REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 1 of 33
No. Company Name and Address Project Name Project Owner Date Approved
1 301 ENGINEERS
17FE0012 – Project Cluster 2017-001 – Repair Maintenance of DPWH Building Quarters A.) Camarines Sur II DEO, Baras, Canaman, Cam. Sur B.) Cam. Sur Area Equipment Services, Concepcion Grande, Naga City
DPWH Camarines Sur 3nd DEO March 1, 2017
264 Pagatpat, Calabanga, Camarines Sur
2 301 ENGINEERS
17FG0015 – Indv. Project – Rehab./Reconstruction/Upgrading of Damaged Paved National Roads including Drainage along Nabua-Balatan Road, Balatan, Camarines Sur K0 484+033 – K0484+331
DPWH Camarines Sur 4th DEO March 1, 2017
264 Pagatpat, Calabanga, Camarines Sur
3 301 ENGINEERS 17FG0016 – Indv. Project – Rehab./Reconstruction of National Roads w/ Slips, Slope Collapse and Landslide along Iriga City-Masoli Road, Iriga City
DPWH Camarines Sur 4th DEO March 1, 2017
264 Pagatpat, Calabanga, Camarines Sur
4 MARK ANTHONY N. ESTOR Ryley’s Grill Mark Anthony N. Estor March 1, 2017
Tahao Road, Bitano, Legazpi City
5 ELMER C. MAGISTRADO Construction of Administrative Building and 49-Meters High Guyed Radio Antenna
Radio Philippines Network, Inc. c/o Elmer C. Magistrado
March 1, 2017
San Nicolas, Iriga City
6 EDROX CONSTRUCTION INC. 17FD0006 – Construction of Multi-Purpose Building DPWH Camarines Sur 1st DEO March 1, 2017
Zone 1, Concepcion Grande, Naga City
7 EDROX CONSTRUCTION INC. 17FD0005 – Completion of Covered Court DPWH Camarines Sur 1st DEO March 1, 2017
Zone 1, Concepcion Grande, Naga City
8 VERZONTAL BUILDERS, INC. 16FB0088 – Southern Legazpi Upland Barangay Federation Water System, Banquerohan/Homapon, Legazpi City
DPWH Albay 1st DEO March 1, 2017
Purok 3, Bagumbayan, Daraga, Albay
9 B. VICENCIO CONSTRUCTION 17FK0011 – Const./Maint. of Flood Mitigation DPWH Sorsogon 1st DEO March 1, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 2 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Structures and Drainage Systems – Const./Rehab. of Tulay Protection Wall
Brgy. Cagsalaosao, Maharlika Highway, Calbayog City, Samar
10 SPRING STAR CONSTRUCTION AND SUPPLY
17FI0005 – Off-Carriageway Improvement including Drainage along Jct. Tawad-Balud Road, K0028+476 – K0028+944; K0029+910 – K0030+900
DPWH Masbate 1st DEO March 1, 2017
143-C Balagtas St., Malate, Manila
11 SPRING STAR CONSTRUCTION AND SUPPLY
17FI0011 – Improvement/Widening of National Roads Milagros-Baleno-Lagta Road, K0025+636 – K0026+866, Net Length = 1.175 km (2.350 lane km)
DPWH Masbate 1st DEO March 1, 2017
143-C Balagtas St., Malate, Manila
12 SPRING STAR CONSTRUCTION AND SUPPLY
17FI0003 – Off-Carriageway Improvement including Drainage along Jct. Crossing – Mandaon Road K0046+818 – K0047+283; K0047+300 – K0048+349
DPWH Masbate 1st DEO March 1, 2017
143-C Balagtas St., Malate, Manila
13 HKP CONSTRUCTION AND SUPPLY 17FN0010 – Construction of Multi-Purpose Building Phase I
DPWH Camarines Sur 4th DEO March 1, 2017
1199 Our Lady’s Village, Bitano, Legazpi City
14 DUAMON CONSTRUCTION & SUPPLY
Repair/Renovation Works of Various Health Facilities, Package VIII-3-2016 HFEP Masbate
DOH – Regional Office V March 1, 2017
J. Reyes St. Bitan-o, Sorsogon City
15 EC STRUCTURAL COMPOSITES, INC.
17FI0016 – Construction and Maintenance of Bridges along National Roads Retrofitting/Strengthening of Permanent Bridges, Agoro Br. (B00014MT) along Jct. Milagros-Baleno-Lagta Road
DPWH Masbate 1st DEO March 1, 2017
4F, EC Center Bldg., Mindanao Ave. Extension, Brgy. Pasong Putik, Quezon City
16 E. GARCIA CONST. CORPORATION 16F00096 – Construction/Rehabilitation/Improvement of Bicol
DPWH Region V March 2, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 3 of 33
No. Company Name and Address Project Name Project Owner Date Approved
River Flood Control, Mabolo Section, Brgy. Mabolo; and Triangulo Section, Brgy. Triangulo, Naga City
2/F Viva Home Ideas Bldg. Concepcion Grande, Naga City
17 ATHENA CONSTRUCTION & DEVELOPMENT
17FA0069 – Repair of Sto. Domingo-Buhatan-Cagraray Circumferential Road, K0554+000 – K0567+000, Sto. Domingo, Albay
DPWH Albay 1st DEO March 2, 2017
239 Ludovice Compound, Arellano Extension, Sagpon, Daraga, Albay
18 ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION
17FA0002 – Construction/Extension of Flood Mitigation Facilities along Major River Basins-Kabilugan/Velascu/Butu River Basin (Lake Bicol)
DPWH Albay 1st DEO March 2, 2017
Arellano Extension, Daraga, Albay
19 NUMERICAL GATE CONSTRUCTION & SUPPLY CORPORATION
16FB0095 – Construction of a 3STY12CL School Building, Malabog National High School, Daraga (Locsin), Albay 2nd LD
DPWH Albay 2nd DEO March 2, 2017
#25 San Juan St., Centro Oriental, Polangui, Albay
20 WATERTON CONSTRUCTION & REALTY DEVELOPMENT CORPORATION
17FO0005 – Cluster II-2017: Rehabilitation/Major Repair of Existing Permanent Bridges along Matacon-Libon-Polangui Junction & Albay West Coast Roads; 1) Boranguit Bridge K0492+179, Kinale, Polangui, Albay, 2) Martirez Bridge K0491+234, Bulusan, Libon, Albay, 3) Bonga Bridge K0521+205, Rawis, Oas, Albay
DPWH Albay 3rd DEO March 2, 2017
42 Anzon St., Doña Maria Subd, Tagas, Daraga, Albay
21 WATERTON CONSTRUCTION & REALTY DEVELOPMENT CORPORATION
17FA0011 – Rehabilitation/Construction/Improvement of Manaet River Control, Cagraray Island, Bacacay, Albay
DPWH Albay 1st DEO March 2, 2017
43 Anzon St., Doña Maria Subd, Tagas, Daraga, Albay
22 TR CONSTRUCTION CORPORATION 17FE0010 – DPWH Camarines Sur 2nd DEO March 2, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 4 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Construction/Rehabilitation/Improvement of Naga River Flood Control (Sabang Section) Brgy. Sabang, Naga City, Camarines Sur 3rd LD
Brgy. 21, Binanuahan West, Legazpi City
23 SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION
16F00103 – Construction/Improvement of Access Roads leading to Declared Tourism Destinations, Mayon-Mariawa-Puro Road leading to Embarcadero de Legazpi and the Proposed Bicol International Airport
DPWH Region V March 2, 2017
Diversion Road, Bogtong, Legazpi City
24 ZKR CONSTRUCTION AND SUPPLY
16FF0083 – CY-2016 Basic Educational Facilities Fund (BEFF)-Natch 13, Construction of Two (2) Storey Six (6) Classroom with Comfort Room School Building, San Rafael National High School
DPWH Camarines Sur 3rd DEO March 2, 2017
PVLB Bldg 6., Room 306, Peñaranda St., Legazpi City
25 ELKANKONSTRAK DEVELOPMENT CORPORATION
17FM0004 – Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on Pavement Management System/Highway Development and Management-4 (HDM-4) San Fernando North Road, San Fernando & San Jacinto, Masbate
DPWH Masbate 3rd DEO March 2, 2017
P#5 Gogon, Legazpi City
26 RODA CONSTRUCTION AND GENERAL SUPPLY
16FK0051 – Construction of 19-Units Day Care Center
DPWH Sorsogon 1st DEO March 2, 2017
#24 Pangpang, Sorsogon City
27 NOLCAST CONSTRUCTION AND SUPPLY
16FE0099 – Project Cluster 2016-002 – Construction of Rainwater Collector
DPWH Camarines Sur 2nd DEO March 2, 2017
#2, Santol St., Liboton, Naga City
28 JIMMY DY Two-Storey Hometel Building Jimmy Dy March 2, 2017
Centro, Tabaco City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 5 of 33
No. Company Name and Address Project Name Project Owner Date Approved
29 A.D. CONSTRUCTION 16FD0057 – Repair/Maintenance of Poblacion, Pamplona River Control
DPWH Camarines Sur 1st DEO March 2, 2017
2 Narra St., Liboton, Naga City
30 EL ACEBUCHE BUILDERS Two Storey 8 Classroom SBFI School Building DEPED – Bigaa Elementary School
March 2, 2017
#228 LG/F Keyland Plaza, Ortigas Ave., Greenhills, San Juan City
31 ALRO CONSTRUCTION & DEVELOPMENT CORPORATION
16FF0077 – Off-Carriageway Improvement of National Roads (Concreting of Road Shoulder with Slope Protection) along Pili-Tigaon-Albay Boundary Road, K0507+680 – K0508+520
DPWH Camarines Sur 3rd DEO March 3, 2017
Peñaranda Extension, Bonot, Legazpi City
32 ALRO CONSTRUCTION & DEVELOPMENT CORPORATION
17FF0005 – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Pili-Tigaon-Albay Boundary Road, KO 497+000 – KO 497+370
DPWH Camarines Sur 3rd DEO March 3, 2017
Peñaranda Extension, Bonot, Legazpi City
33 E.S. BIHAG CONSTRUCTION & SUPPLY
17FN0001 – Concreting of Barangay Road DPWH Camarines Sur 5th DEO March 3, 2017
Alcantara St., Poblacion West, Ocampo, Camarines Sur
34 E.S. BIHAG CONSTRUCTION & SUPPLY
17FN0002 – Concreting of Barangay Road DPWH Camarines Sur 5th DEO March 3, 2017
Alcantara St., Poblacion West, Ocampo, Camarines Sur
35 NQA CONSTRUCTION & SUPPLY 16FH0081 – Cluster I – Construction of Roads in Brgy. Hicming, Brgy. Dugui Too and Brgy. Igang, Virac, Catanduanes
DPWH Catanduanes DEO March 3, 2017
Sta. Cruz, Virac, Catanduanes
36 LEGAZPI PREMIUM DEVELOPMENT CORPORATION
17FM0002 – Replacement of Bridges (Temporary to Permanent) Clemente Bridge along San Fernando
DPWH Masbate 3rd DEO March 3, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 6 of 33
No. Company Name and Address Project Name Project Owner Date Approved
South Road (Phase II)
#51 Greenlane, Jamora Subd., Cabangan, Legazpi City
37 LSL CONSTRUCTION AND SUPPLY
16FH0080 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Const. of Salvacion Protection Wall, Salvacion, Baras, Catanduanes
DPWH Catanduanes DEO March 3, 2017
5th Street, OLV, Bitano, Legazpi City
38 B. VICENCIO CONSTRUCTION 17FL0010 – Construction/Repair/Rehabilitation/Improvement of Barcelona Bypass Road, including ROW, Sorsogon
DPWH Sorsogon 2nd DEO March 3, 2017
Brgy. Cagsalaosao, Maharlika Highway, Calbayog City, Samar
39 RODA CONSTRUCTION AND GENERAL SUPPLY
16FK0047 – Construction of Rain Water Collection System
DPWH Sorsogon 1st DEO March 6, 2017
#24 Pangpang, Sorsogon City
40 RODA CONSTRUCTION AND GENERAL SUPPLY
16FK0050 – Construction of 24-Units Senior Citizen Center
DPWH Sorsogon 1st DEO March 6, 2017
#24 Pangpang, Sorsogon City
41 R.A. PAHATI CONST. & SUPPLY, INC.
17FG0025 – Indv. Project – Construction/Upgrading/Rehabilitation of Drainage along Nabua-Balatan Road, Camarines Sur – K0 478+280 – K0 479+000, K0 494+000 – K0 494+550
DPWH Camarines Sur 4th DEO March 6, 2017
283 Payawal Homes Subd., San Lorenzo Gapan, Nueva Ecija
42 RAMON T. UY Proposed 2-Storey 4-Door Commercial Building Ramon T. Uy March 7, 2017
Zone 1, Maharlika Highway, Brgy. Concepcion Grande, Naga City
43 JERALD S. LO Proposed One Storey Building Jerald S. Lo March 7, 2017
Villa Concepcion Subd., Concepcion Pequeña, Naga City
44 EDGARDO PAREDES Proposed Hemodialysis Center Optimum Kidney Care Solutions, Inc. / Dr. Edgardo Paredes
March 7, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 7 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Magsaysay Ave., Concepcion Pequeña, Naga City
45 VC VARIN CONSTRUCTION & HARDWARE SUPPLY
17FC0041 – Completion of Multi-Purpose Building DPWH Camarines Norte DEO March 7, 2017
Doña Eusebia St., Brgy. Pinya, Labo, Camarines Norte
46 VC VARIN CONSTRUCTION & HARDWARE SUPPLY
16FC0093 – Construction Of Two (2) Units Standard Technical and Vocational Workshop Building
DPWH Camarines Norte DEO March 7, 2017
Doña Eusebia St., Brgy. Pinya, Labo, Camarines Norte
47 VC VARIN CONSTRUCTION AND HARDWARE SUPPLY / ST. GERRARD CONSTRUCTION (JV)
16F00093 – Construction/Improvement of Access Roads leading to Seaport, Airport and Declared Tourism Destinations, a. To Declared Tourism Destination Pres. Cory Aquino Boulevard leading to Bagasbas Beach a. Cory Aquino Bridge 1
DPWH Region V March 7, 2017
Doña Eusebia St., Brgy. Pinya, Labo, Camarines Norte
48 GREAT WALL ENGINEERING 17FC0017 – Construction of Multi-Purpose Building DPWH Camarines Norte DEO March 7, 2017
#249 P3 Cobangbang, Daet, Camarines Norte
49 HRB CONSTRUCTION
16FF0084 – CY-2016 – Basic Educational Facilities Fund (BEFF)-Batch 13, Construction of Two (2) Storey Six (6) Classroom with Comfort Room School Building, Presentacion National High School (Formerly: Pili National High School)
DPWH Camarines Sur 3rd DEO March 7, 2017
Northbound Terminal, Queborac Drive, Bagumbayan Sur, Naga City
50 SANRHO BUILDERS, INC. 17FA0010 – Construction/Rehabilitation of Brgy. Labnig River Control along Quinale River, Labnig, Malinao, Albay
DPWH Albay 1st DEO March 7, 2017
Doña Maria Subd., Tagas, Daraga, Albay
51 3RB CONSTRUCTION & SUPPLY 17FA0016 – Cluster 6 – Network Development – DPWH Albay 1st DEO March 7, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 8 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Improvement/Widening of National Roads – Secondary Roads along DM JCT-Legazpi-Sto. Domingo-Tabaco-Cam Sur Bdry. Roads, Malinao, Albay and along Ligao-Tabaco Roads, Buang, Tabaco City, Albay
P-7, Panal, Tabaco City
52 AVIC CONSTRUCTION AND SUPPLY 17FG0011 – Contract Package - VIII (1-2) Completion of Various Multi-Purpose Building
DPWH Albay 1st DEO March 7, 2017
Purok 4, Travesia, Guinobatan, Albay
53 AVIC CONSTRUCTION AND SUPPLY 17FG0005 – Contract Package - III (1-2) Road Concreting of Various Roads
DPWH Albay 1st DEO March 7, 2017
Purok 4, Travesia, Guinobatan, Albay
54 SHALJOMAR CONSTRUCTION AND SUPPLY
INFRA 2016-09-020 Repair and Rehabilitation of School Buildings under 2016 BEFF Batch 3 LOT 2
DEPED – Division of Masbate March 7, 2017
Villa Concepcion Subd., Ibingay, Masbate City
55 SHALJOMAR CONSTRUCTION AND SUPPLY
INFRA 2016-12-025 Repair and Rehabilitation of School Buildings at Gangao Elementary School, Baleno, Masbate under 2016 QRF Batch 3
DEPED – Division of Masbate March 7, 2017
Villa Concepcion Subd., Ibingay, Masbate City
56 SPRING STAR CONSTRUCTION AND SUPPLY
17FF0004 – Asset Preservation of National Road – Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads Including Drainage Base on pavement Management System/Highway Development Management-4 (HDM-4) along Goa-Digdigon-San Isidro Road, KO 488+177.80 – KO488+599.00
DPWH Camarines Sur 3rd DEO March 7, 2017
143-C Balagtas St., Malate, Manila
57 NVF CONSTRUCTION 17FN0006 – Construction of Multi-Purpose Building Phase I
DPWH Camarines Sur 5th DEO March 7, 2017
Lot 8, Block 3, Parkview Executive Townhomes Subd., San Felipe, Naga
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 9 of 33
No. Company Name and Address Project Name Project Owner Date Approved
City
58 QDC CONSTRUCTION AND SUPPLY 16FA0073 – Cluster 31 – Construction of Malilipot RHU, Malilipot, Albay and Repair of Main Hospital Building, Ziga District Hospital, Tabaco City
DPWH Albay 1st DEO March 7, 2017
43 Orendain St. Doña Maria Subd., Tagas, Daraga, Albay
59 E. GARCIA CONST. CORPORATION
Upgrading (Asphalt Overlay) of the Existing VPA including Connecting Roads inside CAAP Compound at Legazpi Airport, Magayon Drive, Legazpi City (Re-bid)
Civil Aviation Authority of the Philippines
March 7, 2017
2/F Viva Home Ideas Bldg. Concepcion Grande, Naga City
60 E. GARCIA CONST. CORPORATION
17FN0012 – Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road including Drainage (along Sipocot – Cabusao Road)
DPWH Camarines Sur 5th DEO March 7, 2017
2/F Viva Home Ideas Bldg. Concepcion Grande, Naga City
61 PRECIOUS CONSTRUCTION
17FB0032 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Comun – Bongabong Flood Control System, Brgy. Comun Bongabong, Camalig, Albay
DPWH Albay 2nd DEO March 7, 2017
#136 Zone 3, San Isidro, Magarao, Camarines Sur
62 AMEG CONSTRUCTION AND SUPPLY
Road Opening at North Road 1, Legazpi City City Government of Legazpi March 7, 2017
Purok 4, Barriada Street, Legazpi City
63 NFH CONSTRUCTION & SUPPLY 16FC0033 – Concreting of Sisip Road DPWH Camarines Norte DEO March 7, 2017
132 San Vicente, Milaor, Camarines Sur
64 B. VICENCIO CONSTRUCTION 17FL0005 – Construction of Flood Control Structure along Cadac-an River, Tabon-Tabon, Irosin, Sorsogon
DPWH Sorsogon 2nd DEO March 7, 2017
Brgy. Cagsalaosao, Maharlika Highway,
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 10 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Calbayog City, Samar
65 B. VICENCIO CONSTRUCTION 17FL0006 – Construction of Flood Drainage Structure at Gubat Poblacion, Brgy. Paradijon, Luna – Candol and Manook, Gubat, Sorsogon
DPWH Sorsogon 2nd DEO March 7, 2017
Brgy. Cagsalaosao, Maharlika Highway, Calbayog City, Samar
66 HONEYVILLE CONSTRUCTION
16FF0086 – CY-2016 Basic Educational Facilities Fund – Batch 13; Construction of 2-Units Two (2) Storey Six (6) Classroom with Comfort Room School Building, Don Servillano Platon Memorial National High School
DPWH Camarines Sur 3rd DEO March 9, 2017
San Isidro, Magarao, Camarines Sur
67 HONEYVILLE CONSTRUCTION
17FF0006 – Reahbilitation/Reconstruction/Upgrading of Damaged Paved National Road including Drainage Based on Pavement Management System/Highway Development and Management-4 (HDM-4) along Jct. Binalay (Tinambac)-Tamban Road, K0513+400 – K0513+600
DPWH Camarines Sur 3rd DEO March 9, 2017
San Isidro, Magarao, Camarines Sur
68 HI-TONE CONSTRUCTION & DEVELOPMENT CORPORATION
17FO0007 – Completion/Construction of a 4-Storey, 16-Classroom School Building (Site 2) at Ligao National High School
DPWH Albay 3rd DEO March 9, 2017
Diversion Road, Bogtong, Legazpi City
69 HI-TONE CONSTRUCTION & DEVELOPMENT CORPORATION
17FO0006 – Retrofitting/Strengthening of Banao Bridge (B00290LZ) along Daang Maharlika Road
DPWH Albay 3rd DEO March 9, 2017
Diversion Road, Bogtong, Legazpi City
70 EA-EC CONSTRUCTION & SUPPLY 17FG0012 – Contract Package-IX (1-2) – Road Concreting of Various Roads
DPWH Camarines Sur 4th DEO March 9, 2017
Pinaglabanan St., San Agustin, Iriga City
71 EA-EC CONSTRUCTION & SUPPLY 17FG0017 – Indv. Proj. – Off-Carriageway Improvement including Drainage along Iriga City-San Isidro-Sagrada-San Ramon-Hanawan Road
DPWH Camarines Sur 4th DEO March 9, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 11 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Pinaglabanan St., San Agustin, Iriga City
72 ROLA CONSTRUCTION 17FG0018 – Indv. Proj. – Preventive Maintenance along Nabua-Balatan Road
DPWH Camarines Sur 4th DEO March 9, 2017
22 Lomeda Subd., San Felipe, Naga City
73 HILLSIDE CONSTRUCTION 17FG0004 – Contract Package II (1-3) – Completion/Construction of Various Multi-Purpose Building
DPWH Camarines Sur 4th DEO March 9, 2017
Rizal St., San Miguel, Iriga City
74 MR. & MRS. ZEUS HERRERA Proposed 3-Storey Commercial-Residential Building with Roof Deck
Mr. & Mrs. Zeus Herrera March 9, 2017
Purok 1, Brgy. 1, Legazpi City
75 SQUARE METER TRADING AND CONSTRUCTION CORP.
Proposed Xentro Mall Polangui XRC Mall / Alex M. Cruz March 9, 2017
11 Rainbow St. cor. Panganiban St., Concepcion Dos, Marikina City
76 NJNY CONSTRUCTION AND SUPPLY
Furnishing and Delivery of Labor, Materials & Equipments for the Installation & Maintenance of Municipal Street Lights at Various Barangays in Juban, Sorsogon
LGU - Juban, Sorsogon March 9, 2017
Diversion Road, Brgy. Cabid-an, Sorsogon City
77 LEGAZPI PREMIUM DEVELOPMENT CORPORATION
17FK0001 – Construction of New Permanent Bridges Ticol Bridge along Daang Maharlika (LZ)
DPWH Sorsogon 1st DEO March 9, 2017
#51 Greenlane, Jamora Subd., Cabangan, Legazpi City
78 LEGAZPI PREMIUM DEVELOPMENT CORPORATION
17FK0004 – Widening of Permanent Bridges including ROW to more than two lanes, Sorsogon Bridge (B0112LZ) along Sorsogon Diversion Road
DPWH Sorsogon 1st DEO March 9, 2017
#51 Greenlane, Jamora Subd., Cabangan, Legazpi City
79 LEGAZPI PREMIUM DEVELOPMENT 17FK0006 – Widening of Permanent Bridges DPWH Sorsogon 1st DEO March 9, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 12 of 33
No. Company Name and Address Project Name Project Owner Date Approved
CORPORATION including ROW to more than two lanes, Gomihan Bridge (B01161LZ) along Sorsogon Diversion Road
#51 Greenlane, Jamora Subd., Cabangan, Legazpi City
80 AMEG CONSTRUCTION AND SUPPLY
Proposed Additional Amenities of Legazpi City Hospital
City Government of Legazpi March 10, 2017
Purok 4, Barriada Street, Legazpi City
81 ARCH. MARC DUCAY Proposed Two-Storey Office Building Jocelyn D. Destura March 10, 2017
Legazpi City
82 HKP CONSTRUCTION AND SUPPLY 16FI0048 – Construction of 1 Unit 1 Storey (7.0m x 22.5m) Technical-Vocational Multipurpose Workshop Building at A. Delos Reyes Integrated School
DPWH Masbate 1st DEO March 10, 2017
1199 Our Lady’s Village, Bitano, Legazpi City
83 HKP CONSTRUCTION AND SUPPLY 16FI0049 – Construction of 1 Unit 1 Storey (7.0m x 22.5m) Technical-Vocational Multipurpose Workshop Building at Bantigue High School
DPWH Masbate 1st DEO March 10, 2017
1199 Our Lady’s Village, Bitano, Legazpi City
84 HKP CONSTRUCTION AND SUPPLY 16FI0051 – Construction of 1 Unit 1 Storey (7.0m x 22.5m) Technical-Vocational Multipurpose Workshop Building at Capitolina O. Legaspi MHS
DPWH Masbate 1st DEO March 10, 2017
1199 Our Lady’s Village, Bitano, Legazpi City
85 HKP CONSTRUCTION AND SUPPLY 16FI0052 – Construction of 1 Unit 1 Storey (7.0m x 22.5m) Technical-Vocational Multipurpose Workshop Building at Bayombon High School
DPWH Masbate 1st DEO March 10, 2017
1199 Our Lady’s Village, Bitano, Legazpi City
86 DN’D CONSTRUCTION & DEVELOPMENT
17FB0044 – Local Infrastructure Program: Construction of Multi-Purpose Building, Brgy. Taysan, Legazpi City, Albay
DPWH Albay 2nd DEO March 10, 2017
Imelda C. Roces Avenue, Gogon,
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 13 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Legazpi City
87 RMH CONSTRUCTION AND SUPPLY
17FL0008 – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads, Ariman – Jct. Bulusan Lake Road, K0623+818 – K0624+136, Bulusan, Sorsogon
DPWH Sorsogon 2nd DEO March 13, 2017
17th St. OLV, Pangpang, Sorsogon City
88 EVELYN H. BERCENAS 2-Storey Multi-Dwelling (Commercial-Residential) Mr. & Mrs. Fanny H. Morandarte March 13, 2017
San Pedro, Buhi, Camarines Sur
89 MARILOU Z. MARCHAN Proposed Commercial Stalls Marilou Z. Marchan March 13, 2017
Cory Ninoy Ave., Triangulo, Naga City
90 METROPOLITAN NAGA WATER DISTRICT
Proposed Carolina III Pumping Station Metropolitan Naga Water District / GM Cesar H. Federizon
March 13, 2017
#40 J. Miranda Ave., Concepcion Pequeña, Naga City
91 SULVIR ENGINEERING AND CONSTRUCTION
17FB0042 – Construction of 2STYL10CL School Building, Homapon High School, Legazpi City Albay
DPWH Albay 2nd DEO March 14, 2017
PVLB Bldg 6., Room 307, Peñaranda St., Legazpi City
92 MM SEÑAR CONSTRUCTION AND SUPPLY
Construction of Evacuation Center Provincial Government of Camarines Norte
March 14, 2017
#136 Zone 3, San Isidro, Magarao, Camarines Sur
93 VIRGO CONSTRUCTION 17FG0006 – Contract Package-IV (1-2) – Completion of Various Multi-Purpose Building
DPWH Camarines Sur 4th DEO March 14, 2017
#77 Sta. Cruz St., Sta. Cruz, Naga City
94 ROLA CONSTRUCTION 17FG0020 – Indv. Proj. – Construction/Upgrading/Rehab. of Drainage along Iriga-Masoli Road
DPWH Camarines Sur 4th DEO March 14, 2017
22 Lomeda Subd., San Felipe, Naga City
95 SPRING STAR CONSTRUCTION AND SUPPLY
17FG0021 – Individual Project – Channel/Improvement/Revetment at Bicol River
DPWH Camarines Sur 4th DEO March 14, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 14 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Downstream of Sto. Domingo Bridge
143-C Balagtas St., Malate, Manila
96 SPRING STAR CONSTRUCTION AND SUPPLY
16FA0066 – Cluster 30 BEFF 2016 – Batch 13 – Construction of Two Storey Four Classrooms (2STY4CL) and Two Storey Six Classrooms (2STY6CL) at Sto. Domingo NHS, Vinisitahan NHS, Malinao NHS, Naga NHS, Tiwi Agro-Industrial School, 1st District of Albay
DPWH Albay 1st DEO March 14, 2017
143-C Balagtas St., Malate, Manila
97 JOMA CONSTRUCTION 17FG0013 – Indv. Project – Completion of Multi-Purpose Building Market Site
DPWH Camarines Sur 4th DEO March 14, 2017
San Antonio Poblacion, Nabua, Camarines Sur
98 C.T. LEONCIO CONSTRUCTION & TRADING
17FK0012 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/Rehab. of Pili River Control
DPWH Sorsogon 1st DEO March 14, 2017
171 Luwasan St., Brgy. Guyong, Sta. Maria, Bulacan
99 C.T. LEONCIO CONSTRUCTION & TRADING
17FK0014 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Salog River Control Upstream
DPWH Sorsogon 1st DEO March 14, 2017
171 Luwasan St., Brgy. Guyong, Sta. Maria, Bulacan
100 E.P.L. GENERAL CONSTRUCTION AND SUPPLY
Proposed Construction of Portable Concrete Batching Plant
Elena P. Lo / E.P.L. General Construction and Supply
March 14, 2017
Zone 6, Brgy. Del Rosario, Naga City
101 WCS CONSTRUCTION INC. 16F00091 – Bicol River Basin Watershed Management Project (Flood Mitigation Component) – Guinobatan and Ligao Flood Control
DPWH Region V March 14, 2017
#1 J&M Bldg., Rizal Street, Legazpi City
102 SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION
17FB0028 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/Rehabilitation of Barangay 4 Flood
DPWH Albay 2nd DEO March 14, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 15 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Control System, Brgy. 4, Camalig, Albay
Diversion Road, Bogtong, Legazpi City
103 SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION
17FB0007 – Off-Carriageway Improvement including Drainage, Comun-Inarado-Peñafrancia Road (S03706LZ), K0526+000 – K0527+000
DPWH Albay 2nd DEO March 14, 2017
Diversion Road, Bogtong, Legazpi City
104 SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION
17FB0016 – Off-Carriageway Improvement including Drainage, Banquerohan-Bariis-Sogoy-Sorsogon Bdry. Rd (S05859LZ), K0544+(-)148 – K0546+000
DPWH Albay 2nd DEO March 14, 2017
Diversion Road, Bogtong, Legazpi City
105 SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION
17FB0015 – Off-Carriageway Improvement including Drainage, Banquerohan-Bariis-Sogoy-Sorsogon Bdry. Rd (S05859LZ), K0544+(-)148 – K0546+000
DPWH Albay 2nd DEO March 14, 2017
Diversion Road, Bogtong, Legazpi City
106 JR CONTRACTOR 16FH0083 – Cluster III – Construction of Roads in Brgy. Obi, Caramoran; Brgy. Tobrehon, San Miguel and Brgy. Paniquihan, Baras, Catanduanes
DPWH Catanduanes DEO March 15, 2017
District II, San Miguel, Virac, Catanduanes
107 JR CONTRACTOR
17FH0002 – Construction/Maintenance of Bridges along National Roads, Rehabilitation/Major Repair of Permanent Bridges, Buenavista Bridge 2 (B00062N) along Baras-Gigmoto-Viga Road, Buenavista, Viga, Catanduanes
DPWH Catanduanes DEO March 15, 2017
District II, San Miguel, Virac, Catanduanes
108 JR CONTRACTOR 16FH0082 – Construction of Roads in Brgy. Rizal, Viga, Brgy. Magsaysay, Viga and Brgy. Tibo, Panganiban, Catanduanes
DPWH Catanduanes DEO March 15, 2017
District II, San Miguel, Virac, Catanduanes
109 AE BELLEZA BUILDERS 17FE0011 – Construction of Multi-Purpose Hall (Covered Court), Brgy. Cagmanaba
DPWH Camarines Sur 2nd DEO March 15, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 16 of 33
No. Company Name and Address Project Name Project Owner Date Approved
102 Sto. Tomas, Magarao, Camarines Sur
110 QDC CONSTRUCTION AND SUPPLY 17FB0010 – Local Infrastructure Program: Construction of Multi-Purpose Building, Brgy. Tagaytay, Camalig, Albay
DPWH Albay 2nd DEO March 15, 2017
43 Orendain St. Doña Maria Subd., Tagas, Daraga, Albay
111 LEGAZPI PREMIUM DEVELOPMENT CORPORATION
17FL0009 – Widening of Permanent Bridges including ROW to more than two lanes, Buenavista Bridge (B00158LZ) along Daang Maharlika (LZ) (Phase II)
DPWH Sorsogon 2nd DEO March 15, 2017
#51 Greenlane, Jamora Subd., Cabangan, Legazpi City
112 SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION
17FB0021 – Construction/Maintenance of Flood Mitigation Structures and Drainage System – Construction of Yawa Flood Control, Legazpi City, Albay 2nd LD
DPWH Albay 2nd DEO March 15, 2017
Diversion Road, Bogtong, Legazpi City
113 HI-TONE CONSTRUCTION & DEVELOPMENT CORPORATION
17FB0041 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Reinforced Concrete Dike along Pandan – Busay Creek (Downstream)
DPWH Albay 2nd DEO March 15, 2017
Diversion Road, Bogtong, Legazpi City
114 HI-TONE CONSTRUCTION & DEVELOPMENT CORPORATION
17FB0036 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/Rehabilitation of Reinforced Concrete Dike along Pandan – Busay Creek (Upstream)
DPWH Albay 2nd DEO March 15, 2017
Diversion Road, Bogtong, Legazpi City
115 CTC BUILDER AND SUPPLIES, INC. 17FK0024 – Cluster IV – Construction of Various School Building Projects under FY 2016 Basic Educational Facilities Fund (BEFF) Batch 13
DPWH Sorsogon 1st DEO March 15, 2017
Maharlika Highway, Brgy. Balogo, Sorsogon City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 17 of 33
No. Company Name and Address Project Name Project Owner Date Approved
116 EDROX CONSTRUCTION INC. 17FD0007 – Completion of Covered Court DPWH Camarines Sur 1st DEO March 15, 2017
Zone 1, Concepcion Grande, Naga City
117 ARCH. EDWIN MARTIN NOLLEDO Proposed 2-Storey Commercial Building with Deck South-Tagalog Asset Development. Inc. / Faustino Francis T. Yap
March 15, 2017
2/F, TB5 Building, F. Imperial St., Legazpi City
118 HRB CONSTRUCTION 17FG0022 – Contract Package-X (1-2) – Construction of Various Flood Control in Baao, Camarines Sur
DPWH Camarines Sur 4th DEO March 15, 2017
Northbound Terminal, Queborac Drive, Bagumbayan Sur, Naga City
119 HRB CONSTRUCTION 17FF0009 – FY 2017 Infrastructure Program Local Infrastructure Program – Construction of Multi-Purpose Building (Covered Court)
DPWH Camarines Sur 3rd DEO March 15, 2017
Northbound Terminal, Queborac Drive, Bagumbayan Sur, Naga City
120 STEVEN CONSTRUCTION & SUPPLY / CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (JV)
17FK0020 – Multi-Purpose / Facilities – Construction of 48-Rooms Building, Regional Dairy Production & Technology Center (RDPTC)
DPWH Sorsogon 1st DEO March 16, 2017
Sitio Sip-ac, Brgy. Cabid-an, Sorsogon City
121 GACT ENTERPRISES 16FI0053 – Repair/Maintenance of Balatucan Revetment
DPWH Masbate 1st DEO March 16, 2017
Narangasan, Milagros, Masbate
122 GACT ENTERPRISES 16FI0054 – Repair/Maintenance of Cabuluan Revetment
DPWH Masbate 1st DEO March 16, 2017
Narangasan, Milagros, Masbate
123 GACT ENTERPRISES 16FI0055 – Repair/Maintenance of Cancahorao Revetment
DPWH Masbate 1st DEO March 16, 2017
Narangasan, Milagros, Masbate
124 GACT ENTERPRISES 16FI0056 – Repair/Maintenance of Angbu Revetment
DPWH Masbate 1st DEO March 16, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 18 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Narangasan, Milagros, Masbate
125 GACT ENTERPRISES 16FI0057 – Repair/Maintenance of Lagta Revetment DPWH Masbate 1st DEO March 16, 2017
Narangasan, Milagros, Masbate
126 DRA. SALVACION STA. ROSA - PANTORGO
Three Storey Residential Building Dra. Salvacion Sta. Rosa - Pantorgo
March 16, 2017
San Roque, Buhi, Camarines Sur
127 RIGIDHOOK CONSTRUCTION & SUPPLIES
Proposed 3 Storey Commercial Building Roseller D. Lim March 16, 2017
637 De Guzman St., North Centro, Sipocot, Camarines Sur
128 DOMINGUITO A. TABUETE Two Storey Residential / Commercial Building Dominguito A. Tabuete March 16, 2017
Sta. Elena, Buhi, Camarines Sur
129 FEDERICO ALDO LAZARO Renovation of Commercial Building Naga Queentown Realty and Development Inc.
March 16, 2017
Cor. Panganiban & Dinaga Streets, Naga City
130 ST. BERNARDINE CONSTRUCTION AND ENTERPRISES
Repair/Renovation Works of DOH-RO V Complex, Package XIII-2016 RO V
DOH - Regional Office V March 16, 2017
Brgy. San Felipe, Naga City, Camarines Sur
131 ST. BERNARDINE CONSTRUCTION AND ENTERPRISES
Repair/Renovation Works of DOH-RO V Complex, Package VIII-2016 RO V
DOH - Regional Office V March 16, 2017
Brgy. San Felipe, Naga City, Camarines Sur
132 ST. BERNARDINE CONSTRUCTION AND ENTERPRISES
Repair/Renovation Works of DOH-RO V Complex, Package IX-2016 RO V
DOH - Regional Office V March 16, 2017
Brgy. San Felipe, Naga City, Camarines Sur
133 NEWBIG FOUR J CONSTRUCTION INC.
17FB0023 – Construction/Improvement of Barangay 4 – Ilawod Flood Control System, Camalig, Albay
DPWH Albay 2nd DEO March 16, 2017
21 Mustang St., Rancho Estate 1, Marikina City
134 NEWBIG FOUR J CONSTRUCTION 17FB0022 – Construction/Improvement of Ilawod – DPWH Albay 2nd DEO March 16, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 19 of 33
No. Company Name and Address Project Name Project Owner Date Approved
INC. Ligban Flood Control System, Camalig, Albay
21 Mustang St., Rancho Estate 1, Marikina City
135 NFH CONSTRUCTION & SUPPLY / A3 CONSTRUCTION & SUPPLY (JV)
17FJ0025 – MFO2 Flood Control Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage System, Construction of Domorog River Control, Brgy. Domorog, Cataingan, Masbate
DPWH Masbate 2nd DEO March 17, 2017
San Vicente, Milaor, Camarines Sur
136 NFH CONSTRUCTION & SUPPLY / A3 CONSTRUCTION & SUPPLY (JV)
16FJ0039 – Construction of Five (5)-Units Two (2)-Storey Four (4) Classroom School Building at Mayor Tomas V. Rivera MHS, Madbad, Cawayan, Masbate
DPWH Masbate 2nd DEO March 17, 2017
San Vicente, Milaor, Camarines Sur
137 BICOL GOLDROCK CONSTRUCTION CORP.
16FD0070 – Cluster Projects: Construction of Farm-to-Market Roads for Coconut Lands; A.) Beguito Viejo-Udoc, Libmanan, Camarines Sur, B.) Calabnigan, Libmanan, Camarines Sur, C.) Antipolo, Pasacao, Camarines Sur
DPWH Camarines Sur 1st DEO March 17, 2017
Santol St., Cararayan, Naga City
138 BICOL GOLDROCK CONSTRUCTION CORP.
17FD0002 – Cluster Projects: Construction of Multi-Purpose Building; A.) Brgy. District 2-Poblacion, Gainza, Camarines Sur; B.) Brgy. Malbong, Gainza, Camarines Sur
DPWH Camarines Sur 1st DEO March 17, 2017
Santol St., Cararayan, Naga City
139 ALXM CONSTRUCTION
17FG0023 – Contract Package-XI (1-2) – Rehab./Reconst./Upgrading of Damaged Paved National Roads including Drinage along Bato Poblacion Road, Bato, Camarines Sur; 1. K0 477+000 – K0 477+907, K0478+575 – K0 479+000; 2. K0479+087 – K0479+795
DPWH Camarines Sur 4th DEO March 17, 2017
#133 Rizal St., Sagpon, Daraga, Albay
140 AB OPEÑA BUILDERS 17FN0005 – Concreting of Barangay Road DPWH Camarines Sur 5th DEO March 20, 2017
4th St., Parkview Village, San Felipe,
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 20 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Naga City
141 ARKY CONSTRUCTION & SUPPLY
17FJ0006 – Asset Preservation of National Road Network Services - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development and Management – 4 (HDM-4), K0098+000 – K0098+997 & K0100+080 – K0100+616
DPWH Masbate 2nd DEO March 20, 2017
Pinamarbuhan, Mobo, Masbate
142 GOLDEN CROWN BUILDERS & CONSTRUCTION SUPPLY
Furnishing and Delivery of Labor, Materials and Equipments for the Concreting of P. Guamil St. Cogon, Juban
LGU – Juban, Sorsogon March 20, 2017
Manook St., Luna Candol, Gubat, Sorsogon
143 LAHDETH CONSTRUCTION AND SUPPLY
17FG0026 – Individual Project – Retrofitting/Strengthening of Permanent Bridges, Tapayas Bridge (B00470LZ) along Nabua-Balatan Road
DPWH Camarines Sur 4th DEO March 20, 2017
Progress Home 2nd St., San Vicente, Canaman, Camarines Sur
144 LAHDETH CONSTRUCTION AND SUPPLY
17FG0019 – Individual Project – Retrofitting/Strengthening of Permanent Bridges, Mampuag Bridge (B004670LZ) along Nabua-Balatan Road
DPWH Camarines Sur 4th DEO March 20, 2017
Progress Home 2nd St., San Vicente, Canaman, Camarines Sur
145 1247 GUASA CONSTRUCTION CORPORATION
Construction of Caltex Gasoline Filling Station Southern Cross Distribution Inc. March 20, 2017
690 Green St., Sunrise Subd., Brgy. Cruzada, Legazpi City, Albay
146 STEVEN CONSTRUCTION AND SUPPLY
17FK0018 – Off-Carriageway Improvement including Drainage-Tertiary Roads-Bacon-Sawanga-Pto. Diaz
DPWH Sorsogon 1st DEO March 20, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 21 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Road, K0592+071 – K0592+235, K0595+40 – K0595+770, K0597+000 – K0597+190, K0598+320 – K0598+714, K0610+000 – K0610+370, K0610+810 – K0611+767
Lot 6, Blk 1, Central City Subd. Tahao Road, Legazpi City
147 C. L. CARANDANG ENTERPRISES
17FI0024 – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Masbate-Cataingan-Placer Road, K0018+037 – K0018+350
DPWH Masbate 1st DEO March 20, 2017
#0002 Nursery St., Masbate City
148 LADON ENTERPRISE Proposed LDS Cotnogan Polangui LBO Project The Church of Jesus Christ of Latter-Day Saints
March 20, 2017
228 Tapuac District, Dagupan City, Pangasinan
149 MCEL PANGANIBAN CONSTRUCTION AND TRADING CORPORATION
Construction of Mini Port Road, In Front of Larap National High School, Jose Panganiban, Camarines Norte
Provincial Government of Camarines Norte
March 20, 2017
Roy Padilla Blvd., South Poblacion, Jose Panganiban, Camarines Norte
150 BRENTMIN ROOFING ENTERPRISE Construction of Barangay Road, Brgy. Gumaus, Paracale, Camarines Norte
Provincial Government of Camarines Norte
March 20, 2017
Vinzons Ave., Brgy. Gahonon, Daet, Camarines Norte
151 BRENTMIN ROOFING ENTERPRISE Construction of Evacuation Center, Brgy. Rizal, Sta. Elena, Camarines Norte
Provincial Government of Camarines Norte
March 20, 2017
Vinzons Ave., Brgy. Gahonon, Daet, Camarines Norte
152 JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
17FC0016 – Construction of Multi-Purpose Building, Ramon Magsaysay E/S, Brgy. Poblacion, Talisay, Camarines Norte
DPWH Camarines Norte DEO March 20, 2017
Diversion Road, Brgy. Lag-on, Daet, Camarines Norte
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 22 of 33
No. Company Name and Address Project Name Project Owner Date Approved
153 JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
17FC0010 – Construction of Drainage System DPWH Camarines Norte DEO March 21, 2017
Diversion Road, Brgy. Lag-on, Daet, Camarines Norte
154 JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
17FC0052 – Construction/Maintenance of Bridge along National Road Replacement of Permanent Weak Bridge-Malakbang Bridge (B02716LZ) along Daang Maharlika
DPWH Camarines Norte DEO March 21, 2017
Diversion Road, Brgy. Lag-on, Daet, Camarines Norte
155 AVZ CONSTRUCTION AND SUPPLY Concreting of Barangay Road, Brgy. Mangcamagong, Basud, Camarines Norte
Provincial Government of Camarines Norte
March 21, 2017
Purok Atis Gubat, Daet, Camarines Norte
156 SHEAR CONSTRUCTION & SUPPLY Construction of Barangay Road, Brgy. Langga-Mampurog, San Lorenzo Ruiz, Camarines Norte
Provincial Government of Camarines Norte
March 21, 2017
J. Pimentel St., Daet, Camarines Norte
157 ELKANKONSTRAK DEVELOPMENT CORPORATION
17FA0006 – Construction/Rehab. of Brgy. San Antonio River Control (Downstream) along San Vicente River
DPWH Albay 1st DEO March 21, 2017
P#5 Gogon, Legazpi City
158 SPRING STAR CONSTRUCTION AND SUPPLY
16FF0087 – CY-2016 Basic Educational Facilities Fund – Batch 13, Construction of 2-Units Two (2) Storey Six (6) Classroom with Comfort Room School Building, Nato National High School
DPWH Camarines Sur 3rd DEO March 21, 2017
143-C Balagtas St., Malate, Manila
159 TR CONSTRUCTION CORPORATION
17FA0025 – Construction/Maintenance of Flood Mitigation Structure and Drainage Systems: Rehabilitation/Construction/Extension of Seawall, Igang, Bacacay, Albay
DPWH Albay 1st DEO March 21, 2017
Brgy. 21, Binanuahan West, Legazpi City
160 CBC CONSTRUCTION & SUPPLY 16F00113 – Repair /Maintenance of Mayon Sabo DPWH Region V March 21, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 23 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Brgy. 40, P-7, Cruzada, Legazpi City
161 B2K LUMBER CONSTRUCTION SUPPLIES AND SERVICES
17FC0056 – Construction/Improvement of Access Roads leading to Declared Tourism Destinations: Pres. Cory Aquino Boulevard leading to Bagasbas Beach
DPWH Camarines Norte DEO March 21, 2017
Purok 1, Brgy. Camambugan, Daet, Camarines Norte
162 DSB CONSTRUCTION & SUPPLY INC.
17FA0022 – Cluster 12 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Rehabilitation/Construction/Extension of Seawall at Barangay 1 Poblacion, Bacacay, Albay and Seawall at San Isidro Palali and Binitayan, Malilipot, Albay
DPWH Albay 1st DEO March 21, 2017
Brgy. 10, Bacacay, Albay
163 DSB CONSTRUCTION & SUPPLY INC.
17FA0024 – Cluster 14 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Rehabilitation/Construction/Extension of Seawall at San Juan, Sto. Domingo, Albay; Baybay, Tiwi, Albay; Putsan, Tiwi, Albay and Baybay, Malinao, Albay 1st LD
DPWH Albay 1st DEO March 21, 2017
Brgy. 10, Bacacay, Albay
164 SPS. RIZALDE A. PANTE &NECITA J. PANTE
Proposed 4 Units Studio Type Apartment Building with Commercial Building
Sps. Rizalde A. Pante & Necita J. Pante
March 22, 2017
Acasia St., Liboton, Naga City
165 RAMON O. OLAÑO, JR. Proposed Two-Storey Commercial Building Ramon O. Olaño Jr. March 22, 2017
Brgy. Abella, Naga City
166 WILFERROUS BUILDERS INC. Pilipinas Shell Pilipinas Shell March 22, 2017
No. 1, Sto. Niño, San Jose, Antipolo City
167 JM-COFER CONSTRUCTION AND SUPPLY
17FF0002 – FY-2017 Infrastructure Program Local Infrastructure Program – Construction of Multi-Purpose Building (Covered Court)
DPWH Camarines Sur 3rd DEO March 22, 2017
Zone 1, Bagumbayan Norte, Naga City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 24 of 33
No. Company Name and Address Project Name Project Owner Date Approved
168 J-MARBELA CONSTRUCTION AND SUPPLY
17FF0001 – FY-2017 Local Infrastructure Program – Construction of Multi-Purpose Building (Covered Court)
DPWH Camarines Sur 3rd DEO March 22, 2017
Zone 1, Magsaysay Avenue, Naga City
169 ELKANKONSTRAK DEVELOPMENT CORPORATION
16FH0079 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Sta. Teresa, Bagamanoc, Catanduanes
DPWH Catanduanes DEO March 22, 2017
P#5 Gogon, Legazpi City
170 SHEAR CONSTRUCTION & SUPPLY Construction of Covered Court Provincial Government of Camarines Norte
March 22, 2017
J. Pimentel St., Daet, Camarines Norte
171 IA FERRER CONSTRUCTION & SUPPLY
17FF0007 – Rehabilitation/Reconstruction/Upgrading of Damaged Paved along National Roads including Drainage Based on Pavement Management System/Highway Development Management-4 (HDM-4) along jct. Balaynan-Tabgon-Pinamihagan Road, K0505+478 – K0505+769
DPWH Camarines Sur 3rd DEO March 22, 2017
Dama de Noche St., Jardin de Real Subd., Del Rosario, Naga City
172 PARTIDO CONSTRUCTION AND SUPPLY
17FF0013 – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Presentacion-Maligaya Road, KO 529+-290 – KO 529+-210
DPWH Camarines Sur 3rd DEO March 22, 2017
Matacla, Goa, Camarines Sur
173 HEIDE A. PALANCA Renovation of One Storey Commercial Building Heide A. Palanca March 23, 2017
Legazpi City
174 GREAT WALL ENGINEERING 17FC0007 – Construction of Road DPWH Camarines Norte DEO March 23, 2017
#249 P3 Cobangbang, Daet, Camarines Norte
175 JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
17FC0012 – Construction of Multi-Purpose Building DPWH Camarines Norte DEO March 23, 2017
Diversion Road, Brgy. Lag-on, Daet,
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 25 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Camarines Norte
176 VC VARIN CONSTRUCTION & HARDWARE SUPPLY
Construction of Taisan Farm to Market Road Provincial Government of Camarines Norte
March 23, 2017
Doña Eusebia St., Brgy. Pinya, Labo, Camarines Norte
177 YAKAL CONSTRUCTION AND SUPPLY
17FC0015 – Completion of Multi-Purpose Building DPWH Camarines Norte DEO March 23, 2017
Ecology Village, Brgy. Gubat, Daet, Camarines Norte
178 HI-TONE CONSTRUCTION & DEVELOPMENT CORPORATION
17FB0026 – Construction/Maintenance of Flood Mitigation Structures and Drainage System – Construction of Bongalon Flood Control System, Daraga, Albay
DPWH Albay 2nd DEO March 24, 2017
Diversion Road, Bogtong, Legazpi City
179 HI-TONE CONSTRUCTION & DEVELOPMENT CORPORATION
17FA0026 – Construction/Rehabilitation of Brgy. Tagoytoy Flood Control along Taque River, Malinao, Albay
DPWH Albay 1st DEO March 24, 2017
Diversion Road, Bogtong, Legazpi City
180 MICHAEL JAMES C. LOCSIN Renovation for Marlo Enterprises & Development Corp. Building
Marlo Enterprises & Development Corp.
March 24, 2017
Washington Drive, Legazpi City
181 NFH CONSTRUCTION & SUPPLY
17FB0040 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Purok 6 Flood Control System, Brgy. Libod, Camalig, Albay
DPWH Albay 2nd DEO March 24, 2017
132 San Vicente, Milaor, Camarines Sur
182 LEGAZPI PREMIUM DEVELOPMENT CORPORATION
Proposed Warehouse Building with Office Area Johnson T. Uy March 27, 2017
#51 Greenlane, Jamora Subd., Cabangan, Legazpi City
183 3L CONSTRUCTION 17FD0001 – Cluster Projects: Construction of Multi-Purpose Building; A.) Brgy. Cagbunga, Gainza, Camarines Sur, B.) Brgy. Sampaloc, Gainza,
DPWH Camarines Sur 1st DEO March 24, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 26 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Camarines Sur
Leon S.A. Aureus St., Gimenez Subd., Concepcion Pequena, Naga City
184 TOPSPIN CONSTRUCTION 17FL0015 – Construction of Multi-Purpose Building DPWH Sorsogon 2nd DEO March 27, 2017
Immaculate Concepcion Subd., Bulan, Sorsogon
185 TOPSPIN CONSTRUCTION 17FL0019 – Concreting of Local Road, Brgy. J.P. Laurel Road and Brgy. A. Bonifacio, Bulan, Sorsogon (CLUSTER 2)
DPWH Sorsogon 2nd DEO March 27, 2017
Immaculate Concepcion Subd., Bulan, Sorsogon
186 C. L. CARANDANG ENTERPRISES 17FJ0033 – Construction of Multi-Purpose Covered Court (MPB), Brgy. Taboc, Placer, Masbate 3rd LD
DPWH Masbate 2nd DEO March 27, 2017
#0002 Nursery St., Masbate City
187 C. L. CARANDANG ENTERPRISES 17FJ0035 – Construction of Multi-Purpose Covered Court (MPB), Brgy. Guin-awayan, Placer, Masbate 3rd LD
DPWH Masbate 2nd DEO March 27, 2017
#0002 Nursery St., Masbate City
188 C. L. CARANDANG ENTERPRISES 17FJ0036 – Construction of Multi-Purpose Covered Court, Pio V. Corpuz, Masbate 3rd LD
DPWH Masbate 2nd DEO March 27, 2017
#0002 Nursery St., Masbate City
189 C. L. CARANDANG ENTERPRISES 16FJ0051 – Completion/Construction of 2-Storey, 6 Classroom School Building, Buenasuerte IS at Pio V. Corpus (Limbuhan), Masbate
DPWH Masbate 2nd DEO March 27, 2017
#0002 Nursery St., Masbate City
190 C. L. CARANDANG ENTERPRISES 17FI0008 – Construction of Seawall, Brgy. Poblacion, Aroroy, Masbate
DPWH Masbate1st DEO March 27, 2017
#0002 Nursery St., Masbate City
191 DUAMON CONSTRUCTION & SUPPLY
PCS-INFRA-01-03-2017 Construction of Two Storey Office Building
DENR – PENRO Camarines Sur March 27, 2017
J. Reyes St. Bitan-o, Sorsogon City
192 ANTONIO V. NIDEA CONSTRUCTION INC.
17FA0019 – Cluster 9 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems:
DPWH Albay 1st DEO March 27, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 27 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Rehabilitation/Construction/Extension of Seawall at Fatima, San Roque and Sto. Cristo, Tabaco City, Albay 1st LD
Maria Clara St., Albay District, Legazpi City
193 STEVEN CONSTRUCTION AND SUPPLY
17FL0021 – Construction of Flood Control (CLUSTER 1)
DPWH Sorsogon 2nd DEO March 27, 2017
Lot 6, Blk 1, Central City Subd. Tahao Road, Legazpi City
194 B. VICENCIO CONSTRUCTION 17FK0021 – Cluster-1 Construction of Various School Building Projects under FY 2016 Basic Educational Facilities (BEFF) Batch 13
DPWH Sorsogon 1st DEO March 27, 2017
Brgy. Cagsalaosao, Maharlika Highway, Calbayog City, Samar
195 KINGSON CONTRACTORS INC. Construction and Improvement of Portion of Drainage System
LGU - Bacacay, Albay March 27, 2017
Santillan St., Brgy. Quinale, Tabaco City
196 KINGSON CONTRACTORS INC. Construction of Training Center LGU - Bacacay, Albay March 27, 2017
Santillan St., Brgy. Quinale, Tabaco City
197 KINGSON CONTRACTORS INC. Construction of Bridge LGU - Bacacay, Albay March 27, 2017
Santillan St., Brgy. Quinale, Tabaco City
198 KINGSON CONTRACTORS INC. Improvement of Bacacay-San Jose Road LGU - Bacacay, Albay March 27, 2017
Santillan St., Brgy. Quinale, Tabaco City
199 KINGSON CONTRACTORS INC. Construction of Evacuation Center LGU - Bacacay, Albay March 27, 2017
Santillan St., Brgy. Quinale, Tabaco City
200 MJ BUILDERS AND CONSTRUCTION SUPPLY
Completion of Sabido Building (Electronics & Electrical Building), Phase 2
Bicol University March 27, 2017
Manzanilla St., Basud, Polangui, Albay
201 NFH CONSTRUCTION & SUPPLY 17FJ0038 – Construction of Multi-Purpose Building (Covered Court) at Masbate 2nd DEO
DPWH Masbate 2nd DEO March 27, 2017
132 San Vicente, Milaor, Camarines Sur
202 LAHDETH CONSTRUCTION AND SUPPLY
17FJ0037 – MFO-2 Flood Management Services, Construction/Maintenance of Flood Control Mitigation
DPWH Masbate 2nd DEO March 27, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 28 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Structures and Drainage System, Construction of Armenia River Flood Control, Brgy. Armenia, Uson, Masbate 3rd LD
Progress Home 2nd St., San Vicente, Canaman, Camarines Sur
203 PARTIDO CONSTRUCTION AND SUPPLY
17FJ0026 – MFO-2 Flood Management Services, Construction/Maintenance of Flood Control Mitigation Structures and Drainage System, Construction of Pinangapugan River Flood Control, Brgy. Quezon, Uson, Masbate 3rd LD
DPWH Masbate 2nd DEO March 27, 2017
Matacla, Goa, Camarines Sur
204 A3 CONSTRUCTION & SUPPLY 17FJ0028 – Concreting of Poblacion – Labigan Road (Local Roads) Brgys. Poblacion and Labigan, Pio V. Corpuz, Masbate 3rd LD
DPWH Masbate 2nd DEO March 27, 2017
Busay, Daraga, Albay
205 E. GARCIA CONST. CORPORATION
17FC0033 – Asset Preservation of National Roads – Rehab./Reconst./Upgrading of Damaged Paved National Roads including Drainage Based on Pavement Management System/Highway Development-4 (HDM-4)_Primary Roads; Daang Maharlika (LZ) K0292+797 – K0293+000; K0293+642 – K0293+798
DPWH Camarines Norte March 29, 2017
2/F Viva Home Ideas Bldg. Concepcion Grande, Naga City
206 SONIA S. MAYUGA Interior Finishings of 7-Eleven Store - Albay Golden Seven Group March 29, 2017
Sunwest Bldg., Bitano, Legazpi City
207 CONCEPCION GRANDE DEVELOPMENT, INC.
Perimeter Fence for Lot 6, PCS 05-0002285 & Lot 1045-A-1-D PSD 05-037944
Caneridge Investments, Inc. c/o Concepcion Grande Devt., Inc.
March 29, 2017
Concepcion Grande, Naga City
208 RODERICK L. CABRERA Construction of Warehouse and Office Building Roderick L. Cabrera March 29, 2017
Danlog, San Jose, Camarines Sur
209 MILAGROS MUSCA Construction of Eatery Milagros Musca March 29, 2017
Dimasalang St., Naga City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 29 of 33
No. Company Name and Address Project Name Project Owner Date Approved
210 DONALD OLIVAN Proposed Warehouse Olivan Hardware Depot, Inc. March 29, 2017
Poblacion, Sta. Rosa, Pasacao, Camarines Sur
211 HEIDE V. LEE Proposed Warehouse Office Building Heide V. Lee March 29, 2017
Roxas Ave., Diversion Road, Triangulo, Naga City
212 PABLO AGUA & VIRGINIA AGUA 2-Storey Residential/Commercial Building Sps. Pablo Agua & Virginia Agua March 29, 2017
San Pedro, Buhi, Camarines Sur
213 ROVIPHIL CONTRACTOR Provision of Additional Two (2) Septic Tanks at the Terminal Building
Civil Aviation Authority of the Philippines – Area Center V
March 29, 2017
Santillan St., Tabaco City
214 NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION
Establishment of One Town One Product Promotion Center
LGU – Polangui, Albay March 29, 2017
Orogo, Pioduran, Albay
215 NFH CONSTRUCTION & SUPPLY
17FB0029 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Lower Malabog Flood Control System, Brgy. Malabog, Daraga, Albay 2nd LD
DPWH Albay 2nd DEO March 29, 2017
132 San Vicente, Milaor, Camarines Sur
216 DN’D CONSTRUCTION & DEVELOPMENT
17FB0060 – Local Infrastructure Program: Construction of Multi-Purpose Building, Brgy. Dapdap, Legazpi City, Albay
DPWH Albay 2nd DEO March 29, 2017
Imelda C. Roces Avenue, Gogon, Legazpi City
217 ZKR CONSTRUCTION AND SUPPLY 17FB0038 – Local Infrastructure Program: Construction of Multi-Purpose Building, Brgy. Balabagon, Manito, Albay
DPWH Albay 2nd DEO March 29, 2017
PVLB Bldg 6., Room 306, Peñaranda St., Legazpi City
218 STEVEN CONSTRUCTION & SUPPLY / RMH CONSTRUCTION & SUPPLY (JV)
17FL0022 – Construction of Flood Drainage Structure at Gubat Poblacion, Brgys. Luna – Candol, Manook and Balud Del Norte, Gubat, Sorsogon
DPWH Sorsogon 2nd DEO March 29, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 30 of 33
No. Company Name and Address Project Name Project Owner Date Approved
17th Street, Our Lady’s Village, Pangpang, Sorsogon City
219 ALPHA RYDER CONSTRUCTION & SUPPLIES
17FL0018 – Construction/Improvement of Access Road leading to Bulan Seaport, Bulan, Sorsogon and Off-Carriageway Improvement including Drainage along Gate – Bulan Airport Road, K0643+371 – K0644+100
DPWH Sorsogon 2nd DEO March 29, 2017
Maharlika Highway, Pangpang, Sorsogon City
220 BRENTMIN ROOFING ENTERPRISE Construction of Barangay Road, Brgy. Pamorangon - Cobangbang, Daet, Camarines Norte
Provincial Government of Camarines Norte
March 29, 2017
Vinzons Ave., Brgy. Gahonon, Daet, Camarines Norte
221 BRENTMIN ROOFING ENTERPRISE Construction of Barangay Road, Brgy. San Jose, Basud, Camarines Norte
Provincial Government of Camarines Norte
March 29, 2017
Vinzons Ave., Brgy. Gahonon, Daet, Camarines Norte
222 MARIANITO FRIVALO Proposed Gasoline Station Marianito Frivalo March 29, 2017
Corner Burgos St. & Rizal St., Brgy. Talisay, Sorsogon City
223 ARCH. MICHAEL B. ALAMIL Proposed Addition Mezzanine Floor Liatris Hotel Benson L. Chen March 29, 2017
Lapu-Lapu St., Legazpi City
224 EMRA CONSTRUCTION AND SUPPLY SERVICES
Provision of Feeder Line from Generator Set to the Main Distribution Panel and Construction of Fuel Day Tank and Upgrading of Power Supply at Masbate Airport
Civil Aviation Authority of the Philippines – Area Center V
March 29, 2017
#79 Zone 2, Balangibang, Polangui, Albay
225 AJAN JEADA INC. / CBC CONSTRUCTION & SUPPLY (JV)
2017(I)-005 Rehab./Improvement of Albay Farmer’s Village, Cabangan, Camalig, Albay: 1) Improvement of Main Gate; 2) Construction of Water Facilities; 3) Construction of Seven (7) Units Green House; 4) Construction of Cistern Tank; 5) Construction of Two
Provincial Government of Albay March 29, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 31 of 33
No. Company Name and Address Project Name Project Owner Date Approved
(2) Storey Multi-Purpose PAS/PVS Building
Lakandula Drive, Gogon, Legazpi City
226 SPRING STAR CONSTRUCTION AND SUPPLY
17FI0004 – Off-Carriageway Improvement including Drainage Lagta-Crossing Malinta Road K0109+616 – K0111+097
DPWH Masbate 1st DEO March 29, 2017
143-C Balagtas St., Malate, Manila
227 R. JARABO CONSTRUCTION & SUPPLIES
Furnishing of Labor, Materials, Equipment Rental, Fuel, Oil and Lubricants for the Construction of Solar Street Lights at Ponco, Brgy. Maningcay de Oro, Prieto Diaz, Sorsogon
LGU - Prieto Diaz, Sorsogon March 30, 2017
Brgy. Cambulaga, Sorsogon City
228 R. JARABO CONSTRUCTION & SUPPLIES
Furnishing of Labor, Materials, Equipment Rental, Fuel, Oil and Lubricants for the Construction of Barangay Health Center at Brgy. Diamante, Prieto Diaz, Sorsogon
LGU - Prieto Diaz, Sorsogon March 30, 2017
Brgy. Cambulaga, Sorsogon City
229 R. JARABO CONSTRUCTION & SUPPLIES
Furnishing of Labor, Materials, Equipment Rental, Fuel, Oil and Lubricants for the Construction of Multi-Purpose Drying Pavement at Rizal & Maningcay de Oro, Prieto Diaz, Sorsogon
LGU - Prieto Diaz, Sorsogon March 30, 2017
Brgy. Cambulaga, Sorsogon City
230 SISAM CONSTRUCTION AND SUPPLIES
17FG0034 – Individual Project – Concreting of San Isidro-Vicente Road
DPWH Camarines Sur 4th DEO March 30, 2017
#39 Magurang, Polangui, Albay
231 SAINT BERNARD CONSTRUCTION 17FN0015 – Construction of Multi-Purpose Building DPWH Camarines Sur 5th DEO March 30, 2017
Salvacion Ocampo, Camarines Sur
232 SAINT BERNARD CONSTRUCTION 17FN0007 – Construction of Multi-Purpose Building Phase I
DPWH Camarines Sur 5th DEO March 30, 2017
Salvacion Ocampo, Camarines Sur
233 JAMARI CONSTRUCTION / FIRMABUILT CONSTRUCTION (JV)
17FC0044 – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Extension/Rehab./Construction of Basud River Control Structure, Brgy. Poblacion, Basud,
DPWH Camarines Norte DEO March 30, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 32 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Camarines Norte, 2nd LD
Dona Consuelo Subd., San Jose, Occidental Mindoro
234 HRB CONSTRUCTION
16FF0085 – CY-2015 Basic Educational Facilities Fund ( BEFF)-Batch-13, Construction of Two (2) Storey Six (6) Classroom with Comfort Room School Building, Goa National High School
DPWH Camarines Sur 3rd DEO March 31, 2017
Northbound Terminal, Queborac Drive, Bagumbayan Sur, Naga City
235 QDC CONSTRUCTION AND SUPPLY 17FO0008 – Construction of Ligao City Health Office DPWH Albay 3rd DEO March 31, 2017
43 Orendain St. Doña Maria Subd., Tagas, Daraga, Albay
236 JOSE ARCANGEL One Storey Commercial Building (Motorist Hotel) Jose Arcangel March 31, 2017
Brgy. Sto. Niño, Jovellar, Albay
237 PRECIOUS CONSTRUCTION
17FE0001 – Construction/Rehabilitation/Improvement of Bicol River Flood Control (San Roque-San Marcos-Sto. Domingo Section)
DPWH Camarines Sur 2nd DEO March 31, 2017
#136 Zone 3, San Isidro, Magarao, Camarines Sur
238 HGG BUILDERS & SUPPLY 17FG0030 – Individual Project – Rehabilitation/Concrete Paving of Dao Street, Sto. Domingo-La Purisima Road
DPWH Camarines Sur 4th DEO March 31, 2017
Parañaque City St., Gimenez Subd., Naga City
239 3L CONSTRUCTION 17FN0003 – Concreting of Barangay Road DPWH Camarines Sur 5th DEO March 31, 2017
Leon S.A. Aureus St., Gimenez Subd., Concepcion Pequena, Naga City
240 3L CONSTRUCTION 17FN0014 – Reblocking and Widening of Barangay Road
DPWH Camarines Sur 5th DEO March 31, 2017
Leon S.A. Aureus St., Gimenez Subd., Concepcion Pequena, Naga City
241 3L CONSTRUCTION 17FN0016 – Concreting of Barangay Road DPWH Camarines Sur 5th DEO March 31, 2017
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-Regional Office No. 5 March 2017
Page 33 of 33
No. Company Name and Address Project Name Project Owner Date Approved
Leon S.A. Aureus St., Gimenez Subd., Concepcion Pequena, Naga City
242 3L CONSTRUCTION Leon S.A. Aureus St., Gimenez Subd., Concepcion Pequena, Naga City
17FN0013 – Construction of Multi-Purpose Building DPWH Camarines Sur 5th DEO March 31, 2017
243 ARKY CONSTRUCTION & SUPPLY Pinamarbuhan, Mobo, Masbate
PREIS17-MS-124-16 - Providing labor, materials and equipments for the Canal Structures & Canalization Works of Guinbanuahan SWIS, Balud, Masbate under RREIS CY 2017
National Irrigation Administration - Region V
March 31, 2017
244 ARKY CONSTRUCTION & SUPPLY Pinamarbuhan, Mobo, Masbate
PREIS-MS-122-16 - Providing labor, materials and equipments for the Canalization Works of Buracan CIS POW #1, Dimasalang, Masbate under RREIS CY 2017 Fund
National Irrigation Administration - Region V
March 31, 2017
245 ARKY CONSTRUCTION & SUPPLY Pinamarbuhan, Mobo, Masbate
PREIS17-MS-123-16 - Providing labor, materials and equipments for the Canalization Works of Matagbac CIS, Milagros, Masbate under RREIS CY 2017 Fund
National Irrigation Administration - Region V
March 31, 2017