PF - 3006-I [revised 10.26.2018]
RECREATION CREDIT COST ESTIMATE INSTRUCTIONSCity of Los Angeles - Department of Recreation and Parks
These instructions are only for projects proposing to provide private park and recreational facilites or publically-accessible, private maintained park and facilities per LAMC 12.33, Section H.2.
Recreation Credit Cost Estimate Sheets submitted to the Department of Recreation and Parks (Department) shall comply with the following specifications. Additional materials or information may be required according to each type of application. Application forms are available at www.laparks.org and at the Department Public Counter, located at 221 N. Figueroa Street, 4th Floor, Los Angeles, CA 90012 (phone: 213-202-2682).
NOTE: An illegible or inadequate Recreation Credit Cost Estimate Sheets cannot be accepted. Include only information necessary to depict the project and its setting.
Per LAMC 12.33, Section H.2(d), privately owned park and recreational facilities shall be granted a dollar for dollar credit, for any recreational and park impact fees required to be paid for the property. The cost and subsequent credit should bear a reasonable relationship to an independent assessment of the construction cost for the facility, such as the estimates provided by RSMeans Building Construction Cost Data or similar.
Applicants must follow the following instructions when preparing and submitting recreation credit cost estimate sheet. Failure to do so will cause delays in the review of the recreation credit.
Applicants must fill out the Recreation Credit Cost Estimate Sheet (PF-3010-E) for each recreational amenity in order to receive credit using the most recent version of the RSMeans Building Construction Cost Data. Each proposed recreation amenity and the associated costs must be on its own Recreation Credit Cost Estimate Sheet. Note: Only one recreation amenity per Recreation Credit Cost Estimate Sheet and Exhibit Sheet will be accepted.
The Department will use RSMeans to verify labor, material and equipment costs for proposed recreational amenities. For a full list of amenities eligible for recreation credit, see form PF-3002-I.
Applicants will ONLY receive recreation credit for the following non-construction items and ONLY at the specified rates for 2018:
• Architectural Fees - 4.9% (Per RSMeans, Line Number: 01 11 31.10 0060)• Construction Management Fees - 4% (Per RSMeans, Line Number: 01 11 31.20 0350)• Permit Fees - 2% (Per RSMeans, Line Number: 01 41 26.50 0100)• Engineering Fees - 2.5% (Per RSMeans, Line Number: 01 11 31.30 0800)• Grading (only applicable for recreation credit areas on the ground level) - 2% (As determined by Department's
Planning, Maintenance and Construction staff)• Survey - 2% (As determined by Department's Planning, Maintenance and Construction staff)
Page 2 of 2
City Index x Cost Based on National Average Costs = City Cost (Los Angeles) 100
PF - 3006-I [revised 10.26.2018]
A template version form of the Recreation Credit Cost Estimate Sheet (Form PF-3010-E) and sample Recreation Credit Plans and Cost Estimate Sheets are available at http://laparks.org/planning/park-fees.
17. General Requirements – This includes a specified percentage for Architectural Fees, Construction ManagementFees, Permit Fees, Engineering Fees, Grading and Survey, as determined by RSMeans and the Department ofRecreation and Parks. Each percentage is applied to the Adjusted Cost and added to determine the Grand Total.
1. Project Name – Case Number (Tract/Parcel/Permit #)2. Recreational Amenity – Name the recreational amenity the Recreation Credit Cost Estimate Sheet is for. Only
one amenity per cost estimate sheet.3. Sheet # – Number all cost estimate sheets.4. Exhibit/Sheet Reference – The Exhibit or Sheet Number that has the rendering for the corresponding recreation
amenity.5. Line Number – 12 numbers that identify a specific item in the RS Means database.6. Description – Fill in the description of the item.7. QTY – Fill in the quantity of the item.8. Units – Units of measurement for the item.9. Material – This number is calculated by multiplying the QTY by the “Material” cost provided in RSMeans that
corresponds with the Line Number.10. Labor – This number is calculated by multiplying the QTY by the “Labor” cost provided in RSMeans that
corresponds with the Line Number.11. Equipment – This number is calculated by multiplying the QTY by the “Equipment” cost provided in RSMeans that
corresponds with the Line Number.12. Subcontract – The cost of the subcontractor.13. Estimate Total – The sum of estimate Material, Labor, Equipment and SubContract Costs.14. Division – Refers to the Section in RSMeans where all the line items were identified.15. Sales Tax – Current sales tax rate may be added to the Subtotal Cost based on the National Average for material
costs, equipment costs, and subcontracted work.16. City Cost Adjustment – The estimates in RSMeans are based on national average costs, therefore the cost of the
project needs to be adjusted using the City Cost Index. The adjustment can be calculated with the formula below:Per RSMeans, the adjustment formula is:
LAMC 12.33, Section HRecreation Credit Cost Estimate Sheet
PF - 3010 - E *BASED ON BUILDING CONSTRUCTION COSTS WITH RSMEANS 2017
QTY UNITS MATERIAL LABOR EQUIPMENT SUBCONTRACTESTIMATE
TOTAL
800 SF Surf $62,000.00 $20,400.00 $5,120.00 -
20 L.F. $6,800.00 - - -
1 Ea. $16,100.00 $1,975.00 - -
1 Ea. $4,350.00 $292.00 - -
1 Ea. $3,650.00 $292.00 - -$92,900.00 $22,959.00 $5,120.00 - $120,979.00
200 S.F. $334.00 $188.00 $62.00 -
200 S.F. - $106.00 - -$334.00 $294.00 $62.00 - $690.00
2 Ea. $3,950.00 $1,860.00 - -$3,950.00 $1,860.00 $0.00 - $5,810.00
$97,184.00 $25,113.00 $5,182.00 - $127,479.00Sales Tax $8,989.52 - $479.34 $9,468.86Estimate Subtotal $106,173.52 $25,113.00 $5,661.34 $136,947.86
1.134 $18,351.01$155,298.87
Architectural Fees (01 11 31.10 0060) 4.90% $7,609.64
(Cost based on National Average)
Los Angeles City Index/100Adjusted Cost (Los Angeles)
13 11 46.50 1800
Division 23 Subtotal23 52 28.10 0160
Subtotal
Swimming Pool Heaters, gas fired input, 155 MBH
Division 13 Subtotal
Division 3
Lifeguard chair, stainless steel, fixed
Line Number Description
13 11 13.50 1250
CASE NUMBER: VTT-00000RECREATIONAL AMENITY: SWIMMING POOL
13 11 46.50 0600
13 11 13.50 1360 Add for stainless steel gutters
Swimming Pool, municipal, gunite w/plaster finish, incl. high capacity filtatration & chlorination
Diving stand, stainless steel, 3 meter13 11 46.50 0020
Diving board, 16' long, aluminum
EXHIBIT/SHEET REFERENCE: SHEET 03SHEET # 1 of 4
03 30 53.40 3150
03 35 15.30 0125
Regular concrete (4000 psi), 4" slab
Finishing Floors, High Tolerance, Bull Float & Manual Float
SAMPLE
LAMC 12.33, Section HRecreation Credit Cost Estimate Sheet
PF - 3010 - E *BASED ON BUILDING CONSTRUCTION COSTS WITH RSMEANS 2017
Costruction Management (01 11 31.20 0350) 4% $6,211.95Permit (01 41 26.50 0100) 2% $3,105.98Engineering Fees (01 11 31.30 0800) 2.50% $3,882.47Grading Fees (if applicable) 2% $3,105.98
Survey 2% $3,105.98$182,320.87Grand Total
SAMPLE
PF - 3010 - E *BASED ON SITE WORK LANDSCAPE COSTS WITH RSMEANS 2017
QTY UNITS MATERIAL LABOR EQUIPMENT SUBCONTRACTESTIMATE
TOTAL
S.Y. 1111 $4,999.95 $2,210.89 $411.07 -
Ea. 3 $139.50 - - -
Ea. 3 $480.00 - - -
Ea 2 $106.00 - - -
L.F. 500 $125.00 $515.00 - -
S.F. 200 $1,830.00 $1,710.00 - -
Ea. 3 $3,150.00 $471.00 - -$10,830.45 $4,906.89 $411.07 - $16,148.41
Ea. 1 $570.00 $315.00 - -
$570.00 $315.00 - $885.00
Ea. 1 $1,200.00 $187.00 - -$1,200.00 $187.00 - $1,387.00
CASE NUMBER: VTT-00000 SHEET # 2 of 4RECREATIONAL AMENITY: LANDSCAPED OPEN SPACE EXHIBIT/SHEET REFERENCE: SHEET 02
Line Number Description
32 92 19.13 0300Fine grading and seeding incl.lime, fertilizer & seed with equipment
32 93 43.50 3420Jacaranda mimosifolia (Jacaranda), 15 gal
32 93 43.50 4530Pistachia chinesis (Chinese Pistache), 24" box
32 93 43.30 4910Liriodendron tulipifera (Tulip Tree) Z5, B&B, 7' to 8'
32 84 13.10 0200Preinserted P.E. meter, line, hand bury, irregular area, large
Division 33 Subtotal32 33 43.13 0100
Seating, benches, park, precast conc., w/backs, wood rails, 8' long
32 14 40.10 1100Stone Pavers, Flagging Blue Stone, irregular, 1" thick
13 12 13.10 0100Outdoor fountain, 48" high with bowl and figures
22 52 16.10 0200
Fountain Water Pumps, pump w/ controls, single phase, 100' cord, 1/2 H.P. Pump
Division 13 Subtotal
Division 3 Subtotal SAMPLE
PF - 3010 - E *BASED ON SITE WORK LANDSCAPE COSTS WITH RSMEANS 2017
QTY UNITS MATERIAL LABOR EQUIPMENT SUBCONTRACTESTIMATE
TOTAL
C.Y. 296 $42,032.00 $20,720.00 $136.16 -
S.F. 400 - $108.00 - -$42,032.00 $20,828.00 $136.16 - $62,996.16
$54,632.45 $26,236.89 $547.23 - $81,416.57
Sales Tax $5,053.50 - $50.62 $5,104.12
$59,685.95 $26,236.89 $597.85 $86,520.69
1.134 $11,593.77$98,114.46
Architectural Fees (01 11 31.10 0060) 4.90% $4,807.61Costruction Management (01 11 31.20 0350) 4% $3,924.58Permit (01 41 26.50 0100) 2% $1,962.29Engineering Fees (01 11 31.30 0800) 2.50% $2,452.86Grading Fees (if applicable) 2% $1,962.29Survey 2% $1,962.29
$115,186.38
Estimate Subtotal
Grand Total
Division 03 Subtotal
SHEET # 3 of 4RECREATIONAL AMENITY: LANDSCAPED OPEN SPACE EXHIBIT/SHEET REFERENCE: SHEET 04
Line Number Description
Slab on grade (3500 psi), not including finish, 4" thick
PROJECT NAME: VTT-00000
Los Angeles City Index/100Adjusted Cost (Los Angeles)
03 30 53.50 4650
03 35 13.30 0100 Finishing Floor, High Tolerance, Bull Only
(Cost based on National Average)
SAMPLE
PF - 3010 - E *BASED ON BUILDING CONSTRUCTION COSTS WITH RSMEANS 2017
QTY UNITS MATERIAL LABOR EQUIPMENT SUBCONTRACTESTIMATE
TOTAL
Ea. 2 $1,270.00 $1,910.00 - -
L.F. 8 $364.00 $424.00 - -
Ea. 2 $3,150.00 $424.00 - -
Ea. 2 $9,800.00 $382.00 - -
Ea. 1 $515.00 $191.00 - -
Ea. 1 $265.00 $159.00 - -Ea. 1 $2,250.00 $239.00 - -Ea. 2 $1,040.00 $960.00 - -
$18,654.00 $4,689.00 $23,343.00
S.F. 200 $2,290.00 $548.00 - -
Ea. 3 $3,150.00 $471.00 - -$5,440.00 $1,019.00 $6,459.00
$24,094.00 $5,708.00 $0.00 - $29,802.00Sales Tax $2,228.70 - $0.00 $2,228.70
$26,322.70 $5,708.00 $0.00 $32,030.701.134 $4,292.11
$36,322.81Adjusted Cost (Los Angeles)Los Angeles City Index/100
11 68 13.20 0130 Post, steel, 5" square
11 68 13.20 0160 Roof, square poly, 54" side
11 68 13.20 1330 Fire pole for 72" high deck
Playground protective surfacing, resilient rubber surface, poured in place, 4" thick, black
Division 32 Subtotal
(Cost based on National Average)
32 33 43.13 0100Seating, benches, park, precast conc., w/backs, wood rails, 8' long
32 18 16.13 0100
Estimate Subtotal
11 68 13.20 1340 Bridge, ring climber, 8' long11 68 13.20 0200 Activity Panel, crawl through panel
Division 11 Subtotal
11 68 13.20 100Moular Playground, basic components, deck, square, steel, 48" x 48"
11 68 13.20 1240 Spiral slide, 56"-72" high
11 68 13.20 1300 Ladder vertical, for 24" to 72" high deck
CASE NUMBER: VTT-00000 SHEET # 4 of 4RECREATIONAL AMENITY: PLAYGROUND EXHIBIT/SHEET REFERENCE: SHEET 05
Line Number Description
SAMPLE
PF - 3010 - E *BASED ON BUILDING CONSTRUCTION COSTS WITH RSMEANS 2017
Architectural Fees (01 11 31.10 0060) 4.90% $1,779.82Costruction Management (01 11 31.20 0350) 4% $1,452.91
Permit (01 41 26.50 0100) 2% $726.46Engineering Fees (01 11 31.30 0800) 2.50% $908.07Grading Fees (if applicable) 2% $726.46Survey 2% $726.46
$42,642.98Grand Total
SAMPLE