Community Advisory Group • Barrier Update • Haul Road Construction
Raymark Industries, Inc. Superfund Site Stratford, CT Jim DiLorenzo, EPA February 26, 2020
Barrier Update
2
3
Ba
rriers
1 2
3
Barriers 1 and 3
4
Durisol® is the proprietary name of
a durable, lightweight and
cementitous
composition. It is made of
chemically neutralized and
mineralized organic
softwood shavings which are
specially processed to an
acoustically engineered size and
are bonded together under
pressure with Portland cement.
The material is sound-absorbent,
noncombustible, vermin and rot
proof.
Durisol® is self-draining and highly
resistant to weather exposure
including: freeze-thaw, road de-
icing chemicals and fungicides.
5
Model UNC-XT-1
TAN
Outdoor Sound Curtain
UNC-XT-1 offers the benefits of both a noise barrier and
a sound absorber composite in one product. This UNC
product consists of an exterior grade, UV resistant heavy
duty faced quilted fiberglass absorber bonded to a one
pound per sq. ft. reinforced loaded vinyl barrier. The
heavy duty facing is a 10 oz. per sq. yd. vinyl coated
polyester (VCP) quilted to the sound absorber rather than
the standard 4 oz. facing.
• STC 29 Rating, NRC .65
Barrier 2
6
7
Caissons
Wind Load
Depth
8
9
Barrier #1 Entrance at Longbrook Ave
10
11
Behind 44 Cottage Pl.
12
Behind 54 Cottage Pl.
• Instantel Blastmate III
• Placed approximately 80
feet from active work area
• Trigger to stop work is 0.50
in/sec
• Measures at 0.20 in/sec or
greater
• All readings to date below
0.20 in/sec
13
14
15
Drainage Between
Barriers #1 and #2
16
Haul Road Update
17
Ha
ul R
oa
d
Mulch Relocation
18
• "clean" mulch/wood waste = 4,500 CY
• Soil/mulch interface to be segregated = 1,000 CY
19
20
21
Excavation and Consolidation Schedule Update
• November – Resumed home inspections
• December 2 – Tantara re-mobilized to the Site
• Dec 2019 to March 2020 – Construct Barrier #1
• March to August 2020 – Construct Barriers #2 and #3
• April to August 2020 – Construct Haul Road
• June to September 2020 – Install plantings along barriers
• Summer 2020 - Excavate from four OU6 properties 1. Wooster Park
2. 380 E. Main Street
3. 200 Ferry Boulevard
4. Vacant Lots behind 326 Ferry Blvd
• 2020/2021/2022 – OU3/OU6 digging
• 2022/2023 – Consolidation and Landfill Cap Complete 22
23
24
25
OU4 Parking Lot (across from DPW)
26
DPW
OU4
Ballfiled
Contract Plating
Existing Aerial Image
27
Conceptual Land Use Plan
Former
OU4
Ballfiled DPW
Former Contract Plating Site
28
Stormwater System
Upgrades
DPW Ashcroft
OU4 Ball Field
• Vita Nuova 2015 Conceptual Land Use
Study for reuse of Contract Plating and
OU4 Ball Field
• Conceptual Land Use Plan incorporated
into 2016 ROD.
• Stormwater and OU4 design to support
reuse of consolidation area.
• Haul road relocated to abut railroad and
provide 4 ft cap over impacted soil.
• OU4 redevelopment limited by
consolidation area grading and
stormwater management
• Potential OU4 building for use by DPW
to store equipment.
29
2015 Conceptual Land Use Plan
OU4 Ball Field
• 2016 ROD restricts height and grade of
consolidation area cover.
• Basis of Design prepared to determine
final surface conditions.
• Town to verify proposed building design
and foundation loading.
• Design retains outside vegetative
border and barrier wall along OU4
property line.
• Restricted access via Frog Pond Lane
and Longbrook Ave.
• OU4 geotechnical borings to bedrock
completed Jan 2020; foundation design
ongoing.
30
OU4 Conceptual Design and Building
Footprint
Pre-Construction Sampling
• April-June 2020 Seed and OU3/OU6 Properties
• Define horizontal boundary of soil removal; 30-foot
spacing of samples (using historic data)
• Expedite soil removal and restoration
• Define final volume of soil consolidation at ballfield for
construction.
• 3 Properties require no sampling
• 16 Properties require limited sampling (avg of 6 per
site)
• 6 Properties require more extensive sampling:
– OU3 Upper Ferry Creek top of bank (I-95 to East
Broadway)
– Beacon Point and Lockwood Ave (tidal marsh)
– 250 East Main Street (Ashcroft Mfg – rear)
– Wooster Park
– Third Avenue (residential property - horizontal and
vertical per ROD)
31
Property Rights of Entry
• Rights of Entry for Pre-Construction Sampling.
– Using existing Rights of Entry for investigation.
– 15 additional Rights of Entry required for limits of
waste extending on to abutting properties.
• Rights of Entry for Seed Project remediation.
– Required for 190/200 Ferry Blvd, Vacant Lot
behind 326 Ferry Blvd and 380 East Main St;
Wooster Park completed.
• Rights of Entry for OU3 and OU6 remediation
– Meeting with property owners individually to
review plans and any concerns (e.g., schedule,
restoration, etc.) to be addressed prior to
remediation.
• Will work with Town to coordinate meetings with
neighborhood groups prior to construction.
32