Raymond School District

Raymond School Facility Assessment Executive Summary

September 16, 2013

Eppstein Uhen ArchitectsEric Dufek, Senior Design ArchitectTeresa Wadzinski, Project Manager

Page 2: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

EVALUATE

EXPLORE

COLLECTDATA

REVIEWDATA

SETGOALS

BUILDCONSENSUS

DEVELOPALTERNATIVESOLUTIONS

COMPARATIVEANALYSESOF VIABLE

ALTERNATIVES

SELECTPREFERRED

ALTERNATIVE

FINALIZEDESIGN

Raymond School

PROCESS

ENVISION

EXECUTE

Page 3: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

EVALUATE

EXPLORE

COLLECTDATA

REVIEWDATA

SETGOALS

BUILDCONSENSUS

DEVELOPALTERNATIVESOLUTIONS

COMPARATIVEANALYSESOF VIABLE

ALTERNATIVES

SELECTPREFERRED

ALTERNATIVE

FINALIZEDESIGN

Raymond School

FACILITY ASSESSMENT

ENVISION

EXECUTE

Page 4: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Agenda• Why a facility

assessment?• Observations• Next steps

Raymond School Campus – June 2013

Page 5: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Why a Facility Assessment?• Objective analysis of present condition

and capabilities of Raymond School• Comprehensive report detailing needs:

• Building envelope (roof, walls, windows, doors, exterior)

• Infrastructure systems (mechanical, electrical, plumbing)

• American Disabilities Act (ADA)• Site• Building Utilization• Space Analysis• Educational Adequacy

Page 6: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Raymond School Key Observations• Site Size

• Existing size: 14 acres• Recommended size: 22

acres • Building Capacity

• Current enrollment: 442 students

• Max enrollment based on total building square footage: 387 students

• Max enrollment based on classroom square footage only: 486 students

• Lack of middle school appropriate learning spaces such as Family and Consumer Education (FACE) and Technical Education

• Two Portable Classroom Units in use

Page 7: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

North

Raymond School Historical Plan

Portable classroom units

Page 8: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Raymond School ObservationsArchitectural

• Site• Portable classroom units were

installed as a temporary solution in 2003.

• Building Exterior• Windows are single pane, with

deteriorating caulk.• Large number of front

windows were boarded up around 1986.

• Small areas of brick deterioration.

• Exterior wall construction from the 1960’s lacks insulation

• Portions of roof “ponding” creating potential for water damage

• Hollow metal doors are rusted and not weather-tight.

Page 9: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Raymond School ObservationsArchitectural

• Building Interiors• Lack of daylight in core learning

spaces• Inadequate Band and Library

classroom spaces (located in portable classrooms)

• Lack of “life skills” space for Special Education students

• Lack of age-appropriate science labs for middle school students

• Lack of middle school spaces such as FACE or Tech Ed

Library in dark, narrow portable classroom

Inadequate science classroom/lab

Small guidance conference room

Page 10: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Raymond School ObservationsArchitectural

• Building Interior• Lack of appropriate safety

clearances in gymnasium for competition play

• Inflexible furniture and equipment throughout building

• Damaged roof panels in gymnasium

• Non-secured entrance• Lack building security during

evening and community events

Undersized gym

Inflexible computer labMain entrance

Page 11: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Representative Secure Entry – with highly visible sight lines and controlled access

Page 12: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Representative Secure Entry – Floor Plan

Page 13: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Mechanical (heating, ventilation, air conditioning)

• Mechanical system upgrades in 2004• Original hot water piping – 1961, 1963,

1966

Electrical• Original electrical service - 1961• Upgraded classroom receptacles, circuits

and data wiring – late 1990’s via TEACH wiring project

• Fire alarm upgraded in 2011• Security cameras were installed in 2013• Interior lighting was recently replaced• Emergency generator was recently

added

Raymond School Observations

Original hot water heater

Original electrical panel

Page 15: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Lifespan of Building Components

Temporary portable classroom unit from 2003

Exterior windows

Page 16: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Lifespan of Building Components

Typical classroom

Science classroom

Page 17: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Lifespan of Building Components

Packaged rooftop unit

Classroom unit ventilator

Page 18: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Lifespan of Building Components

Emergency generator

Locker room plumbing fixture

Page 19: Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect

Next Steps

• Assess Findings; Identify Priorities• Host School Tour & Community Workshop

• October 1, 2013 at 6 PM (tour) and 6:30 PM (workshop)

• Distribute Community Survey • Early November 2013

Complete report available @ www.raymond.k12.wi.us/facilityplan