2011 Future Projects presentation by the Regional Municipality of Wood Buffalo
Citation preview
REGIONAL MUNICIPALITYOF
WOOD BUFFALOWOOD BUFFALO2011 CONSTRUCTION PROJECTS
Presented to Fort McMurray Construction Association
March 31 2011 by Darcy ElderMarch 31, 2011 by Darcy Elder
2011 Capital Project Tenders39 PROJECTS ANTICIPATED FOR TENDER
Project Categories:
Transportation (New) Road Rehabilitation
Environmental - Water Parks & Recreation
Environmental - Wastewater Facilities
En ironmental Solid WasteEnvironmental - Solid Waste
2
Projects by Category(39 Projects) Road
Rehabilitation3 Projects (8%)
Transportation 6 P j t (15%) 3 Projects (8%)
Water 11 Projects
Parks & Recreation
4 Projects (10%)
6 Projects (15%)
j(29%)
Facilities
Wastewater6 Projects (15%)
Solid Waste3 P j t (8%)
6 Projects (15%)
6 Projects (15%)3 Projects (8%)
3
Projects by Region(39 Projects)
UrbanU ba32 Projects
(82%)
R lRural 7 Projects
(18%)( )
4
Projects by Community(7 Projects) Anzac
3 P j tJanvier
3 Projects (43%)
2 Projects (29%)
Fort FortFort MacKay1 Project
Fort Chipewyan
1 Project (14%) (14%)
5
Value of Multi-Year ProjectsTransportation (New) $ 144M
Road Rehabilitation $ 153MRoad Rehabilitation $ 153M
Environment - Water $ 148M
Environmental - Wastewater $ 84M
Environmental – Solid Waste $ 23M
Parks & Recreation $ 22M
Facilities $ 174MFacilities $ 174M
6
Transportation (New)Transit Shelter Replacements & Additions 2011-2013
Lower Townsite West Loop Road
Fort MacKay Bridge Replacement
Saline Creek Drive and Hangingstone River Bridge
Parsons Creek West Access RoadParsons Creek West Access Road
7
Road RehabilitationFranklin Avenue Revitalization
Rural Road Rehabilitation 2010
U b I f t t R h bilit ti 2011 2013Urban Infrastructure Rehabilitation 2011-2013
8
Environmental – WaterFort Chipewyan Water Line Replacement
Janvier WTP Intake
SE Water Supply Line – Mackenzie to SE
Lower Townsite Reservoir Upgrade
Thickwood Reservoir ReplacementThickwood Reservoir Replacement
Anzac Truck Fill
9
Environmental – Water (cont)Parsons Creek Supply Line from WTP to Parsons Creek Reservoir
Parsons Creek Reservoir
S li C k S l Li f WTP t Ki St tSaline Creek Supply Line from WTP to King Street Booster
Saline Creek S ppl Line from King Street BoosterSaline Creek Supply Line from King Street Booster Station to MacKenzie Reservoir
Saline Creek Plateau Transmission MainSaline Creek Plateau Transmission Main
10
Environmental - WastewaterLift Station Upgrades (South)
Anzac Sewage Lagoon Upgrade
Gregoire East Sanitary OutfallGregoire East Sanitary Outfall
Septage Receiving Station
Parsons Creek Sewer Outfall Syphon
Saline Creek Outfall Sewer to Mills AvenueSaline Creek Outfall Sewer to Mills Avenue
11
Environmental – Solid WasteLandfill Gas Management System
Regional Landfill Cell II and III and Stockpile Pad
R i l C t P dRegional Compost Pad
12
Parks & RecreationAnzac Asphalt Roadside Walkways
Westview/Westwood Community Park Upgrades
H it P k R d l tHeritage Park Redevelopment
Timberlea High School Siteg
13
FacilitiesJubilee Building Maintenance Upgrades 2011-2013 (Equipment Lifecycle Replacements)
Jubilee Center Renovation 2011 (6th Floor)
Shop/Office Space at WWTPShop/Office Space at WWTP
9717 Franklin Avenue Leasehold Improvements
South Municipal Facility (Component 2)
Regional Landfill Relocation & BuildingsRegional Landfill Relocation & Buildings
14
Awards & RecognitionCover and piece in International Society for Trenchless Technology’s (ISTT) magazine - Trenchless International (J 2010)(January 2010)
North American Society for Trenchless Technology’sNorth American Society for Trenchless Technology s (NASTT) 2010 Northwest Trenchless Project of the Year
Consulting Engineers of Alberta’s 2011 ShowcaseConsulting Engineers of Alberta s 2011 Showcase Award – Award of Merit in Water Resources & Energy Production
15
Awards & RecognitionAthabasca River Forcemain Crossing, 1,345m and 1,178m of 900mm diameter DR11 HDPE pipe under the Athabasca River via horizontal directional drillingthe Athabasca River via horizontal directional drilling.
16
17
REGIONAL MUNICIPALITYOF
WOOD BUFFALOWOOD BUFFALO2011 CONSTRUCTION PROJECTS
Presented to Fort McMurray Construction Association
March 31 2011 by Darcy ElderMarch 31, 2011 by Darcy Elder