Page 1 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL PORT, YANBU ANNUAL SUMMARY REPORT 2015 FOR THE NAVIGATIONAL AID OF KING FAHD INDUSTRIAL PORT, YANBU SAUDI SEAPORTS AUTHORITY SUBMITTED BY: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL PORT, YANBU

RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 1 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

ANNUAL SUMMARY REPORT 2015

FOR THE NAVIGATIONAL AID

OF

KING FAHD INDUSTRIAL PORT, YANBU SAUDI SEAPORTS AUTHORITY

SUBMITTED BY:

RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL PORT, YANBU

Page 2: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 2 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF JANUARY 2015 NOS. NAMES DATE REMARKS

1 Buoy #4 JAN. 5, 2015 Replaced the Light, Battery, Solar Panel, Radar Reflector, and Top Mark.

2

Buoy #8R JAN. 22, 2015 Replaced the old Buoy by a brand new set of Buoy, complete with Brand new set of Light, Brand new Set of Chain, Sinker, Swivel and Shackles.

3 Buoy #3 JAN. 27, 2015 Repainted the Structure, Aligned the Top Mark,

Radar Reflector, Change the Battery and Light, model # (GS/LS-C-6)

1) Buoy # 4 2) Buoy # 8R 3) Buoy # 3

Page 3: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 3 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF FEBRUARY 2015 NOS. NAMES DATE REMARKS

4

Maharish South FEB. 18, 2015 Sand Blasted the old Buoy from K.F.I.P., Buoy. Fabricated new Structure, with Radar Reflector, Top Mark, Set of Mooring Chain, Swivel, Shackle and 3 tons Sinker.

5 Duba FEB. 18, 2015 Fabricated new Structure, with Radar

Reflector, Top Mark, set of Mooring Chain, Swivel, Shackle and Sinker. New set of Light.

6 RUT FEB.18, 2015 Fabricated new Structure with Radar Reflector.

And Top Mark, New set of Light, New set of Mooring Chain, Swivel, Shackles and Sinker.

7 2C FEB. 26, 2015 Fabricated new Top Mark Structure 6) Buoy # Maharish South 7) Buoy # DUBA 8) Buoy # RUT 9) Buoy # 2C

Page 4: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 4 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF MARCH 2015 NOS. NAMES DATE REMARKS

9

Maharish South MARCH 2015 Sand Blasted the old Buoy from K.F.I.P., Buoy. Fabricated new Structure, with Radar Reflector, Top Mark, Set of Mooring Chain, Swivel, Shackle and 3 tons Sinker.

10 Duba MARCH 2015 Fabricated new Structure, with Radar

Reflector, Top Mark, set of Mooring Chain, Swivel, Shackle and Sinker. New set of Light.

11 RUT MARCH 2015 Fabricated new Structure with Radar Reflector.

And Top Mark, New set of Light, New set of Mooring Chain, Swivel, Shackles and Sinker.

12 2C MARCH 2015 Fabricated new Top Mark Structure 9) Buoy # Maharish South 10) Buoy # DUBA 11) Buoy # RUT 12) Buoy # 2C

Page 5: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 5 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF APRIL 2015 TO MAY 2015

17 MAHARISH EAST EAST CARDINAL COMPLETE NEW SET OF BUOY

Beacon 1 Beacon 2 Beacon 3

Page 6: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 6 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU Beacon 4 Beacon 5 Beacon 6

Sila Island Beacon Maharish South Duba Bouy

Rut Approach Sila Shoal

Weather AL Wajj Starboard Al Wajj Port Maharish East

Page 7: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 7 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF JUNE 2015

NOS. NAMES DATE REMARKS

30 CZC JUNE 24, 2015 (AIS) Automatic Identification System been Installed on 24 JUNE 2015.

31 1C JUNE 2015 Water blasted and Retouch the paints Clean Solar Panel and Light cover

32 10 JUNE 2015 Lifted up the old buoy and dropped the new Complete set of buoy.

33 S4 JUNE 28, 2015 Installed the (AIS) Automatic Identification System.

34

S3 JUNE 26, 2016 Water Blasted the entire Structure, applied 2 Coats of epoxy primer and 2 coats of top coat Signal Green. Installed (AIS) Automatic Identification System

35

2C JUNE 22, 2015 Replace the top Structure by smaller Pipe, Repainted the Structure Steel Pile. And Fabricated a new Structure at the yard and will install by September 2015

CZC 1C 10 S4 S3 2C

Page 8: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 8 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF JULY 2015

NOS. NAMES DATE REMARKS

36 S1 JULY 9, 2015 Lifted up the old buoy and dropped the new

set of buoy, with (AIS) Automatic Identification System.

37 S2 JULY 9, 2015 Lifted up the old buoy and dropped the new

set of buoy, with (AIS) Automatic Identification System.

S1 S2

Page 9: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 9 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF AUGUST 2015

NOS. NAMES DATE REMARKS

38 9 AUG. 23, 2015 Lifted up the old buoy and dropped a new Complete set of buoy.

39 7 AUG. 20, 2015 Lifted up the old buoy and dropped a new Complete set of buoy.

40 Beacon 28 AUG. 5, 2015 Installed the Brand New Set of Light

Model- GS/LS-C-3 (3 NM RANGE) And re-painted with required color.

9 7 Beacon 28

Page 10: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 10 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF SEPTEMBER 2015

NOS. NAMES DATE REMARKS

41 Range Beacon 38 SEPT. 03, 2015 Water Blasted the Structure, Applied 2 Coats of

Epoxy Primer Grey and 2 coats of Top Coat White.

42 21C SEPT. 03, 2015 Water Blasted the whole structure and Replaced new Battery.

43

19C SEPT. 05, 2015 Water blasted the whole structure, Chipped, scraped rusted part of the Beacon, Applied 2 coats of primer and repainted with Signal Green.

44 12 SEPT. 06, 2015 Replaced the old buoy by a new set of buoy,

new structure, new set of mooring system, Chain. Shackles, swivel and sinker.

45 2C SEPT. 7-17, 2015 Fabricated the Top Mark Structure,

With ladder and installed at the site. Repainted the Structure and the Steel Pile.

46 13C SEPT. 26, 2015 Chipped, scraped rusted part of the Beacon,

Applied 2 coats of primer and repainted with Signal Green. Replaced BATTERY

47

23C SEPT. 25, 2015 Chipped and Repainted the Structure of the Beacon. Applied 2 coats of epoxy primer and 2 Coats of Top Coat Epoxy as per color Requirements.

48 5C SEPT. 27, 2015 Water Blasted the Buoy, Applied Primer to the

rusted part and Installed brand new set of Light.

49

3C SEPT. 27, 2015 27 August 2015Chipped, Scraped the rusted part of the beacon, Applied 2 coats of epoxy primer grey and applied 2 coats of Top coat Green.

Page 11: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 11 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU Range Beacon 38 21C 19C

12 2C 13C

23C 5C 3C

Page 12: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 12 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF OCTOBER 2015

NOS. NAMES DATE REMARKS 50 3C OCT. 1, 2015 Repainted the structure and replaced battery.

51 S8 OCT. 3, 2015 Repainted the buoy body and structure. Installed Automatic Identification system.

52 18 OCT. 3, 2015 Repainted and replace the battery.

53 12 OCT. 12, 2015 Replaced the Lighting system, with Solar Panel And battery box.

54 07 OCT. 12, 2015 Installed new self contained marine lantern And installed Automatic Identification System.

55 16 OCT. 5, 2015 Lifted the buoy and brought to KFIP Service

Harbour and rehabilitated the Buoy and Structure.

56 2R OCT. 5, 2015 Replaced brand new set of marine Lantern.

57

Schermo Reef OCT. 21, 2015 Lifted the buoy and brought to Yanbu Commercial Port for rehabilitation, Water Blasted, Applied 4 coats of Epoxy Primer Grey and Red and 2 coats of Top coat epoxy Black And Yellow. AIS been installed (working)

58

East Reef OCT. 25, 2015 Lifted the buoy for rehabilitation, Water Blasted, Applied 4 coats of Epoxy Primer Grey and Red and 2 coats of Top coat epoxy Black And Yellow. AIS been installed (working)

59

West Reef OCT. 25, 2015 Lifted the buoy and brought to Yanbu Commercial Port for rehabilitation, Water Blasted, Applied 4 coats of Epoxy Primer Grey and Red and 2 coats of Top coat epoxy Black And Yellow.

60 Beacon 26 OCT. 27, 2015 Installed New Set of Light and repainted the whole structure

61 Beacon 24 OCT. 28, 2015 Installed New Set of Light and repainted the whole Structure

62 Beacon 23 OCT. 28, 2015 Installed New Set of Light and repainted the whole structure

63 Beacon 22 OCT. 28, 2015 Installed New Set of Light and repainted the whole structure

64 Beacon 19 OCT. 28, 2015 Installed New Set of Light and repainted the whole structure

65 Beacon 20 OCT. 28, 2015 Installed New Set of Light and repainted the whole structure

66 Beacon 21 OCT. 29, 2015 Installed New Set of Light and repainted the whole structure

Page 13: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 13 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

3C S8 18

12 7 16

2R SCHERMO REEF East Reef

Page 14: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 14 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU West Reef Beacon26 Beacon24

Beacon 23 Beacon 22 Beacon19

Beacon 20 Beacon 21

Page 15: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 15 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF NOVEMBER 2014

NOS. NAMES DATE REMARKS

66 YCP 3 NOV. 8, 2015

Lifted up the buoy on deck and brought Ashore to rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat green

67 YCP 4 NOV. 8, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Red

68 YCP 5 NOV. 3, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Green

69 YCP 6 NOV. 4, 2015 Scrapped and Chipped the parted paints and applied 1 coats of epoxy primer and one coat of Topcoat Red

70 YCP 7 NOV. 5, 2015

Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Green

71 YCP 8 NOV. 5, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Red

72 YCP 9 NOV. 1, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Green

73 1A NOV. 1, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Red

74 N1 NOV. 14, 2015 Replaced the battery, Cleaned the Solar Panel And retouch paint.

75 BEACON 14 NOV. 15, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint and replaced name plate

76 BEACON 16 NOV. 16, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint

Page 16: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 16 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

77 BEACON 18 NOV. 15, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint

78 BEACON 17 NOV. 16, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint

79 BEACON 20 NOV. 15, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint

80 BEACON 15 NOV. 16, 2015 Replaced Name Plate, Replaced battery, Cleaned the Solar Panel and Retouch Paint with required color

81 BEACON 27 NOV. 6, 2015 Replaced Name Plate, Replaced battery, Cleaned the Solar Panel and Retouch Paint with required color

YCP3 YCP4 YCP5

YCP6 YCP7 YCP8

Page 17: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 17 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU YCP9 1A N1

Beacon14 Beacon16 Beacon18

Beacon17 Beacon20 Beacon15

Page 18: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 18 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

Beacon27

Page 19: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 19 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

MONTH OF DECEMBER 2014

NOS. NAMES DATE REMARKS

82 YCP 1 DEC. 22, 2015 Replaced Battery, Cleaned Solar Panel and repainted with color signal green

83 YCP 2 DEC. 12, 2015 Replaced Battery, Cleaned Solar Panel and repainted with color signal red

84 BEACON 4 DEC. 15, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green.

85 BEACON 5 DEC. 15, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red.

86 BUOY 3 DEC. 01, 2015 Replaced Battery, Clean the Solar Panel and Retouch Paint with color Signal Green

87 BEACON 1 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

88 BEACON 2 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red

89 BEACON 3 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

90 BEACON 4 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red

91 BEACON 5 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

92 BEACON 6 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red

93 BEACON 7 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

94 BEACON 8 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red

95 BEACON 9 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

96 BEACON 10 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red

97 BEACON 11 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

98 BEACON 13 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

99 BEACON 15 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

100 BEACON 17 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

101 BEACON 19 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green

102 BEACON 12 DEC. 16, 2015 Build a New Beacon

Page 20: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 20 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU YCP Beacon 1 YCP Beacon 2 Beacon 4

Beacon5 Buoy 3 Beacon1

Beacon2 Beacon3 Beacon4

Page 21: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 21 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

Beacon5 Beacon6 Beacon7

Beacon 8 Beacon 9 Beacon 10

Page 22: RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL … data/NAV AID ANNUAL REPORT… · red sea marine services co. ltd. page 4 capt. r. g. morrison d.h.m. / nav-aid expert aids

Page 22 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert

AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.

KING FAHD INDUSTRIAL PORT, YANBU

Beacon 11 Beacon 13 Beacon 15

Beacon 17 Beacon 19 Beacon 12