATERIAL FROM LOCAL MAKET OR CHINA
MAIN STRUCTURE
24‐09‐2013
8
CRANE GIRDER HOT BEAM FOR HRSG
AUTO BLASTING HEAVY STRUCTURE CRANE GIRDER FOR STEEL ROLLING MILL
24‐09‐2013
9
LACED COLUMN FOR STEEL MELT SHOP LACED COLUMNS FOR STEEL MELT SHOP
HEAVY PIPE LASHING FOR MODULE SHIPPING
TRIAL ASSY. OF OUTLET DUCT FOR HRSG
24‐09‐2013
10
TRIAL ASSY. OF OUTLET DUCT FOR HRSG FABRICATION OF STACK
READY FOR DELIVERY: STACK FOR HRSG STACK TRANSITION (CONNECTION)
24‐09‐2013
11
HRSG CASING (Cr. Mo. Alloy) TRIAL ASSY. OF HRSG CASING & INLET
HRSG INLET DUCT HANDRAIL & LADDER
HANDRAIL LADDER
24‐09‐2013
12
PWHT (POST WELD HEAT TREATMENT)
PWHT (POST WELD HEAT TREATMENT )
LIFTING FRAME (WALKING BEAM FURNACE) MACHINING LIFTING FRAME (WALKING BEAM FURNACE)
24‐09‐2013
13
TRIAL ASSEMBLY AFTER MACHINING MACHINING OF FRAME (WALKING BEAM FURNACE)
SHIFTING FRAME FOR RE‐HEATING FURNACE
WASTE GAS DUCT CONNECTION
24‐09‐2013
14
WASTE GAS DUCT PIPING SPOOLS
PIPING SPOOLS UNDER UTAXIAL FLOW FAN
24‐09‐2013
15
AXIAL FLOW FANAXIAL FLOW FAN
CENTRIFUGAL FANS
CENTRIFUGAL FANS
24‐09‐2013
16
FLAT RACK.
HC CONTAINER.
LOAD TO TRUCK.
PACKING
BREAK BULK.
FAN LOADING ‐ FLAT RACK
FAN LOADING ‐ FLAT RACK FAN LOADING ‐ FLAT RACK
24‐09‐2013
17
STRUCTURE IN HC CONTAINER STRUCTURE IN HC CONTAINER
STRUCTURE IN HC CONTAINER LOADING BREAK BULK IN THE VESSEL
24‐09‐2013
18
BREAK BULK PACKING STYLE BREAK BULK LOADING
LOAD TO VESSEL STORE IN VESSEL
BREAK BULK LOADING BREAK BULK PACKING STYLE
HRSG : STACK CONNECTION HRSG : STACK‐ 5 meter Dia.
24‐09‐2013
19
BREAK BULK PACKING STYLE
UNDER CASING UNDER CASING
LOAD TO TRUCKHEAVY CRANE GIRDER
PROJECTS FABRICATED
GRAND HOTEL KABUL PROJECT.
FIRST SOLAR PROJECT.
METACOR PROJECT.
SHOAIBA CMI PROJECT.
CSVC PROJECT.
POSCO SS VINA PROJECT.
HOWDEN HOMER CITY PROJECT.
SIEMENS PROJECT.
SIEMENS PROJECT.
………
GRAND HOTEL KABUL PROJECT
Location : Kabul, AFGHANISTAN.
Client : TAHER INVEST.
Weight : 5000 tons.
Contract detail : Design Fabricate & ErectionContract detail : Design,Fabricate & Erection.
24‐09‐2013
20
PICTURE ERECTION AT THE SITEOF GRAND HOTEL PROJECT
PICTURE ERECTION AT THE SITE OF GRAND HOTEL PROJECT
PICTURE ERECTION AT THE SITE OF GRAND HOTEL PROJECT
FIRST SOLAR PROJECT
Location : Cu Chi, HCMC, Viet Nam
Client : FIRST SOLAR GROUP
Total weight : 4000 Tons
Contract detail : Fabricate & Erection.
24‐09‐2013
21
PICTURE ERECTION AT THE SITEOF FIRST SOLAR PROJECT
PICTURE ERECTION AT THE SITEOF FIRST SOLAR PROJECT
PICTURE ERECTION AT THE SITEOF FIRST SOLAR PROJECT
PICTURE ERECTION AT THE SITE OF FIRST SOLAR PROJECT
24‐09‐2013
22
PICTURE ERECTION AT THE SITEOF FIRST SOLAR PROJECT METACOR PROJECT
Location : PHU MY, BR‐VT, VIETNAM.
Client : METACOR, CANADA.
Total weight : 1000 Tons.
Contract detail : Fabricate & Erection.
PICTURE ERECTION AT THE SITE OF METACOR PROJECT
PICTURE ERECTION AT THE SITEOF METACOR PROJECT
24‐09‐2013
23
PICTURE ERECTION AT THE SITEOF METACOR PROJECT
PICTURE ERECTION AT THE SITEOF METACOR PROJECT