Bklý -------------- FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: ,2607,-27,2- Survey Unit:,SP'o67 Pkg. A/i/1 Sheet / of .. Date: W167/.2007 Survey Location: w" Pb- R +- /b6 eZ Col)_. I. Instrument Information Inst. HV TE{R 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector) 7I.. -1773 q3-37 24392 I.. l7_S q 2 39.7 1192)08 7 0/8 ___=NA/ NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand- held) unless otherwise noted in the comments below. Comments: Initial Perfor.mance Test Performed & Satisfactory:, H.Rwonn Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (nin.) (cpm) & G,-a&tn / &- I AVq /// 3,75 / Ac+~lfIev] ]in/L1177 Comments: Initial / Date III. Total Surface Activi Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm) / 1 51ton / / _5 .60 / / 5£oo / •- / ( 5 / _____ / /000o / •_I /0,o09 /.,../_,Q Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cn 2 , unless otherwise noted on the attached survey map. Post-Survey Performance Test Performed & Satisfactory: 0i1L4 2cD"( Initial / Date Survey Tech (print/sign): kn Date: be!/ O j C)O Reviewed By (print/sign): V // 0 L/7eJ Retention: LP+10 Filename: FSS Characterization SCAN Survey FormsRev02

Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

Bklý--------------FNR Decommissioning Project

Reconnaissance Level Scan Survey Form

Survey No: ,2607,-27,2- Survey Unit:,SP'o67 Pkg. A/i/1 Sheet / of ..

Date: W167/.2007 Survey Location: w" Pb- R +- /b6 eZ Col)_.

I. Instrument Information

Inst. HV TE{R 27c Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

7I.. -1773 q3-37 24392 I.. l7_S q 2 39.7 1192)08 7 0/8

___=NA/

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments:

Initial Perfor.mance Test Performed & Satisfactory:,

H.Rwonn Measurements

CountsInst. Count perSet Time MinuteNo. Grid or Location (nin.) (cpm)

& G,-a&tn / &-

I AVq /// 3,75/ Ac+~lfIev] ]in/L1177

Comments:

Initial / Date

III. Total Surface Activi MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

/ • 1 51ton/ / _5 .60

/ / 5£oo/ •- / ( 5

/ _____ / /000o/ •_I /0,o09/.,../_,Q

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpm/100-cn 2 , unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: 0i1L4 2cD"(Initial / Date

Survey Tech (print/sign): kn Date: be!/ O j C)O

Reviewed By (print/sign): V // 0 L/7eJRetention: LP+10Filename: FSS Characterization SCAN Survey FormsRev02

Page 2: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

SurveyNo:-2-00"1- A 1• - Survey Unit: 5P-oO7 Pkg. .)4A- Sheet 2- of 2-

Date: 11-7-07 Survey Location: A- k x ''MOe- -

Survey Comment Sheet:

4EA2A ~A ~ A~L~ ~

'~No$~- -eOAJE.

ýtck-a

mL1~

I~I~

Retention: LP+10Filenarne: Survey Comment Map_Form_RevOO

Page 3: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey No: 2-07-- 22-13

Date: 11-1-o-I

Survey Unit: -P-C007 Pkg. Sheet . of Z_

Survey Location: tdtj* 0-aw 0ý001 j

1. Instrument Information , - - -,. - " '/,-

Inst. HIV THR 27t Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

1 1-22z/ /V743 q4-31 2q,3qzZ.. 17s- Z. 34.7 I/tz/og ,7// 7/A2 L-zzl, 23q11 .. qW-iq.. Z ?Tq/ /oo i0 0 37,0 ,'$131og ./oI

tJ/A

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments:

Initial Performance Test Performed & Satisfactory:m

Initial / Date

1. Backgrounfd MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

- 41L t 3=ý2 - ________________

2- _ _ _

o.mmerits:kk4e A 64-. *a 'OL4 4.WL A4dt a, dAl,

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750r~m1llr

2,lc *n.iantAa , tnhd.mnomn

_ _

Post-Survey Performance Test Perform ,& Satisfactory: -•- 07(Initial / Date

Survey Tech (print/signi: Date: 11`9_"__-61

Reviewed By (print/sign),' I4ý " Date: Iit-:9-0'"Filename: FSS Characterization SCAN Survey FormsRevO2 Retention: LP+10

Page 4: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey No: 2o0"7- •-Z1_3 Survey Unit: IP-Co07 Pkg. A/,A Sheet Z of z.

Date: It- Survey Location: 4,o.tg e4 f .a.tc-tt 1i0 ci

Survey Comment Sheet:

6eam, e., K) AU-

Filename: Survey CommentMapForm_RevOO Retention: LP+ 10

Page 5: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

Survey No: ,,ý-2,d

Date: I J5 4ac"7I. Instrument Information

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj

Survey Location: =T jde, 82L2h CORKSc 6MATO7i Pq6mWcAr4-PI1

r-i

Inst. lV THI[R 2n Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

;Z2A) 21%59g 14q*J .2Io 71b WA 35 39-L ~16 1 VA W..Mz4

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-

held) unless otherwise noted In the comments below.

Commens:,&VA .e ol .sije Paails o4ý 4Ac•h.k covers.Initial Performance Test Performed & Satisfactory: 19% /W7

II. Background MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (ain.) (cpm)/ a,, 'I I - 75

NJ& PIA Z90! _,,'an 1 evA ±L. (o0

/W

III. Total Surface ActihA! MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (ri) (cpm)

___ ye- A414

Comm ts*~ - ~~Pciso~yco ,89 m OT slain..,Ra is1- on IV., .Each of the dernarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dprn/100-cm 2, unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: 11 1L512/0-7"' Wial I Dafte

Survey Tech (print/sign): 45y1 (fl rI1 §J1 l N Date: 154/ 2W7Reviewed By (pi/sig: Date: "

Filename- FSS Characterization SCAN Survey Forms-Rev02 Re•tenton LP+ 10

Page 6: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

( Survey No: _2&7-.23"3oDate: I Inforato

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey Unit:_______ Pkg.&SP-4Z7 Sheet _L of /Survey Location: Bm Po4 overH•i end / kA Corn-r-

11 Pjk,4m4iM-~ 4-tb oa~,e.Inst. iiV THIR 2,x Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

I &RP •/,q qq-/qX -;•V 71L 1166 - .1 410&k/•z, .41=/A!Y

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: P ,kfqrL/-CZ C- flke/ta Ch OVf-r AW&17#aI ' _-

Initial Performance Test Performed & Satisfactory:

H. Background Measurements

I V1,0gWInitial / Date

CountsInst. Count perSet Time MinuteNo. Grid or Location (rin.) (cpm)I &CXr.v::ownJ t' I __

/ • S / ___

I •vG .Il/ 3o-W 9

M. Total Surface Activh MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (ain.) (epm)

/do kylw/A

ab -10

Comments:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpmnl00-cin2 . unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: __ _ _ I_ _ -__7'=*" Ihita / Date

Survey Tech (print/sign): Date: I / ZW-7

Reviewed By (print/sign): _ __________________

Filename: FSS Characterization SCAN Survey Forms_Rev/ Retention: LP+10

Page 7: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

SurveyNo: ocWl'- 22319 Survey Unit:-• - Z- Pkg. 6P-MI Sheet t of ý-

Date: I11,g 1./o-) Survey Location: Nci-P'r WaOJJ ea Pcf{ 000K-ov &o"-s' • ,-i Q-L.M

I. Instrument Information

Inst. HV THR 27c Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

-k, I', A..x.o1 ý'ý-3-ý ý 1 161 )"7,_,0D olo q 1710•w '~* 7/1/I;ooS

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes or 15-ft RG-58 (LMI 3-37 gas-flow hand-

held) unless otherwise noted in the comments below.

Comments: nrU,'5 m •,C Floor k WC W, W h 42- 1 9,4810 q-lqu-- d q3S93

Initial Performance Test Performed & Satisfactory: 1,W nb]'*aInitial / Date

II. Background MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

I _______ I~ I•1¢-

,• Kc 2I _______/

; . 3 / /77q

___ dhFv- Lev #,-

IH. Total Surface Activi MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

Nlorfh d-si dMA flD PUYo-,ý&k -+2 q

rea-¢

_ _ Aecpm

04V cve~o-.SJp2-i-42

__________ ________________________________ _____________ I _________________

Comments:ThP~e (ýn noyAf+-\ UXLU~Q r-Luv-y.rnvl .Iq-4rcyywý 4O'-o k)iS FCc4 10

_'eEach of the demarked grids Cor locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpm/100-cm 2, unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed Safisfa•ry: L[LL -1121007)Initial / Date

Survey Tech (print/sign): ýefl (7'-no" A Date: l4I2'? 20C

Reviewed By (print/sign): JI' /1 . Date: (//Z9 ).,7¥

Filename: FSS Characterization SCAN Survey FormsRev02 Retention: LP+10

Page 8: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey No: 9• - - Survey Unit: 0 . Pkg. 'P-)o7 Sheet 2, of

Date: I 1121I, 00" Survey Location: •'orVVY\ WGL~Ju~ pbcrvx ~Rw

I. Instrument Information

Inst. HV THR 27u Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

_T l __E:-E. -,?c

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: w/u nQcrwzdS 4m- •-)" a~Y•>3h, qq-t•j- %q3•30Initial Performance Test Performed & Satisfactory: 1 i.2 -7!/,2007

Initial / Date

II. Background MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

C3 B<e & t-I:3 BK- tir33 Fhm A -oP e..14is 6A __

Comments:

III. Total Surface Activi MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

1c-las6 0ýIc•,y dM oP

and JCone_,to

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpm/100-cm 2, unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: it 1e2/-7•/•2 )"Initial / Date

Survey Tech (print/sign): Date: -r/i)__2"_ _/ _

Reviewed By (print/sign): L 7ate:

Filenarne: FSS Characterizafion SCAN Survey Forms-Rev02 Retention: LP+10

Page 9: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

1-joSurvey No: o00-l - J 3S5 Survey Unit: . Pkg. S P- O-'

Date: I11,• /.2eo7 Survey Location: Z.xan 4-or', C icl5e.--I. Instrument Information

e f

Sheet 1 f• d]•/a

Inst. HV THR 27z Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. d (mVdc) Eff. (Scaler) (Detector)

L a=4~ ý1q '-13-31 Vk 1-75 .20 L4 7 /o/L.a / A19599 L/3-31-/ ?q3ql/l 1750. ,;20 '1/ 'l..z~f 7/6tl2,*

.3 . / 21I ?8g ID 4q-L X A 0330 1100 S5 q3.q q 0/ 2 712m ? o///a

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-21 0, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-

held) unless otherwise noted in the comments below.

Comments: OQOnr-vrecS 5C.9C.weJ ;dA, a4 /-f -/L ,3. ;gg5

Initial Performance Test Performed & Satisfactory: " 11/24/?07Initial / Date

II. Background MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

i BA• •"- / ,,_ IoJ 8KG 3 / 1

I AcAl-/on -val M•/ 3707

-. I- ) ee M/I 3q78'

5 k& its

.3Ac-/'n 1ev' R53~___

Ill. Total Surface Activr MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

A/o Arnt _ _

/hee we__ &alneA Worec

p\J eW Af1 iJ i_ _

Cornm Ibc'yo ( XY xcAI Tr Q QCkEach of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpm/100-cm2' unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: / OJI "Initial / Date

Survey Tech (print/sign): • • A Date: I '-• 2"0"I

Reviewed By (print/sign): KJ/4 >- '-M1-• Date: JLZZ•/,A2

Filename: FSS Characterization SCAN Survey Forms_RevO Retention: LP+10

Page 10: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey No: •L6 ,2-3}8 Survey Unit: .j Pkg.%_•• - Sheet j of I

Date: -,Survey Location: W a- i 9v6( Cb k n Pod 0L'i54oraqe./ Pxrt,_

I. Instrument Information

Inst. HIV THR 27c Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

_____ •72•/ ;3• q ?-37 ;l• 115o3 q0 qL, ±i/,-.A•x (,12z,3

/ 22ý1~ 2-3"01~-- 91351. Ab I C11 S 5O 75 4I 1- ;,Z 61ti2OD

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: 01.0\ onh vcdtL 1..0mJwA 0, 1O00

Initial Performance Test Performed & Satisfactory:

II. lak~ond Measurements

Counts-Inst. Count perSet Time MinuteNo. Grid or Location (min.) (Cpm)

I AG -I q/0

q 7/

I~ i-If Aon A&P- NA -?&2-9-L2. t• 3(, /.

2.- A3c(.on /,eUE 11 ;29& .

Initial / Date

IIl. Total Surface Activity MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

ANl Ain'~cs __

OTkka.-

&2ancAi

Comments:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpm/1 00-cm2 , unless otherwise noted on the attached survey map. ,

Post-Survey Performance Test Performed & Satisfactory:

Survey Tech (pr] t/sign): K •4' v -nit"la] / Date

Date: iO1/qz ol.

Reviewed By (print/sign): • )4 ,,-' ate: I/ 29/0 7

Filenarne: FSS Characterization SCAN Survey Forms-Rev02 Retention: LP+I 0

Page 11: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey No: 7.007-3q Survey Unit:--- Pkg. , , "' Sheet _ of '.

Date: //- Z - f07 Survey Location: <i,--Jc . c_ a o{w "e'-sJ5T OF-t C

I. Instrument Information '-B pou-'O. lr/lch Sae- •'• ((L0.A 2-

Inst. HV THR 27c Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. , Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

.2.-z( & 2l49 4337 ,,,[?2Z !76O 2 3,' 7 /q/Lo 7//7/o0'2- L4-2zzi 22.z /D '-Iq-t/- Z 3-36 /200 3-S: I3zA Y/ Z-7 o/6 6/o1

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-

hold) unless otherwise noted in the comments below.

Comments:

Initial Performance Test Performed & Satisfactory: Z/ 2/-2-F/ -7Initial / Date

II. Background MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

I _&t I AI ;5

__. I 1•,1

Z Com 3 (n

Comments:•

III. Total Surface Activi MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

ok. a 4L _

/A ~ Ma4",

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpm/lOO-crm2

, unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: •6 * - ///zg// 7. A Initial / Date

Survey Tech (print/sign): 6- )tý6' ' Date: 11-2-Y-07

Reviewed By (print/sign): _ Date: [Z

Filename: FSS Characterization SCAN Survey Forms Rev02 Retention: LP+I0

Page 12: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning Project -

Reconnaissance Level Scan Survey Form

Survey No: 2 1-l- X-*L¶ Survey Unit: I-I/,-z!/-3 Pkg. tMa]€• Sheet 2_ of 2_

Date: l 4-'- 0"7 Survey Location: . _-,_ •-L tQ--S -. oL (

Survey Comment Sheet:This radiological survey covers the west-half of the Beam Port Floor overhead. The west-half is fromthe FNR south wall to the FNR north wall and from the storage ports wall to the north-south reactorpool centerline extended to the north stairwell wall. The ceiling and all sides of all head beams werescanned. The west wall of the FNR that extends from ground level (outside) up to the under side ofthe pool floor hatches on the west side and from the FNR south wall to the fan room is included.(The south, west and north walls around the loading bay under the west pool floor hatches. The southand west walls have a one foot wide ledge along their entire lengths). The scope of the survey doesnot include any perimeter walls, vertical columns or the floor, just overhead surfaces.

Exceptions to the "no measurements > action levels" statement on page one:

1. The underside of the four foot by five foot ceiling grate to the fan room reads 2000 gcpm, which isbelow the action level. This grate is currently going to be demolished and disposed of as radwaste.

2. This survey was concentrated of structural surfaces not piping systems. The entire water main wasnot surveyed. A small section under the grate referred to above has a small amount of contamination.It will be decontaminated. &',O 4C_-Y1 R,, tri 'sq _ i44 z_ d .-

Filename: Survey CommentMapForm RevOO Retention: LP+I0

Page 13: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey No: d,•00- dqCC) Survey Unit: I - S Pkg. 5•p1:" Sheet I of jk

Date: *A160- Survey Location: -S.o4h t •k 6&•w Pord- F0ooric••C M

I. Instrument Information

Inst. HV THR 27t Calibration CalibrationSet Meter Scaler Detector Detector. Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

I 43-- I4,49 l-3a • I• 11'5 0 O AD f1,;/ý)4 7/61/=82 2 A;L, AJ qq-lqg- q3a'o I Ilot 3'; '13'1 q4l73Joo q/2T/o,

NO I T: All cables 6i-tt R(.8-b5 (ILMI 44-142, 44-9, HP-21U, or 44-92 probes) or 1 b-tt RG-58-bt (LMI 43-37 gas-lowheld) unless otherwise noted in the comments below._ -A

Comments: FIDoo• ,-o Ce4,I'c 1 COULA,,e SCo tc.9U 10,0W) C&4* .WS- W /O

hand-

Initial Performance Test Performed & Satisfactory: i 11 ;aq/obiInitial / Date

!~ ~2l.uied

11. Background MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

I K• S3 t ______

- .2-_ A dK(, A I

___ ____ ___ LI / 1 7

HI. Total Surface Activi MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

,Wsd ____

CorrnmentF.:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpm/1 00-cm2 , unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory:Initia

Survey Tech (piintsign): VftW G.mko(0 /]d w rI / Date

)ate: bqz"J

)ate:'1 !•- U IReviewed By (print/sign):

Filename: FSS Characterization SCAN Survey FormsRev02 Retention: LP+10

Page 14: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

I . 1:

FNR DecommissioningReconnaissance Level Scan

Survey No: a~bi-L•tt)

Date: I1!301AWo7Survey Unit: I - 7

Survey Location: F4/4

ProjectSurvey Form .,.. :2..Pkg. sp-j -he6_J of i

Ba o+4 Ficor s-ec.( i-1I. Instrument Information

Inst. HV THR 21t Calibration CalibrationSet Meter Scaler Detector Detector Setting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)I ~ 2x9-1 gIS s,-3'Y7 3935q25 I&9O ao "•,A, lti,, -.I•.za

q3.,- , - 3-1 117q7q 1700 2 .'5i3,,#,, 2l 1L9A

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: WaiN.[ CeinLtA OinA P< •rtvr\..aN4 /P I tox off)Initial Performance Test Performed & Satisfactory: I 11L0/2W1

Initial / Date

II. Background MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (ain-) (cpm)

8K Bk P-1- I -V1

j /3K7-1i3 I I~lg

2 Acl-'I I-etie Al/A 3oao-i3 86A< Wt I /I qe

AiýLT 1-?c& NIA -299-2-

151J16I//(o0

Comments:

III. Total Surface Activi MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (ain.) (cpm)

on SUN,-,/

a bale__6ni~A2

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750dpm/1 00-cm2, unless otherwise noted on the attached survey map.

Post-Survey Performan e Test Performed & Satis tactory:

Survey Tech (print/sign): Date: 1)

Reviewed By (printsign): ate: [-0 7"

Filename: FSS Characterization SCAN Survey Forms-Rev02. Retention: LP+10

Page 15: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T
Page 16: Reconnaissance Level Scan Survey Form - Beam Port Nose Cone. · 2012-07-20 · Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location: =T

Survey No: 26-7 - 2-45-6

Date: 1 2/W-/0"I. Instrument Information

FNR Decommissioning ProjectReconnaissance Level Scan Survey Form

Survey Unit: - 13 Pkg. . AcJA Sheet ( ofj

Survey Location: Fft, FiK_ T o ý 1u •t&T---- LA)

11

Inst. HV THR 27c Calibration CalibrationSet Meter Scaler Detector Detector ISetting Setting Inst. Due Date Due DateNo. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

1 .-2ZZ'( ~2,19o60 'q3-37 -175-0 Z 6..7¢ 7/, i ZL."7 v Q2q133 92-Z

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments:

Initial Performance Test Performed & Satisfactory: Tr -07Initial / Date

II. Background MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

K t 3 __M

I M/A 3,2_3

Il. Total Surface Activi MeasurementsCounts

Inst. Count perSet Time MinuteNo. Grid or Location (min.) (cpm)

/J,7

z 1ýql

24C/g4g4ý&Lý /-92

, omments: 124ywem,I .Each of the demarked grids (or locations) on the attached surey map has been scanned and do not exceed the actionlevel of 1,750dpm/fOO-cM 2, unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed Sa• factory: j//4Initial/ Date

Survey Tech (print/sign): 110 /Aý._ I/ Date: 19L-F 07Reviewed By (print/sign): KJ•i A• K Date: /'Ž-I 7

Filename: FSS Characterization SCAN Survey FormsRev02 Retention: LP+10