Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
PASMA(UK)APPROVED TRAINING CENTER
MAX SAFE WORKING LOADSTRUCTURE 250 KG
MAX SAFE WORKING LOADPLATFORM 250 KG
“SOLO ” TOWER INSTRUCTION MANUAL
MANUFACTURER OF ALUMINIUM & FIBER GLASS SCAFFOLD TOWERS AND LADDERS
ALWAYS READ THE INSTRUCTION MANUAL FOR SAFER ASSEMBLY OF SCAFFOLD
ASCEND ACCESS SYSTEMS SCAFFOLDING L.L.C.Tel : +971 4 885 5001Toll Free : 800 722 33653Email : [email protected] : www.ascenduae.com
MAINTENANCE RULES
MOVING A TOWER :
Ensure that the scaffold tower is kept clean.
Grease all moving parts with commercial oil. Wipe off excess oil.Position the stabilizers symmetrically to obtain the MAXIMUM BASE
Spigots and sockets should �it together with ease and be secured by an interlock clip. Check frames and braces, adjustable legs and boards for paint, grit, burrs etc. Remove any foreign substance with a light wire
Where brace, ladder and platform hooks attach the frames, ensure that the frame rungs are kept clean.
Ensure that all locking hooks function correctly. If necessarylubricate with light oil.
Please check that spigot are in to the position and should �iteasily into frames.
The inside diameter of all hooks should be kept clean to ensure they �it to other components without being forced.
If in any doubt about the proper use and maintenance of thescaffold tower equipment, consult the manufacturer.
Do not misuse or abuse the scaffold tower with heavy objects, hammers etc. Do not throw components in and out of vehicles or to the ground when the tower is being dismantled. Such abuse may reduce the structural integrity of the scaffold tower. Adjustable leg's thread should be clean and lightly oiled. Under no circumstances damage or incorrect components shall be used , Either repair it or get replacement.
1. If you must move a tower, remove all materials and personnel. When moving a scaffold tower, force must always be moved from the base. The tower should only be moved manually on �irm, level ground which is free from obstacles. Normal walking speed should not be exceeded during relocation. The ground over which a tower is moved should be capable of supporting the weight of the structure. Make sure tower height is not above 4 mtr while moving the tower. Recheck the tower level and reposition stabilizer before use .2. Check the location is �irm and free from pot holes.3. Raise the stabilizer feet only enough (25mm) to clear the Obstructions. 4. Wind speed should not exceed 29km/h(Beau fort force 4).5. Check that there are no power lines or obstruction overhead.6. Before each use check that the MAT is vertical or need readjustment.7. Whether the structure assembly is still correct and complete.8. That no environmental changes in�luenc safe use of the MAT.
GENE
RAL S
AFET
Y RU
LES
A ris
k ass
essm
ent h
as b
een
done
and
safe
ty e
quip
men
t (Ro
pe et
c) an
d au
xiliar
y too
ls ar
e av
ailab
le o
n sit
e for
erec
�on
and
dism
antli
ng th
e tow
er.
The g
roun
d co
ndi�
on w
ill ta
ke th
e wor
king l
oad
as sp
ecifi
ed .
The
loca
�on
of t
ower
sho
uld
be c
heck
ed t
o pr
even
t ha
zard
s du
ring
erec
�on
& di
sman
tling
, mov
ing
and
while
wor
king
on th
e to
wer.
Leve
l and
slop
e, o
bstru
c�on
and
wi
nd co
ndi�
on sh
ould
be c
heck
ed.
Min
imum
2,3
per
sons
are r
equi
red
to sa
fely
erec
t and
dism
antle
the t
ower
.
Chec
k in
struc
�ons
bef
ore
use.
Mob
ile a
cces
s wor
king
towe
rs m
ay o
nly
be e
rect
ed a
nd
dism
antle
d by
per
son
com
pete
nt fo
r wor
king o
n alu
min
ium
mov
able
towe
r.
Do n
ot u
se a
ny sc
affol
d to
wer w
hich
is d
amag
ed, w
hich
has
not
bee
n pr
oper
ly er
ecte
d,
which
is n
ot fi
rm an
d sta
ble,
and
which
has
any m
issin
g or d
amag
ed p
arts
.
Do n
ot e
rect
a sc
affol
d to
wer o
n un
stabl
e gr
ound
, slo
pes o
r obj
ects
such
as l
oose
bric
ks,
boxe
s or b
lock
s. On
ly a s
ound
rigid
foo�
ng m
ust b
e use
d.En
sure
that
the
scaff
old
towe
r is a
lway
s lev
el an
d th
e ad
justa
ble
legs
are
enga
ged.
Che
ck
that
you
hav
e ta
ken
all n
eces
sary
pre
cau�
ons
to p
reve
nt th
e to
wer
bein
g m
oved
, or
rollin
g awa
y. Al
ways
appl
y all c
asto
r bra
kes o
r use
bas
e plat
es.
Ensu
re th
at al
l fra
mes
, bra
ces a
nd p
la�or
ms a
re fi
rmly
in p
lace
and
that
all lo
ckin
g hoo
ks
are
func
�oni
ng co
rrect
ly. E
nsur
e th
at a
ll fra
me
lock
ing
clips
are
eng
aged
. If a
ny m
issin
g,
repl
ace
them
. Nev
er m
ix pa
rts o
r co
mpo
nent
s fro
m o
ther
man
ufac
ture
rs. D
amag
ed
com
pone
nts s
houl
d be
repl
aced
with
the n
ew co
mpo
nent
s.
It is
reco
mm
ende
d th
at t
he v
er�c
al di
stanc
e be
twee
n tw
o pl
a�or
m l
evel
is
2mtr.
M
axim
um ve
r�ca
l dist
ance
bet
ween
pla�
orm
leve
l mus
t not
exce
ed 4
mtr.
Ensu
re th
at th
e sca
ffold
towe
r is w
ithin
the m
axim
um pl
a�or
m he
ight s
tate
d, an
d tha
t the
ap
prop
riate
stab
ilizer
s are
fi�e
d.
Outd
oor s
caffo
ld to
wers
shou
ld, w
here
ver p
ossib
le, b
e se
cure
d to
a b
uild
ing
or o
ther
str
uctu
re. It
is go
od pr
ac�c
e to �
e in a
ll sca
ffold
towe
rs of
any h
eigh
t, es
pecia
lly w
hen t
hey
are l
e� u
na�e
nded
, or i
n ex
pose
d or
win
dy co
ndi�
ons.
A fre
e sta
ndin
g sc
affol
d to
wer m
ust n
ot b
e us
ed in
win
ds st
rong
er th
an 1
7mph
� 27k
ph�
Beau
fort
scale
4. B
e cau
�ous
if er
ec�n
g or u
sing t
he to
wer i
n ope
n plac
es, s
uch a
s han
gers
or u
n-cla
dded
bui
ldin
gs. I
n su
ch c
ircum
stanc
es th
e wi
nd fo
rces
can
be
incr
ease
d, a
s a
resu
lt of
the f
unne
lling e
ffect
.
Do n
ot u
se sh
eete
d to
wers.
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
11.
12.
13.
14.
15.
16.
17.Do
not
ere
ct o
r us
e a
scaff
old
towe
r ne
ar u
n-in
sulat
ed, l
ive o
r en
ergis
ed e
lect
rical
mac
hine
ry o
r circ
uits
, or n
ear m
achi
nery
in o
pera
�on.
If an
ove
rhea
d ha
zard
exist
s, he
ad p
rote
c�on
shou
ld b
e wor
n.
Do n
ot le
an la
dder
s aga
inst
the t
ower
, or c
limb
outs
ide o
f tow
er. W
hate
ver y
our i
nten
ded
acce
ss sy
stem
, it sh
ould
onl
y be u
sed
insid
e the
towe
r.
Whe
n li�
ing m
ater
ials o
r com
pone
nts a
lway
s use
relia
ble l
i�in
g mat
erial
s to
ensu
re th
ere
is no
pos
sibilit
y of i
t fall
ing.
Guar
drail
s and
toe b
oard
s mus
t be fi
�ed
to th
e wor
king p
la�or
ms.
Neve
r jum
p on
to o
r off
pla�
orm
s.
Neve
r plac
e th
e wo
rkin
g pl
a�or
m o
n th
e gu
ardr
ail fr
ame.
Alw
ays
keep
dou
ble
heigh
t gu
ardr
ail at
each
pla�
orm
leve
ls, n
ever
stan
d on
an u
ngua
rded
pla�
orm
.
DO N
OT ex
ceed
the s
afe w
orkin
g loa
d of t
he pl
a�or
m or
stru
ctur
e by a
ccum
ula�
ng de
bris,
m
ater
ial to
ols o
n pl
a�or
ms a
s the
se ca
n be
a sig
nific
ant a
ddi�
onal
load
.
The t
ower
shou
ld al
ways
be a
cces
sed
from
the i
nsid
e usin
g the
ladd
er fr
ame ,
neve
r clim
b up
from
out
side.
Ensu
re th
at th
e loc
king h
ooks
on
the p
la�or
m ar
e fun
c�on
ing c
orre
ctly.
Bewa
re o
f ho
rizon
tal
forc
es (
e.g.
when
usin
g po
wer
tool
s), w
hich
cou
ld g
ener
ate
insta
bilit
y or o
vertu
rnin
g of t
he to
wer.
Max
imum
hor
izont
al fo
rce 2
0kg.
Shou
ld y
ou re
quire
add
i�on
al pl
a�or
m h
eigh
t, ad
d fu
rther
fram
es. N
EVER
ext
end
your
ad
justa
ble l
egs t
o ac
hiev
e ext
ra h
eigh
t, th
ese a
re fo
r lev
ellin
g onl
y. NE
VER
use a
ladd
er o
r ot
her o
bjec
ts o
n th
e pla�
orm
to ac
hiev
e add
i�on
al he
ight.
Do n
ot th
row
the s
caffo
ld p
arts
, alw
ays l
ower
them
to th
e gro
und.
Alwa
ys ta
ke ca
re of
Alu
min
ium
scaff
old t
ower
equi
pmen
t. Re
mem
ber y
our s
afet
y dep
ends
on
the s
afe e
rec�
on an
d us
e of t
he eq
uipm
ent.
27.
26.
25.
24.
23.
22.
21.
20.
19.
18.
USE OF STABILIZERS
ALWAYS ENSURE STABILIZER SIZE IS CORRECT ANDABLE TO SUPPORT TOWER
Stabilizers are to be used, when specified, to guarantee the structural stability of the tower
Lightly tighten the upper clamps above the third rung on each corner post. Position the lower clamp above the bottom rung. Ensure the lower arm is as horizontal as possible. Position the stabilizers so that the footpads are approximately equidistant from each other, as shown in Fig 1. Adjust the stabilizer and reposition the clamps as required to make �irm contact with the ground. Ensure the clips with locking pin are in place. When in the correct position, tighten the clamps �irmly.
To position the tower against a wall, do not remove the stabilizer; move parallel with the wall. (Fig 2)
To position the tower in a corner, remove the inside stabilizer and place the outside two parallel with the wall. (Fig 3)
Fig 1 Fig 2 Fig 3
SO
LO T
OW
ER K
IT L
IST
4.3
(3.0
)5.
3 (4
.0)
20 C
M W
HEEL
WIT
H 60
CM
ADJU
STAB
LE JA
CK &
NUT
5.
784
4
70 C
M W
IDE
4 RUN
G SP
AN
FRAM
E 10
0 CM
HIGH
3.
628
10
120 C
M LO
NG T
RAPD
OOR
PLAT
FORM
8.
002
2
COMP
ONEN
T HO
LDER
FOR
ON
E MA
N TO
WER
2.77
22
BRAC
ING
FRAM
E FO
R ON
E MA
N TO
WER
3.90
67
ALUM
INUM
TOE
BOA
RD S
ET
FOLD
ABLE
3.97
11
200 C
M LO
NG S
TABI
LIZE
R 3.
654
4SN
AP P
INS
0.04
1216
116.
0712
7.37
TOTA
L
SIZE
70
CM x
120
CM
; SA
FETY
WOR
KING
LOA
D:22
5 KG
S/DE
CKTO
WER
HEI
GHT
(PLA
TFOR
M HE
IGHT
) MTR
COM
PONE
NTS
70 C
M O
NE M
AN N
ARRO
W T
OWER
(WEL
DED)
WEI
GHT
4)Wheel lock - Install castor / leg assem-bly to frame by pushing the leg into the frame tube. This Should be done with manual force only, no tools. Lock Castors before ascending any part of the tower.
Dismantling- Please Dismantle the Tower reverse from build process.
Assembly Process
3)Windlock - A windlock clip is installed on the platform at the hook. This is locked as shown here.
2)Snap pins - Unlock the interlock Clips on all frames. When installed, always move the interlock clip to the “Locked” Position.
1)Brace lock - Sort the braces into horizon-tal and diagonal braces, the diagonal brasses are slightly longer in size.
SOLO TOWER ASSEMBLY INSTRUCTION MANUAL
ILLUSTRATION
STEP-1 Press STOP.Lock brakes on all caster wheels insert caster and adjustable leg in to the base frame and fit one bracing frame on the lowest rung from inside towards outside.
STEP-6Hang all bracing frames on one component holder and extension frames on other component holder.
STEP-11Fit bracing frame on one side of the tower as per this picture.
STEP-16Fit the toe board aluminum foldable.
STEP-12Fit platform on the fifth rung from the top level. Engage wind lock.
STEP-13Shift lower component holderand fit on the bracing frame on this level of platform.
STEP-14Bring all bracing frame upon this component holderfrom lower component holder.
STEP-15 Sitting on the platform fix bracing frame on both the open side of the platform.
STEP-7Hang platform on the frame with the support of platform hook.
STEP-8Fit stabilizer ASAP to increase the base dimension, position the stabilizerso that the foot pads area approximately.equidistant from other at 45 degree for maximum stability.
STEP-9Sitting on the trapdoor opening of the platform fit two bracing frame on both the open side of the platform.
STEP-10Standing on the guarded platform fit two one meter high frame on both the lower frame.
STEP-2Fit two one meter high 4 rungs frame on both the lower frame and engage snap pin. See illustration 2
STEP-3Fit one bracing frame on one side of the frame opposite to the lower bracing frame as per the picture.
STEP-4Fit platform on 8th rung and engage wind lock. See illustration 3
STEP-5Fit one component holder on bracing frame and another component holder on platform level. As Shown in this picture.