13
Van Nuys Station Project Regional Rail

Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Van Nuys Station Project

Regional Rail

Page 2: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Project Location

Project Location

Presenter
Presentation Notes
The Van Nuys Station Project is located on Metrolink’s Ventura Subdivision. This project is part of a greater LOSSAN corridor improvement between Chatsworth and Burbank-Airport North Station. This project, we will improve capacity and operational reliability through this corridor.
Page 3: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Purpose

Provide passenger service to both main tracks

Provide safe pedestrian access through a grade separated pedestrian undercrossing

Improve travel times for intercity and commuter rail service

Improve train operational reliability and on-time performance

Presenter
Presentation Notes
Start off with a short description of current condition. One side platform serving two main tracks – safety concerns. This means trains have to holdout at control points prior to pulling into the station.
Page 4: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Latest Developments

> Previous concept was a side platform.

> Changed to a center platform:> Minimizes impacts

to the bridge.> Eliminates conflicts

with the UPRR facility.

> Minimizes utility impacts.

Page 5: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Existing Station

UPRR Yard Lead

MT-2

Van Nuys Station

UPRR Gemco YardMT-1

Presenter
Presentation Notes
Talk about the project site: Constrained site with 2 main tracks and one side platform-safety concerns and operational reliability, the Van Nuys Station, the Bridge, A Sprint Building, The UPRR yard lead and the challenges of modifying the alignment without modifying the bridges and the sprint bldg.
Page 6: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Existing Station

> The Van Nuys Station serves both Amtrak and Metrolink passengers.

> The main tracks are shared with the Union Pacific Railroad.

> Serves 33 trains per weekday> 850 foot platform> Double track with a single side platform> Bus services

> DASH and Amtrak Thruway onsite> Metro stops on Van Nuys Blvd.

Page 7: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Station Theme

Presenter
Presentation Notes
Talk about homage to GM plant and the auto industry roots in the area. The Architects used this to build the station theme.
Page 8: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Site Accessibility and Travel Path

Proposed Accessible Path of Travel

Presenter
Presentation Notes
Talk through the proposed travel path leading to entry into the center platform.
Page 9: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Platform Model

Page 10: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Station ThemeVan Nuys Station

Presenter
Presentation Notes
Visual run through the image of the station architectural view describing the upgrades made at each location.
Page 11: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Schedule

Finish Construction May 2019

Begin Construction May 2017

End Final EngineeringDecember 2016

Begin Final EngineeringJuly 2014

Page 12: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Participating Agencies

METRO Metrolink Caltrans Amtrak LADOT (City) UPRR

Page 13: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main

Please feel free to contact us with any

additional questions or comments!

Sylvia Novoa, MetrolinkCommunity [email protected]

(213) 452-0300

Contact Us!