REGIONAL ELECTRONIC CARGO TRACKING SYSTEM Page 1 of 3 /RECTS Report January 2018 REGIONAL ELECTRONIC CARGO TRACKING SYSTEM (RECTS) January 2018 Report Content: Start Date 01/01/2018 Summary of e-monitored consignments……pg2 Average Transit time …………………………………pg2 Eseal usage & Accountability……. ……………...pg3 Transit Violations (CMC alerts analysis)……..pg3 RRU interventions (Uganda) ……………………..pg3 RRU interventions (Kenya) ………………………..pg3 Report Date 31/01/2018 Sources of data: www.rects-ea.org RRU field reports Compiled by: Operations Heads RECTS URA & KRA : Reported on: 3 rd January 2018 Driver’s effort to prevent loss of e-seal during transit

REGIONAL ELECTRONIC CARGO TRACKING SYSTEM (RECTS) … · 2020. 7. 16. · REGIONAL ELECTRONIC CARGO TRACKING SYSTEM Page 3 of 3 /RECTS Report January 2018 d) ESEAL usage & Accountability

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REGIONAL ELECTRONIC CARGO TRACKING SYSTEM (RECTS) … · 2020. 7. 16. · REGIONAL ELECTRONIC CARGO TRACKING SYSTEM Page 3 of 3 /RECTS Report January 2018 d) ESEAL usage & Accountability

REGIONAL ELECTRONIC CARGO TRACKING SYSTEM

Page 1 of 3 /RECTS Report January 2018

REGIONAL ELECTRONIC CARGO TRACKING SYSTEM (RECTS)

January 2018 Report

Content:

Start Date 01/01/2018 Summary of e-monitored consignments……pg2

Average Transit time …………………………………pg2

Eseal usage & Accountability……. ……………...pg3

Transit Violations (CMC alerts analysis)……..pg3

RRU interventions (Uganda) ……………………..pg3

RRU interventions (Kenya) ………………………..pg3

Report Date 31/01/2018

Sources of data: www.rects-ea.org RRU field reports

Compiled by: Operations Heads RECTS URA & KRA :

Reported on: 3rd January 2018

Driver’s effort to prevent loss of e-seal during transit

Page 2: REGIONAL ELECTRONIC CARGO TRACKING SYSTEM (RECTS) … · 2020. 7. 16. · REGIONAL ELECTRONIC CARGO TRACKING SYSTEM Page 3 of 3 /RECTS Report January 2018 d) ESEAL usage & Accountability

REGIONAL ELECTRONIC CARGO TRACKING SYSTEM

Page 2 of 3 /RECTS Report January 2018

a) e-monitored consignments;

i) percentage e-monitored

To & thru Uganda

January 2018

Count BIF

Total Transits 23,743 823,044,010,850

e-monitored

4,018 188,550,619,229

Percentage

16.9%

22.9%

i) e-monitored by regime

b) e-monitored by Goods description

Row Labels Count of Serial No Count of Serial No2 MV Units 1527 38.0% Other Assorted goods 1254 31.2% Sugar 433 10.8% Cooking Oil 214 5.3% Rice 206 5.1% Fuel 149 3.7% Wines, Spirits & Beers 96 2.4% Garments & Textiles 59 1.5% Worn Cloths 54 1.3% Shoes 13 0.3% Cigarettes 13 0.3% Grand Total 4018 100.0%

c) Transit time in days

Average (days) January Non-monitored - Uganda 4.64 Days

e-monitored National - Uganda 1.6 days e-monitored Regional – Northern Corridor 3.0 days

Major Transit Routes: e-monitored Transit Time in days – January 2018 Route Name Route Code Average Transit Time Mombasa-Malaba MSA-MLB 2 days, 5 hrs

MOMBASA-BUSIA MSA-BUS 2 days, 1 hrs

Mombasa-Jinja MSA-JJA 5 days, 14 hrs

Mombasa-Kampala Via Malaba MSA-KLA 4 days, 15 hrs

Mombasa-Kampala Cbc Via Busia MSA-KLA2 4 days, 14 hrs

Mombasa-Elegu Via Malaba & Kamdini MBS-ELG1 4 days, 5 hrs

Mombasa-Elegu Via Malaba & Kampala MBS-ELG2 3 days, 13 hrs

Mombasa-Elegu Via Busia & Kamdini MBS-ELG3 4 days, 12 hrs

Mombasa-Mpondwe Via Malaba & Mubende MBS-MPD 2 6 days, 1 hrs

Mombasa-Katuna Via Malaba MBS-KTN 4 days, 19 hrs

Mombasa-Vurra Via Malaba & Kamdini MBS-VR1 4 days, 19 hrs

Mombasa-Goli Via Malaba & Kamdini MBS-GL1 5 days, 9 hrs

Mombasa-Oraba Via Malaba & Kamdini MBS-ORB1 4 days, 22 hrs

Mombasa-Ntoroko Via Malaba MBS-NTR1 4 days, 19 hrs

Mombasa-Goli Via Malaba & Kampala MBS-GL2 8 days, 20 hrs

0

1000

2000

3000

TRANSIT RE-EXPORT EXPORT SCT-DUTY PAID

emonitored by regime

Page 3: REGIONAL ELECTRONIC CARGO TRACKING SYSTEM (RECTS) … · 2020. 7. 16. · REGIONAL ELECTRONIC CARGO TRACKING SYSTEM Page 3 of 3 /RECTS Report January 2018 d) ESEAL usage & Accountability

REGIONAL ELECTRONIC CARGO TRACKING SYSTEM

Page 3 of 3 /RECTS Report January 2018

d) ESEAL usage & Accountability

As at End of: January 2018 Count Usage rate

Usage rate: 2287 1.5 By Location: E-Seals %tage

Circulation 2,129 60%

Kampala MO 738 21%

Mombasa MO and/or in transit to 513 15%

Missing/lost* 142 4%

TOTALS 3,522 100%

e) Transit violations

CMC Alerts analysis & Percentage per CMC: Violation Type %tage Total Per CMC

Off Route 43.24% 10165

E-seal Tampered 29.92% 7034

Cross-Country Emerg Trigger 9.14% 2148

Exceed Transit Duration / Trip 6.61% 1553

Seal Deactivated (Illegal) 4.51% 1059

Seal Activated (Illegal) 3.57% 839

SEAL Broken (Illegal) 1.49% 351

Internal battery low 0.94% 222

Seal Broken (Procedure Violation 0.57% 135

Total

100%

23,506

f) Field Incidences

Type of incidents URA-RRU Jan 2018 KRA-RRU Jan 2018

count BIF saved count BIF saved (Kes.)

Attempted Robbery 7 6,413,445

Attempted diversion 1 48,232,386 8 7,698,251

Accident cases 9 12,723,213

Breach of procedure 12 555,421,329 6 3,960,314

Transhipment cases 10 11,369,346

Trade Facilitation 4 156,030,359 7 8,470,865

TOTALS 17 759,684,074 USD211,023

47 50,635,434

USD506,354

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

KAMPALA NAIROBI KIGALI

15,542 alerts(66.12%)

7,956 alerts(33.85%)

8 alerts(0.03%)