PROJECTBREAKDOWN
MAP
PRO
JEC
TS S
CH
EDU
LES
AND
CO
STS
ARE
ACC
UR
ATE
AS O
F D
ATE
SHO
WN
R-5777 CRAVEN COUNTY US 70 UPDATED - 6/10/2020
R-5777D
R-5777A
R-5777B
μ
R-5777D
STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST
R‐5777ATABERNA WAY. CONVERT AT‐GRADE INTERSECTION TO
INTERCHANGE. 2
DESIGN BUILD PROJECT. LETTING TO BE COMBINED WITH R‐5777B AND U‐5713.
FY 2020 FY 2020 $16,800,000 $300,000 $50,000,000
R‐5777B WEST THURMAN ROAD/EAST THURMAN ROAD. CONVERT AT‐GRADE INTERSECTION TO INTERCHANGE.
2 0.5
DESIGN BUILD PROJECT. LETTING TO BE COMBINED WITH R‐5777A
AND U‐5713. 2020‐2034.
FY 2020 FY 2020 $23,400,000 $300,000 $50,000,000
R‐5777C THURMAN ROAD TO HAVELOCK BYPASS. UPGRADE ROADWAY TO FREEWAY AND CONSTRUCT SERVICE ROADS.
2 6.8 FY 2020 FY 2020 $28,500,000 $1,100,000 $123,500,000
R‐5777DINSTALL BROADBAND FIBER ALONG US 70 FROM I‐40 TO
PORT OF MOREHEAD CITY 2 138.5LETTING TO BE
COMBINED WITH I‐5986C.
FY 2020 FY 2020 N/A N/A $19,000,000
R-5777C