Redesign of Lake Nona, West, and Osceola Student Services. Presented by: Jonathan Hernandez, MA Linda Herlocker, EdD Jillian Szentmiklosi, EdD. Framework. Why? Design Principles Planning Process Functionality Where We Are Now. Lake Nona: New Campus. Lake Nona Student Services . - PowerPoint PPT Presentation

Citation preview

Page 1: Redesign of Lake Nona, West, and Osceola Student Services

REDESIGN OF LAKE NONA, WEST, AND OSCEOLA STUDENT SERVICES

Presented by:Jonathan Hernandez, MALinda Herlocker, EdDJillian Szentmiklosi, EdD

Page 2: Redesign of Lake Nona, West, and Osceola Student Services

FRAMEWORK▪ Why?

▪ Design Principles

▪ Planning Process

▪ Functionality

▪ Where We Are Now

Page 3: Redesign of Lake Nona, West, and Osceola Student Services

LAKE NONA: NEW CAMPUS

Page 4: Redesign of Lake Nona, West, and Osceola Student Services

LAKE NONA STUDENT SERVICES

Page 5: Redesign of Lake Nona, West, and Osceola Student Services

MORE PERSONAL SERVICE Capitalizing on the small campus feel

Page 6: Redesign of Lake Nona, West, and Osceola Student Services

ANSWER CENTER Waiting Area

Page 7: Redesign of Lake Nona, West, and Osceola Student Services

COMBINED ANSWER CENTER & ADVISING SPACETaking the One Stop Shop to a Wholenutha Level

Page 8: Redesign of Lake Nona, West, and Osceola Student Services

STUDENT SERVICES CHECK-INIdentifying Student Needs

Page 9: Redesign of Lake Nona, West, and Osceola Student Services

SHARED SPACERotating Office

Page 10: Redesign of Lake Nona, West, and Osceola Student Services

SPACE TO GROW INTOAdaptability

Page 11: Redesign of Lake Nona, West, and Osceola Student Services

NANA WALL Connection to Multipurpose Room

Page 12: Redesign of Lake Nona, West, and Osceola Student Services

WEST CAMPUS: 4 PHASES

Page 13: Redesign of Lake Nona, West, and Osceola Student Services

PHASE I▪ Answer Center, Admissions, Atlas Lab, Assessment, Bridges, Atrium east

▪ Estimated completion: mid-July

Page 14: Redesign of Lake Nona, West, and Osceola Student Services
Page 15: Redesign of Lake Nona, West, and Osceola Student Services
Page 16: Redesign of Lake Nona, West, and Osceola Student Services
Page 17: Redesign of Lake Nona, West, and Osceola Student Services
Page 18: Redesign of Lake Nona, West, and Osceola Student Services
Page 19: Redesign of Lake Nona, West, and Osceola Student Services

PHASE 2▪ Functional Techs, Call Center, Internship, Atrium west

▪ Estimated completion: mid-August

Page 20: Redesign of Lake Nona, West, and Osceola Student Services
Page 21: Redesign of Lake Nona, West, and Osceola Student Services
Page 22: Redesign of Lake Nona, West, and Osceola Student Services
Page 23: Redesign of Lake Nona, West, and Osceola Student Services

PHASE 3▪ Career Center, Financial Aid

▪ Estimated completion: mid-September

Page 24: Redesign of Lake Nona, West, and Osceola Student Services
Page 25: Redesign of Lake Nona, West, and Osceola Student Services
Page 26: Redesign of Lake Nona, West, and Osceola Student Services

PHASE 4▪ Dual enrollment

▪ Estimated completion: Late September

Page 27: Redesign of Lake Nona, West, and Osceola Student Services
Page 28: Redesign of Lake Nona, West, and Osceola Student Services

“FLOATERS”▪ Business Office and Graduation

▪ Estimated completion: at least by mid-September, if not sooner

Page 29: Redesign of Lake Nona, West, and Osceola Student Services

PROCESS REENGINEERING▪ Six brainstorming sessions, plus time to write protocols and to train.

▪ Rethinking how we do business in terms of our layout, our processes, our protocols, and our technology options.

“Right student at the right time to the right staff member for the right service.”

Page 30: Redesign of Lake Nona, West, and Osceola Student Services

OSCEOLA CAMPUS:TODAY AND TOMORROW

Page 31: Redesign of Lake Nona, West, and Osceola Student Services

OSCEOLA▪ Building 4

▪ Planning Process▪ Board of Trustees approved contracts in September

▪ First official Conversations▪ 10/9/12 (College Night)

▪ Approved department location and general layout▪ 12/5/12

▪ Department review with architects ▪ 1/29/13

▪ Feedback incorporated – most recent plan▪ 2/6/13

Page 32: Redesign of Lake Nona, West, and Osceola Student Services

OSCEOLA▪ Career Center and Internship

▪ Advising/Counseling

▪ Financial Aid

▪ Student Development

▪ Orientation

▪ Presentation Classroom▪ Orientation, Skillshops, SLS

▪ Office for Students with Disabilities

▪ Bridges and Transitions

▪ Admissions, Records, Graduation, and BDMS

▪ Answer Center

▪ Atlas

▪ Business Office

▪ Security

Page 33: Redesign of Lake Nona, West, and Osceola Student Services
Page 34: Redesign of Lake Nona, West, and Osceola Student Services
Page 35: Redesign of Lake Nona, West, and Osceola Student Services
Page 36: Redesign of Lake Nona, West, and Osceola Student Services
Page 37: Redesign of Lake Nona, West, and Osceola Student Services
Page 38: Redesign of Lake Nona, West, and Osceola Student Services
Page 39: Redesign of Lake Nona, West, and Osceola Student Services

OSCEOLA▪ Design Principles

▪ What do we want the student experience to be?

▪ How does design impact how we serve students?

▪ Function ▪ Process flow

▪ The waiting experience

▪ Estimated timeline▪ To begin, late May?

▪ To finish, end of year?

Page 40: Redesign of Lake Nona, West, and Osceola Student Services

QUESTIONS ABOUT LAKE NONA???

QUESTIONS ABOUT WEST???

QUESTIONS ABOUT OSCEOLA???