RFP/LIM/2015/005
P.O. Box 3209, Houghton, 2041 Block A, Riviera Office Park, 6-10 Riviera Road, Riviera
R E Q U E S T F O R P R O P O S A L S
REQUEST FOR QUOTATIONS FOR SUPPLY AND INSTALLATION OF SEWER PIPING AT
BELA-BELA PROPERTY, IN BELA-BELA MUNICIPALITY, LIMPOPO
RFP/LIM/2015/005
PROPOSALS TO BE SUBMITED BY
NOT LATER THAN
12H00 ON 24TH AUGUST 2015
RFP/LIM/2015/005
TERMS OF REFERENCE
1. INTRODUCTION
The Housing Development Agency (HDA) is a national public development agency which promotes sustainable communities by making well located and appropriately planned land available for the development of human settlement. As its primary activity, the HDA identify, acquire, hold, develop and release state, private and communal land and releases it for development. As part of its processes, the HDA conducts property holding plans in order to identify and implement services and maintenance requirements to ensure the sustainability and security of the properties in position. 2. BACKGROUND A signed Implementation Protocol was concluded between the Limpopo Provincial Department of Corporative Governance, Human Settlements & Traditional Affairs LCOGHSTA and the HDA as per the Intergovernmental Relations Framework Act. The Scope of Work as assigned for the Housing Development Agency in this regard included:
Land Acquisition and Preparation (Planning)
Land Holding Functions (Management)
Compilation of a Development Plan
Designs and Approval
Development Implementation
The Housing Development Agency is to act as Implementing Agents in the development of Bela Bela Mixed Development
Erf 1491 Warmbad Ext 25 Township is a piece of land that has been earmarked for a human settlement development by LCOGHSTA in conjunction with Bela Bela Local Municipality (BBLM). The land is situated in Bela Bela with a potential for some 1065 units which would have a major impact on the human settlement needs of the Bela Bela Municipality. The extent of the land is 72.5 Hectares and is undeveloped with natural vegetation such as trees,
shrubs and grass. The land has approximately 255 units of informal settlements. The informal
settlements were in the interim, provided with two (2) communal water points connected from the
adjacent developed township (Spapark). There are no ablution facilities in the settlement area and the
community is using the veld and some have constructed pit latrines at the back of their informal
structures.
The HDA has procured 4 container ablution facilities (2 males with 6 booths each and 2 females with
6 booths each) to be used on an interim basis until permanent infrastructure is installed. These
ablution facilities require to be connected to the existing water services located at the adjacent
developed township (Spapark), see annexure 1, 2, 3 and 4 for detailed bill of quantities (with
specification), ablution facility setup, sewer pipeline laying route and site location.
3. SITE LOCATION
The site is located at Erf 1491 Warmbath, Extension 25 (Adjacent to Spapark Ext 1), approximately 2.0km north west of the town of Bela Bela and just north of of Spapark residential suburb and falls within the urban edge of Bela Bela Local Municipality. The site can be accessed from Parsot Road in Spapark and also from the District Road D180 towards the Warmbaths Dam which is adjacent to the site. GPS Co-ordinates in DMS are: Latitude 24°52ˊ9˝S and Longitude 28°16ˊ14˝E, see annexure 4.
RFP/LIM/2015/005
4. SCOPE OF SERVICES
The HDA hereby requires from appropriately qualified, competent, experienced and professionally
registered contractors to:
undertake the status analyses of the land, and
Provide price proposals for supplying and installing sewer piping and connections as per
specifications attached on Annexure 1.
4.1 General requirements
4.1.1. The work, from the date of issuing access certificate to the completion of the contract shall be
21 days.
4.1.2. All quotations/price proposals must be all inclusive and shall include delivery to the site, and be based on bill of quantities provided in annexure 1 and be valid for the duration of the works.
4.1.3. The works shall be executed by a company properly registered with CIDB grade 2CE and
compliant, and be able to provide proof of registration to the HDA.
4.1.4. The contractor must demonstrate their reputation, knowledge and expertise in line with the
Scope of Work as well as submit detailed Company Profile indicating their ability to undertake
the works.
4.1.5. The contractor shall ensure that its team has relevant expertise and have the necessary
equipment and support to undertake the work including demonstrating to having the necessary
Guarantee (on the goods) in place.
4.1.6. The contractor shall on a weekly basis report on the progress of the works to the HDA Project Manager (Mr. Thabiso Limpe).
5. LOGISTICS
5.1 Responsible Institution The Housing Development Agency will be responsible for the assignment. The HDA team will meet the contractor at mutually agreed times at the beginning of the assignment and for reporting. 5.2 Project Management The Project Manager for this assignment to whom all queries should be directed :
Mr. Thabiso Limpe Project Manager The Housing Development Agency Block A, 6-10 Riviera Road, Killarney, 2193, Tel: 011 544 1000 Email: [email protected]
6. CONTRACT In addition to the letter of appointment, the appointed contractor shall be required to enter into a
Professional Services Agreement with the HDA.
RFP/LIM/2015/005
7. EVALUATION PROCESS
The HDA needs to be satisfied, in all respects, that the organisation selected has the necessary
resources, qualifications and abilities for this project, and that all submissions are regarded in a fair
manner in terms of evaluation criteria and process
The following table will demonstrate the criteria to be used for allocation of points for functionality as
outlined above. Bids scoring less than 70 points on functionality will be set aside:-
7.1 Table 1 – Functionality
CRITERIA SUB-CRITERIA WEIGHTIN
G/ POINTS
Company profile
(Attach
Organogram)
Company profile (s) to be submitted (in case of a
joint Venture, all companies must submit separate
profiles) indicating the Lead Company
10
Organisational
Capacity and
Experience
Related work and experience in fields related to
the TOR.
10
Demonstrable Skills and Capacity, Level of Relevant Knowledge and Experience. Adequacy and completeness of skills of team
presented and fit for task.
30
Proof of related and contactable references
(attach copies of reference letters). Minimum of 3
references.
10
Approach,
Methodology,
Work Plan and
Process
Work programme, plan and allocation of resources and tasks Meeting deliverables and timeframes Proposed methodology
20
10
10
TOTAL 100
The following criteria will be used for point’s allocation for price and B-BBEE compliance on a 80/20
point system:-
7.2 Table 2 – Price and B-BBEE
CRITERIA SUB-CRITERIA WEIGHTING/
POINTS
Price Detailed budget breakdown 80
B-BBEE (Status Level Verification
Certificate) B-BBEE Level Contributor 20
TOTAL 100
RFP/LIM/2015/005
8. GENERAL
8.1. Below are compulsory requirements for this service:-
8.1.1 There will not be a site briefing for this works. In order for the contractor to properly perform and
complete his work, he/she shall ensure he/she is familiar with the premises and how the existing
conditions will affect his work during services. The contractor shall visit and examine the site to
become acquainted with the adjacent areas, means of approach to the site and conditions of
actual service on site. Failure to visit the site or failure to examine any and all contract
documents will in no way relieve the service provider from the necessity of developing any
proposal, or performing any work that may be required to execute the work in accordance with
the Terms of Reference. Neglect of above requirements will not be accepted as reason for delay
in the services or additional compensation.
8.1.2 It is important to note that the successful contractor will work under the supervision of a HDA
representative, abide by HDA’s Code of Conduct, and other organizational guidelines.
8.1.3 Kindly complete and submit the HDA Supplier Registration form if not already on our database
and submit together with:
valid original tax clearance certificate.
CIDB grade 2CE certificate or higher.
SBD Forms (SBD4, SBD6.1, SBD8 and SBD9) obtainable from HDA Website:
www.thehda.co.za/procurement. Under compliance checklist
Valid and Original or Certified B-BBEE Status Level Verification Certificates issued
by the following agencies SANAS, IRBA or CCA.
9. TERMS AND CONDITIONS
9.1. HDA undertakes to pay in full within thirty (30) days, all valid claims for work done to its
satisfaction upon presentation of a substantiated claim/invoice.
9.2. No payment will be made where there is any outstanding information/work by the service
provider/s.
10. SUBMISSION OF PROPOSAL
10.1. Proposals should be submitted on or before the 24th August 2015 by no later than 12h00 to the
following address:
The Procurement Specialist
The Housing Development Agency
Block A, 6-10 Riviera Road, Killarney, 2193
Tel: 011 544 1000
10.2. Further information regarding technical matters can be sent an email to:
[email protected] or at tel: 011 544 1000, and
10.3. further information regarding supply chain matter and queries can be send via email to:
[email protected] or at tel: 011 544 1000
10.4. The selection of the qualifying proposal will be at the HDA’s sole discretion. The HDA does not bind itself to accept any particular bid/proposal, and the HDA reserves the right not to appoint the service provider.
RFP/LIM/2015/005
ANNEXURE 1: Bill of Quantities
HOUSING DEVELOPMENT AGENCY
CONTRACT No.
SCHEDULE A: INTERIM CIVIL SERVICES
SECTION 1 : PRELIMINARY AND GENERAL
ITEM
NO
PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT R
1 SABS
1200 A
SECTION 1 : PRELIMINARY AND GENERAL
1.1 8.3 FIXED-CHARGE ITEMS
1.1.1 B8.3.1 Contractual Requirements (including all facilities on site) Sum 1
8.4 TIME-RELATED ITEMS
(8 weeks Construction Duration)
1.1.2 8.4.1 Contractual Requirements (operate and maintain all facilities on
site)
Sum 1
1.2 8.6 PRIME COST ITEMS
1.2.1 (a) Extra tests, investigations or control
survey required by the engineer for
acceptance control.
P.C. Sum 1 10 000.00 10 000.00
1.2.2 (b) Remuneration of Liaison Officer(s) and reimbursement of
telephone airtime.
P C Sum 1 7 000.00 7 000.00
1.2.3 (c) Remuneration of an independent Occupationa Health and
Safety auditor as ordered
P C Sum 1 10 000.00 10 000.00
1.2.4 (d) Percentage for charges and profit on
Prime Cost items
% 27 000
1.3 8.8 TEMPORARY WORKS
8.8.4 Existing services
1.3.1 (c) Excavate by hand in soft material to expose existing services m3 10
1.4 B 8.8.10 OCCUPATIONAL HEALTH AND SAFETY ACT
1.4.1 (a) Provision of a Health and Safety plan L/SUM 1
1.4.2 (b) Provision of Health and Safety file L/SUM 1
1.4.3 (c) Provision of a safety officer (part-time) L/SUM 1
1.4.4 (d) Health and Safety training L/SUM 1
1.4.5 (e) Provision of personal protective clothing and equipment L/SUM 1
1.4.6 (f) Provision of safety fences, signs and barricades L/SUM 1
1.4.7 (g) All other obligations deemed necessary by the contractor L/SUM 1
Total Carried Forward To Summary
Bela-Bela Ext25 BoQ 1
RFP/LIM/2015/005
HOUSING DEVELOPMENT AGENCY
CONTRACT No.
SCHEDULE A: INTERIM CIVIL SERVICES
SECTION 2 : EARTHWORKS (PIPE TRENCHES)
ITEM
NO
PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT R
2 SECTION 2 : EARTHWORKS (PIPE TRENCHES)
2.1 SABS
1200 C
CLEAR SITE
2.1.1 8.2.1 Clear and grub as instructed by the engineer. m² 1 856
8.2.2 Remove and grub large trees and tree stumps of girth
Over and up to
2.1.2 1 m 2 m No. 2
2.2 1200 DB EXCAVATION
8.3.2 (a) Excavate in all materials for trenches, backfill, compact and
dispose of surplus/ unsuitable material for 150 - 250 mm dia. pipes:
Over and up to
2.2.1 0.0m 1.5m m3 55
2.2.2 1.5m 2.0m m3 876
8.3.2 (b) Extra-over items 8.3.2(a) for excavation in:
2.2.3 Intermediate excavation m3 476
2.2.4 Hard rock excavation m3 400
8.3.3.4 Overhaul
2.2.5 (a) Limited overhaul Over 0,5 km up to 1,0 km (provisional) m3 0
2.2.6 (b) Long overhaul (provisional) m3-km 0
8.3.4 Particular items
2.2.7 (a) Shore trench wall for excavations deeper than 1.5m. m 570
Total Carried Forward To Summary
Bela-Bela Ext25 BoQ 2
RFP/LIM/2015/005
HOUSING DEVELOPMENT AGENCY
CONTRACT No.
SCHEDULE A: INTERIM CIVIL SERVICES
SECTION 3 : BEDDING (PIPES)
ITEM
NO
PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT R
3 SABS
1200 LB
SECTION 3 : BEDDING
8.2.1 Provision of bedding from trench excavation (including screening).
3.1 (a) Selected granular bedding material for Class B bedding m3 27
3.2 (b) Selected fill material (fill blanket) m3 137
8.2.2 Supply only of bedding by importation
8.2.2.1 Other necessary excavations on site: (including screening)
3.3 (a) Selected granular material for bedding m3 27
3.4 (b) Selected fill material for fill blanket m3 137
8.2.2.2 From Borrow pits or approved off site sources identified by the
contractor (only if so instructed by the engineer in writing)
3.5 (a) Selected granular material for bedding m3 0
3.6 (b) Selected fill material for fill blanket m3 0
Total Carried Forward To Summary
Bela-Bela Ext25 BoQ 3
RFP/LIM/2015/005
HOUSING DEVELOPMENT AGENCY
CONTRACT No.
SCHEDULE A: INTERIM CIVIL SERVICES
SECTION 4 : SEWERS
ITEM
NO
PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT R
4 SECTION 4 : SEWERS
8.2.1
1200 LD
Supply, lay, joint, bed and test class 400kPa uPVC sewer pipes
complying to SABS 1601
4.1 1. 160mm diam. m 570
4.2 2. 110mm diam. m 92
8.2.2 Extra over 8.2.1 for the supply and installtion of fittings
4.3 1. 110mm 2-way vent valve No 24
4.4 2. 110mm Squire Junction No 24
4.5 3. 110mm x 90 degree plain bend No 24
4.6 4. 110mm plain Y-junction No 24
4.7 5. 110mm access Y-junction No 4
4.8 6. 11 degree rodding eye No 4
4.9 7. 110mm x 45 degree plain bend No 24
4.1 8. 160 x 110mm access Y-junction No 4
4.11 9. Other fittings P C Sum 3,000
4.12 10. Extra over item 9 for handling, installtion and profit. % 0.00
8.2.3 Manholes
(a) "Salberg" or similar precast concrete manholes complete with
manhole foundation, cover slab with heavy duty cover and frame,
in- and outlets, channel sections, benching and finishing incl.
excavations and backfilling. Manhole diameter - 1000mm
over and up to
4.13 0,0 m 2,0 m No. 8
Sundries
4.14 8.2.11 Break into and connect to existing sewer manhole or pumpstation
including flexible joints, make good all benching
No. 1
Total Carried Forward To Summary
Bela-Bela Ext25 BoQ 4
RFP/LIM/2015/005
HOUSING DEVELOPMENT AGENCY
CONTRACT No.
SCHEDULE A: INTERIM CIVIL SERVICES
SUMMARY OF SECTIONS
SECTION DESCRIPTION AMOUNT R
1 SECTION 1 : PRELIMINARY AND GENERAL
2 SECTION 2 : EARTHWORKS (PIPE TRENCHES)
3 SECTION 3 : BEDDING (PIPES)
4 SECTION 4 : SEWERS
Total Carried Forward To Summary Of Schedules
Bela-Bela Ext25 BoQ 5
RFP/LIM/2015/005
ANNEXURE 2: Ablution Facilities Setup
RFP/LIM/2015/005
ANNEXURE 2: Piping Route Setup
RFP/LIM/2015/005
ANNEXURE 2: Project Location