1 Reduction of Coke Rate from 428 kg/thm to 408 kg/thm at ‘I’ Blast Furnace 1 Vineet R Tripathi Head Operation ‘I’ Blast Furnace S. Subhachandhar Manager Operations & Support ‘I’ Blast Furnace Tata Steel … values stronger than steel 2 © Copyright 2017 Tata Steel. All Rights Reserved 1 5 500 81K 28 110 First Integrated Steel Plant in Asia Over 28 Million tonnes of Steel Produced p.a Providing customized solutions across 5 continents One of the few steel industries to feature in FORTUNE500 Conglomerate with over 81,000 employee 110 Years of Successful operation

Reduction of Coke Rate from 428 kg/thm to 408 kg/thm at ‘I ...Blast Furnace 1 2 Reduction of Coke Rate will impact the Perceived Opportunity –Reduction of Hot Metal Cost 3 Improvement

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    Reduction of Coke Rate

    from 428 kg/thm to 408

    kg/thm at ‘I’ Blast Furnace

    1

    Vineet R TripathiHead Operation ‘I’ Blast Furnace

    S. SubhachandharManager Operations & Support ‘I’ Blast Furnace

    Tata Steel … values stronger than steel

    2© Copyright 2017 Tata Steel. All Rights Reserved

    1

    5

    500

    81K28

    110

    First Integrated Steel Plant

    in Asia

    Over 28 Million tonnes of Steel

    Produced p.a

    Providing customized solutions across 5

    continents

    One of the few steel industries to

    feature in FORTUNE500

    Conglomerate with over 81,000

    employee

    110 Years of Successful operation

  • 2

    ‘I’ Blast Furnace… Journey of Excellence : 2012 - 2017

    3© Copyright 2017 Tata Steel. All Rights Reserved

    2013 2014 2015 2016 2017Breaking the

    Deadlock

    • First breakthrough

    in Operational

    Efficiency – Tata

    Steel benchmark

    • Reduction of CO2

    Emission to Indian

    Benchmark

    • Shram Bhushan

    Award recipient

    from Hon. President

    of India

    Outperforming

    Ourselves

    • Highest Ever Production

    • Lowest Ever Coke Rate and

    Highest Coal Injection –

    Indian Benchmark

    • Lowest Ever Utilities &

    Consumable consumption

    • Achieved Status of Power

    Neutrality – We Consume

    what we produce

    Going Green

    & Up skilling

    Manpower

    • Zero Effluent

    Discharge for the first

    time

    • Highest Power

    Generation

    • 100% Involvement of

    I BF manpower in

    Improvement

    Frameworks – TPM &

    SGA

    Pursuit of

    Excellence in

    Safety

    • Centre for

    Excellence in

    Process Safety

    • 1000 days of LTI

    Free Operations

    • Exemplar in Road

    Safety Performance

    in Tata Steel

    World Class

    Commissioning

    • Benchmark Ramp

    to the Rated

    Capacity

    • Leanest Man-

    Power Blast

    Furnace in Tata

    Steel India &

    EuropeCo

    mm

    issi

    on

    ing

    of

    I BF

    –4

    thA

    pri

    l 20

    12

    INDEX

    4© Copyright 2017 Tata Steel. All Rights Reserved

    Project and Team Selection 1 Slides – < 5 - 17 >

    Current Situation and Improvement Opportunity Analysis 2

    Solution / Improvement Development 3

    Implementation and Results Verification 4

    Sustaining Results Over Time 5

    Beyond Results : Awards & Accolades 6

    6’

    7’

    5’

    6’

    3’

    3’

    Slides - < 18 – 31>

    Slides - < 32 – 48 >

    Slides - < 49 – 59 >

    Slides - < 60 – 63 >

    Slides - < 64 – 66 >

  • 3

    Project and Team Selection1

    5© Copyright 2017 Tata Steel. All Rights Reserved

    Understanding the Context of the Project Selection

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.1.0

    1

    2

    3

    4

    5

    1.1.1.1 – Who was responsible for the selecting the project ?1.1.1.2 – What background information on the company or those who selected the project was provided to better understand the context of the project ?

    6© Copyright 2017 Tata Steel. All Rights Reserved

    Elaborate Project Selection Framework following ‘Top – Down’ ApproachTeam Responsible for

    Selection of the project

    Background Information for the selection of the project

    1

    2

  • 4

    The current position of I BF also states that there is scope of improvement

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    Project Selection Process1.2.0

    1

    2

    3

    4

    5

    1.2.1.1 – How was the gap or opportunity brought to the attention of the project identification group ?1.2.1.2 – What was the opportunity (process improvement) ?

    7© Copyright 2017 Tata Steel. All Rights Reserved

    Company Level Strategy

    (Tata Steel)

    Increasing the savings by INR

    2000 Cr

    Divisional Level Strategy

    (Iron Making)

    Reduce the Cost of Divisions

    product

    Departmental Level Strategy (Blast Furnace)

    Reduction of Hot Metal Cost

    Cost Break Up of Finished Steel60 % of Cost of Hot metal is

    incurred through Coke & Coal consumption in Blast Furnace

    70%

    30%

    Bringing the Opportunity to the Attention of Project Identification Group1 Opportunity

    Scope

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    Project Selection Process1.2.0

    1

    2

    3

    4

    5

    1.2.1.3 – What area of the organization had the gap or opportunity ?

    8© Copyright 2017 Tata Steel. All Rights Reserved

    Opportunity

    42% of the cost of Finished steel comes from the coke and

    coal consumed in Blast Furnace – OPPORTUNITY TO REDUCE THE COKE CONSUMPTION & IMPACT

    THE BOTTOMLINE

    What ?

    Area of Opportunity Identified

    ‘Blast Furnace’

    Where ?2 3

    60 % of Cost of Hot metal is incurred through Coke & Coal consumption in Blast Furnace ‘I’ Blast Furnace

  • 5

    To align the project to the strategic priority

    To understand the current situation and scope for improvement

    To identify the various cost affecting parameters

    Project Selection Process

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.2.0

    1

    2

    3

    4

    5

    1.2.2.1 – What data was generated to help select the project ?1.2.2.2 – What methods and tools were used to assess or prioritize the need for the project ?1.2.2.3 – Why were these methods and tools used to select the project ?

    9© Copyright 2017 Tata Steel. All Rights Reserved

    Dat

    a G

    ener

    ated Input from BO&S

    Operational Data

    From Business Analysis Group

    List of projects shortlisted

    Prioritization Method used‘Project Prioritization Matrix’

    S.No Project Legend Ease of Implementation Business Impact Strategic Priority

    1Elimination of Nut Coke Discharge from I

    BF Stock HouseA 1.2 3.8 6.5

    2 Reduction in cold blast humidity B 1.6 3.5 5.9

    3 Increase Gas Utilisation by 2% C 2.8 3.1 4.5

    4 Reducing Carbon Rate D 2.9 4 6

    5 Reduction of Coke Rate E 2.1 5 10

    6Increasing HM Si Compliance(0.6

  • 6

    Team Selection and Preparation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.3.0

    1

    2

    3

    4

    5

    1.3.1.1 – How was the stakeholder groups identified ?1.3.1.2 – What or who were the stakeholder groups ?

    11© Copyright 2017 Tata Steel. All Rights Reserved

    1 All the Stakeholders were identified through the tool SIPOC

    Raw Materials Management

    Coke Plant

    Sinter Plant

    Pellet Plant

    Fuel Management Division

    Power House

    Maintenance Team

    Coke, Sinter, Pellet, Iron ore, Nut Coke, Fluxes, Cold

    Blast, BF Gas, Humidity, Oxygen, Coal, Nitrogen

    Blast Furnace Process

    Hot Metal, Slag, BF Gas, Electric Power

    Hot Metal Logistics

    Steel Making Shop

    Fuel Management Division

    Slag Granulation and Drying Plant

    Project Steering Committee

    Project Mentor

    Project Team Process Owner *Stakeholders2

    Team Selection and Preparation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.3.0

    1

    2

    3

    4

    5

    1.3.2.1 – What knowledge or skill sets were determined to be necessary for successful completion of the project ?1.3.2.2 – To what extent did the existing stakeholder groups have the required ?1.3.2.3 – What additional knowledge and skills were brought in to make the project successful ?

    12© Copyright 2017 Tata Steel. All Rights Reserved

    1

    3

    2 Stakeholder Knowledge assessment was made and accordingly training requirement was identifiedY – Already Trained, NA – Not Applicable, N – To be Trained

  • 7

    Team Selection and Preparation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.3.0

    1

    2

    3

    4

    5

    1.3.3.1 – Before the project started, what specific training was done ?

    13© Copyright 2017 Tata Steel. All Rights Reserved

    1 Specific Training Imparted to specific Team Based on the Gaps identified

    • Training were imparted based on the Gaps Identified, from the brainstorming sessions of the team. • Dedicated classroom sessions were organized with the help of Tata Management Development Centre & Total

    Quality Management

    Team Selection and Preparation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.3.0

    1

    2

    3

    4

    5

    1.3.3.2 – Before the project started, what was done to prepare the team to work together as a team ?

    14© Copyright 2017 Tata Steel. All Rights Reserved

    2 Preparing the team, as a ‘Team’

    Project Kick Off Meeting

    Project Discussion with Team Lead

    Workshop with the Project Members & Process Owners

    Project Plan Formulation

    Meeting of Project Steering

    Committee to set business context and deliverables

    Elaborating the project requirements to the Team

    Leader and finalizing the Project Team Members

    Workshop of Project Members & Process Owners with the Project Steering Committee where is context is set

    and Team discussion of what each members can contribute and training needs were identified

    The Team Brainstormed and planned the project ahead

    To foster smooth functioning of the team thefollowing steps were taken• SharePoint – Common Repository was created

    with access to all the stakeholders• A Group e-mail ID was created

  • 8

    Team Selection and Preparation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.3.0

    1

    2

    3

    4

    5

    1.3.4.1 – What roles and expectations were determined ahead of the project ?

    15© Copyright 2017 Tata Steel. All Rights Reserved

    Role ProjectMentor

    Project Leader

    Team Member

    Team Member

    Team Member

    TeamMember

    Process Owners

    Name Amit Singh Vineet R. Tripathi

    Subhachandhar S

    Basant Kr Singh

    Sanjiv Kumar Samik Nag Ujjal Ghosh / RajkumarVishwakarma

    Designation Chief, I BF Head Operation

    Manager Operations

    Process Analyst, I BF

    Sr Mgr, BF Process Analysis, Technology Group

    Head, BFResearch & Development

    Sr Mgr & MgrOprns

    Expectation Guide the Team for Successful completion of the project

    Team the Lead,Collaborate with various stakeholders and Problem Solving Expert

    Data Analysis, Quality Assurance and Customer Relations

    Process Expert & Data Analysis

    Data Analysis, Process Expert

    Process Modeling and Blast Furnace Simulations

    Owners of Process & Successful implementation

    Roles & expectation from the Team Members1

    Team Selection and Preparation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.3.0

    1

    2

    3

    4

    5

    1.3.4.2 – What deadlines and deliverables did the team have to consider ahead of actually starting the project ?

    16© Copyright 2017 Tata Steel. All Rights Reserved

    2 Deadlines and Deliverables

    Phase Deliverables Q1 Q2 Q3 Q4

    DefineProject Selection , Project Charter Preparation, SIPOC

    MeasureCause Effect Analysis, Root Cause Analysis, Data Collection Plan

    AnalyzeIdentify and Validate the vital affecting kpis

    ImproveGeneration of possible solution, prioritization and Validation through piloting

    ControlProcess Control Analysis,Standardising the Procedure & Communication to the team

    5th May 2015

    20th Jun 2015

    20th Oct 2015

    31st Dec 2015

    31st Mar 2016

  • 9

    Team Selection and Preparation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    1.3.0

    1

    2

    3

    4

    5

    1.3.4.3 – Before the project started, what team routines, including communications, were established ?

    17© Copyright 2017 Tata Steel. All Rights Reserved

    3 Team Routines

    S.No Meeting Frequency Chair Details

    1 Group Internal Meeting Need Based - Lync Meetings(VC) & Discussion regd the progress of any analysis

    2 Project Assessment by Team Lead

    Weekly Team Leader Assessment of Progress

    3 Meeting with the TeamMentor

    Bi Weekly Team Mentor Assessment of Project Progress & Revisiting Charter

    4 Meeting with Technology Group and R&D

    Bi Weekly Team Leader Results Validation and Inputs for Analysis

    5 Project Steering Committee Review

    Monthly Project Steering Committee

    Assessing Progress and revisiting targets and charter

    6 VP Project Review Quarterly Vice President Review of Project

    Current Situation & Improvement

    Opportunity Analysis2

    18© Copyright 2017 Tata Steel. All Rights Reserved

  • 10

    Key Measures Expected of the Project

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.1.0

    1

    2

    3

    4

    5

    2.1.1.1 – What specific goals and/or measures was the team trying to achieve with the project ?2.1.1.2 – What additional potential benefits, other than the specific goals and / or measures was the project expected to impact ?

    19© Copyright 2017 Tata Steel. All Rights Reserved

    Improvement Opportunity

    Current Performance (kg/thm)

    Target (kg/thm)

    Coke Rate 428 408

    Project Statement : Reduction of Coke Rate of ‘I’ Blast Furnace by 5%, thereby save INR 20 Cr in FY 16

    1

    Thereby the reduction of Cost of Hot Metal

    Reduction of Coke Rate Reduction of Hot Metal Cost

    Reduction of Carbon Footprint

    Improvement in Productivity

    2

    *Additional Benefits

    Project Benefit

    Possible Root Causes / Improvement Opportunities

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.2.0

    1

    2

    3

    4

    5

    2.2.1.1 – What methods and / or tools used to identify possible root causes / improvement opportunities ?2.2.1.2 – Why were these methods and / or tools selected ?

    20© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Process Mapping

    Benchmarking

    Brainstorming

    Control Charts & Stability Charts

    Ishikawa Diagram

    Why

    To understand the as-is process

    To understand the scope for improvements and current gaps

    To look for Opportunities for Improvement

    To study the current capability and stability of the process

    To map and group the various affecting parameters

    1 2

  • 11

    Possible Root Causes / Improvement Opportunities

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.2.0

    1

    2

    3

    4

    5

    2.2.3.1 – How was the team prepared to use these methods and / or tools ?

    21© Copyright 2017 Tata Steel. All Rights Reserved

    3

    3 hours of hands on training imparted on Creation of Process Maps

    1 day training program on Benchmarking methodology

    5 Hours training on Systematic Focused group discussion and brainstorming

    3 day training program on Six Sigma Green Belt Program and use of Statistica

    3 Hours hands on refresher training imparted on the 7 QC Tools and a 6 day six sigma training program was organised

    Preparation of Team for using the Tools

    Process Mapping

    Benchmarking

    Brainstorming

    Control & Stability Charts

    Ishikawa Diagram(Six Sigma Green Belt)Training Imparted to

    1. Project leader2. Project Members &3. The Process Owner

    The Effectiveness of training was verified byconducting Pre Course and Post Course Assessments

    Possible Root Causes / Improvement Opportunities

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.2.0

    1

    2

    3

    4

    5

    2.2.2.1 – What data was generated and how was the data analyzed to identify the possible root cause / improvement opportunities ?

    22© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Process Mapping

    Benchmarking

    Brainstorming

    Control Charts & Stability Charts

    Ishikawa Diagram

    Data Generated

    Process Inputs, Outputs, Sub Processes and Performance Indicators

    In - Processes were also benchmarked along with the major KPIs

    The various affecting parameters were jotted

    The was found stable under 100 % availability

    Various Affecting parameter were drilled down

    How

    Process Mapped through group discussion

    KPIs Collected from various Blast Furnace and Studied

    Dedicated Group discussion to answer what can improve the efficiency

    Using Statistical Tool to predict

    All the affecting Parameters that were operating in not optimized range were identified

    1. What ?? 1. How ??

  • 12

    Possible Root Causes / Improvement Opportunities

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.2.0

    1

    2

    3

    4

    5

    2.2.2.2 – What were the possible root cause / improvement opportunities ?

    23© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Process Mapping

    Benchmarking

    Brainstorming

    Control Charts & Stability Charts

    Ishikawa Diagram

    Data Generated

    Process Inputs, Outputs, Sub Processes and Performance Indicators

    In - Process KPIs are also becnhmarkedalong with the major KPIs

    The various affecting parameters were jotted

    The was found stable under 100 % availabilty

    Various Affecting parameter were drilled down

    Raw Material• Sinter, Pellet, Coke – Chemical &

    Physical Properties• Agglomerates• Moisture Input

    In Process KPIs• Burden

    Distribution• Slag

    Composition• Blowing Rate• Oxygen

    Enrichment• Coal Injection

    Equipment KPIs• Availability• Interruptions

    Human• Lack of

    Knowledge Skill and Training

    Final Root Cause / Improvement Opportunity

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.3.0

    1

    2

    3

    4

    5

    2.3.1.1 – What methods and / or tools were sued to identify the final root cause(s)/improvement opportunities ?2.3.1.2 – Why were these methods and / or tools selected ?

    24© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Correlation Matrix

    KPI Drill Down

    Multiple Regression Analysis

    Why

    To figure out the most affecting parameter among the other KPIs

    To drill down to final few important

    To identify the most affecting parameter and impact of the every variable on the big Y

    1 2

  • 13

    Final Root Cause / Improvement Opportunity

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.3.0

    1

    2

    3

    4

    5

    2.3.1.3 – How was the team prepared to use these tools ?

    25© Copyright 2017 Tata Steel. All Rights Reserved

    3

    3 day training program on Six Sigma Methodology including Correlation Matrix

    3 hours of hands on training imparted on building and conducting KPI Drill Down Analysis

    6 days training program on Six Sigma Methodology including Multiple Regression Analysis

    Preparation of Team for using the Tools

    Correlation Matrix

    KPI Drill Down

    Multiple Regression Analysis(Six Sigma Green Belt)

    Training Imparted to 1. Project leader2. Project Members &3. The Process Owner

    The Effectiveness of training was verified byconducting Pre Course and Post Course Assessments

    Correlations (Spreadsheet22 19v*297c)COKE_RATE

    PRODUCTION

    COAL_RATE

    HMT

    BGV

    COLD_BLAST_FLOW_RATE

    O2_FLOW

    K

    RAFT

    ETA_CO

    Total Agglomerates in Burden, Burden Distrbution, Slag Composition, Blowing Rate, Oxygen Enrichment, Coal Injection

    Final Root Cause / Improvement Opportunity

    Project & Team Selection

    Current Situation and RC /

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.3.0

    1

    2

    3

    4

    5

    2.3.2.1 – What data was generated and how was the data analyzed to identify the final possible root cause / improvement opportunities ?2.3.2.2 – What are specified examples of data analysis that led to the final root cause ?2.3.2.3 – What were the final root cause/improvement opportunity ?

    26© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Correlation Matrix

    KPI Drill Down Analysis

    Multiple Regression Analysis

    Data Generated

    The set of Variables with P

  • 14

    Final Root Cause / Improvement Opportunity

    Project & Team Selection

    Current Situation and RC /

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.3.0

    1

    2

    3

    4

    5

    2.3.3.1 – How was (were) the final root cause(s) / improvement opportunities validated ?2.3.3.2 – What evidence showed that the final root cause(s)/improvement opportunity(ies) were validated prior to solution development ?

    27© Copyright 2017 Tata Steel. All Rights Reserved

    ValidationCategory

    Expert Validation – BF PIT Meeting

    Modeling Software

    Procedure Followed Advice from Experts Mr Ashok Kumar, CTOMr Tijuis Gerard, Tata Steel IjmuidenMr Uttam Singh, CoBF

    Validation done through Static Dynamic Thermodynamic model

    Evidence

    1

    2

    Validation Impact of burden

    Distribution and blowing rate

    Current regime

    Optimized regime

    MOM of Blast Furnaces PIT Meeting

    Meeting No. PIT/BF/07/16 Date: 09/10/2015 Time: 03.30 PM (India); 12.00 (NL); 11.00 (UK)

    Chaired by Mr. Uttam Singh

    Attendees :

    Jamshedpur IJmuiden Port Talbot Scunthorpe

    Uttam Singh Johannes de Lange Andrew McGregor No attendance

    Sanjiv Kumar Mark van den Berg

    AS Reddy Gerard Tijhuis (CoE)

    Krishnendu Jan van der Stel (R&D)

    Goutam Kr Raut

    Vineet Tripathi

    Sl. No

    Item Discussed

    Timeline / Action plan

    Responsibility Status (Open /Closed/ Carry Forward)

    Comment

    A Share information on through life in Port Talbot Port Talbot (McGregor)

    Open

    B Share report on depressurising hose failure in IJmuiden coal preparation plant

    IJmuiden (de Lange)

    Open EBFC presen- tation on sharepoint

    C Typical report on hearth temperature behaviour as presented in morning meeting

    IJmuiden (de Lange)

    Open PDF on sharepoint

    D I BF Project on Coke Rate- Key Factors that affect Coke Rate

    I BF, Jamshedpur

    Closed Panel reached a conclusion

    Pending points from previous meetings

    3 Information on sealing material used to arrest tuyere leakage. Material, equipment, procedure, etc. Work in progress.

    IJmuiden (Nugteren)

    CF Separate lync to be set up in week 42

    8 Information sharing on type of eyes and face protection safety gears at cast house

    All Sites CF

    Jsr & SCP info on share-point. Other sites to do.

    MoM of BF Pit with the Point discussed about I BF

    Coke Rate Project

    Project Management Update

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.4.0

    1

    2

    3

    4

    5

    2.4.1.1 – How was the correctness of the initial project scope, deliverables, and timing confirmed (or what changes were made)?

    28© Copyright 2017 Tata Steel. All Rights Reserved

    Review of Progress with respect to the Project Charter1

    Phase end review with the Project Steering Committee• Progress as per Charter• No Change of Scope Identified Plan

    Actual

  • 15

    Project Management Update

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.4.0

    1

    2

    3

    4

    5

    2.4.1.2 – How were stakeholders involved and / or communicated with during root cause / improvement opportunity phase of the project ?

    29© Copyright 2017 Tata Steel. All Rights Reserved

    1. No change

    2

    Project Management Update

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.4.0

    1

    2

    3

    4

    5

    2.4.1.3 What stakeholder resistance was identified and / or addressed in this phase of the project ?

    30© Copyright 2017 Tata Steel. All Rights Reserved

    Category of Stakeholders

    Stakeholders Resistance Identification Resolved

    Suppliers

    Raw Material Management None None None

    Coke PlantThrottling of Production might be reqd

    Feedback in MonthlyReview Meeting

    Supply from Batt 10 &11 to top up A-F BF Bunkers

    Sinter Plant None None None

    Pellet Plant None None None

    Fuel Management Division None None None

    Maintenance None None None

    Internal

    Project Steering Committee None None None

    Project Team None None None

    Process OwnerRequirement of Fine coal wil increase leading to depletion of Buffer

    Brainstorming sessionMeasures to improve throughput were taken

    Customer

    Steel Melting ShopsNew Trials may increase Quality deviations

    Customer Visit Feedback

    Management of Quality Change Procedure used

    Slag Granulation and Drying Plant None None None

    Hot Metal Logistics None None None

    Fuel Management Division None None None

    3

  • 16

    Project Management Update

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    2.4.0

    1

    2

    3

    4

    5

    2.4.1.4 – How was the appropriateness of the initial team membership and management routines confirmed ?

    31© Copyright 2017 Tata Steel. All Rights Reserved

    Team Membership & Management Routines

    Confirming Appropriateness Changes needed

    Team Membership • Project Charter Review –Completion as per timeline

    • Stakeholder Matrix Analysis –Work done as per plan

    No Change required

    Management Routines • Documentations were found in place

    • Procedures followed• Proper Communication to all

    stakeholders were evident

    No Change Required

    4

    Solution / Improvement Development3

    32© Copyright 2017 Tata Steel. All Rights Reserved

  • 17

    Possible Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.1.0

    1

    2

    3

    4

    5

    3.1.1.1 – What methods and / or tols were used to identify the possible solutions / improvements ?3.1.1.2 – Why were these methods and / or tools selected ?

    33© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Expert Consultation - PIT

    Benchmarking

    Focused Group Discussion – LEO (Learning from Each Other)

    Literature Review

    Why

    To facilitate cross learning among the European and Indian Opportunity

    Comparing various in processes to identify the directionality towards solution

    Experts views from Blast Furnaces in Jamshedpur were taken

    To identify the best practices in the industry

    1 2

    Possible Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.1.0

    1

    2

    3

    4

    5

    3.1.1.3 – How was the team prepared ot use these mehtods and / or tools ?

    34© Copyright 2017 Tata Steel. All Rights Reserved

    3

    All the Root Causes identified were compiled and sent across to the experts from various Tata Steel Plants around the world

    1 day training program on Benchmarking methodology

    5 Hours training on Systematic Focused group discussion and brainstorming

    Dedicated Topic Research were given to each member of the team and a period of 1 week to come up with solutions

    Preparation of Team for using the Tools

    Expert Consultation

    Benchmarking

    Focused Group Discussion

    Literature ReviewTraining Imparted to 1. Project leader2. Project Members &3. The Process Owner

    The Effectiveness of training was verified by conducting PreCourse and Post Course AssessmentsThe progress was also tracked in the Weekly review meeting

  • 18

    Possible Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.1.0

    1

    2

    3

    4

    5

    3.1.2.1 – What data was generated and how was the data analyzed to determine the possible solutions / improvements ?

    35© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Expert Consultation - PIT

    Benchmarking

    Focused Group Discussion – LEO (Learning from Each Other)

    Literature Review

    Data Generated

    The Solutions Ideas

    Key Gaps were identified

    Various Ideas were collated

    Some best practices across other blast furnace and process changes at higher

    coal were noted

    How

    Translated into Actions in Team meetings

    Used Necessity and sufficiency checks to translate into results to check validity

    Translated into Actions in Team meetings

    Used Necessity and sufficiency checks to translate into results to check validity

    1 1

    Possible Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.1.0

    1

    2

    3

    4

    5

    3.1.2.2 – What are the possible solutions / improvements?

    36© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Expert Consultation - PIT

    Benchmarking

    Focused Group Discussion –LEO (Learning from Each

    Other)

    Literature Review

    Data Generated

    The Solutions Ideas

    Key Gaps were identified

    Various Ideas were collated

    Some best practices across other blast furnace and process

    changes at higher coal were noted

    In Process KPIs1. Opt for Flatter distribution2. Adjust the screening size3. Reduce the centre coke percentage4. Optimize slag composition5. Reduce the Wind Volume6. Reduce the Hot Metal Temperature7. Increase the Oxygen Enrichment8. Increase Coal Inecjtion9. Increase the Hot Blast Temperature10. Improve Cast House Operation

    Raw Material1. Increase of Agglomerates2. Increase the size of Coke3. Increasing the Cold strength of Coke4. Improve the Reducibility of Sinter & Pellet5. Increase the Calorific value of coal

    2

  • 19

    Possible Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.1.0

    1

    2

    3

    4

    5

    3.1.2.3 – What evidence showed that the solutions / improvements identified were possible instead of final ?

    37© Copyright 2017 Tata Steel. All Rights Reserved

    Process No. Process Function

    Product (Output)

    Characteristics

    Requirements

    Potential Failure ModePotential Effect(s) of

    Failure

    A

    Severity

    (Out of 10)

    Potential Cause (s) / Mechanism (s) of Failure

    40.I1 Fluctuation in Wind Volume

    40.I2 Raw material quality(Sn-RDI, C-Ash,

    P-SI)

    40.I3 Cooling water Flow

    40.I4 Physical and Chemical Properties of

    Raw Material

    40.I5 Stock line

    40.I6 Distribution of RM

    40.I7 Fluctuation of Top Gas Pressure

    40.I8 Variation in input coal quantity and

    quality

    40.I9 Variation in agglomerate percentage

    40.I10 High input moisture load

    40.I11 %Sn in burden

    40.I12 Oxygen Enrichment

    40.I13 Burden Distribution

    40.I14 Low Sinter basicity

    40.I15 High Al2O3 in raw material

    40.I16 Phosphorus in input raw material

    40.I17 Hot Metal Temperature

    40.P1 SLC

    40.P2 Coal Injection

    40.P3 RAFT

    40.P4 water Circuit make up

    40.P5 Fuel rate

    40.P6 Slag Chemistry

    40.P7 ECO

    40.P8 E H2

    40.P9 Amount of dust dumped from dust

    catcher

    40.P10 Heat Flux (Circuit#3 Heat Loss)

    40Furnace

    Operation

    Hot Metal Si (40.O1)

    Hot Metal S (40.O2)

    Hot Metal

    Temperature (40.O3)

    Slag Chemistry(MgO,

    Al2O3 & B2) (40.O4)

    Coke Rate (40.O5)

    Hearth liquid level

    (40.O6)

    Si < 0.44%

    Si >1.04%

    S >0.065%

    Coke Rate

  • 20

    Possible Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.2.0

    1

    2

    3

    4

    5

    3.2.1.3 – How was the team prepared to use these methods and / or tools ?

    39© Copyright 2017 Tata Steel. All Rights Reserved

    3

    Usage and creation of Affinity Diagram was instructed and activity was carried out by the Project team along with the process owners

    4 hours session in hands on training of Pay off Matrix

    Modelling of different scenario and its results analysis were imparted to the team in a 2 day training module

    Preparation of Team for using the Tools

    Affinity Diagram

    Pay Off Matrix

    Modelling

    Training Imparted to 1. Project leader2. Project Members &3. The Process Owner

    The Effectiveness of training was verified by conducting PreCourse and Post Course AssessmentsThe progress was also tracked in the Weekly review meeting

    Final Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.2.0

    1

    2

    3

    4

    5

    3.2.2.1 – How were the methods and / or tools used to determine the final solutions / improvement ?3.2.2.2 – What was (were) the final solution(s) / improvement (s) ?

    40© Copyright 2017 Tata Steel. All Rights Reserved

    Tools used to identify Improvement Opportunities

    Tools Used

    Affinity Diagram

    Payoff Matrix

    Modelling

    How

    Brainstorming helped categorizing the solutions

    Categorized the available solutions

    Validated various scenarios after building in the model

    1

    2

    Increasing cold strength of coke, Adjusting Screening size, optimize the slag composition, reduce wind volume, increase oxygen enrichment, coal injection and hot blast temperature

    and improve the cast house operation

    Final Improvement Opportunities

  • 21

    Final Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.2.0

    1

    2

    3

    4

    5

    3.2.3.1 – How were the final solutions / improvements validated ?3.2.3.2 – What evidence showed that the validation was performed prior to implementation ?

    41© Copyright 2017 Tata Steel. All Rights Reserved

    ValidationCategory

    Expert Validation FMEA Pilot Scale Implementation

    Procedure Followed Advice from ExpertsMr Ashok Kumar, CTOMr Tijuis Gerard, Tata Steel IjmuidenMr Uttam Singh, CoBF

    Cross Referenced through the Failure Mode and Effect Analysis

    Pilot Scale Implementation of Various actions were tried with a small change and monitored for one month to capture data

    Evidence

    1

    2MOM of Blast Furnaces PIT Meeting

    Meeting No. PIT/BF/09/16 Date: 04/12/2015 Time: 03.30 PM (India); 12.00 (NL); 11.00 (UK)

    Chaired by Mr. Uttam Singh

    Attendees :

    Jamshedpur IJmuiden Port Talbot Scunthorpe

    Uttam Singh Johannes de Lange Andrew McGregor No attendance

    Sanjiv Kumar Mark van den Berg

    AS Reddy Jan van der Stel (R&D)

    Shambu Nath Gerard Tijhuis (CoE)

    Padma Pal

    Shantanu Mallick

    Krishnendu Mukhopadhyay

    Manish Pandey

    Vineet Tripathi

    Sl. No

    Item Discussed

    Timeline / Action

    plan

    Responsibility Status (Open /Closed/ Carry Forward)

    Comment

    A

    Low CSR coke was charged to I BF from 10 to 20 Nov. (slide 4 in presentation). What are the actions taken in such a case at TSE furnaces ? Request to share our procedures.

    All sites Open Discussion in next PIT meeting

    B Damage to stove #2 at KPO during heat-up. What is recommendation of TSE for start-up ? Blow-in with only two stoves ?

    All sites Open

    Port Talbot and IJmuiden adviced not to start with only 2 stoves. Risk in case of failure of other stove is too big.

    C The Action points identified for coke rate reduction in I BF were discussed and deliberated – More discussion to held in person

    Jamshedpur Open

    D

    Document on trough discharge in Jsr is made available on sharepoint. All sites are requested to share their practices on this, including safety measures

    All sites Open Share you practice

    E Port Talbot mentioned an investigation on the torpedo collision (~one month ago) is still ongoing.

    Port Talbot Open Outcomes to be shared for learnings.

    MoM of BF Pit with the Point discussed about I BF

    Coke Rate Project Results of Pilot Trials in I BFPFMEA

    Final Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.2.0

    1

    2

    3

    4

    5

    3.2.4.1 – What additional potential benefits were anticipated from the final solutions / improvements ?3.2.4.2 – Were the additional potential benefits anticipated prior to implementation ?

    42© Copyright 2017 Tata Steel. All Rights Reserved

    *Additional Benefits

    Project Benefit

    Additional Benefits anticipated from the final solutions1

    2 These Benefits were anticipated from the implementation of solution

    Reduction of Coke Rate Reduction of Hot Metal Cost

    Reduction of Carbon Footprint

    Improvement in Productivity

  • 22

    Final Solutions or Improvements

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.2.0

    1

    2

    3

    4

    5

    3.2.5.1 – What data was generated and how was the data analyzed to justify why the chosen final solutions / improvements should be implemented ?3.2.5.2 – What evidence showed that the justification was performed prior to the implementation of the solution ?

    43© Copyright 2017 Tata Steel. All Rights Reserved

    1 Final Solutions to be implemented

    Method IncreasingCSR of Coke

    Adjusting CokeScreen Size

    Optimize Slag Composition

    Softer Blowing Rate

    Oxygen Enrichment

    Coal Injection

    Optimizing Cast House Operation

    Hot Blast Temperature

    Expert Consulta

    ncyY Y Y Y Y Y N Y

    Brainstorming

    Y Y N Y Y Y Y Y

    Correlation Matrix

    N Y Y Y Y Y N Y

    Final Decision

    Y Y Y Y Y Y N Y

    - Final implementable solutions were decided based on the matrix tabulated below

    2 Evidence that the justification was performed

    Evidence of Brainstorming session and its finalized MoM

    Project Management Update

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.3.0

    1

    2

    3

    4

    5

    3.3.1.1 – How was the correctness of the initial or updated project scope, deliverables, and timings confirmed ?

    44© Copyright 2017 Tata Steel. All Rights Reserved

    Review of Progress with respect to the Project Charter1

    Phase end review with the Project Steering Committee• Progress as per Charter• No Change of Scope Identified

    PlanActual

  • 23

    Project Management Update

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.3.0

    1

    2

    3

    4

    5

    3.3.1.2 – How were the stakeholders involved and / or communicated with during the solution / improvement phase of the project ?

    45© Copyright 2017 Tata Steel. All Rights Reserved

    2

    Project Management Update

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.3.0

    1

    2

    3

    4

    5

    3.3.1.3 – What stakeholders resistance was identified and / or addressed in this phase of the project ?

    46© Copyright 2017 Tata Steel. All Rights Reserved

    Category of Stakeholders

    Stakeholders Resistance Identification Resolved

    Suppliers

    Raw Material Management None None None

    Coke Plant None None None

    Sinter Plant None None None

    Pellet Plant None None None

    Fuel Management DivisionReduction of Wind Volume to the Threshold of the Blower House

    Feedback during Monthly Review

    Maintained at the minimum rpm of the blower house

    MaintenanceTRT Power Generation mayreduced at softer blowing rates

    Reduction of Generation during pilot implementation

    Inreased Top Pressure and Inlet pressure of TRT

    Internal

    Project Steering Committee None None None

    Project Team None None None

    Process Owner None None None

    Customer

    Steel Melting Shops None None None

    Slag Granulation and Drying Plant None None None

    Hot Metal Logistics None None None

    Fuel Management Division None None None

    3

  • 24

    Project Management Update

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    3.3.0

    1

    2

    3

    4

    5

    3.3.1.4 – How was the appropriateness of the initial or updated team membership and management routines confirmed ?

    47© Copyright 2017 Tata Steel. All Rights Reserved

    Team Membership & Management Routines

    Confirming Appropriateness Changes needed

    Team Membership • Project Charter Review –Completion as per timeline

    • Stakeholder Matrix Analysis –Work done as per plan

    No Change required

    Management Routines • Documentations were found in place

    • Procedures followed• Proper Communication to all

    stakeholders were evident

    No Change Required

    4

    Implementation and Results

    Verification4

    48© Copyright 2017 Tata Steel. All Rights Reserved

  • 25

    Stakeholders consideration in Implementation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.1.0

    1

    2

    3

    4

    5

    4.1.1.1 – How were the stakeholders involved in planning the solution/improvement implementation ?4.1.1.2 – How were the stakeholders involved in implementing the solution / improvement ?

    49© Copyright 2017 Tata Steel. All Rights Reserved

    1 2

    Stakeholders consideration in Implementation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.1.0

    1

    2

    3

    4

    5

    4.1.2.1 – What was done to anticipate resistance before it occurred ?4.1.2.2 – What types of resistance were actually encountered during the course of solution / improvements implementation ? (1/2)4.1.2.3 – How was the actual resistance identified ? (1/2)

    50© Copyright 2017 Tata Steel. All Rights Reserved

    Anticipation of Resistance: As a measure to predict the resistance, dedicated brainstorming session were organized and detailed discussion was carried out against each element in the stakeholder matrix

    1

    1 2 3

  • 26

    Stakeholders consideration in Implementation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.1.0

    1

    2

    3

    4

    5

    4.1.2.1 – What was done to anticipate resistance before it occurred ?4.1.2.2 – What types of resistance were actually encountered during the course of solution / improvements implementation ? (2/2)4.1.2.3 – How was the actual resistance identified ? (2/2)

    51© Copyright 2017 Tata Steel. All Rights Reserved

    2 31

    Stakeholders consideration in Implementation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.1.0

    1

    2

    3

    4

    5

    4.1.3.1 – How was the actual resistance addressed ? (1/2)4.1.3.2 – How did the team know it was successful in addressing the resistance ? (1/2)

    52© Copyright 2017 Tata Steel. All Rights Reserved

    1 2

  • 27

    Stakeholders consideration in Implementation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.1.0

    1

    2

    3

    4

    5

    4.1.3.1 – How was the actual resistance addressed ? (2/2)4.1.3.2 – How did the team know it was successful in addressing the resistance ? (2/2)

    53© Copyright 2017 Tata Steel. All Rights Reserved

    1

    2

    1 2

    Stakeholders consideration in Implementation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.1.0

    1

    2

    3

    4

    5

    4.1.4.1 – What was the evidence of stakeholder group buy-in ?4.1.4.2 – What evidence showed that buy-in was obtained prior to implementation ?

    54© Copyright 2017 Tata Steel. All Rights Reserved

    Evidence of Stakeholder Buy-in: 1

    Bu

    y in

    fro

    m S

    take

    ho

    lder

    s Sign off at the end of each stage of the Project

    Following the Management of Quality Change - MQC

    Recording the Changes incorporated in the MoUs and VoCs –Inmprovement in Customer Satisfaction

    Regular Communications in various Forums and recorded MoMs

    Evidence That Buy-in was obtained: 2

    MoM of Quality Council Meeting

    MQC Raised for reduction of Coke Rate

  • 28

    Solution / Improvement Implementation

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.2.0

    1

    2

    3

    4

    5

    4.2.1.1 – What process or systems were changed or created to implement the solution / improvement ?4.2.1.2 – What systems were changed or created to measure and manage the performance of the implementation ?

    55© Copyright 2017 Tata Steel. All Rights Reserved

    Systems Processes

    Implement Solution

    Introduction of Modeling Software in Level 2 Automation : MOGADOR, Burden Distribution Model

    ASAM Testing of Burden

    HOSIM Testing of Burden

    Enhancing the grinding system

    Adjusting the screening rate in

    stock house

    Increasing the Size of laval tuyerefor higher injection

    Optimize the casting rate to facilitate better

    drainage

    Creation of New SOPs

    Updating Daily Management Checklist and documents

    Measure / Manage the Implementation

    Job Cycle Checks and updating the Old SOPs and Action Standards

    FMEA , Control Plan and Risk Status Up-gradation

    Increasing the Sampling frequency

    Installation of Above Burden Probe with

    Gas analyser to measure the Gas

    Composition across the radial pattern

    Training Process Strengthened and

    change documents identified

    1

    2

    Project Results

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.3.0

    1

    2

    3

    4

    5

    4.3.1.1 – What were the results ?4.3.1.2 – How did the results compare to the specific project goals / measures from item 2.1.1 ?

    56© Copyright 2017 Tata Steel. All Rights Reserved

    ResultsResults Exceeded the TargetIn the first step it was broughtdown to 353 which furtherreduced to 328 kg/thm

    1 Improvement Opportunity

    Current Performance (kg/thm)

    Target (kg/thm)

    Actual Achieved (kg/thm)

    Coke Rate 428 408 353

    2 Performance of Coke Rate

    This resulted in a Overall Saving of INR 65 Cr

    The coke rate performance of I BF and the improvement journey is illustrated hereThe biggest step Jump in the last 30 years in Tata Steel Blast Furnaces

  • 29

    Project Results

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.3.0

    1

    2

    3

    4

    5

    4.3.2.1 – What additional benefits were realized from the project ?

    57© Copyright 2017 Tata Steel. All Rights Reserved

    Coke Rate Reduction

    Reduction of Carbon

    Footprint

    Q - Reduction of Mean HM

    Si

    Increase of Productivity

    Reduction of Steam

    Consumption

    Additional Benefits Realized1

    Two additional Benefits wererealized which were notanticipated earlier

    Reduction from 1.52 tCO2/thm to 1.41tCO2/thm

    Reduction of Mean HM Si from 0.84 to 0.72%

    Increase of Productivity from 2.65 to 2.72 t/m3/day

    Reduction of Steam Consumption from

    17,000 tons/month to 1600 tons/month

    Project Results

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.3.0

    1

    2

    3

    4

    5

    4.3.2.2 – How did the team measure any of the additional benefits that were “soft”?

    58© Copyright 2017 Tata Steel. All Rights Reserved

    Additional Soft Benefits Realized2

    Soft Benefits

    Customer Satisfaction

    Increased Morale of

    Team

    Inspiration to other

    departments

    Awards and Accolades

    Improved Customer Satisfaction and reduction of Customer Complaint by 35%

    Becoming the Indian Benchmark gave motivation to the team to drive for excellence and change –Ripple Effect

    Seeing the transformation of I BF other departments started

    following the path of I BF –Sense of Pride to the Team

    More Feathers were added to the cap of I BF – Recognitions, Awards

    and Accolades

  • 30

    Coke Rate Reduction

    Reduction of Carbon

    Footprint

    Q -Reduction of Mean HM Si

    Increase of Productivity

    Reduction of Steam

    Consumption

    Project Results

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    4.3.0

    1

    2

    3

    4

    5

    4.3.2.3 – How do the actual additional benefits that were realized compare to the expected additional benefits identified in item 3.2.4 ?

    59© Copyright 2017 Tata Steel. All Rights Reserved

    Realization of Additional Benefits3

    Anticipated and Fully Realized

    Not anticipated realized

    All the four additionalbenefits were fullyrealized

    Sustaining Results Over Time5

    60© Copyright 2017 Tata Steel. All Rights Reserved

  • 31

    Sustaining Results Over Time

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    5.1.0

    1

    2

    3

    4

    5

    5.1.1.1 – What was done to make sure the process or system changes made during the implementation continued to be followed ?5.1.1.2 –What evidence showed that this became part of the organization’s culture/operating strategy ?

    61© Copyright 2017 Tata Steel. All Rights Reserved

    Steps to ensure the changes to be followed:

    1

    Step

    s fo

    r Su

    cces

    sfu

    l Su

    sten

    ance

    of

    the

    Im

    pro

    vem

    en

    t

    Updating the SOPs and Action Standards and subsequent Training

    Updating the Daily Management Documentation

    Updating the FMEA & CP and subsequent communication

    Evidence : 2

    Process No. Process Function

    Product (Output)

    Characteristics

    Requirements

    Potential Failure ModePotential Effect(s) of

    Failure

    A

    Severity

    (Out of 10)

    Potential Cause (s) / Mechanism (s) of Failure

    B

    Occurrence

    (Out of 10)

    Current process Controls - Detection/Prevention

    C

    Detectability

    (Out of 10)

    Risk Priority

    Number (RPN)

    AXBXC

    Actions to reduce RPNResponsi

    bility

    Target

    Date

    40.I1 Fluctuation in Wind Volume 3 Online monitoring & follow up with supplier 5 135

    40.I2 Raw material quality(Sn-RDI, C-Ash,

    P-SI)3 Lab analysis 3 81 Information to supllier CR Opr w.i.e

    40.I3 Cooling water Flow 2 Online monitoring & follow up 3 54

    40.I4 Physical and Chemical Properties of

    Raw Material3 HBT data from control room 1 27

    40.I5 Stock line 2 Online monitoring & follow up 3 54

    40.I6 Distribution of RM 4 Online monitoring & follow up 4 144

    40.I7 Fluctuation of Top Gas Pressure 2 Online monitoring & follow up 3 54

    40.I8 Variation in input coal quantity and

    quality3 Online monitoring & follow up 3 81

    40.I9 Variation in agglomerate percentage 4 Bin level monitoring & adjustment in burden 2 72

    40.I10 High input moisture load 3 CRMT report and adjustment in fuel rate 3 81 Information to supllier CR Opr w.i.e

    40.I11 %Sn in burden 2 Online monitoring 2 36

    40.I12 Oxygen Enrichment 5 Online monitoring 1 45

    40.I13 Burden Distribution 4 Online monitoring 2 72 Information to supllier CR Opr w.i.e

    40.I14 Low Sinter basicity 1 Online monitoring 1 9

    40.I15 High Al2O3 in raw material 3 Online monitoring & follow up with supplier 2 54

    40.I16 Phosphorus in input raw material 3 Online monitoring(HM) & follow up with supplier 2 54

    40.I17 Hot Metal Temperature 4 Online monitoring(HM) & follow up with supplier 2 54

    40.P1 SLC 3 Online monitoring & follow up with supplier 3 81

    40.P2 Coal Injection 4 RAFT set point and PV 4 144

    40.P3 RAFT 3 Furnace DP and K value at control room 5 135 SOP CR Opr w.i.e

    40.P4 water Circuit make up 2 Make up trend of cooling circuits in control room 5 90 SOP CR Opr w.i.e

    40.P5 Fuel rate 4 Fuel rate at tuyere data of level2 system 1 36

    40.P6 Slag Chemistry 2 Online monitoring 2 36

    40.P7 ECO 3 ECO data from furnace overvie page 2 54

    40.P8 E H2 3 E H2 data from furnace overviw page 2 54

    40.P9 Amount of dust dumped from dust

    catcher4 DM log sheet 2 72

    40.P10 Heat Flux (Circuit#3 Heat Loss) 7 Heat flux data from staves structure page 1 63

    Section: IBF (Operations) Date : 01.09.2016 Approved by: Chief IBF Rev. : 03

    Doc. No.: OPR/DM/PFC/03 Effective Date : 01/04/2016

    Department: I Blast Furnace Revision No.: 5 Prepared by: Head Operations IBF Form No. : TQM/DM/FMEA/003

    40Furnace

    Operation

    Hot Metal Si (40.O1)

    Hot Metal S (40.O2)

    Hot Metal

    Temperature (40.O3)

    Slag Chemistry(MgO,

    Al2O3 & B2) (40.O4)

    Coke Rate (40.O5)

    Hearth liquid level

    (40.O6)

    Si < 0.44%

    Si >1.04%

    S >0.065%

    Coke Rate

  • 32

    Communication of Results

    Project & Team Selection

    Current Situation and Improvement

    Opportunity Analysis

    Improvement Development

    Implementation & Result Verification

    Sustaining & Communicating

    Results

    5.2.0

    1

    2

    3

    4

    5

    5.2.1.1 – How did the team communicate the results to the various stakeholder groups ?

    63© Copyright 2017 Tata Steel. All Rights Reserved

    Communication to Stakeholder1

    Coke Rate Improvement

    Suppliers

    Internal

    Customers

    - TQM Council Meetings- RM Quality Meeting- Monthly Report Circulation

    - Blast Furnace Process Review Meeting- I-Mirror Circulation- Monthly Report Circulation- Learning From Each Other – LEO – Meeting

    - Customer Visits- TQM Council Meeting- War Room Meeting- Monthly Report Circulation

    Apart from these forums, MD Online, Monthly Newsletter from VP and TQM Apex Project Review were also used to communicate across Tata Steel

    Awards and Accolades6

    64© Copyright 2017 Tata Steel. All Rights Reserved

  • 33

    Awards and Accolades

    • Achieving the feat. of Indian Benchmark in Monthly Coke rate, coal Rate and carbon

    footprint

    • The Project was awarded in APEX Level by TQM Division

    • Lauded by Senior Management and Ex Tata Steel Management and made them feel proud

    of the achievement

    • Won in Eastern region in Tata Groups Innovista Competition and represented in Tata Steel in

    Finals of Innovista