Portal RATOL & Rates PreMo CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015 Work Item Unit Overall Average (RM) TRAFFIC MANAGEMENT AND CONTROL TRAFFIC MANAGEMENT AND CONTROL TEMPORARY ROAD FURNITURES Supply temporary road furnitures including installation, storage, maintenance, replacement, shifting within the work area and removal upon completion of the works as shown in the drawings and /or as directed by the S.O/P.D*. Temporary guardrail m Location Range (RM) Average (RM) RM 200.00 F 200.00 - 200.00 200.00 TRAFFIC MANAGEMENT AND CONTROL TEMPORARY ROAD FURNITURES Supply temporary road furnitures including installation, storage, maintenance, replacement, shifting within the work area and removal upon completion of the works as shown in the drawings and /or as directed by the S.O/P.D*. Temporary Surfacing Supply, lay and compact 200mm thick crusher run surfacing as temporary as temporary road bypass along the edge of existing road m2 Location Range (RM) Average (RM) RM 15.00 F 15.00 - 15.00 15.00 TRAFFIC MANAGEMENT AND CONTROL TRAFFIC MANAGEMENT AND CONTROL TRAFFIC MANAGEMENT PLAN AND REPORT Road & traffic management plan Removal of temporary road diversion and structures upon completion of project sum Location Range (RM) Average (RM) RM 29517.00 C 29517.00 - 29517.00 29517.00 TRAFFIC MANAGEMENT AND CONTROL TRAFFIC MANAGEMENT AND CONTROL TEMPORARY ROAD FURNITURES Supply temporary road furnitures including installation, storage, maintenance, replacement, shifting within the work area and removal upon completion of the works as shown in the drawings and /or as directed by the S.O/P.D*. Road hump at access including painting (overall length 7m) no Location Range (RM) Average (RM) RM 3000.00 F 3000.00 - 3000.00 3000.00 1 / 9

rates-02032015 (3)

  • Upload
    qoci5ko

  • View
    233

  • Download
    3

Embed Size (px)

DESCRIPTION

jkr

Citation preview

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    Work Item Unit Overall Average (RM)TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Temporary guardrail

    m Location Range (RM) Average (RM) RM 200.00F 200.00 - 200.00 200.00

    TRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Temporary SurfacingSupply, lay and compact 200mm thick crusher runsurfacing as temporary as temporary road bypassalong the edge of existing road

    m2 Location Range (RM) Average (RM) RM 15.00F 15.00 - 15.00 15.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT PLAN AND REPORTRoad & traffic management planRemoval of temporary road diversion and structuresupon completion of project

    sum Location Range (RM) Average (RM) RM 29517.00C 29517.00 - 29517.00 29517.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Road hump at access including painting (overall length7m)

    no Location Range (RM) Average (RM) RM 3000.00F 3000.00 - 3000.00 3000.00

    1 / 9

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    Work Item Unit Overall Average (RM)TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD DIVERSIONPavementAsphaltic concrete binder course 50mm thick.

    m2 Location Range (RM) Average (RM) RM 21.59F 21.59 - 21.59 21.59

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Sand filled Light Weight Movable Barriers withDelineators

    no Location Range (RM) Average (RM) RM 85.00F 85.00 - 85.00 85.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.String Delineators

    m Location Range (RM) Average (RM) RM 1.79C 1.57 - 1.57 1.57F 2.00 - 2.00 2.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Barrier Delineators

    no. Location Range (RM) Average (RM) RM 17.46C 4.92 - 4.92 4.92F 30.00 - 30.00 30.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT TEAM

    mth Location Range (RM) Average (RM) RM 3443.65

    2 / 9

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    Work Item Unit Overall Average (RM)Appointment of traffic management team as follows :Traffic Safety Officer

    C 3443.65 - 3443.65 3443.65

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT TEAMAppointment of traffic management team as follows :Supervisor/Foreman

    mth Location Range (RM) Average (RM) RM 1983.90C 1967.80 - 1967.80 1967.80F 2000.00 - 2000.00 2000.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT TEAMAppointment of traffic management team as follows :Traffic Controller / Flagman

    mth Location Range (RM) Average (RM) RM 991.95C 983.90 - 983.90 983.90F 1000.00 - 1000.00 1000.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Precast Movable Reinforced Concrete Barriers orequivalent

    no. Location Range (RM) Average (RM) RM 196.74C 245.98 - 245.98 245.98F 145.00 - 150.00 147.50

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Light Weight Movable Barriers

    no. Location Range (RM) Average (RM) RM 121.25C 92.49 - 92.49 92.49F 150.00 - 150.00 150.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within the

    no. Location Range (RM) Average (RM) RM 32.85

    3 / 9

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    Work Item Unit Overall Average (RM)work area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Light Weight Movable Traffic Guidance Cones

    C 18.69 - 18.69 18.69F 24.00 - 70.00 47.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Blinkers including batteries

    no. Location Range (RM) Average (RM) RM 56.52C 59.03 - 59.03 59.03F 38.00 - 70.00 54.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Beacon Light including batteries

    no. Location Range (RM) Average (RM) RM 250.39C 380.77 - 380.77 380.77F 120.00 - 120.00 120.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Double Sided Reflective String Delineators

    m Location Range (RM) Average (RM) RM 4.00F 4.00 - 4.00 4.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within the

    no. Location Range (RM) Average (RM) RM 2336.32

    4 / 9

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    Work Item Unit Overall Average (RM)work area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Flashing Arrow

    C 1672.63 - 1672.63 1672.63F 3000.00 - 3000.00 3000.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Sand Bag

    m3 Location Range (RM) Average (RM) RM 50.00F 50.00 - 50.00 50.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD FURNITURESSupply temporary road furnitures including installation,storage, maintenance, replacement, shifting within thework area and removal upon completion of the worksas shown in the drawings and /or as directed by theS.O/P.D*.Temporary Lighting

    no. Location Range (RM) Average (RM) RM 3656.53C 5313.06 - 5313.06 5313.06F 2000.00 - 2000.00 2000.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY GUARDRAILSSupply item including installation, maintenance,replacement and removal upon completion of theworks as shown in the drawings and /or as directed bythe S.O/P.D*.Temporary Guard Rails

    m Location Range (RM) Average (RM) RM 200.00F 200.00 - 200.00 200.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY SIGNSSupply, install in position and maintain all temporarytraffic signs of fluorescent orange prismaticretro-reflective sheeting including all posts, frames,

    no. Location Range (RM) Average (RM) RM 358.41

    5 / 9

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    Work Item Unit Overall Average (RM)brackets and everything complete as shown in thedrawing and/or as directed by the S.O/P.D* includingshifting at the end of each stage and removal at thecompletion of the road works.Not exceeding 1 m2

    C 316.82 - 316.82 316.82F 250.00 - 550.00 400.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY SIGNSSupply, install in position and maintain all temporarytraffic signs of fluorescent orange prismaticretro-reflective sheeting including all posts, frames,brackets and everything complete as shown in thedrawing and/or as directed by the S.O/P.D* includingshifting at the end of each stage and removal at thecompletion of the road works.1 - 2 m2

    no. Location Range (RM) Average (RM) RM 675.00F 350.00 - 1000.00 675.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY SIGNSSupply, install in position and maintain all temporarytraffic signs of fluorescent orange prismaticretro-reflective sheeting including all posts, frames,brackets and everything complete as shown in thedrawing and/or as directed by the S.O/P.D* includingshifting at the end of each stage and removal at thecompletion of the road works.2 - 3 m2

    no. Location Range (RM) Average (RM) RM 1500.00F 1500.00 - 1500.00 1500.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY SIGNSSupply, install in position and maintain all temporarytraffic signs of fluorescent orange prismaticretro-reflective sheeting including all posts, frames,brackets and everything complete as shown in thedrawing and/or as directed by the S.O/P.D* includingshifting at the end of each stage and removal at thecompletion of the road works.

    no. Location Range (RM) Average (RM) RM 2000.00

    6 / 9

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    Work Item Unit Overall Average (RM)3 - 4m2 F 2000.00 - 2000.00 2000.00TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY SIGNSSupply, install in position and maintain all temporarytraffic signs of fluorescent orange prismaticretro-reflective sheeting including all posts, frames,brackets and everything complete as shown in thedrawing and/or as directed by the S.O/P.D* includingshifting at the end of each stage and removal at thecompletion of the road works.More than 4 m2

    no. Location Range (RM) Average (RM) RM 3000.00F 3000.00 - 3000.00 3000.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD DIVERSIONPavementPreparation of formation as specified and as directedby the S.O/P.D* for receiving temporary roadpavement.

    m2 Location Range (RM) Average (RM) RM 0.75F 0.75 - 0.75 0.75

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD DIVERSIONPavementRoadbase material complying with Type I or Type IIgrading limits of Table 4.3 of the specifications,Crushed Aggregate - 300mm

    m2 Location Range (RM) Average (RM) RM 21.04F 21.04 - 21.04 21.04

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTEMPORARY ROAD DIVERSIONPavementBituminous Prime Coat.

    m2 Location Range (RM) Average (RM) RM 1.74F 1.74 - 1.74 1.74

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT PLAN AND REPORTRoad & traffic management plan

    sum Location Range (RM) Average (RM) RM 6794.50

    7 / 9

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    Work Item Unit Overall Average (RM)Allow for the preparation and submission of trafficmanagement plan and method statement for approvalupon request by the S.O/P.D*.

    C 9839.00 - 9839.00 9839.00F 3750.00 - 3750.00 3750.00

    TRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT AND CONTROLTRAFFIC MANAGEMENT PLAN AND REPORTRoad & traffic management planSubmission 6 sets of Traffic Management SafetyReport once in every 3 months.

    sum Location Range (RM) Average (RM) RM 4919.00C 4919.00 - 4919.00 4919.00

    8 / 9

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

    NotaSekiranya anda mempunyai sebarang pertanyaan, sila hubungi: Ketua Penolong Pengarah KananBahagian Perolehan dan Khidmat KosCawangan Kontrak dan Ukur BahanIbu Pejabat JKR MalaysiaTingkat 19, Menara Tun Ismail Mohamed AliNo 25, Jalan Raja Laut50582 Kuala Lumpur

    u.p: En Husnan HusinTel: 03-26161111Email: [email protected]

    Catatan