13
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction Status of Cryostat 3.R&D Studies of Cryostat Components 4.Summary

R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction

Embed Size (px)

Citation preview

R&D Status and Plan on The Cryostat

N. Ohuchi, K. Tsuchiya, A. Terashima,

H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano

1. STF-Cryostat Design2. Construction Status of Cryostat3. R&D Studies of Cryostat Components4. Summary

• Gaining the experience of the long cryostat for the S.C. cavity.

• R&D of the high performance and the low cost ILC cryostat.

• Cooling two types of the cavities of 35 MV/m and 45 MV/m down to 2 K in STF, and measuring the thermal characteristics.

• Starting point of the STF cryostat design: TESLA TYPE III Cryomodule

• R&D and study items for the STF cryostat– Understanding the TESLA design from the thermal and mechanical points of view.

• Temperature profile and heat load of the components, and construction errors.

– R&D component• SUS-Ti joint between the helium vessel and cryogenic lines.

– Magnetic shield• Measurement of the remnant field in the shield and the magnetic characteristics of the shield

material.

– Survey of the low cost quadrupole magnet system (conduction cooling)

Target of the cryostat R&D in KEK

Strategy of the cryostat R&D

STF-Cryostat Design (1)

Two cryomodules are connected with bellow tubes.– Four cavities designed for 35 MV/m and 45 MV/m are assembled in the

individual cryostat.

– The total length of two cryostats is 13.2 m. • The vacuum vessel of the TESLA TYPE III cryomodule has the length of 11.4 m

including one quadrupole.

STF-Cryostat Design (2)

Design Overview of STF Cryostat

• The design of the cold mass are same as the TESLA TYPE III cryomodule.– Cold mass : support post, gas return pipe, thermal radiation shields (5 K, 80 K), cooling channels– The diameter of the vacuum vessel is 965.2 mm, same as the TESLA cryomodule.

• The helium vessels, frequency tuners and input couplers between the cavities of 35 MV/m and 45 MV/m have different configurations.

STF-Cryostat Design (3)

Cross sections of STF Cryostat

80 K Thermal Radiation Shield

5 K Thermal Radiation Shield

Alignment Target

Gas Return Pipe (GRP)

Input Coupler

35MV/m Cavity 45MV/m Cavity

STF-Cryostat Design (4)

Cooling scheme and heat loads

Cryostat

Static

35MV/m

Static

35MV/m

Dynamic

45MV/m

Static

45MV/m

Dynamic

Total

S+D

2K 0.3 0.8 5.0 0.0 6.0 12.1

5K 3.6 6.0 0.8 2.2 11.5 24.1

80K 120 20.0 8.0 5.0 8.6 161.6

STF-Phase-1 Cryogenic system : 20 W @ 2K (Cold box : 600 W @ 4.4 K)

Calculated Heat Load for STF-Cryomodule (W)

Heat loads via signal wires are not included.

STF-Cryostat Design (5)

Calculated pressure distribution

Calculation model

Qc: 10/8 W or 30/8 Wm: evaporated helium gas

1.900

2.000

2.100

2.200

2.300

2.400

2.500

0 2 4 6 8 10 12 14

Temp. profile STF

Temp. profile for 10 W/one moduleTemp. profile for 30 W/one module

Temperature, K

Position

3.125

3.130

3.135

3.140

3.145

3.150

0 2 4 6 8 10 12 14

Pres. profile STF

Pres. profile for 10 W/one modulePres. profile for 30 W/one module

Pressure, kPa

Position

• Pressure drop along the system = 2.27 Pa for 10 W, 17.59 Pa for 30W• Temperature at each cavity = 2.000 K for 10/8 W, 2.002 K for 30/8 W

• Gas return pipes (GRP) are connected with the support posts which have the alignment targets.

• The helium vessels for cavities are supported from the GRPs.• The surfaces for the connection are processed by a milling machine with the target precision

of 0.05 mm.

Construction of STF-Cryostat (1)

Gas Return Pipe

Cryostat Connection Bellows

• Thermal radiation shield : aluminum, vacuum vessel : carbon steel (used for magnetic shield)• These components have been delivered from the company (Hitachi) on 24th March.

Construction of STF-Cryostat (2)

Vacuum vessel for 45 MV/m cavities Thermal radiation shield

• The four support posts for the STF-cryomodules have been delivered from INFN Milano on March 3 under the research collaboration between INFN and KEK.

• The support post on the inlet side is fixed to the vacuum vessel, and the other one has a sliding function.

– The position change of the sliding support post by thermal contraction is calculated to be 8.4 mm.

• The cavity helium vessels are hold with sliding supports from the Gas Return Pipes.– The axial positions of the helium vessels are decided by the invar rods.

Construction of STF-Cryostat (3)Fixed FixedSlide:8.4mm Slide:8.4mm

Fixed Slide:1.4mmFixed Slide:1.4mm

Invar rod

Support post Sliding cavity support

• Material of helium vessel for the 35 MV/m cavity and the TESLA cavity : Ti– The SUS-Ti junction is being studied for the connection between the cooling channel pipes (SUS) and the

helium vessels (Ti).

• Samples of two types (Hot Isostatic Pressure, Friction Pressure Welding) have been manufactured. Mechanical strength tests have been completed.

– For both methods, the mechanical strength at the junction was almost same as Ti at room temperature.

• Helium leak test at 2 K (super-leak) will be performed next week.

R&D Studies of Cryostat Components (1)

SUS-Ti junction by HIP

SUS Ti

SUS-Ti junction (35 MV/m cavity helium vessel)

SUS-pipe

Ti helium vessel

The heat losses of the components in the cryomodule will be estimated by the temperature profile and the FEM calculation.

– Temperature sensors 2K~ 5K (input coupler, helium vessel etc) : Cernox temperature sensor (54 points) 4K ~ 300 K (support post, thermal radiation shield etc) : PtCo temperature sensor

(44 points) > 80K : Copper-Constantan thermo-couple temperature sensor (58 points)

The heat loss of the system at the 2 K region will be measured by the attainable saturated pressure value of the He-II with the pump system.

R&D Studies of Cryostat Components (2)

Heat Loss Measurement

From the test results of the TESLA cryomodule, the 1st thermal cycle induced the position change of GRP with respect to the original position.

Measurement of cavity position during cool-down and warm-up : WPM sensors Helium vessel : 2 sensors in axial direction

16 sensors for cavity helium vessels GRP : 5 sensors for one cryostat

10 sensors for GRPs

R&D Studies of Cryostat Components (3)

Wire Position Monitor

GRP

CavityHeliumVessel

• The cryomodule design for the STF phase-1 is based on the TESLA type III cryomodule.

Calculated heat loss of the cryostat at 2 K : 12.1 W Cooling power of cryogenic system at 2 K : 20 W

• Manufacturing the cryostat components have been completed, and they have been delivered from the company.

The four support post were delivered from INFN under the research collaboration between INFN and KEK.

The assembly of these components and the cavities will start in this summer.

• R&D studies of the cryostat components; SUS-Ti junction

The junctions have been manufactured by two methods (HIP, friction pressure welding). The helium leak test at 2 K will start next week.

WPM The performance test will start in April.

Summary