20
REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC : Ross Greeff ED : Themba Camane

REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

Embed Size (px)

Citation preview

Page 1: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

REGIONAL SUMMIT MEETINGSMARCH 2007

INFRASTRUCTURE & SERVICES DEPARTMENT

MMC : Ross GreeffED : Themba Camane

Page 2: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

2

DETAILED SECTOR PERFORMANCE INDICATORS

Page 3: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

3

WATER SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comments

Target Projected

Achieve 98% Coverage of

LOS 1 for water

Asset Maintenance

& Refurbishme

nt

20 000 households

20 000 households

45 000 The objective is to eradicate waterservices backlogs by 2008, by providing at least- 200 litres of water per family within 200 meters. The City as a whole must provide access for 196 000 additional households over next three years

Achieve 95% Coverage of

LOS 1 for sanitation

Asset Maintenance

& Refurbishme

nt

20 000 households

20 000 households

45 000

Introduce delivery mechanisms to ensure residents of multi-dwelling stands receive benefits as per the revised Social Package

Basic Service Delivery Program

Research to inform the development of measures that will provide relief to residents of secondary dwellings.

Finalise research

Social Package to be finalised

The COJ intends increasing the allocation of free basic water to poor and vulnerable households.

Page 4: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

4

WATER SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda

2007/8 Delivery Agenda

Comments

Target Projected

Deliver LOS 3 water &

Sanitation to targetted housing program

Housing & Service Delivery

2843 4436

28434436

Awaiting Housing figures

By June 2006/07, Housing aims to deliver at least 2 843 serviced stands, and at least 4 436 fully serviced stands with top-structures, to serve low income families. This is a Housing indicator which impacts on delivery of high level services

Develop and implement a revised tariff policy which addresses

affordability.

Tariff Restructuring

1st Phase

1st Phase

Revised tariff

structure

Sustainable delivery of water services requires substantial ongoing capital investment, and monthly tariffs that reflect the real cost of service delivery Further development of a comprehensive new tariff structure, to take effect from 1 July 2008 when the new Social Package is introduced.

Page 5: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

5

WATER SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comment

Target Projected

Reduce UFW to 25% by

2011

Asset Maintenance

& Refurbishme

nt

44 400 meters

installed in & Cosmo Greater Soweto

44 400 meters

installed in Greater

Soweto & Cosmo

60 865 There are 170 000 account holders . JW has completed 59 0000 prepayment meter installations so far since 2004.The programme will be completed in 08/09.

Reduce UFW to 25% by

2011

Asset Maintenance

& Refurbishme

nt

29% 29% Reduction below 29%

Physical and commercial losses are being reduced steadily through the upgrading of networks, repair of leaks and upgrading from deemed consumption to metered consumption.

Page 6: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

6

WATER SECTOR PLAN

Objective 5 Yr Program

2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comment

Target Projected

Improve service delivery

Resolve 90% of reported

water & sanitation problems

within agreed time

lines

48hrs water

24hrs sewer

48hrs water

24hrs sewer

48hrs water

24hrs sewer

Joburg Water is required to report on seven KPI’s tracking customer responsiveness, and a further two which track response times to leaks, bursts and blockages.

Improve the City’s understanding of users consumption needs and behaviours, especially among poor and vulnerable groups

Demand Side Management

Research into water usage by poor households, including the Inner City, is being undertaken

Research into water usage by poor household, including the Inner City, is being undertaken

Ongoing research, extended to detailed assessment of service provision in informal settlements

Information was gathered through six focus group discussions, 700 questionnaire-based interviews, 372 water diaries and rigorous analysis of actual consumption data from JW’s billing system.       

Page 7: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

7

WATER SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comments

Target Projected

Introduce 2 new

sanitation systems for areas where

VIPs not suitable

Infrastructure

Modernisation Program

Ongoing monitoring of emerging

practice and new

technologies to enable piloting of possible options

Ongoing monitoring

of new technologi

es to enable piloting

Implementation

subject to

outcome of

research

No viable and acceptable alternatives identified yet

Achieve 97% compliance with waste

water effluent quality

Asset refurbishmen

t and Maintenance

Program

97% 96% 97% The impacts of rapid growth, which exceeds available treatment capacity, and ageing infrastructure, are being felt.JW has budgeted R227-m to upgrade and increase capacity at its wastewater treatment works, in addition to refurbishment and upgrading of its sewer networks.

Page 8: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

8

Identification of

resource efficient alt.

to conventional water borne sanitation

Resource conservatio

n programme

Ongoing monitoring of local and

international developments to identify

possible alternatives

to conventional water-borne sanitation.

Ongoing monitoring of local and internationa

l developmen

ts to identify possible

alternatives to

conventional water-borne

sanitation.

Undertake

research

A number of options exist at present which are environmentally

sound and technically feasible; however, unless

they are acceptable to users, they will fail. The challenge is finding or developing systems

which combine environmental

sustainability, technical feasibility, affordability and user acceptability.

Develop & implement strategy to

reduce phosphate

in wastewater

Resource conservation programme

To be done in 07/08

Initial work on

the development of a strategy

will begin in

2007/08.

Excessive phosphate levels raise the cost of wastewater treatment and drive damaging algal blooms and eutrophication which choke river systems and can kill aquatic life. Strategies are needed to incentivise reduced use of phosphates

WATER SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comments

Target Projected

Page 9: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

9

ENERGY SECTOR PLAN

Objective 5 Yr Program

2006/7 Delivery Agenda

2007/8 Delivery Agenda

Comments

Target Projected

Electrification

distribution to at least

95% of formalised households

Basic Service Delivery

10500 10500 17000 houses

Provision of electricity within the COJ boundaries is split between Eskom and City Power which is a Municipal owned entity. Currently over 310 000 electricity customers are supplied by City Power whilst all the other remaining customers are supplied by Eskom.

Provide street

lighting to 95% of

formal areas

Basic Service Delivery

5% increase

in coverag

e

5% increase in coverage

10% increase

in coverage

the City is currently refurbishing and upgrading existing public lights whilst rolling out new public lights to newly developed areas

Provide street

lighting to 60% of

informal settlements

Housing Service Delivery Program

10% coverag

e

10 % 10% The targeted areas are s follows: Ivory Park, Orange Farm, Kaya Sands, Lawley Extension, Leratong and Lehae have been proclaimed and will require the installation of streetlights.

Page 10: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

10

ENERGY SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda 2007/8 Delivery Agenda

Risk & Mitigation InterventionsTarget Actual

Introduce mechanisms

to ensure residents of

multi dwelling stands receive

benefits as per the

revised social package

Basic Service Delivery

Social package is currently in draft form

Social package is currently in draft form

Finalisation of social

package by July 2008

Finalization of all work on the Social Package to ensure implementation from July 2008.Rollout will be in terms of an agreed targeting mechanism.

Develop and implement a revised tariff policy which addresses

both affordability

and the requirements of strategic

asset management

Tariff Restructuring

•Investigation of energy

usage patterns in low income residential

areas including the inner city.

Investigation of energy

usage patterns in low income residential

areas including the inner

city.

New Tariff

Structure by July

2008

NERSA is the electricity regulator and approves the tariffs proposed by the City for electricity. The City and City Power engage NERSA each year on the appropriate tariffs.

Page 11: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

11

ENERGY SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda

2007/8 Delivery Agenda

Comments

Target Projected

Reduction in

electricity outages by

50% in 2010

Service delivery

improvement program

1315(bulk and

MV outages)

1315 (bulk and

MV outages)

1095 (bulk

and MV outages)

To ensure improved performance and the ongoing reduction of outages, the City continues to implement increased maintenance programmes to ensure that the service provided is more reliable, considering the rapid growth the City is experiencing.

Reduce electricity

billing losses from 3% to 1%

Service delivery

improvement program

Rollout to targeted

areasEg.

Westbury, BosmontLenasia,

Tshepisong

Rollout to targeted

areasEg.

Westbury, BosmontLenasia

Tshepisong

Rollout to

targeted areas

Different programs are being rolled out in different areas of the City. These programs will enable the City to reduce losses by 2% in 2010. For 06/07 losses are projected to be 12.8% and 12.4% for 07/08.

Page 12: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

12

ENERGY SECTOR PLAN

Objective 5 Yr Program

2006/7 Delivery Agenda

2007/8 Delivery Agenda

Comments

Target Projected

Provide fault free token vending system

Service delivery

improvement program

Ongoing research

Ongoing research

Ongoing Research

the ISD and City Power are researching alternative methods to extend service delivery and refine delivery mechanisms.

Reduce illegal connections

by 70%

Demand Side

Management

Policy on Prepaid Meters

Policy on Prepaid Meters

Target specific

areas for removal of

illegal connections

    Target set at 20% of identified areas. Amongst these areas are (Westbury, Zacharia Park and Tshepisong).

Develop and implement comprehensive demand side management programmes for energy

Demand Side

Management

Formulate State of Energy Report

Formulate State of

Energy Report

Formulate Demand

Side Strategy

DSM requires education of the community to better manage scarce energy resources in an efficient and environmentally friendly manner. DSM is critical in reducing outages

Page 13: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

13

ENERGY SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comments

Target Projected

Eradicate all backlogs in

network maintenance

and refurbishmen

t programmes

Asset refurbishmen

t and maintenance programme

Continuous audits on the system as to be able pin – point priority areas. 

Continuous audits on the system as to be able pin – point priority areas. 

Implement

maintenance plan

& identificat

ion of network capacity

gaps

The City’s commitment to eradicating service backlogs and extending services to new areas must be undertaken in conjunction with expanded network maintenance and refurbishment

Roll out solar street lighting

Demand Side

Management

Installation of a pilot project

Installation of a pilot project

Install solar

lighting in targeted

areas

Develop innovative ways to provide lighting to those areas which are not connected to the grid such as the solar public Lighting pilot in Zandspruit

Page 14: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

14

ENERGY SECTOR PLAN

Objective 5 Yr Program 2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comment

Target Projected

Citywide education

program on energy

conservation

Resource Conservation & Demand Side Management

Customer communication and education

Customer communica

tion and education

Customer communica

tion and education

Make customers aware of energy efficiency & resource limitations,Dangers of illegal connections

Page 15: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

15

WASTE SECTOR PLAN

Objective 5 Yr Program

2006/7 Delivery Agenda

2007/8 Delivery Agenda

Comments

Target Projected

Collect waste once a week from

all formal & informal

settlements.

Basic Service Delivery Program

50 000 50 000 Roll Out to other targetted areas

Orange Farm historically received a basic level of municipal solid waste collection, comprising plastic bin liners (bags) that are distributed to communities which they use to store their daily waste.

Roll Out appropriate

waste receptacles to

informal & formal areas by 2009

Basic Service Delivery Program

40 000 240l bins

40 000 42 000 Extend the bin roll out programme by increasing the target to 42, 00 in 07/08

Formulate waste collection

optimisation plan

Basic Service Delivery Program

         review the entire fleet management

reReview the entire fleet management

Implement

Optimisation Plan

Develop a waste optimisation plan to improve reliability, availability and reduce insurance risks

Page 16: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

16

WASTE SECTOR PLAN

Objective 5 Yr Program

2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comments

Target Projected

Develop and implement a revised tariff policy which addresses cost recovery

Tariff restructuring programme

Tariff Methodolog

y Assessment

Tariff Methodolog

y Assessment

Implement Revised

Tariff Methodolo

gyBy July 2008

A new tariff methodology is required taking into account the full cost of providing waste services, while factoring in the affordability of vulnerable communities

Achieve clean city by 2008

Basic Service Delivery

A revised 24/7 Inner-city Waste

Plan for submission

and approval

A revised 24/7 Inner-city Waste

Plan for submission

and approval

Implement Clean City Strategy

A 24/7 Clean City Programme will ensure that the City will have sustained cleanliness levels on a 24 hour daily and seven day weekly basis.

Page 17: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

17

WASTE SECTOR PLAN

Objective 5 Yr Program

2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comments

Target Projected

Reduce illegal

Dumping by 30% by

2008

Service delivery Improve

ment

1000 1000 1000  Extend the programme to eradicate an additional 1000 spots

Implement a Citywide waste awareness programme

Demand Side

Management

Forge Partnershi

pSchool

Education programs

Forge Partnership

sSchool

Education programs

Establish ecommunitie

s in 40 wards

An education and awareness programme was developed targeting communities by way of ward based environmental forums, commonly referred to as Ecommunities.

Waste minimizati

on, recycling

and landfill

diversion

Demand Side

Management

Review IWMP

Review IWMP

ImplementIWMP

Establish 1 MRF each

year

Some of the programmes include new compost plant, buyback centres, and materials recycling facilities.

Page 18: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

18

WASTE SECTOR PLAN

Objective 5 Yr Program

2006/7 Delivery Agenda 2007/8 Delivery Agenda

Comment

Target Projected

Design & implement long term

asset management strategy

Asset Refurbishment &

Maintenance

Program

Asset register

updated & records

completed

Asset register

updated & records

completed

Formulate asset manage

ment strategy

Consider all factors affecting the life of assets and associated risks which could diminish the lifespan of critical assets. Identify an optimum maintenance regime for serving and maintaining assets so that the City can extract the maximum benefit

Introduce pilot under

ground waste

storage facility .

Infrastructure

Modernisation

Program

Construct 1 bin system

Construct 1 bin

system

Roll Out to High Density areas

     Implement the underground bins policy in designated areas Extend the rollout programme to approved high density residential areas like Alexandra and Soweto

Establish landfill gas to energy

programme by 2008

Infrastructure

Modernisation

Program

prefeasibility study for (Kya Sands Robinson

Deep)

prefeasibility study for (Kya Sands

Robinson Deep)

Phase 2 implementation

         PHASE 2 – Feasibility   Project design document ,  Host country approval ‘ External project validation’ CDM executive board approval ‘  Issuing carbon credits

50% green waste

diverted to compost

facilities by 2010

Introduce 3

composting plants

1 1 1 Panorama composting plant fully operational. Robinson plant planned for 2007/08

Page 19: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

19

WASTE SECTOR PLAN

Objective 5 Yr Program

2006/7 Delivery Agenda

2007/8 Delivery Agenda

Comment

Target Projected

Recycle at least 15% waste by

2010

Resource Conservat

ion

Plan & Design

MRF

Plan & Design

MRF

Implement 2 MRF in Robinson

& Kya Sands

A MRF comprises equipment which captures sorts and recycles inorganic waste (i.e. bottles, plastic and paper) for purposes of recycling.

Reduce waste to

landfills by 15% by 2010

Resource Conservat

ion

Establish Buy back Centre in Mapetla

Establish Buy back Centre in Mapetla

          Establish one new Buyback Centre at Cosmo City. Plan and design a new facility at Orlando East

Buyback centres are facilities where recyclable dry waste is collected (i.e. bottles, plastic and paper). Communities collect the recyclable materials and sell it to the Buyback centres.

       Reduce green waste by 50% by 2010

Resource Conservat

ion

Establish 1

(Robinson Deep

Establish 1

(Robinson Deep

Establish 1 at Linbro. Plan for 1 at Goudkoppies

Composting involves the biological handing and processing of green waste into compost. New equipment will be purchased and installed to produce compost.

Page 20: REGIONAL SUMMIT MEETINGS MARCH 2007 INFRASTRUCTURE & SERVICES DEPARTMENT MMC: Ross Greeff ED:Themba Camane

20

Conclusions

• The attainment of the water and energy sector objectives is largely determined by the constraints experienced in the housing delivery programmes

• The attainment of a clean city objective will be determined by a successful implementation of a PIKITUP turnaround strategy and increased by-law enforcement

• The focus for the remainder of the FY and 2007/08 will be on delivering innovative solutions to improve service delivery and backlog eradication

• The sectors are best positioned to make a positive contributions to govt. wide objectives of poverty alleviation, job creation and skills development