Rail Baltica progress in Lithuania in2018Plans for 2019Arenijus JackusDirector of Rail Baltica CoordinationDepartment Railway InfrastructureDirectorate at JSC Lithuanian railways
January 23, 2018
20252018 2020 2021 2023
Land expropriated for
public needsKaunas-LT/LV
Completed spatialplanning
PL/LT - Kaunas
A technical design prepared
Kaunas-LT/LV
Completed spatialplanning
Vilnius-Kaunas
Land expropriated for
public needsPL/LT -Kaunas
A technicaldesign prepared
PL/LT -Kaunas
Land expropriated for
public needsVilnius-Kaunas
A technicaldesign prepared
Vilnius-Kaunas
Project implemented
Completed construction
worksAll sections
IMPLEMENTATION OF THE „RAIL BALTICA“ PROJECT. LITHANIA
Completed construction ofsection Jiesia –
Rokai
Completed construction of section Kaunas –
Palemonas
Completed construction ofsection Rokai -
Palemonas
2016-2021Construction Rokai -Palemonas
By the end of 2025Construction of 1435 mm "Rail Baltica" lineKaunas - LT / LV state border, Kaunas - Vilnius
By the end of 2025• Spatiall planning. 2018
December - LTGovernment resolutionadopted for:
PL/LT – Kaunas”,Kaunas Node, “Vilnius –Kaunas”
infrastructure facilities• Design and upgrading/
construction Kaunas –PL / LT
Poland
Latvia
RU
BY2016-2018
Constructed Jiesia – Rokai
2016-2020Construction Kaunas -Palemonas
Kaunas-LT/LV (167 km)• Completed Special plan and EIA;• Ongoing Land acquisition for: Main line. Plan to be completed in Q1 2019 Local Access roads. Preparatory stage• Ongoing preparation of the Technical design
Kaunas - LT / LV
Archaeological study, procurement
Kaunas – Vilnius (100 km)Feasibility study is already prepared
2013-2015 Constructed PL/LT – Kaunas(central station). Built 120 km of 1435 mm RB line, 1 stage.
KAUNAS NODE. THE WAY FORWARD
Jiesia
Rokai
Kaunas
Palemonas
HES
OP: Kaunas node can be seen as the main
hub of Rail Baltica, ...gateway to the
Lithuanian railway network both on 1435
mm gauge and on 1520 mm gauge
Decisions on Kaunas Node were made -
agreed with project partners and the
European Commission
Construction workscontinues.
Plan to be finished in2021
IMPLEMENTATION OF „RAIL BALTICA“ PROJECT IN 2018. PLANS FOR 2019
2019Kaunas–
PalemonasConstruction
ongoing
Land acquisition
Kaunas - LT / LV completed
Rokai –Palemonas
Constructionstarted
Land acquisition
Project Kaunas - LVcompleted, acquisition
ongoing
Jiesia-RokaiConstruction completed
Construction onsection Kaunas–
Palemonas started
2018
The project coordinator RB Rail implements:Studies, including
- Technical Studies;- Commercialization
Studies
Technical designSection Kaunas - LT / LV
Vilnius connection
study completed
Initiated Spatialplanning procedure.
Resolution of the Government
adopted
Archeological study Kaunas –LT/LV started
Preparation of specialplans and EIA Sections
“PL/LT – Kaunas”, Kaunas Node, “Vilnius –
Kaunas” and railway infrastructure facilities
started
Thank you for your attention
Rail Baltica progress in 2018 �Plans for 2019The Project Progress in 2018 �Political Commitments Slide Number 3Design Guidelines Approved�7 Detailed Technical Design Tenders Launched�List of participants �Detailed Technical Design in Estonia Detailed Technical Design in Latvia Detailed Technical Design in Lithuania Key studies in 2018 Finished and procured ongoing technical studiesStudies completed or to be completed soonSlide Number 18Key procurements in 2019Thank you for your attention!Slide Number 21Slide Number 22Rail Baltica route alignment in Estonia approved Technical design and construction in 2019Ülemiste passenger terminalPärnu passenger terminalMuuga multimodal freight terminalEnvironment and horizontal studiesThank you!Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Rail Baltica progress in Lithuania in 2018 �Plans for 2019Slide Number 39Slide Number 40KAUNAS NODE. �THE WAY FORWARD IMPLEMENTATION OF „RAIL BALTICA“ PROJECT IN 2018. PLANS FOR 2019Thank you for your attention