11

Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain
Page 2: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain
Page 3: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain

1

Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: derabassi, distt: mohali,

Derabassi,Sas nagar

PUNJAB POLLUTION CONTROL BOARD

Zonal Office-I, Patiala

Website:- www.ppcb.gov.in

Industry ID:R13SAS660386

This is with reference to the request made by the facility for extension in the validity of consent granted bythe Board under the Air (Prevention & Control of Pollution) Act, 1981.The validity of consent to operate granted to the facility vide no. ZO-I/SAS Nagar/APC/2011-12/F-158dated 17/2/2011 (valid upto 16/02/2014) under the Air (Prevention & Control of Pollution) Act, 1981, ishereby, further extended upto 31/03/2015 with the same conditions and following additional condition that:1. The facility will install CCTV Camera at the unloading, mixing and dumping section having connectivitywith the Board's website.2. The facility shall raise the level of partition of the storm water drain and effluent drain within one monthto rule out the possibility of mixing of the storm water with effluent during rainy season.3. The facility shall make the area all around the cell between cell and the leachate collection drainpermeable/ pucca to rule out the possibility of seepage of leachate generated during rainy season and shallprovide brick masonry wall all around the cell where the waste has been dumped above ground level oradopt other environmentally sound measures for collection of leachate, within two months.4. The facility shall get examine the hazardous waste, which has already been dumped on the cell afterstabilization, from any external expert agency within three months, to ascertain as to whether thestabilization of already dumped hazardous waste had been done properly or not.5. The facility shall take up matter with an expert agency to explore the possibility of providing mechanizedsystem for stabilization of waste instead of present practice being followed by it which is not

No:R15SASCTOA1840055 Registered Date:13/01/2015

To

M/s Ramky enviro engineers ltdVillage: nimbua, po: rampur sainia, teh: derabassi, distt: mohaliDerabassi140507Tehsil: DerabassiDistrict: Sas nagar

Subject:- Extension in validity of consent no. ZO-I/SAS Nagar/APC/2011-12/F-158 dated17/2/2011 granted under the provisions of the Air (Prevention & Control ofPollution) Act, 1981.

Reference :R15SASCTOA1840055 Application No :1840055 Date :13/01/2015

Page 4: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain

2

Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: derabassi, distt: mohali,

Derabassi,Sas nagar

environmentally sound.All other contents shall remain unchanged. This letter be appended with the original consent issued to thefacility vide letter no. 923 dated 17/2/2011 under the Air (Prevention & Control of Pollution) Act, 1981 andits subsequent extensions. for & on behalf ofPb. Pollution Control BoardEndst. No. __________Dated __________A copy of the above is forwarded to the Environmental Engineer, Punjab Pollution Control Board, RegionalOffice, SAS Nagar for information and necessary action. He is requested to ensure the compliance ofconsent conditions in time bound manner. for & on behalf ofPb. Pollution Control Board

“ This is computer generated document from OCMMS by PPCB ”

Page 5: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain
Page 6: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain

1

Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: derabassi, distt: mohali,

Derabassi,Sas nagar

PUNJAB POLLUTION CONTROL BOARD

Zonal Office-I, PatialaWebsite:- www.ppcb.gov.in

Industry ID:R13SAS660386

This is with reference to the request made by the facility for extension in the validity of consent granted bythe Board under the Water (Prevention & Control of Pollution) Act, 1974.The validity of consent to operate granted to the facility vide no. ZO-I/SAS Nagar/WPC/2011-12/F-180dated 17/2/2011 (valid upto 16/02/2014) under the Water (Prevention & Control of Pollution) Act, 1974, ishereby, further extended upto 31/03/2015 with the same conditions and following additional condition that:1. The facility will install CCTV Camera at the unloading, mixing and dumping section having connectivitywith the Board's website.2. The facility shall raise the level of partition of the storm water drain and effluent drain within one monthto rule out the possibility of mixing of the storm water with effluent during rainy season.3. The facility shall make the area all around the cell between cell and the leachate collection drainpermeable/ pucca to rule out the possibility of seepage of leachate generated during rainy season and shallprovide brick masonry wall all around the cell where the waste has been dumped above ground level oradopt other environmentally sound measures for collection of leachate, within two months.4. The facility shall get examine the hazardous waste, which has already been dumped on the cell afterstabilization, from any external expert agency within three months, to ascertain as to whether thestabilization of already dumped hazardous waste had been done properly or not.5. The facility shall take up matter with an expert agency to explore the possibility of providing mechanizedsystem for stabilization of waste instead of present practice being followed by it which is notenvironmentally sound.All other contents shall remain unchanged. This letter be appended with the original consent issued to the

No: R15SASCTOW1847588 Registered Date: 13/01/2015

To

M/s Ramky enviro engineers ltdVillage: nimbua, po: rampursainia, teh: derabassi, distt: mohali140507DerabassiSas nagar

Subject:- Extension in validity of consent no. ZO-I/SAS Nagar/WPC/2011-12/F-180 dated17/2/2011 granted under the provisions of the Water (Prevention & Control ofPollution) Act, 1974.

Reference :R15SASCTOW1847588 Application No. :1847588 Dated :13/01/2015

Page 7: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain

2

Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: derabassi, distt: mohali,

Derabassi,Sas nagar

facility vide letter no. 925 dated 17/2/2011 under the Water (Prevention & Control of Pollution) Act, 1974and its subsequent extensions. for & on behalf ofPb. Pollution Control BoardEndst. No. __________Dated __________A copy of the above is forwarded to the Environmental Engineer, Punjab Pollution Control Board, RegionalOffice, SAS Nagar for information and necessary action. He is requested to ensure the compliance ofconsent conditions in time bound manner. for & on behalf ofPb. Pollution Control Board

“ This is computer generated document from OCMMS by PPCB ”

Page 8: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain
Page 9: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain
Page 10: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain
Page 11: Ramky enviro engineers ltd,Village: nimbua, po: rampur sainia, teh: …environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2016-03-09 · All other contents shall remain