Upload
buithien
View
226
Download
4
Embed Size (px)
Citation preview
ReferencesHigh Rise Construction
DIN 18218
2
Arabtec (United Arab Emirates) built the world’s highest building – the Burj Khalifa – together with Sam-sung (Korea), Besix (Belgium) and Turner Corporation (USA), relying on MEVA formwork to do so.
More than just FormworkKnow-how for your building successFrom the beginning, it has been MEVA‘s philosophy to offer added value in the form of know-how and expertise – beyond supply-ing high-quality formwork. This far-reaching promise has been redeemed impressively for many years.
Leaders in the fieldCommittee and industry standards work has a high priority because it is essential to further expertise in concrete works. This is where qual-ity and safety standards are defined and imple-mented. The German quality control association (GSV) nominated MEVA to chair the technology committee; MEVA ist part of the influential, internationally active American Concrete Institute and its formwork committee and we´re a member of the ASCC (American Society of Concrete Contractors) to name only a few.
MEVA MEVA
3
High-Rise Construction: Contents
In the client satisfaction rankingconducted by the professional
building magazine SOLID among50 leading formerwork suppliers
Client Winner2012
No 1
Leading the way in concrete standardsMEVA has been instrumental in redefining the European DIN 18218 Standard for concrete load to take account of new concrete mixtures such as self-compacting and flowable concrete. A new procedure to determine how concrete pressure will develop during each pour is based on MEVA know-how and will be part of the new standard.
Expertise in architectural concreteMEVA is active part of the research consortium investigating the interaction between concrete, release agent and forming face. Its findings are the basis for the industry’s definitive publication on achieving top concrete finish: The Guide to Architectural Concrete.
MEVA is acclaimed as an innovative leader in the formwork industry, underlined by several awards, distinctions and commendations for quality and service.
MEVA
MEVA: More than just formwork .................................................................................................... 2Solutions in High-Rise Construction ................................................................................................. 4Technology in High-Rise Construction ............................................................................................. 6Quality Concrete Finish ................................................................................................................... 8MEVA International / Addresses and contacts ................................................................................ 26
More London Business Tower, Great Britain ...................................................................................10Mirax Federation Tower, Moscow, Russia .......................................................................................11Ardmore Park, Singapore ..............................................................................................................12Palais Royale, Mumbai, India .........................................................................................................13Soul Tower, Surfer’s Paradise, Australia ..........................................................................................14Burj Khalifa, Dubai, United Arab Emirates .....................................................................................15Al Nadha Tower, Sharjah, United Arab Emirates.............................................................................16Grass Residence, Manila, Philippines .............................................................................................17Jazz Residence, Manila, Philippines ................................................................................................18One Rockwell, Manila, Philippines .................................................................................................19Al Manara Tower, Dubai, United Arab Emirates .............................................................................20Burswood Tower 5, Perth, Australia ...............................................................................................21Al Attar Tower, Dubai, United Arab Emirates .................................................................................22Barwa Financial District, Doha, Qatar ............................................................................................23Maze Tower, Dubai, United Arab Emirates .....................................................................................24Allianz Tower, Wallisellen, Switzerland ...........................................................................................25
REFERENCES
4
Cost Efficiency, Safety, QualityWith what and how?Requirements in high-rise construction are com-plex and demand expertise far beyond standard formwork applications. Where crane time and availablity is limited, site space is cramped and work flow is tight, it is the intelligent solution that makes the dif-ference. How you work is what determines suc-cess, not just with what you work. MEVA offers you a comprehensive product and technology programme plus the know-how and support that makes your project a success from A to Z.
Logistics, inventory, handlingHandling formwork material is often as impor-tant as the formwork itself. How much material needs to be moved from
one level to the next? Are the panels light enough to be lifted and
set up by hand? What is the best cycle? Can the formwork be stripped early to save
40 % inventory? Which climbing methods fits and how can
they combine for the interlocking work flows for walls, shafts and slabs?
What about worker protection?
Engineering
Work flow planning
Formwork design
MEVA MEVAMEVA
5
Solutions in High-Rise Construction
Contractor Benefit through ExpertiseMEVA engineers are committed to answering your questions with solu-tions and to assisting you in making the project a success through: Formwork design and planning Application consultation Customised solutions and design Work flow, cycles and early stripping Training for site managers and foremen Technical documentation
On-site project support Instruction of workers on site Supervision of work flows Forming and assembly services Support during concrete pours
Based on MEVA’s comprehensive prod-uct range for high-rise construction, the best solution for your project will be found. We are at your side to develop clever answers and support you in all formwork challenges.
On site support
Project management
Customised designs
Logistics
1 2
3 4
5 5
6
Wall formwork Mammut 350 Support Frame STB 450
Slab formwork MevaDec Shoring System MEP
MEVA Guided Climbing MGC MEVA Guided Climbing MGC
MEVA MEVAMEVA
6 7
8
7
Technology in High-Rise Construction
Leading the Way
MEVA Guided Screens MGS Climbing scaffold KLK 230
MEVA Automatic Climbing MAC
Mammut 350: heavy-duty wall formwork for higher, faster, bigger pours
Support Frame STB: single-sided formwork for wall heights up to 13.50 m
Slab Formwork System MevaDec: fastest cycle, simple assembly, early stripping, less labour
Shoring System MEP for flexibility in heights and loads
MEVA Guided Climbing MGC: crane-lifted rail-guided wall climbing solution
MEVA Guided Screens MGS: crane or hydraulic-lifted rail-guided safety system for optimum edge protection
Climbing Scaffold KLK 230: scaffold platform for single and double-sided formwork
MEVA Automatic Climbing MAC: automatic hydraulic climbing system for fast precision-climbing in a single platform.
1
2
3
4
5
6
7
8
12321
1 2
3
21
8
Warranty against rotting
Warranty against ripplings
Warranty on �exural rigidity
Warranty against discoloration
Warranty on UV resistance
7 Year unlimited usage
The All-Plastic Facing for Unlimited Cycles
The patented all-plastic facing sheet is made of polypropylene (1 and 3), reinforced by an aluminium foil (2). The facing is resistent to UV rays, shrinking, swelling, rotting, building chemicals and fungal decay. It remains stable in any climate or temperature.
The Serwator Hotel in Warsaw, Poland: superb concrete finish with every pour.
The all-plastic facing puts an end to plywood waste in formworkThe introduction of the world´s first 100% wood-free facing started a new age in form-work. Replacing worn-out plywood sheets is now a thing of the past. No more waste. Get your job done without interruptions. No more unnecessary freight costs, no down-times and no hassles in work flow. No more chemical coat-ings that make disposal dangerous and expen-sive. Less waste means fewer C02 emissions. Besides offering better quality, the all-plastic innovation saves time and money.
Your advantages No swelling and shrinking Nailable like plywood No re-facing – no hidden costs Easy and quick to clean Repairable using the same material Better concrete finish
MEVA
9
Quality Concrete Finish
10
More London Business Tower, United Kingdom
ProjectOffice tower in London‘s CBD
MEVA SystemsMammut formwork on climbing scaffold KLK 230
Contractor Laing O‘Rourke
Formwork engineeringMEVA Formwork Systems, Tamworth
Combination of safety, cost-effectiveness and speed for climbing the cores.
Mammut, KLK 230
11
Mirax Federation Tower, Moscow, Russia
Walls and Cores
ProjectCommercial tower and Europe´s highest build-ing
MEVA Systems Wall formwork Mammut Climbing scaffold KLK 230
Formwork engineeringZAO MosMeva, Moscow
High concrete pres-sure, robust on-site use over several years; no re-facing.
12
Ardmore Park, Singapore
ProjectLuxury comdominium tower in Singapore´s central business district
MEVA Systems MEVA Automatic Climbing MAC Slab formwork MevaDec Wall formwork Mammut 350
DeveloperSC Global Development
Contractors Dragages / BBI Bouygues Batimat International
Formwork engineeringMEVA Formwork Systems, Singapore
Precision and speed: each level completed in 6 days including one climbing lift.
MAC, Mammut 350, MevaDec
REPROPPING
13
Cores, Walls and Slabs
Palais Royale, Mumbai, India
ProjectHotel and commercial tower – the largest and most innovative building project on the Indian subcontinent with: Underground parking garage Hotel complex Office tower Shopping mall
MEVA Systems MEVA Automatic Climbing MAC MEVA Guided Climbing MGC MEVA Guided Screens MGS Wall formwork Mammut 350 Wall formwork AluFix Slab formwork MevaDec Shoring system MEP
Formwork engineeringMEVA Formwork Systems, Mumbai
Safe overall solution with five systems for climbing, cores, walls and slabs.
14
Soul Tower, Surfer‘s Paradise, Australia
ProjectCondominium tower with 77 levels on the Gold Coast in Quensland, Australia
MEVA SystemSlab formwork MevaDec
Contractor Grocon Pty Ltd., Melbourne, Australia
Formwork engineeringMEVA Formwork Systems, Singapore
Crane-independent slab formwork; 40 % less inventory due to early stripping.
MevaDec
15
Burj Khalifa, Dubai, United Arab Emirates
Slabs
Project The Burj Khalifa is the world´s highest building at 818 m and 206 levels. It was built with MEVA formwork technology. Seen here in December 2008: MEVA’s Tarc Froehlich and SAMSUNG Construction Manager Martin Kang on level 154.
MEVA SystemSlab formwork MevaDec with early stripping achieved record-breaking 3-day cycle no interruptions for re-facing in 28 month building period
ContractorJV Samsung, Besix, Arabtec
Project managementTurner Corporation (issued official recommendation for MevaDec as preferred slab formwork method in high-rise buildings)
Formwork engineering MEVA Schalungs-Systeme, Haiterbach
224,808 m² slabs on 154 levels: 0 re-facing. 3 dasy per slab. Tight schedule fulfilled.
16
Al Nadha Tower, Sharjah, United Arab Emirates
ProjectResidential and commercial complex MEVA Systems MEVA Automatic Climbing MAC Slab formwork MevaDec Wall formwork Mammut 350
DeveloperSaef Abdullah Al Noman
ContractorUnited Engineering Construction
Formwork engineeringMEVA Schalungs-Systeme, Haiterbach, Germany
Combined safety and climbing solution for shafts, slabs and walls.
MAC ,MGC, Mammut 350
17
Walls, Cores and Slabs
Grass Residence, Manila, Philippines
ProjectFour residential high-rise buildings
MEVA Systems MEVA Guided Climbing MGC Wall formwork Mammut Slab formwork MevaDec
ContractorMegawide Construction Corp.
Customised climbing and safety work flow for all cores, walls and slabs.
Formwork engineeringMEVA Formwork Systems, Singapore
18
Jazz Residence, Manila, Phillipines
Project4 residential towers with up to 45 levels. Fast tracking was applied: Using AluFix, the inner walls were poured after the slabs had been poured.
MEVA Systems Wall formwork AluFix Slab formwork MevaDec
ContractorMegawide Construction Corporation
Formwork engineeringMEVA Formwork Systems, Singapore
Crane-independent hand-set formwork for slabs and walls. High safety requirements.
AluFix, MevaDec
19
One Rockwell, Manila, Philippines
Walls and Slabs
ProjectResidential & commercial tower
MEVA SystemSlab formwork MevaDec
ContractorDatem Inc.
Formwork engineeringMEVA Formwork Systems, Singapore
Slab work flow with hand-set formwork; less material required due to early stripping.
20
Project Commercial office tower
MEVA Systems MEVA Automatic Climbing MAC Wall formwork Mammut 350 Slab formwork MevaDec
Formwork engineeringMEVA KHK
Climbing in one short lift. Adjustment of form panels with +/- 3 mm precision.
Al Manara Tower, Dubai, United Arab Emirates
MAC, Mammut 350
21
Walls, Cores and Slabs
Burswood Tower 5, Perth, Australia
ProjectResidential high-rise building in Burswood Park, Perth
MEVA Systems MEVA Automatic Climbing MAC Wall formwork Mammut 350 Slab formwork MevaDec Shoring system MEP
ContractorCrown Construction (Pty) Ltd.
Formwork engineeringMEVA Formwork Systems, Singapore
Highest safety demands. Closed hous-ing. Fast, safe climb in a single lift.
22
Al Attar Tower, Dubai, United Arab Emirates
Labour and material handling reduced through crane-free work with MevaDec.
ProjectCommercial high-rise building
MEVA SystemSlab formwork MevaDec
ContractorAl Fara‘a
Formwork engineeringMEVA KHK
MevaDec
23
Barwa Financial District, Doha, Qatar
Slabs
Project9 residential and commercial high-rise buildings and a mosque
MEVA SystemsSlab formwork MevaDec with3 days per slab pouring schedule
ContractorBouygues Construction, Qatar
Formwork engineeringMEVA KHK, Dubai
Fast, zero error work with hand-set slab sys-tem. Optimum work flow. No down times.
24
Maze Tower, Dubai, United Arab Emirates
ProjectCommercial high-rise building
MEVA Systems Wall formwork Mammut 350 Slab formwork MevaDec MEVA Guided Climbing MGC MEVA Guided Screens MGS
Work flow optimised in cycles: guided climbing plus hand-set system for slabs.
ContractorAl Rostamani Pegel
Formwork engineeringMEVA KHK
MGC / MGS
25
Allianz Tower, Wallisellen, Switzerland
Walls, Slabs, Guided Climbing & Screens
Strict safety super-vision by SUVA; complete enclosure for worker protection.
ProjectOffice tower for the Allianz Suisse insurance in the urban district Richti-Areal of the town of Wallisellen near Zurich. All safety precau-tions and equipment had to be planned and installed following the strict safety guideline of the national Swiss accident insurance SUVA. The MEVA Guided Screens system was a key factor for the required safety.
MEVA Systems MEVA Guided Screens MGS MEP shoring towers Wall formwork Mammut Working scaffold KAB 190 Slab formwork MevaDec
ContractorAllreal Generalunternehmung AG, Zurich
Formwork engineeringMEVA Schalungs-Systeme, Seon
MEVA SchalungsSysteme Pfaffstätten, A - Österreich
Novatec Construction SystemsAdelaide, AUS - Australia
N.V. van HautKruibeke, B - België/Belgique
MEVA Formwork SystemsToronto, CDN - Canada
MEVA SchalungsSystemeSeon, CH - Schweiz/Suisse/Svizzera
MEVA Sistemas de EncofradoBogotá, CO - Colombia
MEVA SchalungsSystemeHaiterbach, D - Deutschland
MEVA Systèmes de CoffrageSarreguemines, F - France
MEVA Formwork SystemsTamworth, GB - United Kingdom
MEVA Zsalurendszerek Budapest, H - Magyarország
VIBAU Gradevinska TehnikaBestovje, HR - Hrvatska
MEVA Formwork SystemsMumbai, IND - India
MEVA Formwork Systems, Mumbai, India
MEVA Schalungs-Systeme, Seon, Schweiz
MEVA Bekistingssystemen, Gouda, Nederland MEVA Sisteme de Cofraje, Bucuresti, Romania
MEVA Formwork Systems, Tamworth, Great Britain
26
MEVA in Haiterbach in the Black Forest, Ger-many. It is the home of the MEVA group of companies with its 40 locations in around 30 countries and 10 logistics centers all over the world. The headquarters are also home to research and development, engineering, production, rental logistics, detailing and sales. Cost-effective, lean logistics, transparent work flow, cost-saving rental concepts, technical sup-port for better concrete results: client benefit is in focus, everywhere. All the time. All over the world.
MEVA
MEVA Asia PacificSingapore, SGP - Singapore
VIBAPetrovce, SLO - Slovenija
MEVA KHKDubai, UAE - United Arab Emirates
MEVA Formwork SystemsSpringfield, Ohio USA - United States of America
UAB MuramedaKaunas, LT - Lietuva
Waiko Engineering WorksPerak, MAL - Malaysia
TeknikkOslo, N - Norge
MEVA BekistingssystemenGouda, NL - Nederland
CorpinsaCuidad de Panamá, PA - Panamá
PPU PalisanderBialystok, PL - Polska
MEVA Sisteme de cofrajeBucuresti, RO - Romania
ZAO MosMevaMoskva, Sankt-Peterburg, RUS - Rossija
MEVA
MEVA Schalungs-Systeme, Haiterbach, Deutschland
MEVA Formwork Systems, Springfield, Ohio, USA
27
International
Headquarters (Germany) International Sales & ServiceLogistic Centers
2458
GB
1000
3/1
3 M
, Prin
ted
in G
erm
any
MEVA Schalungs-Systeme GmbH
Industriestrasse 5
D-72221 Haiterbach
Tel. +49 7456 692-01
Fax +49 7456 692-66
www.meva-international.com
A-Pfaffstätten, Tel. 02252 20900-0
D-Berlin, Tel. 03375 90300
D-Haiterbach, Tel. 07456 692-01
D-Hannover, Tel. 0511 949930
GB-Tamworth, Tel. 01827 60217
H-Budapest, Tel. 01 2722222
RO-Bucuresti, Tel. 021 2066460
RUS-Moskva, Tel. 495 7813737
USA-Springfield, Tel. 937 3280022
A-Pfaffstätten, Tel. 02252 20900-0
AUS-Adelaide 08 82634377
B-Kruibeke, Tel. 03 250 11 11
CHSeon, Tel. 062 7697100
CDN-Toronto, Tel. 416 5766397
CO-Bogotá, Tel. 01 5204236
FSarreguemines, Tel. 0387 959938
GBTamworth, Tel. 01827 60217
HBudapest, Tel. 01 2722222
HR-Bestovje, Tel 013 323 666
IND-Mumbai, Tel. 022 27563430
LT-Kaunas, Tel. 0684 82795
MAL-Perak, Tel. 12 5209337
N-Oslo, Tel. 067 154200
NLGouda, Tel. 0182 570770
PA-Panama City 507 2372222
PL-Bialystok, Tel. 085 6768159
ROBucuresti, Tel. 0 21 2066460
RUSMoskva, Tel. 495 7813737
RUSSankt-Peterburg, Tel. 812 6802890
SGP-Singapore, Tel. 67354459
SLO-Petrovce, Tel. 03 7131500
UAEDubai, Tel. 04 3411180
USASpringfield, Tel. 937 3280022