Ralph J. Bunche Middle School1925 Niskey Lake Road

Project Overview

March 25, 2010Facilities Services Department

June 21, 2013

Page 2: Ralph J. Bunche Middle School

This image cannot currently be displayed.

Project Location

Aerial View of Existing Site

Page 3: Ralph J. Bunche Middle School

This image cannot currently be displayed.

Project Description

• Grades: 6 – 8• Site Size: +/‐ 44.0 acres (+/‐ 28.0 acres developable)• Student Capacity:  +/‐ 975 @ 25 students per classroom• Core Classrooms: +/‐ 39 (9 classrooms, 3 science labs, 1 computer lab per grade)• Total Classrooms:  +/‐ 57• Approximate Size: +/‐ 149,000 sf (64,000 sf addition + 85,000 sf renovation)• Tentative Schedule: October 2013 – December 2014• Partial Demolition of existing facility with construction of new auditorium, 

gymnasium, academic and support spaces • Renovated and relocated New Kitchen and Cafeteria• New Gymnasium with seating for approximately 1,000• New Auditorium with seating for approximately 500• New natural grass Football Field (can also be used for soccer, lacrosse, etc.)• New 400 meter Track• New Softball Field • Reconfigured parking, drop‐off and bus cueing areas• Site, storm water management and landscaping improvements 

Page 4: Ralph J. Bunche Middle School

This image cannot currently be displayed.

Site Plan

Addition Renovation

Football Field / Track 

Softball Field

Proposed New Site Plan

Page 5: Ralph J. Bunche Middle School

This image cannot currently be displayed.

Floor Plans

Lower Level Upper Level

8th Grade7th Grade

6th Grade

Cafeteria

Admin.

Auditorium

Gymnasium

CourtyardCourtyard

CourtyardCourtyard

Main Entrance

Page 6: Ralph J. Bunche Middle School

This image cannot currently be displayed.

Conceptual Image

Aerial View of Modified Facility

Page 7: Ralph J. Bunche Middle School

This image cannot currently be displayed.

Exterior Image 

Image of New Front Entrance Court 

Page 8: Ralph J. Bunche Middle School

This image cannot currently be displayed.

Project Timeline

• Select Architect January 15, 2013• Design Kick‐Off Meeting w/ school February 14, 2013• Project Committee No. 1 May 9, 2013• Relocate School June 3, 2013• Draft Design Narrative June 28, 2013• Schematic Design July 12, 2013• Project Committee Meeting No. 2 July 18, 2013• Design Review No. 1 July 24, 2013 • Design Development August 9, 2013• Project Committee Meeting No. 3 August 13, 2013• Preliminary  Submittal to GDOE August 14, 2013• 50 % Construction Documents August 16, 2013• Project Committee Meeting No. 4 August 21, 2013 • Recommend CM to Board September 2013 • “Check Set” submittal to GDOE September 6, 2013 • Design Review No. 2 September 13, 2013• Start Demolition/Construction October 2013• Substantial Completion December 2014• School Opening January 2015

Page 9: Ralph J. Bunche Middle School

This image cannot currently be displayed.This image cannot currently be displayed.

Questions & Answers

March 25, 2010

Weekly Progress Reports for the Ralph J. Bunche Middle School Project can be accessed at:

http://www.atlanta.k12.ga.us