1
! ( ! ( ! ( Pender Beaufort Martin Pitt Greene Onslow Carteret Jones Craven Pamlico Washington Bertie Chowan Halifax Northampton Hertford PROJECT BREAKDOWN MAP PROJECTS SCHEDULES AND COSTS ARE ACCURATE AS OF DATE SHOWN R-5777 CRAVEN COUNTY US 70 UPDATED - 6/10/2020 R-5777D R-5777A R-5777B μ R-5777D STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST R5777A TABERNA WAY. CONVERT ATGRADE INTERSECTION TO INTERCHANGE. 2 DESIGN BUILD PROJECT. LETTING TO BE COMBINED WITH R5777B AND U5713. FY 2020 FY 2020 $16,800,000 $300,000 $50,000,000 R5777B WEST THURMAN ROAD/EAST THURMAN ROAD. CONVERT ATGRADE INTERSECTION TO INTERCHANGE. 2 0.5 DESIGN BUILD PROJECT. LETTING TO BE COMBINED WITH R5777A AND U5713. 20202034. FY 2020 FY 2020 $23,400,000 $300,000 $50,000,000 R5777C THURMAN ROAD TO HAVELOCK BYPASS. UPGRADE ROADWAY TO FREEWAY AND CONSTRUCT SERVICE ROADS. 2 6.8 FY 2020 FY 2020 $28,500,000 $1,100,000 $123,500,000 R5777D INSTALL BROADBAND FIBER ALONG US 70 FROM I 40 TO PORT OF MOREHEAD CITY 2 138.5 LETTING TO BE COMBINED WITH I 5986C. FY 2020 FY 2020 N/A N/A $19,000,000 R-5777C

R-5777 CRAVEN COUNTY · 2020. 6. 10. · r-5777 craven county updated - 6/10/2020 us 70 r-5777d r-5777a r-5777b μ r-5777d stip description division length (mi) comment row/utility

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: R-5777 CRAVEN COUNTY · 2020. 6. 10. · r-5777 craven county updated - 6/10/2020 us 70 r-5777d r-5777a r-5777b μ r-5777d stip description division length (mi) comment row/utility

! (! ( ! (

Pender

Beaufort

Martin

Pitt

GreeneLenoir

Onslow

Carteret

Duplin

Jones

Craven

Pamlico

Edgecombe

Washington

Bertie

Chowan

Halifax

Northampton

Hertford

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c)OpenStreetMap contributors, and the GIS User Community

PROJECTBREAKDOWN

MAP

PRO

JEC

TS S

CH

EDU

LES

AND

CO

STS

ARE

ACC

UR

ATE

AS O

F D

ATE

SHO

WN

R-5777 CRAVEN COUNTY US 70 UPDATED - 6/10/2020

R-5777D

R-5777A

R-5777B

μ

R-5777D

STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST

R‐5777ATABERNA WAY.  CONVERT AT‐GRADE INTERSECTION TO 

INTERCHANGE. 2

DESIGN BUILD PROJECT. LETTING TO BE COMBINED WITH R‐5777B AND U‐5713.

FY 2020 FY 2020 $16,800,000 $300,000 $50,000,000

R‐5777B WEST THURMAN ROAD/EAST THURMAN ROAD.  CONVERT AT‐GRADE INTERSECTION TO INTERCHANGE.

2 0.5

DESIGN BUILD PROJECT. LETTING TO BE COMBINED WITH R‐5777A 

AND U‐5713. 2020‐2034.

FY 2020 FY 2020 $23,400,000 $300,000 $50,000,000

R‐5777C THURMAN ROAD TO HAVELOCK BYPASS. UPGRADE ROADWAY TO FREEWAY AND CONSTRUCT SERVICE ROADS.

2 6.8 FY 2020 FY 2020 $28,500,000 $1,100,000 $123,500,000

R‐5777DINSTALL BROADBAND FIBER ALONG US 70 FROM I‐40 TO 

PORT OF MOREHEAD CITY 2 138.5LETTING TO BE 

COMBINED WITH I‐5986C. 

FY 2020 FY 2020 N/A N/A $19,000,000