Pekerjaan : Rehabilitasi Ruang Kelas SDN Pagu II (3 Lokal) Lokasi : Jl. Supriyadi no. 213 DS. Pagu Kecamatan : Kec. Pagu - Kab. Kediri Tahun Anggaran : Anggaran 2012 A PEKERJAAN DINDING 1 Pasang Bata Merah m2 14.00 58,135.00 813,890.00 2 Pek. Plesteran m2 28.00 28,126.00 787,528.00 3 Pek. Acian Dinding m2 28.00 16,859.00 472,052.00 2,073,470.00 Rp B PEKERJAAN BETON 1 Pasang Kolom Teras 20 x 20 Pekerjaan Beton Bertulang m3 0.80 666,118.00 532,894.40 Pembesian kg 91.27 10,005.00 913,187.67 Pasang Papan Begisting m2 16.00 108,483.33 1,735,733.33 JUMLAH A ( R A B ) RENCANA ANGGARAN BIAYA NO URAIAN PEKERJAAN SAT VOLUME HARGA JUMLAH 2 Pasang Konsol Teras 20 x 30 Pekerjaan Beton Bertulang m3 0.45 666,118.00 299,753.10 Pembesian kg 47.23 10,005.00 472,584.97 Pasang Papan Begisting m2 6.00 110,983.33 665,900.00 3 Pasang Talang Beton Pekerjaan Beton Bertulang m3 0.60 666,118.00 399,670.80 Pembesian kg 79.64 10,005.00 796,828.72 Pasang Papan Begisting m2 10.00 121,816.67 1,218,166.67 4 Psang Ring Balk 15/20 Pekerjaan Beton Bertulang m3 1.68 666,118.00 1,119,078.24 Pembesian kg 114.09 10,005.00 1,141,501.03 Pasang Papan Begisting m2 15.40 110,983.33 1,709,143.33 5 Psang Listplank Beton m' 15.00 35,000.00 525,000.00 11,529,442.27 C PEKERJAAN ATAP Pasang Bubungan Genteng Kodok m 10.00 64,365.00 643,650.00 Pasang Plafond Eternit Rangka Kayu m2 55.00 67,675.00 3,722,125.00 Pasang List Plafon Gypsum m2 51.00 21,930.00 1,118,430.00 Pasang Asbes Gelombang m2 18.00 42,500.00 765,000.00 6,249,205.00 D PEKERJAAN LANTAI JUMLAH B JUMLAH C D PEKERJAAN LANTAI Pasang Keramik Lantai m2 40.00 112,420.00 4,496,800.00 Pasang Keramik Tangga m2 56.00 112,420.00 6,295,520.00 Pasang Paving Halaman m2 15.00 43,125.00 646,875.00 11,439,195.00 E PEKERJAAN PENGECATAN Pengecatan Dinding m2 327.59 9,150.00 2,997,448.50 Pengecatan Plafond m2 55.00 9,150.00 503,250.00 3,500,698.50 JUMLAH D JUMLAH E

RAB Masjid Q

Embed Size (px)

Citation preview

Page 1: RAB Masjid Q

Pekerjaan : Rehabilitasi Ruang Kelas SDN Pagu II (3 Lokal)Lokasi : Jl. Supriyadi no. 213 DS. PaguKecamatan : Kec. Pagu - Kab. KediriTahun Anggaran : Anggaran 2012

A PEKERJAAN DINDING1 Pasang Bata Merah m2 14.00 58,135.00 813,890.002 Pek. Plesteran m2 28.00 28,126.00 787,528.003 Pek. Acian Dinding m2 28.00 16,859.00 472,052.00

2,073,470.00RpB PEKERJAAN BETON

1 Pasang Kolom Teras 20 x 20Pekerjaan Beton Bertulang m3 0.80 666,118.00 532,894.40Pembesian kg 91.27 10,005.00 913,187.67Pasang Papan Begisting m2 16.00 108,483.33 1,735,733.33

2 Pasang Konsol Teras 20 x 30

JUMLAH A

( R A B )RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN SAT VOLUME HARGA JUMLAH

Pasang Papan Begisting m2 16.00 108,483.33 1,735,733.33

2 Pasang Konsol Teras 20 x 30Pekerjaan Beton Bertulang m3 0.45 666,118.00 299,753.10Pembesian kg 47.23 10,005.00 472,584.97Pasang Papan Begisting m2 6.00 110,983.33 665,900.00

3 Pasang Talang BetonPekerjaan Beton Bertulang m3 0.60 666,118.00 399,670.80Pembesian kg 79.64 10,005.00 796,828.72Pasang Papan Begisting m2 10.00 121,816.67 1,218,166.67

4 Psang Ring Balk 15/20Pekerjaan Beton Bertulang m3 1.68 666,118.00 1,119,078.24Pembesian kg 114.09 10,005.00 1,141,501.03Pasang Papan Begisting m2 15.40 110,983.33 1,709,143.33

5 Psang Listplank Beton m' 15.00 35,000.00 525,000.0011,529,442.27

C PEKERJAAN ATAPPasang Bubungan Genteng Kodok m 10.00 64,365.00 643,650.00Pasang Plafond Eternit Rangka Kayu m2 55.00 67,675.00 3,722,125.00Pasang List Plafon Gypsum m2 51.00 21,930.00 1,118,430.00Pasang Asbes Gelombang m2 18.00 42,500.00 765,000.00

6,249,205.00D PEKERJAAN LANTAI

JUMLAH B

JUMLAH CD PEKERJAAN LANTAI

Pasang Keramik Lantai m2 40.00 112,420.00 4,496,800.00Pasang Keramik Tangga m2 56.00 112,420.00 6,295,520.00Pasang Paving Halaman m2 15.00 43,125.00 646,875.00

11,439,195.00E PEKERJAAN PENGECATAN

Pengecatan Dinding m2 327.59 9,150.00 2,997,448.50Pengecatan Plafond m2 55.00 9,150.00 503,250.00

3,500,698.50

JUMLAH D

JUMLAH E

Page 2: RAB Masjid Q

NO URAIAN PEKERJAAN SAT VOLUME HARGA JUMLAH

F PEKERJAAN LAIN LAINPasang Instalasi Listrik ttk 3.00 79,000.00 237,000.00Pasang Lampu SL 20 Watt bh 6.00 28,200.00 169,200.00Pasang Stop Kontak bh 1.00 17,200.00 17,200.00Psang Saklar Ganda bh 2.00 20,700.00 41,400.00

464,800.00

35,256,810.77

35,250,000.00

JUMLAH TOTAL

DIBULATKAN

Tiga Puluh Lima Juta Dua ratus Lima Puluh Ribu Rupiah Terbilang :

JUMLAH F

PANITIA PEMBANGUNAN MASJID “AN NUUR”Dsn. Boro RT/RW 002/005 Ds. Wonorejo - Kec. Pagerwojo

KETUA

SAJURI

SEKRETARIS

MUNAJI

BENDAHARA

MUTIRAN

Page 3: RAB Masjid Q

D 6 HARGA SATUAN PEKERJAAN DINDING

Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Bata Merah 5 x 11 x 22 Bh 70.0000 380.00Rp 26,600.00RpPC Kg 8.3200 1,187.50Rp 9,880.00RpPasir Pasang M3 0.0490 95,000.00Rp 4,655.00RpTenaga Kerja :Pekerja Oh 0.3000 40,000.00Rp 12,000.00RpTukang Batu Oh 0.1000 50,000.00Rp 5,000.00Rp

0.4250 41,135.00Rp 17,000.00Rp 58,135.00Rp58,135.00Rp

6 HARGA SATUAN PEKERJAAN BETON

Membuat 1 m2 lantai kerja beton tumbuk 1PC : 3PS : 5KR tbl. 5 cm.

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :PC Kg 10.0000 1,187.50Rp 11,875.00RpPasir Beton M3 0.0260 95,000.00Rp 2,470.00Rp

DAFTAR ANALISA

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Harga per satuan pekerjaan dibulatkan

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Pasir Beton M3 0.0260 95,000.00Rp 2,470.00RpKoral Beton (maks 30 mm) M3 0.0440 120,000.00Rp 5,280.00RpTenaga Kerja :Pekerja Oh 1.1500 40,000.00Rp 46,000.00RpTukang Batu Oh 0.0200 50,000.00Rp 1,000.00Rp

1.1780 19,625.00Rp 47,000.00Rp 66,625.00Rp66,625.00Rp

1 m3 Membuat Beton Mutu fc = 19.3 Mpa (K 225), slump (12 + 2) cm, w/c = 0.58

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :PC Kg 371.0000 1,187.50Rp 440,562.50RpPasir Beton M3 0.4986 95,000.00Rp 47,364.27RpKoral Beton (maks 30 mm) M3 0.7756 120,000.00Rp 93,066.67RpAir Ltr 215.0000 25.00Rp 5,375.00RpTenaga Kerja :Pekerja Oh 1.6500 40,000.00Rp 66,000.00RpTukang Batu Oh 0.2750 50,000.00Rp 13,750.00Rp

2.0360 586,368.44Rp 79,750.00Rp 666,118.44Rp666,118.00Rp

Pembesian per 1 kg Besi Polos/Ulir

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Besi Beton (polos/ulir) Kg 1.0500 8,750.00Rp 9,187.50RpKawat Beton kg 0.0150 12,500.00Rp 187.50RpTenaga Kerja :

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Harga per satuan pekerjaan dibulatkan

Harga per satuan pekerjaan dibulatkan

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Tenaga Kerja :Pekerja Oh 0.0070 40,000.00Rp 280.00RpTukang Batu Oh 0.0070 50,000.00Rp 350.00Rp

0.0151 9,375.00Rp 630.00Rp 10,005.00Rp10,005.00RpHarga per satuan pekerjaan dibulatkan

Page 4: RAB Masjid Q

Memasang per 1 m2 bekisting untuk pondasi

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kayu Kelas III (Meranti) m3 0.0400 2,500,000.00Rp 100,000.00RpPaku 5 - 12 cm kg 0.3000 12,500.00Rp 3,750.00RpMinyak Begisting Ltr 0.1000 5,000.00Rp 500.00RpTenaga Kerja :Pekerja Oh 0.5200 40,000.00Rp 20,800.00RpTukang Batu Oh 0.2600 50,000.00Rp 13,000.00Rp

0.8320 104,250.00Rp 33,800.00Rp 138,050.00Rp138,050.00Rp

Memasang per 1 m2 bekisting untuk sloof

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kayu Kelas III (Meranti) m3 0.0450 2,500,000.00Rp 112,500.00RpPaku 5 - 12 cm kg 0.3000 12,500.00Rp 3,750.00RpMinyak Begisting Ltr 0.1000 5,000.00Rp 500.00RpTenaga Kerja :Pekerja Oh 0.5200 40,000.00Rp 20,800.00RpTukang Batu Oh 0.2600 50,000.00Rp 13,000.00Rp

0.8320 116,750.00Rp 33,800.00Rp 150,550.00Rp150,550.00Rp72,716.67Rp3 x Pasang

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Harga per satuan pekerjaan dibulatkan

Uraian Satuan Indeks Total (Rp)

Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan

72,716.67Rp

Memasang per 1 m2 bekisting untuk kolom

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kayu Kelas III (Meranti) m3 0.0400 2,500,000.00Rp 100,000.00RpPaku 5 - 12 cm kg 0.4000 12,500.00Rp 5,000.00RpMinyak Begisting Ltr 0.2000 5,000.00Rp 1,000.00RpBalok Kayu Kelas II (Meranti) m3 0.0150 2,500,000.00Rp 37,500.00RpPolywood/Triplek tebal 9mm lbr 0.3500 95,000.00Rp 33,250.00RpDolken Kayu Galam Ø (8 - 10) cm btg 2.0000 10,000.00Rp 20,000.00RpTenaga Kerja :Pekerja Oh 0.6600 40,000.00Rp 26,400.00RpTukang Batu Oh 0.3300 50,000.00Rp 16,500.00Rp

1.0560 196,750.00Rp 42,900.00Rp 239,650.00Rp239,650.00Rp108,483.33Rp

Memasang per 1 m2 bekisting untuk balok

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kayu Kelas III (Meranti) m3 0.0400 2,500,000.00Rp 100,000.00RpPaku 5 - 12 cm kg 0.4000 12,500.00Rp 5,000.00RpMinyak Begisting Ltr 0.2000 5,000.00Rp 1,000.00RpBalok Kayu Kelas II (Meranti) m3 0.0180 2,500,000.00Rp 45,000.00RpPolywood/Triplek tebal 9mm lbr 0.3500 95,000.00Rp 33,250.00RpDolken Kayu Galam Ø (8 - 10) cm btg 2.0000 10,000.00Rp 20,000.00RpTenaga Kerja :

3 x Pasang

3x Pasang

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Harga per satuan pekerjaan dibulatkan

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Tenaga Kerja :Pekerja Oh 0.6600 40,000.00Rp 26,400.00RpTukang Batu Oh 0.3300 50,000.00Rp 16,500.00Rp

1.0560 204,250.00Rp 42,900.00Rp 247,150.00Rp247,150.00Rp110,983.33Rp3 x Pasang

Harga per satuan pekerjaan dibulatkan

Page 5: RAB Masjid Q

Memasang per 1 m2 bekisting untuk plat lantai

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kayu Kelas III (Meranti) m3 0.0400 2,500,000.00Rp 100,000.00RpPaku 5 - 12 cm kg 0.4000 12,500.00Rp 5,000.00RpMinyak Begisting Ltr 0.2000 5,000.00Rp 1,000.00RpBalok Kayu Kelas II (Meranti) m3 0.0150 2,500,000.00Rp 37,500.00RpPolywood/Triplek tebal 9mm lbr 0.3500 95,000.00Rp 33,250.00RpDolken Kayu Galam Ø (8 - 10) cm btg 6.0000 10,000.00Rp 60,000.00RpTenaga Kerja :Pekerja Oh 0.6600 40,000.00Rp 26,400.00RpTukang kayu Oh 0.3300 50,000.00Rp 16,500.00Rp

1.0560 236,750.00Rp 42,900.00Rp 279,650.00Rp279,650.00Rp121,816.67Rp

34. Memasang per 1 m2 bekisting untuk tangga

Harga Satuan Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Kayu Kelas III m3 0.0300 2,500,000.00 75,000.00Paku 5 - 12 cm kg 0.4000 12,500.00 5,000.00Minyak Bekisting ltr 0.1500 5,000.00 750.00

3 x Passang

Satuan IndeksJumlah Harga Satuan

Total (Rp)U r a i a n

Harga per satuan pekerjaan dibulatkan

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Minyak Bekisting ltr 0.1500 5,000.00 750.00Balok Kayu Kelas II m3 0.0150 2,500,000.00 37,500.00Plywood/Triplek tebal 9 mm lbr 0.3500 95,000.00 33,250.00Dolken Kayu Galam Ø (8 - 10) cm btg 2.0000 10,000.00 20,000.00Tenaga Kerja :Pekerja oh 0.6600 40,000.00 26,400.00Tukang Kayu oh 0.3300 50,000.00 16,500.00

1.0560 171,500.00 42,900.00 214,400.00Harga per satuan pekerjaan dibulatkan 214,400.00

3x Pasang 100,066.67Rp

Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kayu Kelas III M3 0.0020 2,500,000.00Rp 5,000.00RpPaku 5 - 12 cm Kg 0.0100 12,500.00Rp 125.00RpBesi Beton Polos Kg 3.0000 8,750.00Rp 26,250.00RpKawat Beton Kg 0.0450 12,500.00Rp 562.50RpPC Kg 4.0000 1,187.50Rp 4,750.00RpPasir Beton M3 0.0060 95,000.00Rp 570.00RpKoral M3 0.0090 120,000.00Rp 1,080.00RpTenaga Kerja :Pekerja Oh 0.1800 40,000.00Rp 7,200.00RpTukang Batu Oh 0.0200 50,000.00Rp 1,000.00RpTukang Kayu Oh 0.0200 50,000.00Rp 1,000.00RpTukang Besi Oh 0.0200 50,000.00Rp 1,000.00Rp

0.2550 38,337.50Rp 10,200.00Rp 48,537.50Rp

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Harga per satuan pekerjaan dibulatkan0.2550 38,337.50Rp 10,200.00Rp 48,537.50Rp

48,537.00RpHarga per satuan pekerjaan dibulatkan

Page 6: RAB Masjid Q

Membuat 1 m' ring balok beton bertulang (10 x 15) cm

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kayu Kelas III (Meranti) M3 0.0030 2,500,000.00Rp 7,500.00RpPaku 5 - 12 cm Kg 0.0200 12,500.00Rp 250.00RpBesi Beton Polos Kg 3.6000 8,750.00Rp 31,500.00RpKawat Beton Kg 0.0500 12,500.00Rp 625.00RpPC Kg 5.5000 1,187.50Rp 6,531.25RpPasir Beton M3 0.0090 95,000.00Rp 855.00RpKoral Beton M3 0.0150 120,000.00Rp 1,800.00RpTenaga Kerja :Pekerja Oh 0.2970 40,000.00Rp 11,880.00RpTukang Batu Oh 0.0330 50,000.00Rp 1,650.00RpTukang Kayu Oh 0.0330 50,000.00Rp 1,650.00RpTukang Besi Oh 0.0330 50,000.00Rp 1,650.00Rp

0.4210 49,061.25Rp 16,830.00Rp 65,891.25Rp65,891.00Rp

E 6 HARGA SATUAN PEKERJAAN PLESTERANMemasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :

IndeksJumlah Harga Satuan

Total (Rp)

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Harga per satuan pekerjaan dibulatkan

Uraian Satuan

Bahan :PC Kg 5.1840 1,187.50Rp 6,156.00RpPasir Pasang M3 0.0260 95,000.00Rp 2,470.00RpTenaga Kerja :Pekerja Oh 0.3000 40,000.00Rp 12,000.00RpTukang Batu Oh 0.1500 50,000.00Rp 7,500.00Rp

0.4800 8,626.00Rp 19,500.00Rp 28,126.00Rp28,126.00Rp

Memasang 1 m2 acian

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :PC Kg 3.2500 1,187.50Rp 3,859.38RpTenaga Kerja :Pekerja Oh 0.2000 40,000.00Rp 8,000.00RpTukang Batu Oh 0.1000 50,000.00Rp 5,000.00Rp

0.3200 3,859.38Rp 13,000.00Rp 16,859.38Rp16,859.00Rp

G6 HARGA SATUAN PEKERJAAN PENUTUP ATAP5. Memasang 1 m' genteng bubung kodok/glazzur

Harga Satuan Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Genteng Bubung Kodok bh 5.0000 4,500.00 22,500.00Semen Portland kg 10.8000 1,187.50 12,825.00Pasir Pasang m3 0.0320 95,000.00 3,040.00

Satuan IndeksJumlah Harga Satuan

U r a i a n

Harga per satuan pekerjaan dibulatkan

Harga per satuan pekerjaan dibulatkan

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Pasir Pasang m3 0.0320 95,000.00 3,040.00Tenaga Kerja :Pekerja oh 0.4000 40,000.00 16,000.00Tukang Batu oh 0.2000 50,000.00 10,000.00

0.6220 38,365.00 26,000.00 64,365.00Harga per satuan pekerjaan dibulatkan 64,365.00

Page 7: RAB Masjid Q

H6 HARGA SATUAN PEKERJAAN LANGIT-LANGIT1.a Memasang 1 m2 langit-langit asbes semen, tebal 4 mm rangka kayu meranti

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kaso-kaso (4x6) cm m3 0.0108 2,500,000.00Rp 27,000.00RpPaku 7 sampai 10 cm kg 0.2000 12,500.00Rp 2,500.00RpAsbes Semen M2 1.1000 13,500.00Rp 14,850.00RpPaku Tripleks Kg 0.0100 12,500.00Rp 125.00RpTenaga Kerja :Pekerja Oh 0.1800 40,000.00Rp 7,200.00RpTukang Kayu Oh 0.3200 50,000.00Rp 16,000.00Rp

0.6110 44,475.00Rp 23,200.00Rp 67,675.00Rp67,675.00Rp

8. Memasang 1 m' list plafond gypsum profil

Harga Satuan Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :List Gypsum Profil m' 1.0500 15,500.00 16,275.00Tepung Gypsum kg 0.1500 1,700.00 255.00Tenaga Kerja :Pekerja oh 0.0600 40,000.00 2,400.00Tukang Kayu oh 0.0600 50,000.00 3,000.00

0.1290 16,530.00 5,400.00 21,930.00

Jumlah Harga SatuanU r a i a n Satuan Indeks

Harga per satuan pekerjaan dibulatkan

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

0.1290 16,530.00 5,400.00 21,930.00Harga per satuan pekerjaan dibulatkan 21,930.00

I.6 HARGA SATUAN PEKERJAAN PIPA DAN SANITASIMemasang 1 bh kran dia 3/4 atau 1/2"

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kran Air Bh 1.0000 25,000.00Rp 25,000.00RpSeal Tape Bh 0.0250 2,500.00Rp 62.50RpTenaga Kerja :Pekerja Oh 0.0100 40,000.00Rp 400.00RpTukang Batu Oh 0.1000 50,000.00Rp 5,000.00Rp

0.1250 25,062.50Rp 5,400.00Rp 30,462.50Rp30,462.00Rp

Memasang 1 Buah Floor Drain

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Floor Drain Bh 1.0000 20,000.00Rp 20,000.00RpTenaga Kerja :Pekerja Oh 0.0100 40,000.00Rp 400.00RpTukang Batu Oh 0.1000 50,000.00Rp 5,000.00Rp

0.1250 20,000.00Rp 5,400.00Rp 25,400.00Rp25,400.00Rp

Harga per satuan pekerjaan dibulatkan

Uraian Satuan

Uraian

Harga per satuan pekerjaan dibulatkan

IndeksJumlah Harga Satuan

Total (Rp)

Satuan IndeksJumlah Harga Satuan

Total (Rp)

Page 8: RAB Masjid Q

L 6 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

34.a. Memasang per 1 m2 lantai keramik ukuran (40 x 40) cm

Harga Satuan Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Ubin Keramik m2 1.0500 45,000.00 47,250.00PC kg 8.1900 1,187.50 9,725.63Pasir Pasang m3 0.0450 95,000.00 4,275.00Semen Warna kg 1.6200 3,500.00 5,670.00Tenaga Kerja :Pekerja oh 0.7000 40,000.00 28,000.00Tukang Batu oh 0.3500 50,000.00 17,500.00

1.1200 66,920.63 45,500.00 112,420.63Harga per satuan pekerjaan dibulatkan 112,420.00

Memasang per 1 m2 dinding porselen ukuran (20 x 25) cm

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Porselen M2 1.0500 45,000.00Rp 47,250.00RpPC Kg 9.3000 1,187.50Rp 11,043.75RpPasir Pasang M3 0.0180 95,000.00Rp 1,710.00RpSemen Warna Kg 1.9400 3,500.00Rp 6,790.00Rp

U r a i a n

Uraian Satuan IndeksJumlah Harga Satuan

Total (Rp)

Satuan IndeksJumlah Harga Satuan

Semen Warna Kg 1.9400 3,500.00Rp 6,790.00RpTenaga Kerja :Pekerja Oh 0.9000 40,000.00Rp 36,000.00RpTukang Batu Oh 0.4500 50,000.00Rp 22,500.00Rp

1.4400 66,793.75Rp 58,500.00Rp 125,293.75Rp125,293.00Rp

M 6 HARGA SATUAN PEKERJAAN PENGECATANMengecat 1 m2 bidang tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Cat Dasar Kg 0.1200 12,500.00Rp 1,500.00RpCat Penutup (2x) Kg 0.1800 12,500.00Rp 2,250.00RpTenaga Kerja :Pekerja Oh 0.0600 40,000.00Rp 2,400.00RpTukang Cat Oh 0.0600 50,000.00Rp 3,000.00Rp

0.1280 3,750.00Rp 5,400.00Rp 9,150.00Rp9,150.00Rp

Ls. ANALISA BIAYA PEKERJAAN LAIN - LAINLs.4 Memasang 1 titik instalasi listrik

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Kabel M 10.0000 2,750.00Rp 27,500.00RpPipa Paralon 1/2" M 3.0000 6,300.00Rp 18,900.00RpT doos PVC Bh 1.0000 2,500.00Rp 2,500.00Rp

Satuan IndeksJumlah Harga Satuan

Total (Rp)

IndeksJumlah Harga Satuan

Total (Rp)

Harga per satuan pekerjaan dibulatkan

Uraian Satuan

Uraian

Harga per satuan pekerjaan dibulatkan

T doos PVC Bh 1.0000 2,500.00Rp 2,500.00RpFitting Plfond Bh 1.0000 4,500.00Rp 4,500.00RpTenaga Kerja :Pekerja Oh 0.2400 40,000.00Rp 9,600.00RpTukang Listrik Oh 0.3200 50,000.00Rp 16,000.00Rp

0.8400 53,400.00Rp 25,600.00Rp 79,000.00Rp79,000.00RpHarga per satuan pekerjaan dibulatkan

Page 9: RAB Masjid Q

Ls.5 Memasang 1 bh skakelar tunggal

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Skakelar Bh 1.0000 15,500.00Rp 15,500.00RpTenaga Kerja :Tukang Listrik Oh 0.0640 50,000.00Rp 3,200.00Rp

0.0704 15,500.00Rp 3,200.00Rp 18,700.00Rp18,700.00Rp

Ls.6 Memasang 1 bh skakelar ganda

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :Skakelar Bh 1.0000 17,500.00Rp 17,500.00RpTenaga Kerja :Tukang Listrik Oh 0.0640 50,000.00Rp 3,200.00Rp

0.0704 17,500.00Rp 3,200.00Rp 20,700.00Rp20,700.00Rp

Ls.7 Memasang 1 bh stop kontak

Harga Satuan Harga SatuanBahan : (Rp) Bahan : (Rp) Bahan : (Rp) Bahan : (Rp)

Bahan :

Jumlah Harga Satuan

Harga per satuan pekerjaan dibulatkan

Uraian Satuan Indeks

Uraian Satuan IndeksJumlah Harga Satuan

Harga per satuan pekerjaan dibulatkan

Uraian Satuan Indeks

Total (Rp)

Total (Rp)

Jumlah Harga Satuan Total (Rp)

Bahan :Stop Kontak Bh 1.0000 14,000.00Rp 14,000.00RpTenaga Kerja :Tukang Listrik Oh 0.0640 50,000.00Rp 3,200.00Rp

0.0704 14,000.00Rp 3,200.00Rp 17,200.00Rp17,200.00Rp

Ls.7. b Memasang 1 bh Lampu TL 40 W

U r a i a n Harga Satuan Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Lampu TL 40 w bh 1.0000 75,000.00 75,000.00Armatur Tipe RML 300 236 bh 1.0000 50,000.00 50,000.00Tenaga Kerja :Tukang Listrik oh 0.0640 50,000.00 3,200.00

0.0704 125,000.00 3,200.00 128,200.00Harga per satuan pekerjaan dibulatkan 128,200.00

Ls.7. d Memasang 1 bh Lampu SL 20 watt

U r a i a n Harga Satuan Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Lampu SL 40 Watt bh 1.0000 25,000.00 25,000.00Tenaga Kerja :Tukang Listrik oh 0.0640 50,000.00 3,200.00

0.0704 25,000.00 3,200.00 28,200.00Harga per satuan pekerjaan dibulatkan 28,200.00

Jumlah Harga Satuan

Satuan IndeksJumlah Harga Satuan

Satuan Indeks

Harga per satuan pekerjaan dibulatkan

Harga per satuan pekerjaan dibulatkan 28,200.00

Page 10: RAB Masjid Q

2. 1 m2 Pasang Paving Blok Mesin K225U r a i a n Harga Satuan Harga Satuan

Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)BahanPaving Blok m

3 1.0000 35,000.00 35,000.00Pasir Urug m

3 0.1000 25,000.00 2,500.00TenagaPekerja OH 0.6250 40,000.00 25,000.00Tukang Batu OH 0.3125 50,000.00 15,625.00

0.9375 2,500.00 40,625.00 43,125.00Harga per satuan pekerjaan dibulatkan 43,125.00

KETUA BENDAHARASEKRETARIS

Jumlah Harga Satuan

PANITIA PEMBANGUNAN MASJID "AN NUR"Dsn. Boro RT/RW 002/005 Ds. Wonorejo - Kec. Pagerwojo

Satuan Indeks

KETUA

S A J U R I M U T I R A N

BENDAHARA

M U N A J I

SEKRETARIS

Page 11: RAB Masjid Q

A. HARGA BAHAN

NO URAIAN SATUAN HARGA SATUAN ( Rp.)1 2 3 41 Pasir urug m3 25,000.00Rp2 Pasir pasang/Pasir beton m3 95,000.00Rp7 Batu bata merah kelas I bh 380.00Rp10 Semen PC (Gresik) @ 40 kg. zak 47,500.00Rp11 Semen putih kg 1,500.00Rp12 Semen berwarna kg 3,500.00Rp13 Semen merah m3 145,000.00Rp14 Batu pecah 20/20 cm. m3 90,000.00Rp15 Batu belah 15/20 cm. m3 95,000.00Rp16 Batu pecah 4/6 cm. m3 110,000.00Rp17 Batu kali pecah 3/5 cm. m3 115,000.00Rp18 Batu cor/koral beton 2/3 cm. m3 120,000.00Rp19 Batu pecah 1/2 cm. m3 130,000.00Rp20 Batu pecah 0,5/1 cm. m3 140,000.00Rp24 Besi beton ulir kg 8,750.00Rp25 Besi beton polos kg 8,750.00Rp26 Kawat ikat beton kg 12,500.00Rp27 Besi beugel/baut 25 cm. 12 mm. bj 12,200.00Rp57 Kayu dolken 8-10 cm. bt 10,000.00Rp

DARTAR HARGA SATUAN BAHAN

57 Kayu dolken 8-10 cm. bt 10,000.00Rp70 Kayu meranti balok 8/12 cm. m3 2,500,000.00Rp71 Kayu meranti usuk 5/7 cm. m3 2,500,000.00Rp72 Kayu meranti reng 3/5 cm. m3 2,500,000.00Rp73 Kayu meranti papan m3 2,500,000.00Rp74 Kayu meranti bekisting m3 2,500,000.00Rp78 Bambu 10-12 cm. pj. 6 m. bt 15,800.00Rp79 Teakwood 110x210x4 mm. lbr 75,000.00Rp80 Teakwood 122x244x4 mm. lbr 85,000.00Rp81 Plywood 122x244x4 mm. lbr 70,000.00Rp82 Woodplank (20 x 400 x 1) cm lbr 65,000.00Rp83 Woodplank (30 x 400 x 1) cm lbr 85,000.00Rp84 Triplek 122x244x9 mm. lbr 95,000.00Rp85 Triplek 90x200x4 mm. lbr 45,000.00Rp86 Triplek 120x240x4 mm. lbr 65,000.00Rp87 Triplek 122x244x4 mm. lbr 70,000.00Rp88 Eternit gresik m2 13,500.00Rp89 Asbes gelombang bsr. (3,05x1,05) tb. 5 mm setara Gresik lbr 110,000.00Rp90 Asbes gelombang kcl. (1.50x1.05) tb. 4 mm setara Gresik lbr 42,500.00Rp96 Genteng wuwung kodok (ex. Trenggalek ) bj 4,500.00Rp101 Paku biasa kg 12,500.00Rp102 Paku pancing kg 17,500.00Rp103 Paku asbes/ulir bh 250.00Rp104 Paku seng payung bj 125.00Rp105 Paku sumbat bj 80.00Rp106 Paku skrup bh 350.00Rp108 Roster merah bh 4,000.00Rp109 Paving stone abu-abu persegi tebal 6 cm. m2 35,000.00Rp113 Tegel keramik uk. 20 x 20 cm. m2 35,000.00Rp114 Tegel keramik uk. 30 x 30 cm. m2 37,500.00Rp114 Tegel keramik uk. 30 x 30 cm. m2 37,500.00Rp115 Tegel keramik uk. 40 x 40 cm. m2 45,000.00Rp116 Tegel keramik uk. 20 x 25 cm. m2 45,000.00Rp150 Cat tembok (Decolith)/sejenis kg 12,500.00Rp151 Cat plincute (Avian)/sejenis kg 35,000.00Rp152 Plamir tembok kg 12,500.00Rp153 Plamir kayu kg 15,500.00Rp154 Thinner B (minyak cat) lt 7,000.00Rp155 Politur lt 35,000.00Rp156 Lem (Rajawali) bks 12,000.00Rp157 Lem kayu (Fox) kg 13,500.00Rp158 Kertas gosok lbr 4,500.00Rp

Page 12: RAB Masjid Q

NO URAIAN SATUAN HARGA SATUAN ( Rp.)1 2 3 4

177 Kran air bh 25,000.00Rp178 TBA/isolasi rol 2,500.00Rp190 Fitting plafon set 4,500.00Rp191 T dos PVC set 2,500.00Rp192 Isolator bh 3,500.00Rp193 Stop kontak (Broco) bh 14,000.00Rp194 Skakelar tunggal (Broco) bh 15,500.00Rp195 Zekering SPA 60 A bh 5,000.00Rp196 Panel box 290 x 30 cm bh 185,500.00Rp197 Lampu TL 20 W komplit (Philips) bh 45,000.00Rp198 Lampu Tl 40 W komplit (Philips) bh 75,000.00Rp199 Lampu SL 40 Watt bh 25,000.00Rp212 Residu ltr 1,400.00Rp213 Minyak bekisting ltr 5,000.00Rp234 Skakelar ganda (Broco) bh 17,500.00Rp238 List gypsum profil 10 cm. m' 15,500.00Rp

PANITIA PEMBANGUNAN MASJID “AN NUUR”Dsn. Boro RT/RW 002/005 Ds. Wonorejo - Kec. Pagerwojo

KETUA

SAJURI

SEKRETARIS

MUNAJI

BENDAHARA

MUTIRAN

Page 13: RAB Masjid Q

B. TENAGA KERJA

NO URAIAN SATUAN HARGA SATUAN ( Rp.)1 2 3 410 Tukang Batu org/hr 50,000.00Rp

27 Pekerja org/hr 40,000.00Rp

PANITIA PEMBANGUNAN MASJID “AN NUUR”Dsn. Boro RT/RW 002/005 Ds. Wonorejo - Kec. Pagerwojo

KETUA

SAJURI

SEKRETARIS

MUNAJI

BENDAHARA

MUTIRAN

PANITIA PEMBANGUNAN MASJID “AN NUUR”Dsn. Boro RT/RW 002/005 Ds. Wonorejo - Kec. Pagerwojo

KETUA

SAJURI

SEKRETARIS

MUNAJI

BENDAHARA

MUTIRAN