35
RECENT REMOTE HANDLING EXPERIENCE AT NUMI/ANU NBI 2012 P. Hurh (FNAL) Nov. 10, 2012

Recent Remote Handling Experience at NuMI/ANU

  • Upload
    aradia

  • View
    49

  • Download
    0

Embed Size (px)

DESCRIPTION

Recent Remote Handling Experience at NuMI/ANU. NBI 2012P. Hurh (FNAL). Nov. 10, 2012. Overview. Experiences over past 2 years (since last NBI) MiniBooNE NuMI Target Support NOvA Target Hall Re-configuration C-0 Remote Handling Facility Future Concerns Support of future experiments - PowerPoint PPT Presentation

Citation preview

Page 1: Recent Remote Handling Experience at NuMI/ANU

RECENT REMOTE HANDLING EXPERIENCE AT NUMI/ANUNBI 2012 P. Hurh (FNAL)Nov. 10, 2012

Page 2: Recent Remote Handling Experience at NuMI/ANU

Overview Experiences over past 2 years (since last

NBI) MiniBooNE NuMI Target Support NOvA Target Hall Re-configuration C-0 Remote Handling Facility

Future Concerns Support of future experiments Long Term Radioactive Storage and

Disposal Dose rate prediction tools

Page 3: Recent Remote Handling Experience at NuMI/ANU

Over past 2 years MiniBooNE

Only maintenance and inspection activities No Horn/target replacement needed for ~8 years

NuMI/MINOS No Horn replacement needed Many Target problems (J. Hylen’s earlier talk) From the remote handling perspective:

Standard replacement procedures (5 replacements in 2 years was not standard!)

Specialized target autopsy tool successful

Page 4: Recent Remote Handling Experience at NuMI/ANU

Residual Radiation

Horns and Targets supported on the bottom of large shielding modules Replaced in a simple work cell (no manipulators) where almost all

activities take place above the module through holes using specialized tools

Radioactive components are transported in end-loaded casks using a system designed by Vladimir Sidorov

Measured dose rates for NuMI Horn 1 water line repair (250 kW proton beam)

Page 5: Recent Remote Handling Experience at NuMI/ANU

NuMI Work Cell

Page 6: Recent Remote Handling Experience at NuMI/ANU

NuMI Target Hall

Page 7: Recent Remote Handling Experience at NuMI/ANU

NuMI Horn Transport Cask

Page 8: Recent Remote Handling Experience at NuMI/ANU

V. Sidorov’s Target Autopsy Tool Similar to a tubing cutter:

Page 9: Recent Remote Handling Experience at NuMI/ANU

Target Cutting Tool Lined up to Target in NuMI Work Cell

Page 10: Recent Remote Handling Experience at NuMI/ANU

NuMI Target NT-05 Cut-Apart

Page 11: Recent Remote Handling Experience at NuMI/ANU

NOvA Target Hall Re-configuration Change to Medium Energy Optics for NOvA

requires moving the second horn location about 9 meters downstream

Target Chase area has been irradiated from many years of NuMI operation

Careful preparation and planning predicted total dose to worker of 2,495 mrem

Job was just completed in Sept-Oct 2012 with a measured dose of 1,538 mrem

Lead engineer: Salman Tariq

Page 12: Recent Remote Handling Experience at NuMI/ANU

NOvA Target Hall Re-configuration

Page 13: Recent Remote Handling Experience at NuMI/ANU

Clear out new location for Horn 2

Page 14: Recent Remote Handling Experience at NuMI/ANU

Lower shielding blocks handled remotely

Page 15: Recent Remote Handling Experience at NuMI/ANU

Storage for shield blocks

Page 16: Recent Remote Handling Experience at NuMI/ANU

Horn 2 carriage installed

Temporary shielding to limit dose from upstream

T-block kinematic mounts

Page 17: Recent Remote Handling Experience at NuMI/ANU

Horn 2 Lowered into carriage

Page 18: Recent Remote Handling Experience at NuMI/ANU

T-Block Installation

Page 19: Recent Remote Handling Experience at NuMI/ANU

Horn 2 installed (utilities yet to be connected)

Page 20: Recent Remote Handling Experience at NuMI/ANU

C-0 Remote Handling Facility Needed to enable (while running beam):

Repairs Autopsies Volume reduction

Uses C-0 Detector Assy Bldg (from canceled B-Tev project) 10 m deep pit Triple redundant sump system Connected to Tevatron tunnel (future expansion

opportunity?)

Page 21: Recent Remote Handling Experience at NuMI/ANU

C-0 Remote Handling Facility

Repair Cell Approximately 6m x 7m (internal

dimensions) Internal overhead crane (10 ton) and jib

crane (2 ton) Re-furbished Lead Glass Window

(PLUTO project- nuclear ramjet) 1 new manipulator, 1 surplus

manipulator Large sliding steel doors

Storage Bays 3 Large storage bays End load design allows for shielded

transfer Lead Engineer: Vladimir Sidorov

Lead Glass windows came from 1950’s era Project Pluto!

Page 22: Recent Remote Handling Experience at NuMI/ANU

C-0 Repair Cell

Page 23: Recent Remote Handling Experience at NuMI/ANU

C-0 RHF Storage Bays and Cask

Page 24: Recent Remote Handling Experience at NuMI/ANU

C-0 Repair Cell

Page 25: Recent Remote Handling Experience at NuMI/ANU

C-0 RHF Manipulators

Page 26: Recent Remote Handling Experience at NuMI/ANU

C-0 RHF Remote Handling Tzar Sidorov

Page 27: Recent Remote Handling Experience at NuMI/ANU

Future Concerns: Proposed Facilities Near & Mid-Term

NOvA (50-400 R/hr) Micro-BooNE (20-100 R/hr) Mu2e (300,000 R/hr!!) G-2 (12-60 R/hr) ORKA? NuSTORM?

Long Term (Project X) Four simultaneous running

target facilities at 1+ MW each!

Page 28: Recent Remote Handling Experience at NuMI/ANU

Project X Reference Design

Page 29: Recent Remote Handling Experience at NuMI/ANU

Project X Staging Layout

Page 30: Recent Remote Handling Experience at NuMI/ANU
Page 31: Recent Remote Handling Experience at NuMI/ANU

Future Target Facilities Impact:

Higher activity levels Multiple locations on site Increased frequency of handling

Requires: More sophisticated equipment More time for operations More and better-trained staff Better management of entire life cycle (LT

storage and disposal)

Page 32: Recent Remote Handling Experience at NuMI/ANU

Long Term Storage and Shipment Facility

In order to handle the possibly hundreds of highly activated components from the rich Project X program, Fermilab is considering building a facility to: Safely and securely hold radioactive items

to decay Volume reduce large radioactive items Package decayed items for off-site disposal

Preliminary design features expandability to adapt to future needs

Page 33: Recent Remote Handling Experience at NuMI/ANU

LTSF – Conceptual Design

Expandable end wall

Earth berm

Large Shielded

PitWork Cell

Large Item Bays

Control Room

Page 34: Recent Remote Handling Experience at NuMI/ANU

LTSF - Expanded

Page 35: Recent Remote Handling Experience at NuMI/ANU

Dose Rate Prediction Tools for Multiple Sources

What tools exist to predict dose rate at a point in space from multiple sources?

What can be developed?I v

neutrinos