    AGENCY:JK ENGINEERING

    BILL No:RA 02

    S.No. Drawing No. DESCRIPTION Unit

    Work

    completed

    as per Drg.

    Qty

    As per

    BILLED

    Qty

    Excess

    Wt in

    Kgs

    Rate

    per Unit

    Rs/-

    As per Billed

    Value in

    Rs/-

    Payable

    Value in Rs/-

    Excess

    Value in

    Rs/-

    1 10189697 Erection of Pipe Line 6" Mtrs 24 24 0 291.00 6984.00 6984.00 0.00

    210189697 & 10190088 &

    A0-08148-00-02-01-R8Erection of Pipe Line 10" Mtrs 428 428 0 485.00 207580.00 207580.00

    0.00

    3 10189697 Erection of Pipe Line 12" Mtrs 50 50 0 582.00 29100.00 29100.00 0.00

    4 A0-08148-00-02-01-R8 Erection of Pipe Line 14" Mtrs 320 320 0 679.00 217280.00 217280.00 0.00

    5 No Drawing No Erection of Pipe Line 1" Mtrs 90 90 0 48.50 4365.00 4365.00 0.00

    6 Reducer Fabrication 6" Nos 2 2 0 780.00 1560.00 1560.00 0.00

    7 Reducer Fabrication 8" Nos 3 3 0 1040.00 3120.00 3120.00 0.00

    8 Reducer Fabrication 10" Nos 3 3 0 1300.00 3900.00 3900.00 0.00

    9 Reducer Fabrication 12" Nos 3 3 0 1560.00 4680.00 4680.00 0.00

    10 Reducer Erection 6" Nos 2 2 0 840.00 1680.00 1680.00 0.00

    11 Reducer Erection 8" Nos 3 3 0 1120.00 3360.00 3360.00 0.00

    12 Reducer Erection 10" Nos 3 3 0 1400.00 4200.00 4200.00 0.00

    13 Reducer Erection 12" Nos 3 3 0 1680.00 5040.00 5040.00 0.00

    14 Tee Erection 12" Nos 7 7 0 1440.00 10080.00 10080.00 0.00

    15 Bend Fabrication 12" Nos 3 3 0 1200.00 3600.00 3600.00 0.00

    16 Bend Fabrication 10" Nos 8 8 0 1000.00 8000.00 8000.00 0.00

    17 Bend Fabrication 14" Nos 8 8 0 1400.00 11200.00 11200.00 0.00

    18 Bend Erection 12" Nos 6 6 0 1320.00 7920.00 7920.00 0.00

    19 Bend Erection 10" Nos 8 8 0 1100.00 8800.00 8800.00 0.00

    20 Bend Erection 14" Nos 8 8 0 1540.00 12320.00 12320.00 0.00

    21 Insert Plates Nos 22 22 0 275.00 6050.00 6050.00 0.00

    22 Pipe Support Fabrication Kgs 3349.26 3349.26 0 5.80 20095.56 19425.71 669.85

    23 Pipe Support Erection Kgs 3045.96 3045.96 0 6.00 17666.57 18275.76 -609.19

    24 Dismantling of steel structure Kgs 832.5 832.5 0 3.00 2497.50 2497.50 0.00

    25 Flanges Erection Nos 35 40 5 90.00 3600.00 3150.00 450.00

    26 Vertical Storage Tank Kgs 11040 11340 300 6.75 76545.00 74520.00 2025.00

    Total 19306.72 19612 305 681223.63 678687.97 2535.66

    FABRICATION & ERECTION BILL

    10189697 & 10190088 &A0-08148-00-02-01-R8

    No Drawing No

    10190088

  • 7/27/2019 RA 02

    2/12

    Payable Value Is Rs/- 678688.00

  • 7/27/2019 RA 02

    3/12

    9/20/2011

    Remarks

    Excess wt done

  • 7/27/2019 RA 02

    4/12

  • 7/27/2019 RA 02

    5/12

    AGENCY:JK ENGINEERING

    BILL No:RA 03

    S.No. Drawing No. DESCRIPTION Unit

    As per

    BILLED

    Qty

    Work

    completed

    as per Drg.

    Qty

    Excess

    Qty

    Rate

    per Unit

    Rs/-

    As per Billed

    Value in

    Rs/-

    Payable

    Value in Rs/-

    Excess

    Value in

    Rs/-

    1 10190088,A0-08148-00-02-01-R8 Pipe Support Erection Kgs 2849.680 2849.680 0.000 6.00 17098.08 17098.08 0.00

    2 10190088,A0-08148-00-02-01-R9 Pipe Support Fabrication Kgs 2849.680 2849.680 0.000 5.80 16528.14 16528.14 0.00

    3 A0-08148-00-02-01-R8 Erection of Pipe Line 10" Mtrs 113 113 0 485.00 54805.00 54805.00 0.00

    4 A0-08148-00-02-01-R8 Erection of Pipe Line 14" Mtrs 113 113 0 679.00 76727.00 76727.00 0.00

    5 10190088 Erection of Pipe Line 12" Mtrs 12.6 12.6 0 582.00 7333.20 7333.20 0.00

    6 A0-08148-00-02-01-R8 Bend Fabrication 10" Nos 1 1 0 1000.00 1000.00 1000.00 0.00

    7 A0-08148-00-02-01-R8 Bend Fabrication 14" Nos 1 1 0 1400.00 1400.00 1400.00 0.00

    8 10190088 Bend Fabrication 12" Nos 3 3 0 1200.00 3600.00 3600.00 0.00

    9 10190088 Bend Fabrication 20" Nos 1 1 0 2000.00 2000.00 2000.00 0.00

    11 10190088 Reducer Fabrication 20" to 10" Nos 2 2 0 1300.00 2600.00 2600.00 0.0012 A0-08148-00-02-01-R8 Bend Erection 10" Nos 10 10 0 1100.00 11000.00 11000.00 0.00

    13 A0-08148-00-02-01-R8 Bend Erection 14" Nos 10 10 0 1540.00 15400.00 15400.00 0.00

    14 A0-08148-00-02-01-R8 Flange Erection 12" Nos 15 15 0 90.00 1350.00 1350.00 0.00

    Total 210841.42 210841.42 0.00

    FABRICATION & ERECTION BILL

    Payable Amount Is Rs/- 210841.00

  • 7/27/2019 RA 02

    6/12

    10/31/2011

    Remarks

  • 7/27/2019 RA 02

    7/12

    AGENCY:JK ENGINEERING BILL No:RA 04

    S.No.Name of the

    equipment

    Payable

    Amount

    1 Size 20" to 10" 2.5" to 1.25" 1.5" 1.25"

    2 Qty 2 2 2 14

    4 Rate per Size 1400 175 180 150

    5 Total Amount 2800 350 360 2100 6450.00

    S.No.Name of the

    equipment

    1 Size 20" 12" 2" 2.5" 20" 12" 2.5" 10" 14" 1.25" 1.5"

    2 Qty 1 4 2 1 2 7 1 3 3 116 33

    4 Rate per Size 2000 1200 200 250 2200 1320 275 1100 1540 137.5 165

    5 Total Amount 2000 4800 400 250 4400 9240 275 3300 4620 15950 5445 50680.00

    S.No.Name of the

    equipmentMs Flange Erection

    1 Size 20" 12" 10" 8" 4" 1.25" 1.5" 5"

    2 Qty 4 14 2 3 3 96 16

    4 Rate per Size 90 90 90 90 40 30 30 70

    5 Total Amount 360 1260 180 270 120 2880 480 0 5550.00

    1

    Name of the

    equipment

    2 Size 1.25" 1.5" 2.5" 8" 12" 20"

    3 Qty/Mtrs 133 15 70 2.93 67.25 25

    4 60.62 72.75 121.25 388 582 970.00

    5 Total Amount 8062.46 1091.25 8487.50 1136.84 39139.50 24250.00 82167.55

    S.No. Bill Wt Drg Wt Excess Wt Rate/MT Bill AmountPayable

    Amount

    Excess

    AmountRemarks

    1 0.484 0.484 0.000 6750 3267.00 3267.00 0

    2 0.882 0.882 0.000 6750 5953.00 5953.00 0

    5 1.186 1.186 0.000 5800 6877.30 6877.30 0.00

    6 1.186 1.186 0.000 6000 6001.18 6001.18 0.00

    7 0.400 0.400 0.000 7000 2800.00 2800.00 0

    10 Insert Plates 06 Nos 06 Nos 0.000 275 1650.00 1650.00 0

    4.137568 4.137568 0.000 26548.48 26548.48 0.00 26548.48

    171396.03

    FABRICATION & ERECTION BILL

    30.00 30.00

    1.25" 1.5"

    24 4

    Oil Tank Erection for HAG

    Pneumatic Damper Erection

    Slide Gate Erection 12"

    Structural Fabrication

    StructuralErection

    171396.00

    Total Payable Amount

    MS Ball Valve Erection

    12/28/2011

    Description

    MS Pipes Erection

    MS Tee Erection

    Total

    MS Reducers Fabrication

    MS Bends Fabrication MS Bends erection

    720 120

    As per Mech.Depot.Recommended Bill Amount in Rs/- 177557.39

    As per Trusst Engineers Recommended Amount Rs/-TRUSST ENGINEERS

  • 7/27/2019 RA 02

    8/12

  • 7/27/2019 RA 02

    9/12

    AGENCY:JK ENGINEERING BILL No:RA 05 12/29/2011

    S.No.Name of the

    equipment

    1 Size 14" 10" 8" 1" to 0.5" 1" to 0.5" 1" 14" 10" 8" 1" 2"

    2 Qty 2 2 2 4 4 4 2 2 2 9 2

    4 Rate per Size 1820 1300 1040 130 140 140 1960 1400 1120 120 240

    5 Total Amount 3640 2600 2080 520 560 560 3920 2800 2240 1080 480

    S.No.Name of the

    equipment

    1 Size 12" 10" 6" 2.5" 0.5" 2" 3" 12" 2.5" 0.5" 12" 10" 6" 1"

    2 Qty 6 8 10 1 10 3 4 3 1 10 6 8 10 12

    4 Rate per Size 1200 1000 600 250 100 220 330 1320 275 110 1320 1100 660 110

    5 Total Amount 7200 8000 6000 250 1000 660 1320 3960 275 1100 7920 8800 6600 1320

    S.No.Name of the

    equipmentMs Flange Fabrication

    MS Flange

    Hole

    Fabrication

    Flange Erection

    1 Size 8" 3" 2" 8" 3" 12" 6" 10" 0.5" 1" 1.5" 5" 2" 12"2 Qty 2 1 3 36 2 53 19 3 24 52 46 20 4 17 6

    4 Rate per Size 155 115 90 5.5 90 40 90 70 90 30 30 30 70 30 90

    5 Total Amount 310 115 270 198 180 2120 1080 210 2160 1560 1380 600 280 510 540

    1

    Name of the

    equipment

    2 Size 0.5" 1" 1.5" 2" 3" 6" 10" 12" 12" 1.5" 1.25" 2.5"

    3 Qty/Mtrs 84.2 181.05 21.1 163 31.2 29.8 80.38 18.98 39.96 5 89.18 65

    4 30 48.50 72.75 97 145.5 291 485 582 582 72.75 60.62 121.25

    5 Total Amount 2526.00 8780.93 1535.03 15811.00 4539.60 8671.80 38984.30 11046.36 23256.72 363.75 5406.09 7881.25

    1

    Name of the

    equipment Butterfly Valve Erection

    2 Size 0.5" 2" 2.5" 1"

    3 Qty/Mtrs 4 3 3 6

    4 30 30 40 30

    5 Total Amount 120.00 90.00 120.00 180.00

    S.No. Bill Wt Drg Wt Excess Wt Rate/MTBill

    Amount

    Payable

    Amount

    Excess

    AmountRemarks

    1 0.40233 0.40233 0.000 5800 2331.60 2331.60 0.00

    2 0.40233 0.40233 0.000 6000 2413.90 2413.90 0.003 1.14547 1.14547 0.000 6750 7731.90 7731.90 0.00

    4 1.14547 1.14547 0.000 6750 7731.90 7731.90 0.00

    5 8.795 3.518 5.277 7000 61565.00 24626.00 36939.00

    6 10.05 10.05 0.000 6750 67837.60 67837.50 0.10

    7 0.534 0.534 0.000 6750 3471.00 3471.00 0.00

    22.4746 17.1976 5.277 153082.90 116143.81 36939.09

    MS Bends erectionMS Bends Fabrication

    MS Tee ErectionMS Reducers Fabrication MS Reducers erection

    MS Pipes Erection

    17

    Gate Valve Erection Hose pipe

    38

    Insert Platre Fixing

    3"

    9

    FABRICATION & ERECTION BILL

    packing Plate Fabrication

    packing Plate Erection

    275

    4675.00

    Support Fabrication

    Support Erection

    40

    360.00

    31

    1178.00

    Description

    Hold due to no support DetailsBlower Erection

    Nitrogen Tank Erection

    Slide Gate for HAG System

  • 7/27/2019 RA 02

    10/12

    AGENCY: JK ENGINEERING BILL No: RA 06 21/02/2012

    S.No. Bill Qty Drg Qty Excess Qty Rate/Nos Bill Amount Payable Amountxcess

    Remarks

    1 35 35 0.000 110 3850.00 3850.00 0.00

    2 54 54 0.000 110 5940.00 5940.00 0.00

    3 32 32 0.000 110 3520.00 3520.00 0.00

    4 3 3 0.000 165 495.00 495.00 0.00

    5 22 22 0.000 220 4840.00 4840.00 0.00

    6 9 9 0.000 275 2475.00 2475.00 0.00

    7 13 13 0.000 330 4290.00 4290.00 0.00

    8 2 2 0.000 440 880.00 880.00 0.00

    9 3 3 0.000 1320 3960.00 3960.00 0.00

    10 24 24 0.000 100 2400.00 2400.00 0.00

    11 10 10 0.000 200 2000.00 2000.00 0.00

    12 3 3 0.000 1200 3600.00 3600.00 0.00

    13 2 2 0.000 280 560.00 560.00 0.00

    15 1 1 0.000 280 280.00 280.00 0.00

    16 1 1 0.000 210 210.00 210.00 0.00

    17 1 1 0.000 140 140.00 140.00 0.00

    19 8 8 0.000 140 1120.00 1120.00 0.00

    18 8 8 0.000 130 1040.00 1040.00 0.00

    19 1 1 0.000 260 260.00 260.00 0.00

    20 14 14 0.000 120 1680.00 1680.00 0.00

    21 12 12 0.000 120 1440.00 1440.00 0.00

    22 15 15 0.000 120 1800.00 1800.00 0.00

    M.S Bend Fabrication 1/2"

    M.S Bend Erection 1.5"

    M.S Bend Erection 2"

    M.S Bend Erection 2.5"

    Reducer Fabrication 1/2"to1"

    Reducer Fabrication 3"to2"

    M.S Tee Erection 1/2"

    Reducer Erection 1.5"to1"

    FABRICATION & ERECTION BILL

    Reducer Erection 2"to1"

    M.S Tee Erection 3/4"

    M.S Tee Erection 1"

    M.S Bend Fabrication 2"

    M.S Bend Fabrication 12"

    Reducer Erection 3"to2"

    Reducer Erection 4"to2"

    Reducer Erection 2"to1.5"

    M.S Bend Erection 3"

    M.S Bend Erection 4"

    M.S Bend Erection 12"

    Description

    M.S Bend Erection 1/2"

    M.S Bend Erection 1"

    M.S Bend Erection 3/4"

  • 7/27/2019 RA 02

    11/12

    23 7 7 0.000 240 1680.00 1680.00 0.00

    24 3 3 0.000 360 1080.00 1080.00 0.00

    25 3 3 0.000 125 375.00 375.00 0.00

    26 9 9 0.000 30 270.00 270.00 0.00

    27 22 22 0.000 30 660.00 660.00 0.00

    28 10 10 0.000 250 2500.00 2500.00 0.00

    29 18 18 0.000 250 4500.00 4500.00 0.00

    30 15 15 0.000 250 3750.00 3750.00 0.00

    31 6 6 0.000 250 1500.00 1500.00 0.00

    32 6 6 0.000 250 1500.00 1500.00 0.00

    33 1 1 0.000 250 250.00 250.00 0.00

    34 1 1 0.000 30 30.00 30.00 0.00

    35 1 1 0.000 30 30.00 30.00 0.00

    36 21 21 0.000 90 1890.00 1890.00 0.00

    37 127 127 0.000 30 3810.00 3810.00 0.00

    38 93 93 0.000 48.5 4510.50 4510.50 0.00

    39 351.5 351.5 0.000 48.5 17047.75 17047.75 0.00

    40 3 3 0.000 72.75 218.25 218.25 0.00

    41 281 281 0.000 97 27257.00 27257.00 0.00

    42 57 57 0.000 121.25 6911.25 6911.25 0.00

    43 153.3 153.3 0.000 145.5 22305.15 22305.15 0.00

    44 54 54 0.000 194 10476.00 10476.00 0.00

    45 37.6 37.6 0.000 582 21883.20 21883.20 0.00

    46 106 106 0.000 80 8480.00 8480.00 0.00

    47 63 63 0.000 275 17325.00 17325.00 0.00

    48 2 2 0.000 250 500.00 500.00 0.00

    M.S Pipe Erection 1"

    Anker Fashner Bolt Fixing

    Saftey Valve Erection

    Ball Valve Erection 1/2"

    M.S Pipe Erection 3/4"

    Ball Valve Erection 3/4"

    Ball Valve Erection 1"

    Ball Valve Erection 2"

    Ball Valve Erection 2.5"

    Ball Valve Erection 3"

    M.S Tee Erection 2"

    M.S Tee Erection 1.5"to1"

    M.S Funel Erection 3"

    M.S Flange Erection 1"

    M.S Flange Erection 2"

    M.S Dummey Flange Erection 3"

    M.S Dummey Flange Erection 4"

    M.S Flange Erection 12"

    M.S Pipe Erection 1/2"

    M.S Pipe Erection 1.5"

    M.S Pipe Erection 2"

    M.S Pipe Erection 2.5"

    M.S Pipe Erection 3"

    M.S Pipe Erection 4"

    M.S Pipe Erection 12"

    In shut Plate Fixing

  • 7/27/2019 RA 02

    12/12

    49 4 4 0.000 250 1000.00 1000.00 0.00

    50 2 2 0.000 250 500.00 500.00 0.00

    51 0.235 0.235 0.000 6750 1586.25 1586.25 0.00

    52 0.2 0.2 0.000 7000 1400.00 1400.00 0.00

    53 0.14 0.14 0.000 7000 980.00 980.00 0.00

    54 0.75 0.75 0.000 7000 5250.00 5250.00 0.00

    55 0.6 0.6 0.000 7000 4200.00 4200.00 0.00

    56 0.425 0.425 0.000 7000 2975.00 2975.00 0.00

    57 1.811 1.811 0.000 5800 10504.15 10504.15 0.00

    58 1.811 1.811 0.000 6000 10866.00 10866.00 0.00

    59 5.277 5.277 0.000 7000 36939.00 36939.00 0.00

    60 3.65 3.65 0.000 7000 25550.00 25550.00 0.00

    61 0.12057 0.12057 0.000 7000 843.99 843.99 0.00

    62 0.12057 0.12057 0.000 7000 843.99 843.99 0.00

    309957.00 310957.48 0.00

    supports Erection

    Blower Erection

    Water Spray Pump Erection

    Air Reciver tank Erection

    Compressure Erection

    Air Reciver tank Erection

    Air Dryar Erection

    supports Fabrication

    Pressure Gauge

    Pressure Valve

    H.A.G. System Valve

    TOTAL

    TRUSST ENGINEERS

    Net Payable Amount :- Rs. Three Lac Nine Thousand Nine Hundred Fifty Seven Only

    Sintex tank Erection

    Packing Plate Fabrication

    Packing Plate Erection