Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 1
Reactors & Services
Plants Safety and Profitability : Focus on the
Installed Base Solutions
Claude Jaouen
Senior Executive Vice-President, Reactor & Services Business Group
AREVA
Atoms for the Future
25th October 2012
Paris
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 2
Introduction The paradigm
Focus on the Installed Base Activities & Market
Safety of NPPs operation and
development Profitability for NPPs operators
IB Safety Alliance
Nuclear Fleet Optimization
Long Time Operation
New Builds
Development of Gen III
reactors
Gen III Competitiveness
Lessons Learned
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 3
Contents ►Nuclear Scenario
►Worldwide Installed Base Business Market Outlook
►AREVA Installed Base Business Unit Activities
Safety Alliance Program
Investment & Profitability for customer NPPs operation
Nuclear Fleet Optimization
Long Term Operation
►Conclusion
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 4
Contents
►Nuclear Scenario
►Worldwide Installed Base Business Market Outlook
►AREVA Installed Base Business Unit Activities
Safety Alliance Program
Investment & Profitability for customer NPPs operation
Nuclear Fleet Optimization
Long Term Operation
►Conclusion
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 5
Nuclear Scenario: installed capacity growth will be delayed
0
150
300
450
600
350
500
650
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
2030 New builds Life
extensions
Plants shut
down
2010
583
378
Growth in installed capacity:
+2.2% per year on average until 2030
304
159
AREVA
2010
scenario (262) 190 393 659
AREVA
2010 scenario
AREVA
2011 scenario
Reassessed as of end June 2011
New builds
projects are
postponed
(258)
Incl. 60%
in Asia
AREVA 2011 scenario (GWe) Change in global installed base (GWe)
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 6
Contents
►Nuclear Scenario
►Worldwide Installed Base Business Market Outlook
►AREVA Installed Base Business Unit Activities
Safety Alliance Program
Investment & Profitability for customer NPPs operation
Nuclear Fleet Optimization
Long Term Operation
►Conclusion
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 7
From €5.5bn to €6.3bn in 2020 (+14%)
mainly driven by life extensions
Modernization of I&C and
electrical systems
Specialized maintenance
Component Repairs
China South
Africa
South
Korea
Russia
Non Domestic Markets
Plant Life Extensions, post-
Fukushima safety Upgrades,
Performance Improvements
Life Extensions including Upgrades
and Component Repairs,
Completions
Nuclear Phase-Out
Emerging D&D opportunity
France
USA
Germany
Domestic Markets
Worldwide Installed Base Market Growth
5.5
(€ Bn) 6.3
Source : AREVA
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 8
Contents
►Nuclear Scenario
►Worldwide Installed Base Business Market Outlook
►AREVA Installed Base Business Unit Activities
Safety Alliance Program
Investment & Profitability for customer NPPs operation
Nuclear Fleet Optimization
Long Term Operation
►Conclusion
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 9
Installed Base BU Footprint
Servicing 250+ all designs reactors worldwide
Sales: ~ €1,600m (+1% vs. 2010)
(by country of destination)
• France ~ 25%
• USA ~ 25%
• Germany ~ 15%
• China ~ 5%
• ROW ~ 30%
6,573 professionals in 9 countries
& more than 20 sites • France ~ 35%
• Americas ~ 25%
• Europe (excluding France) ~ 35%
A large and various project portfolio
• About 6,000 projects
• From €50k up to €800m
AREVA Installed Base BU Activities: ID Card
2011 Key figures
South
Africa
Canada
USA
Brazil
China
Germany France
Sweden
Spain
Major customers (by country of destination)
• France: EDF, CEA
• USA: TVA, Duke, Constellation, Exelon,
Progress, Dominion, Entergy
• Germany: E-ON, RWE, EnBW, VENE
• China: CGNPC, CNNC
• ROW: Eskom, Electrabel, Vattenfall, ETN, OPG
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 10
AREVA Installed Base Scope of Work
► Delivering services, solutions and products for maintenance, modernization and long time operation for the installed base nuclear fleet
► Providing engineering, procurement and construction services for reactors completion
► Assisting in construction & commissioning of new builds
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 11
Contents
►Nuclear Scenario
►Worldwide Installed Base Business Market Outlook
►AREVA Installed Base Business Unit Activities
Safety Alliance Program
Investment & Profitability for customer NPPs operation
Nuclear Fleet Optimization
Long Term Operation
►Conclusion
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 12
Help utilities meet the anticipated increased plants safety requirements
AREVA Safety Alliance Program
3 SAFETY SHIELDS
3 Release
Prevention
2 Robustness
of the Cooling
Function
1 Safety Margin Reassessment
4 Robustness
of Moni toring
and Control
5 Safety Procedures
and Emergency
Support
6 Safe Used Fuel
Management
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 13
►Qualified filtering and venting system
for reduced containment pressure
►Benefits:
Prevent from excessive containment
pressure and contribute to containment
integrity
Provide excellent purification levels of
gas discharges
►References: more than 50
applications in nuclear power plants
worldwide
Containment Filtering & Venting
System
AREVA Safety Alliance catalogue
Examples of IB solutions
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 14
►Reduce the risk of hydrogen
explosion in the containment in case
of a severe accident
► Benefits :
Maintain containment integrity
High hydrogen depletion and flow rate /
unit
High resistance to possible poisoning of
catalyst products
►References: 100 NPPs equipped with
PAR in 17 countries
Passive Autocatalytic Recombiners
AREVA Safety Alliance catalogue
Examples of IB solutions
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 15
Contents
►Nuclear Scenario
►Worldwide Installed Base Business Market Outlook
►AREVA Installed Base Business Unit Activities
Safety Alliance Program
Investment & Profitability for customer NPPs operation
Nuclear Fleet Optimization
Long Term Operation
►Conclusion
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 16
Nuclear Fleet Optimization AREVA Services, Solutions and Products
a comprehensive portfolio (1/2)
Outage Services
Maintenance and Refueling Services, Pumps & Motors
Services, Chemistry & Decontamination, Diagnostic &
Monitoring…
(IB Teams are involved in more than 110 Outages every year worlwide)
Non Destructive Examinations Solutions Inspection services and products for nuclear & industrial
markets
Leader in Non-Destructive Examination (NDE) for PWR, BWR
and VVER.
NDE Technical Center for base R&D serving all AREVA units.
Plant Studies Basic Engineering activities, Licensing & Safety related
studies…
RECURRING BUSINESSES
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 17
Plant Upgrades Power Uprates, Long Term Operation, Completion Projects
and Modernizations
I&C and Electrical Systems Modernization Safety and Reactor I&C Systems (TELEPERM® XS), Non-Safety
I&C, Electrical Systems (Power Supply & Distribution, Variable
Frequency Drives…), I&C/ES Engineering Services
Component Repair & Replacement Repair and replacement of primary circuit components
(steam generators, pressurizers, reactor vessel heads)
and all parts of the Nuclear Steam Supply System (NSSS)
PROJECT-RELATED BUSINESSES
Nuclear Fleet Optimization AREVA Services, Solutions and Products
a comprehensive portfolio (2/2)
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 18
Worldwide Plant Optimization Programs AREVA Scope in 2011
Ulchin 1&2: Steam
Generators
Replacement
►Oskarshamn 2: Modernization and power uprate
►Ringhals 4: Component repair and power uprate
Kola 3&4: I&C
modernization
Mochovce 3&4: I&C
implementation
►Ling Ao 2: I&C modernization (DCS)
China
South Korea
Slovakia
Sweden Russia
Full Service Offer
project Sizewell
Kozloduy 5&6: I&C
modernization and
electrical systems
modernization
Bulgaria
►Goesgen: I&C modernization
Switzerland
►Tianwan 3&4: Modernization of I&C and modernization of Emergency Diesel Generator systems
Great Britain
►Leibstadt: Modernization of I&C and reactor circulation system
►Bellefonte completion
►Oconee: Lifetime extension and I&C modernization
►Sequoyah 2: Steam Generator replacement
USA
►EDF Engineering Services Agreement
►900 MWe 10-year outage
►EDF 1300 MWe fleet I&C modernization
►Fessenheim: Steam Generator replacement
France
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 19
► Customer: Tennessee Valley Authority (TVA)
► Contract amount: up to €800m
► Delivery date: Mid 2020
► Reactor design: Babcock and Wilcox Pressurized Water Reactor (PWR)
► NSSS Design, analysis, licensing
► Components replacement supply and installation
► Design, supply and installation of TELEPERM XS® digital I&C
► Fuel design
Nuclear Power Plant Completion
Bellefonte (USA)
Resumption of one of the biggest completion project since 30 years
Project scope of work
Project description
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 20
► Customer: Duke Energy
► Delivery date: 2014
► Reactors design: Babcock and Wilcox Pressurized Water Reactor (PWR)
First Safety related Digital I&C System licensed by NRC and installed in the US
AREVA awarded “Engineering Project of the Year” by Platts
► Design, manufacturing, installation, test & commissioning of TELEPERM® XS digital safety related I&C System:
►Successful implementation for Unit 1
►On going for Unit 2&3
Long Time Operation / Modernization of I&C Oconee 1 (USA)
Project Description
Project Scope of work
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 21
► Customer: Vattenfall / E-ON
► Delivery date: Q4 2011
► Unit 4 Reactor design: Westinghouse Pressurized Water Reactor (PWR)
► Engineering studies for power up-rate: +18%
► Design, supply, installation and commissioning of steam generators, pressurizer and supply of associated equipment
Components Repair & Power Uprate Ringhals 4 (Sweden)
Highest Power Up-Rate completed for Pressurized Water Reactor
Project Description
Project Scope of work
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 22
► Customer: CNP
► Delivery date: Between 2013 and 2018
► 12 reactors: Fangjiashan 1-2, Fuging 1-4, Yangjang 1-6
► Reactors design: CPR1000 design based on French 900MWe PWR by FRAMATOME
Modernization of emergency diesel generators (EDG) in several Chinese nuclear power plants
Supply of a large fleet of EDGs in China meeting new post-Fukushima
requirements
► Engineering, Qualification, Manufacturing, Testing, Supply and Transport of 27 Emergency Diesel Generators (EDG) - 2 per Unit + 3 spares
►Main Equipment
►Spare Parts & Special Tools & Consumables
► Supervision for Installation & Commissioning
► Training
Project Description
Project Scope of work
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 23
► Customer: EDF
► Delivery date: 2020
► Reactor design: FRAMATOME Pressurized Water Reactor (PWR)
Modernization program implemented on EDF 900 MWe fleet (34 units):
► 11 NSSS Safety related and operational modifications with focus on I&C (Reactor Protection System upgrade) and mechanical equipment (i.e. safety valve replacement)
► Safety and design studies, installation studies, procurement, on-site work and requalification tests
Modernization program 900MWe 3rd ten-year outage (France)
Fleet modernization program to improve Safety and Operational
Performance
Project Description
Project Scope of work
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 24
Contents
►Nuclear Scenario
►Worldwide Installed Base Business Market Outlook
►AREVA Installed Base Business Unit Activities
Safety Alliance Program
Investment & Profitability for customer NPPs operation
Nuclear Fleet Optimization
Long Term Operation
►Conclusion
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 25
• France (CETIC): 4000m2
dedicated resources, for
maintenance preparation and
qualification and training
• Germany: Test facility for
components and systems of
the new BWR KERENATM
• State-of-the-art training
facilities which includes over
7600m2 in Europe and the
U.S.
Training and Qualification Centers
• Technical Center in Europe and
the U.S. with scientific engineers
and technicians for the develop-
ment of basic technology
(welding, chemistry services, …)
• France (NETEC): Global Center
for NDE technologies
• US: 8000ft2 Global Chemistry
and Material Center, $ 6.5M
investment
Global and Regional
Technical Centers
Investing to maintain technology leadership and to answer new
customer needs.
Long Term Operation The Installed Base BU Innovation Centers,
Training & Qualification Centers and Hot Workshops
Hot Workshops
• Over 11 000m2 of hot
workshops in Europe
(Somanu) and the U.S.
(Pump and Motor Services)
• Capacities for
• Shipment & Storage
• Maintenance & Repairs
• Decontamination &
Dismantling
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 26
Contents
►Nuclear Scenario
►Worldwide Installed Base Business Market Outlook
►AREVA Installed Base Business Unit Activities
Safety Alliance Program
Investment & Profitability for customer NPPs operation
Nuclear Fleet Optimization
Long Term Operation
►Conclusion
Atoms for the Future 2012 – Paris – Thursday, October 25th, 2012 27
Conclusion
►The Existing Fleet challenges
Availability and Performance increasing – Long Term Operation – Upgrading
►The New Builds challenges
OL3 - FA3 - Taishan : “integrated projects” for more safety, competitiveness
and profitability