26
Regional Open Houses GO Transit Service Expansion November 2016

Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Regional Open Houses

GO Transit Service Expansion November 2016

Page 2: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

2

Today

Page 3: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

3

Tomorrow: Modern, Integrated Network

Page 4: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

4

Metrolinx is embarking on a massive transformation of the existing GO rail system to provide:

• Four times the number of trips outside of weekday rush-hour periods, including evenings and weekends.

• Twice the number of trips during weekday rush-hour periods. • Line extensions to new communities.

GO Transit Expansion

Page 5: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

• Bringing new transit options and new levels of service doesn’t come easy.

• Metrolinx is undertaking one of the largest infrastructure projects in North America.

• There is community-level disruption required to build a region-wide, integrated transit network.

5

Infrastructure Needs for GO Expansion

Page 6: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

What’s going on in your neighbourhood

• Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service; currently half-hour in your area

• Infrastructure needed to provide this level of service – Add a 4th Track

– Widen 4 rail bridges

– Modify Danforth Station – Planning Study underway

– Build Electrification Infrastructure (e.g. overhead catenary system)

• New GO/SmartTrack stations announced – Don Yard/Unilever (between Cherry Street and Eastern Avenue)

– Gerrard (in the vicinity of Carlaw Avenue)

6

Page 7: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Lakeshore East Service

TODAY FUTURE

7

115 daily trips (between Don River and Scarborough GO Station)

408 daily trips

Service Planning and Phasing is still not complete

Page 8: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Beginning the Conversation

• First round of public meetings in February/March

• Ongoing briefings for local community groups such as the Danforth East Community Association and the Danforth Village Residents’ Association

• On the ground – face-to-face, door-to-door outreach by the local Community Relations Specialist

8

Page 9: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Transit Project Assessment Process

9

Page 10: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

What Are We Assessing

Natural Environment Terrestrial, aquatic habitat and species Species of conservation concern Sensitive areas and features Stormwater Management

Socio-Economic Environment Land Use Property Air Quality Noise and Vibration Traffic and Transportation Utilities Electromagnetic

Interference/Electromagnetic Fields Cultural Environment Archaeological resources

Built Heritage resources Cultural Heritage landscapes

10

Page 11: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

GO Rail Network Electrification TPAP Study Area

11

Page 12: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Electrification - Power Supply & Distribution

• Metrolinx and Hydro One are EA co-proponents

12

Page 13: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Electrification - Overhead Contact System (OCS)

• The span between OCS supports ranges from 50 to 65 metres.

13

Cantilevers: one foundation required Portals: two foundations required

Page 14: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Electrification - Bridge Modifications

14

Location: Lititz Pike, Lancaster, PA

Page 15: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Electrification - Pedestrian Bridges Reinforce or Replace

15

Wallace Ave. Drury Lane

PAPE Mooregate Ave / Tara Ave

Page 16: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Electrification-Lakeshore East Corridor Traction Power Facilities

16

Page 17: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Electrification – Stouffville Corridor Traction Power Facilities

17

Page 18: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Electrification - Visual/Aesthetics

18

Page 19: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Electrification - Tree/Vegetation Removals

Vegetation/Tree Removal may be required to : • Minimize the risk of tree limbs

falling on the track or overhead wires.

• Secure the safety of maintenance workers when working in an electrified environment.

• Maintain the safety of our customers and neighbours.

19

Page 20: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Noise Assessment – Approach

• When building new infrastructure, Metrolinx models noise

• Noise modeling compares current noise levels to 2025 service levels

• Sensitive receptors are identified such as residences, hospitals, daycares etc.

• When noise is expected to increase >5dB at sensitive receptors, then mitigation is considered

• Mitigation could include noise walls, berms, rail dampeners etc.

20

Page 21: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Lakeshore East Don River to Scarborough GO Station TPAP Study Area

21

Page 22: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

New 4th Track Location

22

New track on south side between the Don River Bridge and Gerrard Street shifting to the north side between Pape Avenue and Scarborough GO Station.

Page 23: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

New 4th Track - Bridge Modifications

Woodbine Ave. – Widen to the North Warden Ave. – Widen to the North

Danforth Ave. – Widen to the North Birchmount Rd. – Widen North Abutment 23

Page 24: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Construction Completed 2025

TPAP Completion (Tentative) Summer/Fall 2017

TPAP Notice of Commencement (Tentative) Winter/Spring 2017

Public Meetings November 2016

Prepare Draft EPR Fall 2016/Winter 2017

Completion of Environmental Impact Studies Underway

4th Track and Electrification - Next Steps

24

Page 25: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

Q & A

25

Page 26: Regional Open Houses...Nov 16, 2016  · What’s going on in your neighbourhood • Expanding GO Service as part of a rapid transit network – Future 15-minute electrified service;

26