Page 1: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

REFORMS MILESTONES STATUS 2017-18

UNNAO (NPP), UTTAR PRADESH

Dr. R.P Srivastav(Executive Officer)

Ms. Himani Yadav(Urban Planner, CMMU –AMRUT)

Mrs. Usha Katiyar(Chairman)

2017-2018

Mr. Utkarsh Shukla(UIE , CMMU –AMRUT)

Page 2: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

REFORMS

Page 3: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

Unnao is the Nagar Palika Parishad city in district of Unnao, UttarPradesh. The city is divided into 29 wards for which elections are heldevery 5 years. Unnao NPP has population of 177,658 of which 93,021are males while 84,637 are females as per report released by censusIndia 2011.

Area Number of Wards

Population (2011 census)

Sex Ratio

Literacy

21.5 sq. km 32 (new assessment)

177,658 910 81.71%

In ancient days this town was known as Kusapura or Kushbhawanpur after the name of its founder Kushason of Lord Rama. The historical timeline states this town being ruled by various dynasties at differenttime periods, to name a few were- Magadhas, Maurayns, Sunga, Kanishka, Guptas, Gurjara- Pratihars,Iltutmish, Sharqi Dynasty, Wajid Ali Shah. In 1856 Lord Dalhouise, the governor general deposed Wajid AliShah and annexed his territories including the district of Unnao to the British empire.On June 9, 1857 the struggle for freedom was commenced at Unnao, when the troops rose against theBritish. The people of this district whole heartedly took part in the all movements for freedom. Thedistrict achieved the long sought for independence from British rule with the whole country on August15, 1947.

About The City

REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

INTRODUCTION

Page 4: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

The climate of is characterized by a hot summer and a pleasant cold season. The maximum temperaturehas touched 44.7 C , while a minimum of 1.8 C has been recorded. The year may be divided into fourseasons. The average annual rainfall in the town is recorded to be 1005 mm.

Physical Features

Physiography:

On the basis of geology soils, topography, climate and natural vegetation the district has been sub-divided in the following three regions-I. Amethi PlainII. Ganga BasinIII. Majhai PlainThe Unnao town lies in Amethi Plain.

Climate:

Natural and Economic Resources

The conventional classification of the soils here is of three types, the light loam, the sandy soil and the clay. The large areas of barren waste are striking characteristics of the district. Tahsil Unnao and Amethihave the greatest area of such land

Soil:

REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

INTRODUCTION

Page 5: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

AMRUT Reform Milestones for FY 2017-18ULB Name: UNNAO

WEBSITE OF UNNAO NPP : http://unnaonpp.in/Dynamic/WebControlPanel/English/index.aspx

All Reforms related document has been uploaded on a separate tab for AMRUT on the above mentioned

website. The link for the same is :http://unnaonpp.in/Dynamic/Common/Frm_Amrut.aspx?Lang=E

S.No Reform Milestones Present Status

1 E-GovernancePersonnel Staff Management Achieved

Project Management Achieved

2 Municipal CadrePolicy for right-sizing the No of Municipal

functionaries prepared by StatesState Level

3 DEAPublication of Annual Financial Statement

on websiteAchieved

4 Urban Planning

Establish Urban Development Authorities State Level

Develop at least one Children Park every

year in AMRUT cities

Achieved

5

Swachh

Bharat

Mission

Elimination of open defecation Achieved

Waste Collection (100%), Achieved

Transportation of Waste (100%) Achieved

Scientific Disposals (100%) AchievedREFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

CURRENT STATUS

Page 6: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

6

S.No REFORMS MILESTONES CURRENT STATUS ANNEXURE

(for booklet)

URL of Attachments as

on ULB Website

1.E-

Governance

a) Personnel

Staff

Management

• Online Notification of Recruitment Rules for

all municipal cadres is available at

http://localbodies.up.nic.in/rules.html

ANNEX 1.a.1 Recruitment rules URL

• Online Up-to-date Service records/staff

Details- Data entry to the online portal made

by NIC , PIS is done at Unnao NPP. Through

this, full details of staff in all the Departments

at NPP has been converted online. The url on

website as well as PIS portal screenshot and

Details attached.

ANNEX 1.a.2 Online staff details URL

• Online Bio-metric attendance system is

active at NPP Unnao, a screen shot and the

photograph is attached.

ANNEX 1.a.3 Biometric Attendance

document URL

• Online Payment of salaries & wages of

staff is done through NEFT, link and

screenshots have been attached.

ANNEX 1.a.4 Online salary payment

document URL

• Online Employees Grievance Redressal

system is existing and active at Unnao NPP.ANNEX 1.a.5 Online Grievance URL

• Sou-motu disclosure under RTI Act on Unnao

website is done. ANNEX 1.a.6

Sou-motu disclosure URL

REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

REFORMS 2017-18

Page 7: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

7

S.No REFORMS MILESTONES CURRENT STATUS ANNEXURE URL of Attachments as

on ULB Website

1.

(cont

.)

E-

Governance

(cont.)

b) Project

Management

System

• Financial Progress : For Online Project Management

Information System (PMS) data entry for AMRUT

projects, e.g.: parks and green spaces is done.

Screenshots showing financial progress is attached.

ANNEX

1.b.1

PMS Financial Progress

details URL

• Physical Progress : Similarly, Screenshots showing

physical progress of projects on PMS portal is attached.

ANNEX

1.b.2PMS Physical Progress

details URL

• Online issue of NIT and providing tender documents

online : E-tendering is done for all projects at NPP. Url

to UP e-tender portal is-

https://etender.up.nic.in/nicgep/app

ANNEX

1.b.3

• Online issue of NIT proof URL

• E-tendering URL

• Online Submission of tender including online

payment of EMD : Documents and url is attached.

ANNEX

1.b.4

• Online submission

of tender URL

• Online EMD GO

• Online payments to consultant/ contractor/ vendors is

existing and implemented at NPP Unnao. Also, all the

payments to contractors and vendors for AMRUT project,

have been decided to be make by PFMS portal by NIC.

The link for the same is –

https://pfms.nic.in/NewDefaultHome.aspx

ANNEX

1.b.5

• Online payment to

contractors details

URL

• PFMS URL

• Geo-tagging of assets is done for AMRUT projects at

Unnao via mAMRUT app and Moud web portal for

projects .

ANNEX

1.b.6

• Moud screenshot

URL

• Geo tagged assets

details URL

REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

REFORMS 2017-18

Page 8: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

8

S.No REFORMS MILESTONES CURRENT STATUS ANNEXURE URL of Attachments as on

ULB Website

2.Municipal

Cadre

Policy for right-sizing the

number of the Municipal

functionaries prepared by

the States.

STATE INITIATIVE STATE INITIATIVE

3.

Double

Entry

Accounting

System

1. Audited Balance Sheet

of FY 2015-16

This milestone is already achieved.

The screenshot and url as

uploaded on ULB website is

attached.

ANNEX 3.1Audited Balance sheet

2015-16 URL

2. Audited Balance Sheet

of FY 2016-17

This milestone is already achieved.

The screenshot and url as

uploaded on ULB website is

attached.

ANNEX 3.2Audited Balance sheet

2016-17 URL

3. Annual Financial

Statement of 2017-18

publication on website

This milestone is already achieved.

The screenshot and url as

uploaded on ULB website is

attached.

ANNEX 3.3

Annual Financial Statement

2017-18 URL

4. Urban

Planning

a) Establish Urban

Development Authorities

Unnao Urban Development

Authority is already existing under

the name of ‘ Unnao Shuklaganj

Development authority’ in Unnao.

The url and screenshot of the UDA

website is attached.

ANNEX 4.a http://usdaunnao.in/index.

php

REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

REFORMS 2017-18

Page 9: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

9

S.No REFORMS MILESTONES CURRENT STATUS ANNEXURE URL of Attachments as on

ULB Website

4.

(cont

.)

Urban

Planning

(cont.)

b) Develop at

least one children

park every year

in the AMRUT

cities

Parks developed in Unnao-

• 2017-18- Nirala Park( maintenance

work by NPP)

• 2016-17- Manoranjan Park (NPP)

• SAAP 2015-16- Work for development

of Pannalal Park had commenced in

March 2018.

Work order and photographs for each

park has been attached and uploaded on

website, the url is also given for the same.

Work Orders

ANNEX 4.b.1

Children Parks work order

URL

Photographs

ANNEX 4.b.2

Children Parks photographs

URL

5.

Swachh

Bharat

Mission

a) Elimination of

open defecation.

Elimination of ODF Policy: State

Sanitation Policy Notified / City Sanitation

Plans prepared

(City Sanitation plan for Unnao is made

and uploaded on website)

ANNEX 5.a

(STATE

INITIATIVE)

City Sanitation Plan URL

Elimination of ODF Percentage: 100%

wards in Unnao NPP have been achieved

as ODF (self- declared). The certificate

and newspaper screenshot has been

attached, and uploaded on website as

well.

ANNEX 5.a.1

• ODF Details and ULB

Certificates URL

• ODF Letter

REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

REFORMS 2017-18

Page 10: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

10

S.No REFORMS MILESTONES CURRENT STATUS ANNEXURE URL of Attachments

as on ULB Website

5.

(cont

.)

Swachh

Bharat

Mission

(cont.)

b)Waste

Collection

Percentage of Wards with 100% door to door waste

collection: All the wards in Unnao are now covered under

door to door collection.

ANNEX 5.b.1

Door to door

collection Details

and Certificates

URL

Percentage of complaints resolution on Swachhta App by

ULB: 100% complains are resolved on the app. Total 923

people have installed the app in Unnao.

ANNEX 5.b.2 Swachhta App

Details URL

Percentage of wards practicing 100% source Segregation. :

Source segregation data is attached here along.

ANNEX 5.b.3 Source

Segregation URL

c)Transporta

tion of

Waste

Percentage of collected waste being transported for

scientific disposal (scientific landfill or processing) :100%

of the waste collected(non-bio) in city is daily transported to

the present dumping ground. Route map of one of the

ward(no. 27) is attached too.

ANNEX 5.c

Transportation of

Waste URL

(including Route

map at the end of

the url document)

d) Scientific

Disposals

Percentage of waste being processed scientifically :

Yes, there is provision of scientific disposal in the city. 100% of total

biodegradable waste is processed by the process. through

Composting by compost pit regularly at Households, parks(e.g weekly

process in Chandrashekhar Azad Park)

Also a scientific Landfill site has been identified for city waste disposal,

upon completion. Details for the same is uploaded and the URL is

attached.

ANNEX 5.d

Scientific Disposal

of waste Details

URL

REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

REFORMS 2017-18

Page 11: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

11REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

REFORMS 2017-18

Page 12: REFORMS MILESTONES STATUS 2017-18unnaonpp.in/UploadFiles/News/Unnao_AMRUT Reforms_2017_18c89… · REFORMS MILESTONES STATUS 2017-18 UNNAO (NPP), UTTAR PRADESH Dr. R.P Srivastav (Executive

12

THANK YOU!

REFORMS MILESTONES STATUS 2017-18

UNNAO NPP (U.P)

REFORMS 2017-18

REDUCE REUSE RECYCLE

MADE BY-

HIMANI YADAV

URBAN PLANNER (CMMU AMRUT)

NPP UNNAO