RECAPP Facility Evaluation Report
Carewest SarceeB1076ACalgary
Calgary Health Region
Report run on: March 8, 2012 9:47 AM Page 2 of 47
B1076ABuilding Id:
Carewest SarceeBuilding Name:
CalgaryLocation:3504 - 29 Street S. W. Address:
8,742.00Gross Area (sq. m): $41,926,886Replacement Cost:0Construction Year:
Evaluation Date: August 24 2011
DC Stewart Architect LimitedEvaluation Company:
Don StewartEvaluator Name:
The Carewest Sarcee facility is a concrete framed, two storey structure, that was developed in 1960 as an AuxiliaryHospital. Almost immediately the building was expanded to the north, with a one storey addition that containedextensive resident areas, kitchen and dining rooms, and social facilities. Then in 1976 the east addition wascompleted, which is a one story building with basement at grade. The total area of the facility is now 8742 squaremetres and contains approximately 144 patient beds. The exterior is a combination of brick, concrete block andaluminum framed windows. An interior renovation was completed in 1996, installing new partitions, finishes, fixturesand fittings throughout. The large commercial kitchen serves prepared meals to residents in an adjacent DiningRoom. The building contains diagnosis facilities, therapy rooms, and a Day Hospital.
General Summary:
Structural Summary:Foundations for this Carewest Building are concrete spread footings, concrete pads, and grade beams. The structureconsists of a reinforced concrete frame above and below grade. Floors are reinforced concrete slab and beamconstruction. The roof is a bolted structural steel system, with open-web steel joists and ribbed steel decking. There is nocracking or settlement evident with the structure. Overall, the structure of this building is in acceptable condition.
Envelope Summary:Exterior cladding for this facility consists of a combination of brick veneer, exposed concrete block, and welded steelframed sunshades above the windows, as well as some accent walls of natural stone cladding. Approximately 85% ofthe roof is built-up asphalt membrane, which is failing and needs to be replaced. The balance of the roof is a newertwo-ply SBS membrane, which is in better condition. Main entrance doors are anodized aluminum horizontal sliderswith safety glazing. Other entrance doors are glazed aluminum swinging doors in aluminum frames. Staff entrancedoors are recommended for replacement. Windows are fixed with double glazed sealed units set in aluminum frames. The envelope of this building is in acceptable condition.
Interior Summary:Interior division in this facility is mostly gypsum board partitions, with some concrete block walls, both of which arepainted. The majority of this building has sheet vinyl flooring with welded seams. There is some carpet, and ceramictile in wet areas and in therapy and tub rooms. Ceilings are mostly suspended t-bar grid with acoustic tiles, thebalance is painted gypsum board on metal studs. Doors are mostly solid core wood in pressed steel frames, and arepainted. There is a considerable amount of plywood millwork throughout, finished with plastic laminate and paint.Greenhouse glazing has failed and needs replacement. Overall, the interiors of this facility are in acceptable condition.
Mechanical Summary:The building was renovated in 1996 resulting in four new Thermal Solution hot water boilers, sprinkler system, DDCcontrols (original part of the building), and new AHU's (with exception of the 1976 addition). Perimeter areas areheated with finned tube radiation. Mechanical equipment appears to have been upgraded on a regular basis. Theoverall mechanical condition is acceptable.
Electrical Summary:The main service in this facility is fed from the 750 KVA utility owned transformer with under ground ducts. The mainservice to this facility is a 1600 amp 120/208 volt 3 phase 4 wire service. The main service and utility ownedtransformer appear to have been upgraded in 1996. The emergency generator for this facility was upgraded in 1996 toa 120/208 volt 150 KVA(108 KW) Cummins Diesel generator. The lighting in this facility is made up of mainlyincandescent fixtures as well as T12 fluorescents complete with magnetic ballasts. The facility has two separate nursecall systems installed. The fire alarm system in this facility was upgraded in 1996 to an Edwards EST 3 fullyaddressable system. All the data cabling was upgraded in 2004 to CAT5E cabling. The main telephone equipmentswitch was upgraded in 2007. Recommended work includes:
13.87%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $5,817,000
Calgary - Carewest Sarcee (B1076A)
Report run on: March 8, 2012 9:47 AM Page 3 of 47
- replacement of the 1960 MCC - replacement of incandescent bulbs with compact fluorescent - retrofitting remaining T12 fluorescent fixtures to T8 with electronic ballasts. Overall, the electrical systems appear to be in acceptable condition.
Calgary - Carewest Sarcee (B1076A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 8, 2012 9:47 AM Page 4 of 47
A1010 Standard Foundations*
A1030 Slab on Grade*
A2020 Basement Walls (& Crawl Space)*
B1010.01 Floor Structural Frame (Building Frame)*
B1010.03 Floor Decks, Slabs, and Toppings*
B1010.06 Ramps: Exterior*
B1010.07 Exterior Stairs*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1960
1960
1960
1960
1960
1960
1960
Installed
Installed
Installed
Installed
Installed
Installed
Installed
100
100
100
100
100
40
40
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Carewest Sarcee (B1076A)S1 STRUCTURAL
Standard concrete footings, pad footings, and reinforced concrete grade beams.
Reinforced concrete slabs on grade.
Reinforced concrete walls to basement area - which is at grade at east side of building.
Reinforced concrete columns and beams.
Reinforced concrete slabs and beams.
Reinforced concrete ramps on grade at three locations around building. Welded steel railings, painted.
Reinforced concrete exit stair from main floor, north pod. Welded steel railings, painted.
Report run on: March 8, 2012 9:47 AM Page 5 of 47
B1010.10 Floor Construction Firestopping*
B1020.01 Roof Structural Frame*
B1020.03 Roof Decks, Slabs, and Sheathing*
B1020.04 Canopies*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1960
1960
1960
1960
Installed
Installed
Installed
Installed
50
0
0
50
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Calgary - Carewest Sarcee (B1076A)
Where visible, penetrations of fire separations appear to be sealed.
Original building is reinforced concrete construction. North addition roof is framed with steel beams and joists; flat roof isopen web steel joists.
Ribbed steel roof decking.
Front entrance canopy, and Day Clinic entrance canopy, are framed with welded steel construction, with ribbed metal roofpanels.
Report run on: March 8, 2012 9:47 AM Page 6 of 47
B2010.01.02.01 Brick Masonry: Ext. Wall Skin*
B2010.01.02.02 Concrete Block: Ext. Wall Skin*
B2010.01.03 Stone Assemblies: Exterior Wall Skin*
B2010.01.06.03 Metal Siding**
B2010.01.09 Expansion Control: Ext. Wall*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1960
1960
1960
1976
1960
Installed
Installed
Installed
Installed
Installed
75
75
0
40
75
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace 700 sm prefinished metal siding
Lifecycle Replacement 2016 $220,000 Unassigned
Calgary - Carewest Sarcee (B1076A)S2 ENVELOPE
Event:
Type Year Cost Priority
Updated: MAR-12
The majority of the building is clad in modular clay brick veneer.
The north-east addition is clad in a combination of concrete block and modular clay brick. There is both smooth faced andsplit faced concrete block.
The walls surrounding the main entrance are finished with natural stone facing.
The exterior walls of the clerestory window enclosures, the raised parabolic roof structures, as well as the mechanicalpenthouse are clad in prefinished corrugated metal siding.
Masonry expansion joints are caulked full of sealant.
Report run on: March 8, 2012 9:47 AM Page 7 of 47
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
B2010.02.03 Masonry Units: Ext. Wall Const.*
B2010.02.04 Load-Bearing-Metal Studs: Ext. Wall*
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*
B2010.05 Parapets*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1960
1976
1960
1960
1960
Installed
Installed
Installed
Installed
Installed
20
100
100
100
50
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace exterior wall caulking at 160 frames
Lifecycle Replacement 2015 $68,000 Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Type Year Cost Priority
Updated: MAR-12
Caulking is applied around window and door frames, and between dissimilar materials.
Exterior walls of the 1976 addition are concrete block cavity wall construction.
Most exterior walls, with the exception of the 1976 addition, are metal studs with exterior sheathing and masonry finish.
Building operators confirm the existence of a poly vapour barrier, but no air barrier was installed, on the exterior walls.
Low parapets are in evidence around all roof areas; exterior clad with masonry, interior finished with roof membrane andmetal flashing.
Report run on: March 8, 2012 9:47 AM Page 8 of 47
B2010.06 Exterior Louvers, Grilles, and Screens*
B2010.09 Exterior Soffits*
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1976 Addition
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2010
1960
1976
Installed
Installed
Installed
0
50
40
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Completed - Steel Sunshades Refurbishing
Replace 75 glazed aluminum windows
Repair
Lifecycle Replacement
2010
2016
$275,000
$192,000
Medium
Unassigned
Sunshades require refurbishment - loss of paint and rustingsurfaces.
Concern:
Repair, sandblasting and painting of rusted sunshades hasbeen completed.
Recommendation:
Recommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Welded steel sunshades are provided above all windows in the original building.
Exterior soffits are finished with exterior gypsum sheathing and stucco.
Anodized aluminum frames, fixed glazing, sealed double glazed units.
Report run on: March 8, 2012 9:47 AM Page 9 of 47
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - Original Building
B2030.01.01 Aluminum-Framed Storefronts: Doors** - Public Entrance
B2030.01.01 Aluminum-Framed Storefronts: Doors** - Staff Entrance
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
1960
1960
1960
Installed
Installed
Installed
40
30
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 112 glazed aluminum windows
Replace 4 aluminum framed doors and hardware
Replace 2 staff entrance doors and sidelites
Lifecycle Replacement
Lifecycle Replacement
Failure Replacement
2015
2015
2013
$286,000
$9,000
$25,000
Unassigned
Unassigned
Medium
Existing entrance doors and glazed sidelites are over 50 yearsold and failing. Doors are warped and do not close properly.
Concern:
Replace staff entrance doors, hardware and sidelites.Recommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Anodized aluminum frames, fixed and operable glazing, single glazed.
Safety glazed aluminum framed doors, operating hardware.
Single glazed aluminum framed door and sidelites; staff entrance on north side.
Consequences of Deferral:Increased operational cost due to heat loss.
Report run on: March 8, 2012 9:47 AM Page 10 of 47
B2030.01.06 Automatic Entrance Doors**
B2030.02 Exterior Utility Doors**
B2030.03 Large Exterior Special Doors (Overhead)*
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1996
1960
1960
Installed
Installed
Installed
30
40
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 4 automatic sliding entrance doors
Replace 10 flush steel doors and frames
Lifecycle Replacement
Lifecycle Replacement
2026
2015
$92,000
$13,000
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Aluminum framed, safety glazed, horizontal sliding automatic doors at the main entrance and at the Day Clinic entrance.
Flush steel doors in pressed steel frames, painted, operating hardware.
Sectional overhead door at loading area, wood door panels, single glazing, motor operated.
Report run on: March 8, 2012 9:47 AM Page 11 of 47
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**
B3020.02 Other Roofing Openings (Hatch, Vent, etc)*
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1960
2003
1960
Installed
Installed
Installed
25
25
25
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 5500 sm asphalt built-up roofing
Replace 900 sm SBS roofing
Failure Replacement
Lifecycle Replacement
2013
2028
$840,000
$186,000
Medium
Unassigned
Approximately 85% of the roof is built-up asphalt membrane,which is failing and needs to be replaced.
Concern:
Replace built-up roofing.Recommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Most of the roofing on this facility is built-up asphalt membrane, most of it is original. A roofing report, dated 30 May2011, has been prepared by Mason & Associates Consulting Ltd.
Modified bituminous membrane roofing has been installed on the west and south wings of the original building; as well ason small raised roof sections on the 1976 addition.
The original building had a considerable number of skylites installed. These have been covered over with flashing andsheet metal covers -- the glazing may also be removed.
Report run on: March 8, 2012 9:47 AM Page 12 of 47
C1010.01 Interior Fixed Partitions*
C1010.05 Interior Windows*
C1010.07 Interior Partition Firestopping*
C1020.01 Interior Swinging Doors (& Hardware)*
C1020.03 Interior Fire Doors*
C1020.04 Interior Sliding and Folding Doors*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1960
1960
1960
1960
1960
1976
Installed
Installed
Installed
Installed
Installed
Installed
0
80
50
40
50
25
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Carewest Sarcee (B1076A)S3 INTERIOR
Interior partitions are gypsum board, painted.
Interior windows single glazed, steel frames, painted.
Where visible, penetrations of interior partitions appear to be fire sealed.
Interior doors are mostly solid core wood in pressed steel frames, painted.
Interior fire doors are flush steel in pressed steel frames, painted, some with wired glazing.
There is an operable wall, of sliding glazed panels in anodized aluminum frames, into the Occupation Therapy exerciseroom.
Report run on: March 8, 2012 9:47 AM Page 13 of 47
C1030.02 Fabricated Compartments (Toilets/Showers)**
C1030.05 Wall and Corner Guards*
C1030.06 Handrails*
C1030.08 Interior Identifying Devices*
C1030.10 Lockers**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1960
1960
1960
1960
1976
Installed
Installed
Installed
Installed
Installed
30
15
40
20
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace 5 toilet compartments
Replace 60 steel lockers
Lifecycle Replacement
Lifecycle Replacement
2015
2015
$8,000
$42,000
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Prefinished steel toilet compartments, floor mounted, in staff washrooms.
Some high traffic locations have been fitted with plastic or stainless steel corner guards.
Continuous wood handrails have been placed in all public corridors and patient areas.
Engraved lamacoid signage placed at most doors.
Full height prefinished steel lockers provided for staff, cleaning staff and in maintenance workrooms.
Report run on: March 8, 2012 9:47 AM Page 14 of 47
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010 Stair Construction*
C2020.02 Terrazzo Stair Finishes*
C2020.08 Stair Railings and Balustrades*
C3010.06 Tile Wall Finishes**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1960
1960
1960
1960
1960
1960
Installed
Installed
Installed
Installed
Installed
Installed
30
20
100
60
40
40
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Replace 1250 sm ceramic wall tile
Lifecycle Replacement 2015 $382,000 Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Type Year Cost Priority
Updated: MAR-12
A variety of steel and wood shelving systems are provided, painted finish.
Standard institutional quality bathroom fixtures and accessories, stainless steel finish.
Stairs in service areas are cast in place concrete, with steel angle nosings. Public stairs are welded steel construction,with steel framing and precast concrete treads.
Public stair concrete treads are finished with terrazzo.
Stair railings are welded steel construction, paint finish.
The main kitchen, public washrooms, therapy rooms, shower rooms and special purpose rooms have ceramic tile wallfinishes.
Report run on: March 8, 2012 9:47 AM Page 15 of 47
C3010.11 Interior Wall Painting*
C3010.12 Wall Coverings*
C3020.01.02 Painted Concrete Floor Finishes*
C3020.02 Tile Floor Finishes**
C3020.04 Wood Flooring**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1960
1960
1960
1960
1976
Installed
Installed
Installed
Installed
Installed
10
15
10
50
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace 1000 sm ceramic tile floor finishes
Replace 100 sm wood laminate flooring
Lifecycle Replacement
Lifecycle Replacement
2015
2015
$202,000
$16,000
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Gypsum board walls, and exposed concrete block walls, are painted.
Some common rooms and offices are finished in vinyl wallcoverings.
Service room concrete floors are painted.
The main kitchen, some therapy rooms, shower rooms and special purpose rooms have ceramic tile floor finishes. Somewashrooms have ceramic mosaic tile flooring.
The Chapel and adjacent corridor, as well as part of the central multi-purpose space have laminate wood flooring.
Report run on: March 8, 2012 9:47 AM Page 16 of 47
C3020.07 Resilient Flooring**
C3020.08 Carpet Flooring**
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**
C3030.07 Interior Ceiling Painting*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
1996
1960
1960
Installed
Installed
Installed
Installed
20
15
25
20
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace 5500 sm of sheet vinyl flooring
Replace 1200 sm carpet flooring
Replace 4800 sm acoustic ceilings
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2015
$520,000
$94,000
$252,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
The majority of the facility floors are finished in resilient sheet flooring, including many of the large shower rooms, whichare seamless flooring.
Some corridors, offices and lounges are finished in level loop carpet.
The majority of this facility has a suspended t-bar ceiling with acoustic tiles.
Gypsum board ceilings and bulkheads are painted.
Report run on: March 8, 2012 9:47 AM Page 17 of 47
D1010.01.02 Hydraulic Passenger Elevators**
4 - AcceptableRating
1960Installed
30Design Life
MAR-12Updated
Replace 2 passenger elevators
Lifecycle Replacement 2015 $190,000 Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Type Year Cost Priority
Updated: MAR-12
Two hydraulic passenger elevators are provided; one of 1160 kg and the other of 1814 kg capacity.
Report run on: March 8, 2012 9:47 AM Page 18 of 47
D2010.04 Sinks** - 1961
D2010.04 Sinks** - 1976
D2010.04 Sinks** - 2000
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1960
1976
2000
Installed
Installed
Installed
30
30
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 29 Sinks
Replace 14 Sinks
Replace 13 Sinks
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2030
$45,000
$22,000
$20,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Single bowl SS sink - 15 Units Double bowl SS sink - 2 Units Kitchen pot sink - 4 Units Janitor sink - 2 Units Bedpan Washer - 6 Units
Single bowl SS sink - 5 Units Double bowl SS sink - 6 Units Hair sink - 1 Unit Janitor sink - 1 Unit Bedpan Washer - 1 Unit
Single bowl SS sink - 9 Units Double bowl SS sink - 1 Unit Poly janitor sink - 2 unit Bedpan washer -1 unit
Report run on: March 8, 2012 9:47 AM Page 19 of 47
D2010.05 Showers**
D2010.05 Showers** - 1961
D2010.05 Showers** - 1976
D2010.06 Bathtubs**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
2000
1960
1976
2000
Installed
Installed
Installed
Installed
30
30
30
30
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace 1 Shower
Replace 2 Showers
Replace 2 Showers
Replace Therapy Tubs - 6 Units
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2030
2015
2015
2030
$2,500
$5,000
$5,000
$60,000
Unassigned
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
MAR-12
Roll in BF shower - 1 Unit
Roll in BF shower - 2 Units
Roll in BF shower - 2 Units
Therapy bathtub - 6 Units
Report run on: March 8, 2012 9:47 AM Page 20 of 47
D2010.08 Drinking Fountains/Coolers**
D2010.10 Washroom Fixtures (WC, Lav, Urnl)**
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1960
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2000
1996
1960
Installed
Installed
Installed
35
35
35
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Drinking Fountain
Replace Washroom Fixtures - 24 Units
Replace Washroom Fixtures - 110 Units
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2035
2031
2015
$2,500
$36,000
$165,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
SS refrigerated drinking fountain - 1 Unit
Drop in China lav - 12 Units Water closets - 12 Units
Drop in China lav - 70 Units Water closets - 39 Units Urinal - 1 Unit
Report run on: March 8, 2012 9:47 AM Page 21 of 47
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1976
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 2000
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
2000
1960
1960
Installed
Installed
Installed
Installed
35
35
40
40
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace Washroom Fixtures - 69 Units
Replace Washroom Fixtures - 13 Units
Replace Domestic Water Valves - 150 Units
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2035
2015
$105,000
$20,000
$110,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Wall mount China lav - 40 Units Water closets - 29 Units
Drop in China lav -6 Units Water closets - 7 Units
Domestic water piping is constructed from copper.
Washroom groups are isolated with valves.
Report run on: March 8, 2012 9:47 AM Page 22 of 47
D2020.01.03 Piping Specialties (Backflow Preventers)**
D2020.02.02 Plumbing Pumps: Domestic Water**
D2020.02.04 Domestic Water Conditioning Equipment**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2000
2007
1994
Installed
Installed
Installed
20
20
20
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Backflow Preventers - 4 Units
Replace Plumbing Pumps: Domestic Water - 2Units
Replace Domestic Water Conditioning Equipment -1 Unit
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2020
2027
2015
$12,000
$4,000
$10,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Backflow preventers are provided for the domestic water, fire line, irrigation and hot water heating make-up.
Domestic recirc pump and domestic circulation pumps provided.
Water softner provided, 2 softners and one brine tank.
Report run on: March 8, 2012 9:47 AM Page 23 of 47
D2020.02.06 Domestic Water Heaters** - 2000
D2020.02.06 Domestic Water Heaters** - 2007
D2020.03 Water Supply Insulation: Domestic*
D2030.01 Waste and Vent Piping*
D2030.02.04 Floor Drains*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
2000
2007
1960
1960
1960
Installed
Installed
Installed
Installed
Installed
20
20
40
50
50
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace Domestic Water Heater - 1 Unit
Replace Domestic Water Heaters - 2 Units
Lifecycle Replacement
Lifecycle Replacement
2020
2027
$5,000
$15,000
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Basement hot water heater, Bradford White TW75-S753NH and Grundfos recirc pump.
Two AO Master fit water heaters model BTRC500A + two domestic water storage tanks.
Domestic water lines are covered with fiberglass insulation.
Waste and vent piping is constructed from cast iron and copper.
Floor drains are provided in service areas and mechanical room.
22
132x2
Capacity Size
Capacity Size
kW
kW
Capacity Unit
Capacity Unit
Report run on: March 8, 2012 9:47 AM Page 24 of 47
D2030.03 Waste Piping Equipment*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
D3010.01 Oil Supply Systems (Fuel, Diesel)*
D3010.02 Gas Supply Systems*
D3020.02.01 Heating Boilers and Accessories: H.W.**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
2000
1960
1960
1960
1960
1996
Installed
Installed
Installed
Installed
Installed
Installed
30
50
40
60
60
35
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Replace 4 H.W. Heating Boilers and Accessories
Lifecycle Replacement 2031 $200,000 Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Type Year Cost Priority
Updated: MAR-12
Duplex sanitary lift pumps are provided in a basement sump.
Rain water is drained from the roof to an internal storm water collection system.
Roof drains are provided through out.
Diesel storage tank is located in the emergency generator room. Tank is vented and filled from the exterior. A spillcontainment barrier is in place.
Natural gas is piped to all fuel burning appliances in the mechanical room and air handling equipment on the roof.
Four Thermal Solutions hot water heating boilers, model EVAM 2000. Each boiler has individual circulation pump. Inaddition there is 4 building heating pumps.
586x4Capacity Size
kWCapacity Unit
Report run on: March 8, 2012 9:47 AM Page 25 of 47
D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
D3030.06.01 Refrigeration Compressors**
D3030.06.02 Refrigerant Condensing Units**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1996
1996
1996
1995
Installed
Installed
Installed
Installed
30
30
25
25
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace Chimneys & Comb. Air (4 vents each,200mm SS x 6m)
Replace Refrigeration Compressors - 5 Units
Replace Condensing Units - 3 Units
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2021
2020
$50,000
$20,000
$20,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Each boiler is vented separately. Combustion air is provided.
Chemical pot feeder and micron filter provided. Water treatment program is followed.
Refrigeration compressors provided for the juice, freezer, milk, veggie and morgue coolers.
Each air handling unit on the two story portion has York H4CE090A25A condensing unit.
Report run on: March 8, 2012 9:47 AM Page 26 of 47
D3030.06.02 Refrigerant Condensing Units** - 2000
D3030.06.02 Refrigerant Condensing Units** - 2005
D3040.01.01 Air Handling Units: Air Distribution** - 1976
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2000
2005
1976
Installed
Installed
Installed
25
25
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Air Conditioning Unit - 1 Unit
Replace 1 Condensing Unit
Replace AHU - 1 Unit
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2025
2030
2015
$12,000
$20,000
$100,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Skymark International VCN240E32A-A split unit with BSMT AHU. - 1 Unit
Split condensing unit for the 1976 addition AHU, Carrier 38AKS028.
1976 addition AHU, Trane Climate Changer c/w glycol heating coil and 2005' dx cooling coil. Four R/A fans are alsolocated in the rooftop penthouse.
88Capacity Size
kWCapacity Unit
Report run on: March 8, 2012 9:47 AM Page 27 of 47
D3040.01.01 Air Handling Units: Air Distribution** - 1996
D3040.01.01 Air Handling Units: Air Distribution** - 2000
D3040.01.03 Air Cleaning Devices: Air Distribution*
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets: Air Distribution*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1996
2000
1960
1960
1960
Installed
Installed
Installed
Installed
Installed
30
30
30
50
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace 5 Air Handling Units
Replace 1 Basement Air Handling Unit
Lifecycle Replacement
Lifecycle Replacement
2026
2030
$60,000
$15,000
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Smoking Rm MUA - Engineered Air HE 20; 566 l/s. Kitchen MUA - ICE MUA c/w packaged Carrier cooling skid. Two story AHU's - Engineered Air S-350-C-O c/w DX cooling coil; 1,650 l/s.
Basement AHU Carrier 39THEBLDA c/w glycol heating coil and dx cooling coil.
AHU's are provided with disposable filter media.
Ducts are constructed of galvanized sheet metal.
Supply air grilles and diffusers are provided through out.
Report run on: March 8, 2012 9:47 AM Page 28 of 47
D3040.03.01 Hot Water Distribution Systems**
D3040.04.01 Fans: Exhaust**
D3040.04.03 Ducts: Exhaust*
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1960
1996
1960
Installed
Installed
Installed
40
30
50
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Completed - Heating Zone Valve Replacement
Replace Hot Water Distribution System (8,742 m2gfa)
Replace Exhaust Fans - 15 Units
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2011
2015
2026
$35,000
$800,000
$60,000
Medium
Unassigned
Unassigned
Main zone valves are 30 years old. Many are frozen in theopen or closed position
Concern:
Replacement of heating and domestic hot water valvesRecommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Hot water heating system is constructed of black steel pipe.
Domes exhaust fans located on the roof - 15 Units
Exhaust ducts are constructed of galvanized sheet metal.
Report run on: March 8, 2012 9:47 AM Page 29 of 47
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)** - 1996
D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)** - 2002
D3050.01.03 Packaged Terminal Air Conditioning Units*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1960
1996
2002
2000
Installed
Installed
Installed
Installed
30
25
30
30
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace Packaged Rooftop Air Conditioning Units -6 Units
Replace RTU
Lifecycle Replacement
Lifecycle Replacement
2021
2032
$45,000
$6,000
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Each washroom is provided with an exhaust grille.
York D1NA024N05 - 2 Units York D7CG060N09 - 3 Units Carrier ACP018G045 - 1 Unit
Carrier 48TJD005
Mitsubushi Mr. Slim cooling units with roof mounted condensing units provided. - 11 Units
Report run on: March 8, 2012 9:47 AM Page 30 of 47
D3050.05.03 Finned Tube Radiation**
D3050.05.06 Unit Heaters**
D3060.02.01 Electric and Electronic Controls**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1960
1960
1996
Installed
Installed
Installed
40
30
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Finned Tube Radiation (8,742 m2 gfa)
Replace Unit Heaters - 4 Units
Replace Electric Controls
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2026
$400,000
$16,000
$2,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Perimeter areas are heated with finned tube radiation.
Unit heaters are provided in storage, mechanical room and loading areas - 4 Units
The 1996 addition utilizes electronic controls for the heating terminals.
Report run on: March 8, 2012 9:47 AM Page 31 of 47
D3060.02.02 Pneumatic Controls**
D3060.02.05 Building Systems Controls (BMCS, EMCS)**
D4010 Sprinklers: Fire Protection*
D4020 Standpipes*
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1976
1996
1996
1960
1996
Installed
Installed
Installed
Installed
Installed
40
25
60
60
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace Pneumatic Controls in 1976 Addition
Replace Building Systems Controls (8,742 m2 gfa)
Lifecycle Replacement
Lifecycle Replacement
2016
2021
$15,000
$80,000
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Pneumatic controls are utilized in the 1976 addition. Two controls air compressors are located in the mechanical roomand a refrigerated air dryer.
Digital controls added to the original portion of the building in 1996. Heating system and air handling unit operate off theBMS system.
Sprinklers were added to the entire facility in 1996.
The existing standpipe system remains.
Portable fire extinguishers are provided through out the facility.
Report run on: March 8, 2012 9:47 AM Page 32 of 47
D4090.04 Dry Chemical Fire Extinguishing Systems (Kitchen Hood)**
4 - AcceptableRating
1996Installed
40Design Life
MAR-12Updated
Replace Wet Chemical Fire Extinguishing Systems(Kitchen Hood) - 2 Units
Lifecycle Replacement 2036 $25,000 Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Type Year Cost Priority
Updated: MAR-12
A wet chemical fire suppression system is provided for each commercial kitchen hood. Ansul R-102.
Report run on: March 8, 2012 9:47 AM Page 33 of 47
D5010.01.02 Main Electrical Transformers (Utility Owned)*
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
1996
1996
1996
Installed
Installed
Installed
40
40
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 120/208 volt 1600 amp main distributionpanel.
Replace (30) 120/208V branch circuit panels
Lifecycle Replacement
Lifecycle Replacement
2036
2026
$85,500
$30,000
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)S5 ELECTRICAL
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
The facility is fed from a utility owned 750 KVA 13,300/7620:120/208 volt step down transformer. The transformer andincoming service was upgraded in 1996.
The main service is a Commander (Westinghouse) 120/208 volt 3 phase 4 wire 1600 amp distribution panel. The mainservice was upgraded in 1996. The main service consists of a 1600 amp 120/208 volt main breaker, CT section forconnection of the utility meter and distribution section that feeds panels throughout the facility.
The facility has several branch circuit panels, both surface and flush mounted, throughout the facility. All the branch circuitpanels are 120/208 volt and the majority of the panels appear to have been upgraded in 1996 when the main service wasupgraded.
750
1600
Capacity Size
Capacity Size
kVA
amps
Capacity Unit
Capacity Unit
Report run on: March 8, 2012 9:47 AM Page 34 of 47
D5010.07.01 Switchboards, Panelboards, and (Motor) Control Centers** - 1960
D5010.07.01 Switchboards, Panelboards, and (Motor) Control Centers** - 1996
D5010.07.02 Motor Starters and Accessories**
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1960
1996
1996
Installed
Installed
Installed
30
30
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace (3) four-plex motor control centers
Replace (1) 16-plex motor control center
Replace 12 loose motor starters.
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2013
2026
2026
$16,500
$20,500
$9,000
Low
Unassigned
Unassigned
The motor control centers have surpassed the expected lifecycle replacement date. The equipment is no longermanufactured and replacement parts are not available.
Concern:
Replace the existing 4 plex motor control centers with newequipment.
Recommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
The facility has three 4-plex Westinghouse motor control centers that were installed as part of the oriignal construction
The facility has a 16-plex Cutler-Hammer motor control center installed in the main floor mechanical room. This motorcontrol center appears to have been installed in 1996.
The facility has several loose motor starters installed throughout the facility. The majority of these starters appear to havebeen upgraded in 1996. The starters appear to be Allen Bradley motor starters throughout the facility.
Consequences of Deferral:Increased maintenance costs can be expected as equipmentbegins to fail due to age without a supply of replacementparts.
Report run on: March 8, 2012 9:47 AM Page 35 of 47
D5010.07.03 Variable Frequency Drives**
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1996
1960
1960
Installed
Installed
Installed
30
50
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 2 VFD's
Completed - Install Additional Sub-Circuit Wiring.
Lifecycle Replacement
Code Upgrade
2026
2011
$2,000
$130,000
Unassigned
Low
Panel boards are in good condition with adequate sparebreakers. There are nuisance tripping problems on thecircuits. There are too many resident rooms (3) on one circuit,with the increased use of electric beds this is becoming anincreasing problem.
Concern:
Provide additional sub circuit wiring to panel boards.Recommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
The facility has two Armstrong VFD's to control Pump 7 and Pump 8 in the main mechanical room.
The branch circuit wiring throughout the facility consists of single conductor cable installed in conduit. AC90 cable hasbeen used for light fixture drops, drops down concealed walls to outlets, and in locations where a flexible connection isneeded for motors. There are several instances of single conductor cable installed within liquid tight flexible conduitwhere the cabling could be subjected to excess moisture or water.
The interior lighting in this facility is controlled with the use of line voltage switches and line voltage dimmers throughout.The switching scheme appears to meet the current facility requirements.
Report run on: March 8, 2012 9:47 AM Page 36 of 47
D5020.02.02.01 Interior Incandescent Fixtures*
4 - AcceptableRating
1960Installed
30Design Life
MAR-12Updated
Replace incandecant lamps with compactfluorescent lamps.
Energy Efficiency Upgrade 2015 $9,000 Low
The existing incandescent lamps are not as energy efficientas compact fluorescent lamps.
Concern:
Replace all existing incandescent lamps with compactfluorescent lamps.
Recommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Type Year Cost Priority
Updated: MAR-12
The facility has several different styles of incandescent fixtures installed throughout. They range from pendant mountedglobe style decorative fixtures to wall mounted decorative fixtures and recessed pot lights. All the incandescent fixturesappear to be in good working order and appear to provide adequate lighting levels for the area served.
Consequences of Deferral:Increased maintenance costs replacing burnt out lamps, andhigher energy costs.
Report run on: March 8, 2012 9:47 AM Page 37 of 47
D5020.02.02.02 Interior Fluorescent Fixtures**
D5020.02.03.01 Emergency Lighting Built-in*
4 - Acceptable
4 - Acceptable
Rating
Rating
1960
1996
Installed
Installed
30
35
Design Life
Design Life
MAR-12
MAR-12
Updated
Updated
Replace approximately 1000 fluorescant fixtures
Retrofit 600 T12 fixtures to T8 lamps withelectronic ballasts
Lifecycle Replacement
Energy Efficiency Upgrade
2015
2015
$75,000
$45,000
Unassigned
Low
T12 lamps with magnetic ballast are not as energy efficient asT8 lamps with electronic ballasts.
Concern:
Retrofit the remaining T12 fixtures to T8 lamps complete withelectronic ballast.
Recommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
The facility fluorescent lighting consist of 1x4 surface mounted fixtures, 2-lamp strip fixtures for cove lighting, 2x4recessed fixtures and 2-lamp chain suspended strip fixtures in all mechanical and electrical rooms. The majority of thefixtures appear to utilize T12 lamps with magnetic ballasts, however, approximately 40% of the fixtures have beenconverted to T8 as ballasts and lamps fail.
The emergency lighting in this facility consist of lighting branch circuits throughout the facility that are connected toemergency branch circuit panels. The emergency branch circuit panels are connected to the emergency generator.
Consequences of Deferral:Increased energy costs as ballasts age as well as increasedmaintenance costs to replace ballasts and lamps.
Report run on: March 8, 2012 9:47 AM Page 38 of 47
D5020.02.03.02 Emergency Lighting Battery Packs**
D5020.02.03.03 Exit Signs*
D5020.03.01.01 Exterior Incandescent Fixtures*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1996
1960
1960
1960
1960
Installed
Installed
Installed
Installed
Installed
20
30
0
30
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace two battery packs
Lifecycle Replacement 2016 $1,000 Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Type Year Cost Priority
Updated: MAR-12
The facility appears to have two battery packs installed: one in the emergency generator room and one in themaintenance office located in the basement level.
The majority of exit lights in this facility are original exit lights installed in 1960. The are also some LED style fixtures thatwere added during an expansion in 1997, as well as in the basement day use area that were added in 2000.
There are several incandescent security lights installed at the exit doors. The security lights light up these areas whenthe motion sensors are triggered. The facility also has wall mounted up/down column lights installed at the main entrancecanopy, as well as a decorative pendant fixture installed in the canopy. The main entrance landscape is illuminated withincandescent spot lights.
There are several shoe box style pole-mounted high pressure sodium fixtures installed in the parking lot, wall mountedhigh pressure sodium wall packs above the exterior doors, as well as high pressure sodium marine lights around thebasement day use area.
The exterior lighting appears to be controlled with the use of photocells and associated relays. The incandescent securitylighting is controlled with the use of motions sensors installed on each fixture.
Report run on: March 8, 2012 9:47 AM Page 39 of 47
D5030.01 Detection and Fire Alarm**
D5030.02.02 Intrusion Detection**
D5030.02.03 Security Access**
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1996
1996
1986
Installed
Installed
Installed
25
25
25
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Edwards EST fire alarm panel and allassociated devices (based on 8,742 m2 gfa)
Replace intrusion detection system (based on8,742 m2 gfa)
Replace the door access control system (based on8,742 m2 gfa)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2021
2021
2015
$105,000
$35,000
$45,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
The fire alarm is a fully addressable Edwards EST 3 system. The system was upgraded in 1996 to the current panel. Thesystem consists of manual pull stations at each exit, smoke detectors, heat detectors and bell strobes throughout.
The facility has door monitoring contacts at each door to monitor door status. Monitoring is accomplished through a DSCPower 832 security system. The intrusion detection system is also connected to door access control to release the alarmpoints when the door keypads are used.
Door access control utilizes door magnets at all secure doors. Access is granted through the use of a key pad at eachdoor. The door access control system is a Securitron system.
Report run on: March 8, 2012 9:47 AM Page 40 of 47
D5030.02.04 Video Surveillance**
D5030.04.01 Telephone Systems*
D5030.04.03 Call Systems** - 1986
D5030.04.03 Call Systems** - 2000
5 - Good
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
1986
2007
1986
2000
Installed
Installed
Installed
Installed
25
25
25
25
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace existing CCTV system and DVR (based on8,742 m2 gfa)
Replace 1986 Rauland 3000 nurse call system(based on 7,742 m2 floor area)
Replace basement day use area nurse call system(based on 1,000 m2 floor area)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2025
$35,500
$62,000
$8,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
The CCTV system consists of cameras installed throughout the facility. Each camera is connected to a Digimerge DVRcomplete with Philips monitor at the main telephone room.
The telephone system consists of CAT 3 cabling to telephone jacks throughout the facility. The switch is a NortelNetworks Meridian 1 and was upgraded in 2007.
The original nurse call system was installed in 1986. The system is a Rauland 3000 and consists of indicator lights, pullcords in each washroom and standard nurse call equipment at each patient bed.
The facility has a second nurse call system installed in the basement day use area. This system was installed in 2000 andconsists of a pull cord installed in each washroom, strobe and buzzer for each washroom.
Report run on: March 8, 2012 9:47 AM Page 41 of 47
D5030.04.04 Data Systems*
D5030.05 Public Address and Music Systems**
D5030.06 Television Systems*
D5090.02 Packaged Engine Generator Systems (Emergency Power System)**
5 - Good
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
2004
1986
1960
1996
Installed
Installed
Installed
Installed
25
25
20
35
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace paging speakers and amplifers (based on8,742 m2 gfa)
Replace 150 KVA 120/208 volt Cummins DieselGenerator
Lifecycle Replacement
Lifecycle Replacement
2015
2031
$52,000
$175,500
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
The data cabling in this facility was upgraded to CAT5E in 2004. The cabling terminates to the closest data rack whichare located throughout the building.
The facility has an Inter M PA-2000 public address system. The system consists of paging speakers throughout andamplifiers. All paging is accomplished through telephone handsets as the paging system is connected to the telephoneswitch.
The television system consists of COAX cabling to each TV outlet. Each outlet has cable installed back to the closestdata closet.
The facility has a Cummins Diesel Generator, complete with an ASCO transfer switch, to handle the emergency lightingand emergency systems within the facility. It is a 150 KVA (108 KW) 120/208 volt 3 phase 4 wire generator, installed in1996.
Report run on: March 8, 2012 9:47 AM Page 42 of 47
E1010.05.01 Barber and Beauty Shop Equipment*
E1010.06 Commercial Laundry and Dry Cleaning Equipment*
E1020.08 Medical Equipment*
E1030.03 Loading Dock Equipment*
E1090.03 Food Service Equipment*
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1960
1960
1960
1960
1960
1960
Installed
Installed
Installed
Installed
Installed
Installed
0
0
25
0
25
15
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Carewest Sarcee (B1076A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
A small beauty shop is provided for the residents, with the usual dryers and other equipment.
A commercial washer and dryer is provided, for resident use.
Various medical equipment and therapeutic devices are provided, suitable for a short term Rehabilitation Facility.
Loading dock bumpers are provided, as well as a dock leveler.
Full commercial kitchen, of 275 sm; stainless steel equipment and dry chemical fire extinguisher system.
Various therapeutic tubs, showers and associated equipment. Physiotherapy exercise equipment also provided in a wellequipped gymnasium.
Report run on: March 8, 2012 9:47 AM Page 43 of 47
E2010.02 Fixed Casework**
E2010.03.01 Blinds**
E2010.03.06 Curtains and Drapes**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1960
1976
1976
Installed
Installed
Installed
35
30
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 500 lm of fixed casework
Replace 60 window blinds
Replace 130 window drapes
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2015
$680,000
$14,000
$22,000
Unassigned
Unassigned
Unassigned
Calgary - Carewest Sarcee (B1076A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Casework provided in patient rooms, kitchens, serveries, washrooms, workrooms, crafts rooms, offices and lounges --plywood construction, plastic laminate counters.
Exterior windows and some interior windows are covered with vertical blinds. Some west and south-facing windows haverolling solar blinds.
Most patient rooms, and some lounges, are provided with fabric draperies.
Report run on: March 8, 2012 9:47 AM Page 44 of 47
F1010.02.03 Glazed Structures*
3 - MarginalRating
1976Installed
0Design Life
MAR-12Updated
Replace greenhouse glazing (50 sm)
Failure Replacement 2013 $34,000 Low
The seals on most glazing in the greenhouse have failed andmany sealed units are failing also.
Concern:
Replace all glazing with new sealed units.Recommendation:
Calgary - Carewest Sarcee (B1076A)
Event:
Type Year Cost Priority
Updated: MAR-12
A small greenhouse is attached to the main functional space of the building; anodized aluminum frames, sealed doubleglazing.
Report run on: March 8, 2012 9:47 AM Page 45 of 47
K4010.01 Barrier Free Route: Parking to Entrance*
K4010.02 Barrier Free Entrances*
K4010.03 Barrier Free Interior Circulation*
K4010.04 Barrier Free Washrooms*
K4020.03 Other Codes*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
2 - Poor
Rating
Rating
Rating
Rating
Rating
1960
1960
1960
1960
1960
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Instruct staff regarding fire doors
Code Repair 2012 $1,000 Medium
Numerous fire doors are propped open, presumably bycleaning staff.
Concern:
Staff to be instructed to not block open fire doors in anycircumstances.
Recommendation:
Calgary - Carewest Sarcee (B1076A)S8 SPECIAL ASSESSMENT
Event:
Type Year Cost Priority
Updated: MAR-12
Sidewalks and roadway slope up to the main entrance from the main parking lot.
The main entrance and other entrances have automatic operators.
Corridors are wide and unobstructed. Elevators are provided to other levels of the building.
Barrier free washrooms are provided in public areas, and in patient areas.
Numerous fire doors are propped open, presumably by cleaning staff.
Consequences of Deferral:Danger of spread of fire.
Report run on: March 8, 2012 9:47 AM Page 46 of 47
K4030.01 Asbestos*
K4030.02 PCBs*
K4030.04 Mould*
K5010.01 Site Documentation*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
0
0
0
2011
Installed
Installed
Installed
Installed
0
0
0
0
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Calgary - Carewest Sarcee (B1076A)
No asbestos was noted or reported.
No PCB's were noted or reported.
No conditions supporting mould growth were noted or reported.
Overall Site Plan -- provided by Building Management. Prime Consultant: Don Stewart - DC Stewart Architect Limited Evaluation Date: August 24, 2011.
Overall Site Plan
Report run on: March 8, 2012 9:47 AM Page 47 of 47
K5010.02 Building Documentation*
4 - AcceptableRating
2011Installed
0Design Life
MAR-12Updated
Calgary - Carewest Sarcee (B1076A)
Building Floor Plans -- provided by Building Management. Prime Consultant: Don Stewart - DC Stewart Architect Limited Evaluation Date: August 24, 2011.
Main Floor Plan