12
R. S. Govindaraju, J. E. Alleman, R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. J. Cooper, T. P. Chan, V. Jain T. P. Chan, V. Jain School of Civil Engineering School of Civil Engineering Purdue University Purdue University (SPR-2455, SPR-2456, SPR-2487) (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield Rest Area I-70 Greenfield Rest Area Constructed Wetland Constructed Wetland Wastewater Treatment Wastewater Treatment System Research Project System Research Project March 19, 2004 March 19, 2004

R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

R. S. Govindaraju, J. E. Alleman, T. J. Cooper,R. S. Govindaraju, J. E. Alleman, T. J. Cooper,T. P. Chan, V. JainT. P. Chan, V. Jain

School of Civil EngineeringSchool of Civil EngineeringPurdue UniversityPurdue University

(SPR-2455, SPR-2456, SPR-2487)(SPR-2455, SPR-2456, SPR-2487)

I-70 Greenfield Rest AreaI-70 Greenfield Rest AreaConstructed Wetland Constructed Wetland Wastewater Treatment Wastewater Treatment System Research ProjectSystem Research Project

March 19, 2004March 19, 2004

Page 2: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 2

Project location

Page 3: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 3

ST-2 ST-1

W-1 W-2W-3

Bio

fiel

d

F-2

AS-3

AS-2

AS-1

AS-4

F-3

F-1

M-1

M-2

LS-2

LS-1

LS-3

LS-4

M-3

M-4

EffluentInflow

Septic tank

Automatic sampler

V-notch weir

Lift station / dosing chamberMagnetic flow meter

Wetland cell

Rec

ircu

lati

on

North RestStop

South RestStop

Design layout

Page 4: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 4

Hydraulic issues

Undersized wetland dosing pumps (LS-1) Surges from the eastbound side High rate of recirculation (~83%)

Solutions Reduce recirculation rate Addition of surge tank

Page 5: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 5

Flow measurements

Weir / flume measurements are NOT accurate Backup due to overcapacity of LS-1 and LS-4 Inadequate calibration Inherent error due to low flows

Magnetic flow meters More reliable Erroneous spikes in the data

Page 6: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 6

02/01 02/08 02/15 02/220

1000

2000

3000

4000

5000

6000

Date

Da

ily F

low

To

tal (

ga

l)Inflow (M-1)

Outflow (M-4)

Flume 1

Flume 2

Flume 3

Page 7: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 7

9/25/2003

Page 8: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 8

02/01 02/08 02/15 02/22 02/29 03/070

2000

4000

6000

8000

10000

12000

Date

Da

ily F

low

To

tal (

ga

l)Inflow (M-1)

Outflow (M-4)

Biofield (M-3)

02/01 02/08 02/15 02/22 02/29 03/07150

200

250

300

350

400

450

Da

ily S

tre

am

flow

(cf

s)

Big Blue River

Page 9: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 9

Wastewater test results 12/22/2003

Sample pHTSS

(mg/L)NH3-N(mg/L)

BOD5

(mg/L)

Sampler #1 8.80 110 83 280

Sampler #3 8.24 60 62 225

Sampler #4 8.17 60 65 215

Page 10: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 10

Wastewater test results 3/5/2004

Sample pHTSS

(mg/L)NH3-N(mg/L)

BOD5

(mg/L)

Sampler #1 8.40 140 136 310

Sampler #2 7.94 110 122 294

Sampler #3 7.72 60 131 310

Sampler #4 7.65 60 80 226

Page 11: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 11

Current status

Only receiving wastewater from west-bound side

No recirculation Flow-through with no drain-and-fill Biofield shut down till desired effluent quality

is attained

Page 12: R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield

April 18, 2023 12

To-do list

Installation of SCADA system Surge tank addition Installation of weather station Re-calibration of weir and flume meters