Real-Time Operation Tools Using PMU Data Dr. Pengwei Du On behalf of Jeff Dagle, PE Chief Electrical Engineer Advanced Power & Energy Systems Group Pacific Northwest National Laboratory (509) 375-3629 [email protected] Nov. 16, 2012 ERCOT Phasor Technology Workshop November 16, 2012

Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Real-Time Operation Tools

Using PMU Data

Dr. Pengwei Du

On behalf of

Jeff Dagle, PE

Chief Electrical Engineer

Advanced Power & Energy Systems Group

Pacific Northwest National Laboratory

(509) 375-3629

[email protected]

Nov. 16, 2012

ERCOT Phasor Technology Workshop

November 16, 2012

Page 2: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Pacific Northwest National Laboratory:

Battelle-managed and mission-driven

DOE Office of Science Laboratory

Operated by Battelle since 1965

Outstanding science, impactful solutions

Nearly 5,000 employees

2

Our vision

PNNL will be recognized

worldwide and valued

nationally and regionally

for our leadership in

science and for rapidly

translating discoveries

into solutions for

challenges in energy,

the environment, and

national security.

Page 3: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Examples of phasor-based advanced

analytics projects at PNNL

Mode Meter and Spectral Analysis

Real-Time Wide-Area Monitoring Tool Based on Characteristic Ellipsoid Method (CELL)

Modal Analysis for Grid Operations (MANGO)

Typical Patterns, Atypical Events, and Uncertainty in Complex Systems

Funding acknowledgement U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, Consortium for Electric Reliability Technology Solutions (CERTS)

California Energy Commission

3

Page 4: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

4

Mode Meter and Spectral Analysis

Dr. Ning Zhou (PI) Pacific Northwest National Laboratory

Page 5: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Measurements vs Model Simulation

5

[1] Kosterev, D. N., C. W. Taylor,

and W. A. Mittelstadt, “Model

Validation for the August 10,

1996 WSCC System Outage,”

IEEE Transactions on Power

Systems, vol. 14, no. 3, pp. 967-

979, August 1999.

Initial Results from

the Comprehensive

Simulation Model

using Component-

based Modeling

Method

4000

4200

4400

4600

0 10 20 30 40 50 60 70 80 90

4000

4200

4400

4600

Time in Seconds

Simulated COI Power (initial WSCC base case)

Observed COI Power (Dittmer Control Center)

4000

4200

4400

4600

0 10 20 30 40 50 60 70 80 90

4000

4200

4400

4600

4000

4200

4400

4600

0 10 20 30 40 50 60 70 80 90

4000

4200

4400

4600

Time in Seconds

Model

Reality

4000

4200

4400

4600

0 10 20 30 40 50 60 70 80 90

4000

4200

4400

4600

4000

4200

4400

4600

0 10 20 30 40 50 60 70 80 90

4000

4200

4400

4600

Time in Seconds

Simulated COI Power (initial WSCC base case)

Observed COI Power (Dittmer Control Center)

4000

4200

4400

4600

0 10 20 30 40 50 60 70 80 90

4000

4200

4400

4600

4000

4200

4400

4600

0 10 20 30 40 50 60 70 80 90

4000

4200

4400

4600

Time in Seconds

Model

Reality

Po

wer

Tra

nsf

er

No

rth

-So

uth

Page 6: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Oscillations in Power Grid

6

[bitmap version

1100

1200

1300

1400

1500 15:42:03

15:48:51

15:47:36

Power (MW)

August 10, 1996 Western Power System Breakup

California-Oregon Intertie

Tim

e D

om

ain

~ -3.1%

< ~3.5%

Damping

~ 8.4%

Early Warning

~6 minutes

Fre

q D

om

ain

Page 7: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Mode Meter

Problem statement:

Unstable oscillations occur in power

system and may cause system

breakup and power outage(e.g.

western system break on Aug 10,

1996.)

Mode meter:

Approach: to detect unstable

oscillations in a power system

using measurement data.

Impact: increases asset utilization by

improving confidence in oscillation

detection and enables proactive

actions to prevent system breakup

and power outage.

7

In an event playback, PNNL mode meter prototype tool can detect

the low damping oscillations 6 minutes before the breakup of WECC

on Aug 10th, 1996.

Page 8: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Spectral Analysis

8

Spectral history of bus frequency for August 14 2003

North East Blackout. 12:00-16:10 EDT

"Performance of 'WAMS East' in Providing Dynamic Information for the North East Blackout of August 14,

2003", J. F. Hauer, Navin Bhatt, Kirit Shah, and Sharma Kolluri. Invited paper for IEEE/PES Panel on Major Grid

Blackouts of 2003 in North America and Europe, IEEE PES General Meeting, Denver, CO, June 6-12, 2004.

Page 9: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

9

Real-Time Wide-Area Monitoring Tool Based

on Characteristic Ellipsoid Method (CELL)

Dr. Yuri Makarov (PI), Dr. Ruisheng Diao Pacific Northwest National Laboratory

Page 10: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

10

Project Objectives and Quick Overview

Objective:

Develop a relatively simple, easy-to-implement and easy-to-use tool to monitor, predict the dynamic behavior of power systems for wide-area situational awareness, prediction and decision making support for operators

Specific Objectives:

Monitor dynamic behaviors of power systems

Identify system disturbances

Provide wide-area situation awareness far beyond a single control area

Supply predictive and actionable information (in progress)

Demonstration and Testing:

Tested on WECC (Western Electricity Coordinating Council) model

Page 11: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

11

CELL: Minimum Volume Inclusive

Ellipsoid

System trajectory Simple quadratic algebraic equation

An optimization procedure minimizes the volume of CELL

CELL encloses all recent points of system trajectory

Key characteristics of CELL:

♦ volume ♦ derivative of the volume

♦ eccentricity ♦ characteristic sizes

♦ orientation of axes ♦ projection of axes

11 1 2

22 2 22 1 2

1 1 2 2

1 2

( , ,..., )

( , ,..., )...

...

( , ,..., )

n

n

n n

nn n

dxF x x x

dt

dxF x x x

a y a y a y cdt

dxF x x x

dt

Physically meaningful system Information:

♦ disturbances (type, location, size, etc)

♦ damping

♦ coherency of oscillations

Page 12: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Case Study: Full WECC Model

12

Overview of the full WECC operational model: 16,031 buses 3,993 transmission lines 3,216 generators 6,330 transformers

Operating conditions: 2009 heavy summer base case 25 operating conditions

Simulated five types of events at various locations: Generator trips: 112 machines Line trips: 117 transmission lines Three-phase faults: 111 bus locations Load loss: 34 loads Shunt switching: 23 locations Over 19,000 simulations

Selected only 12 PMUs across WECC to identify types and locations of various events

Performance (Success rate, %): Generator trip locations (13 zones): 97.86% Load loss locations (3 zones): 98.24% Line trip locations (9 zones): 95.21% Fault locations (9 zones): 99.01% Event types (5 types): 97.48%;

Page 13: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

13

Modal Analysis for Grid Operations (MANGO)

Dr. Henry Huang (PI), Dr. Ning Zhou (CO-PI) Pacific Northwest National Laboratory

Page 14: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

14

MANGO

Power Grid

Real-Time Phasor and

SCADA Measurements

Mode Meter

Mode Shape

Estimation

MANGO

Pa

ram

ete

r

Se

lecto

r

Operation

Procedures

Stage 1:

Manual

(Operator-in-the-loop)

Stage 2:

Automatic

(beyond scope)

Generation re-dispatch

Load shedding

Capacitor switching

……

Modes and Mode Shapes

Key

Operation

Parameters

Power Flow and

Dynamic Models

Mode Estimation

MANGO Model

Feasibility

Test

Recommended Actions

Operation Parameters

Mo

de

s

Target Modes

(damping)

Page 15: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Relative Modal Sensitivity Estimate on

WECC model

15

M a j o r i n t e r a c t i o n p a t h

" I n d e x " g e n e r a t o r

S U N D A N C E

K E M A N O

M I C A

C O L S T R I P

P A L O

V E R D E

H O O V E R

G R A N D C O U L E E

M E A D F O U R C O R N E R S

S H A S T A

C A N A D A

M E X I C O

G M S H R U M

Page 16: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

16

Typical Patterns, Atypical Events, and

Uncertainty

in Complex Systems

Brett G. Amidan (PI) Pacific Northwest National Laboratory

Page 17: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Morning Report

The Morning Report was developed to help the aviation industry use mathematical methods to look at thousands of flights a day. These analyses focused on -

Typical patterns, that characterize >99% of the flights

Atypical events, that are worthy of individual inspection

17

PNNL is applying this technology to power system analysis.

Page 18: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

18

Discovering Atypical Events

Finds the UNENVISIONED entities

that are anomalous.

End-users do NOT have to know what

they are looking for.

Viewable reports, drill-down plots,

and interactive data viewers allow

the user to explore each anomaly.

Page 19: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

SitAAR (Situation Awareness Alerts in Real-time)

We have demonstrated a reporting system which finds

atypicalities and typical patterns for power grid.

Next step is to convert this to a real-time process –

Process enough data within the domain to be able to

establish typical patterns, using a mathematically-based

classification approach.

Use “active learning” to refine the patterns with domain

input.

Allow for the creation of new patterns, as they develop.

Add control chart alerts.

19

Page 20: Real-Time Operation Tools Using PMU Data · 11/16/2012  · ERCOT Phasor Technology Workshop November 16, 2012 . Pacific Northwest National Laboratory: ... MANGO Power Grid Real-Time

Thank you!

Questions?

Contact: Jeff Dagle, PE

Chief Electrical Engineer

Advanced Power & Energy Systems Group

Pacific Northwest National Laboratory

(509) 375-3629

[email protected]

20