CONTIGUOUS BORED PILE WALL Rama Thibodi Hospital Object Contiguous bored pile wall and bored piles for con- struction of basement and foundation of the Rama Thibodi Hospital. Project Description Bored pile wall with temporary braced excavation method for construction of 3 level basements for car parking. Type of Work Foundation Piling, Contiguous bored pile wall. Owner Rama VI Hospital. Designer Arun Chaiseri Consulting Engineers Co., Ltd. Main Contractor Ch. Karnchang Public Company Limited. Project Schedule 2005-2006 Construction Method Excavation with contiguous pile wall using bot- tom up construction method to –11.5m. Construction Details Foundation bored pile: 7 (φ0.8mx55m) 121 (φ1.0mx55m) 163 (φ1.2mx55m) 32 (φ1.5mx55m) Contiguous Pile Wall: 364 (φ1.0mx20.0m) Subsoil Conditions Soft clay: 0.0-11.0m Medium clay: 11.0-14.0m Stiff clay: 14.0-28.0m Dense sand: 28.0-30.0m Hard clay: 30.0-47.0m Very dense sand: 47.0-55.0m REFERENCES: Exposed contiguous bored pile wall. Layout of contiguous and foundation bored piles. Excavation with braced pile wall for construction of footings and basements. No. 144, Prayasuren Road, Bangchan, Khlong Sam Wah, Bagkok 10510, Thailand. Tel. (662) 919-0090 to 97, Fax. (662) 919-0098, 518-3088. Email: [email protected], Homepage: www.seafco.co.th.

RAMA VI HOSPITAL - Seafco Public Company Limited VI HOSPITAL.pdfContiguous bored pile wall and bored piles for con-struction of basement and foundation of the Rama Thibodi Hospital

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RAMA VI HOSPITAL - Seafco Public Company Limited VI HOSPITAL.pdfContiguous bored pile wall and bored piles for con-struction of basement and foundation of the Rama Thibodi Hospital

CONTIGUOUS BORED PILE WALL

Rama Thibodi Hospital

Object Contiguous bored pile wall and bored piles for con-struction of basement and foundation of the Rama Thibodi Hospital.

Project Description Bored pile wall with temporary braced excavation method for construction of 3 level basements for car parking.

Type of Work Foundation Piling, Contiguous bored pile wall.

Owner Rama VI Hospital.

Designer Arun Chaiseri Consulting Engineers Co., Ltd.

Main Contractor Ch. Karnchang Public Company Limited.

Project Schedule 2005-2006

Construction Method • Excavation with contiguous pile wall using bot-

tom up construction method to –11.5m.

Construction Details Foundation bored pile: 7 (φ0.8mx55m)

121 (φ1.0mx55m)

163 (φ1.2mx55m)

32 (φ1.5mx55m)

Contiguous Pile Wall: 364 (φ1.0mx20.0m)

Subsoil Conditions Soft clay: 0.0-11.0m Medium clay: 11.0-14.0m Stiff clay: 14.0-28.0m Dense sand: 28.0-30.0m Hard clay: 30.0-47.0m Very dense sand: 47.0-55.0m

REFERENCES:

Exposed contiguous bored pile wall.

Layout of contiguous and foundation bored piles.

Excavation with braced pile wall for construction of footings and basements.

No. 144, Prayasuren Road, Bangchan, Khlong Sam Wah, Bagkok 10510, Thailand. Tel. (662) 919-0090 to 97, Fax. (662) 919-0098, 518-3088. Email: [email protected], Homepage: www.seafco.co.th.