52
Regional Transportation Commission of Southern Nevada Fuel Revenue Index Project List - Approved Authorizations to Proceed Entity RTC Project Name RTC Project # Boulder City 060AV-FTI I-11 Boulder City Bypass Utility Crossings FRI Projects Included in Interlocal Contract: 214-Utility Sleeves Construction along I-11 [Construction] Project Events 7/9/2015 Authorization to Proceed for Construction approved by RTC 7/14/2015 Agreement approved with Las Vegas Paving 1/19/2016 Notice to Proceed for Construction issued Boulder City 177A-FTI Interstate 11, US-95/Hoover Dam Bridge FRI Projects Included in Interlocal Contract: 1-Interstate 11, US-95 to Hoover Dam Bridge [Design/Build] Project Events 4/12/2012 Design contract awarded: Louis Berger Group (Also funded with Q10) 4/12/2012 Notice to Proceed for Design issued 10/10/2013 Design/Build RFQ Advertise #14-011 (Issued by RTC) 10/24/2013 Pre-proposal meeting 11/25/2013 Statement of Qualifications Due 1/9/2014 RFQ Short List Approved by RTC Board: Ames Fisher Joint Venture; Eldorado Mountain Constructors Joint Venture; Las Vegas Paving 2/10/2014 Draft RFP No. 14-011A, PWP No. CL-2014-149 issued to short listed firms 4/10/2014 RTC Board Approved issuance of final RFP 4/14/2014 Final RFP No. 14-011A, PWP No. CL-2014-149 Issued 10/16/2014 Design/Build proposals due 12/11/2014 Authority to negotiate final contract with Las Vegas Paving, Inc. approved by RTC Board 2/12/2015 Construction management services contract with 4Leaf Consulting LLC approved by RTC Board 2/12/2015 Design/Build contract approved with Las Vegas Paving, Inc. approved by RTC Board 2/17/2015 Notice to Proceed issued for construction phase to Louis Berger 2/17/2015 Notice to Proceed issued to 4Leaf Consulting LLC 4/20/2015 Notice to Proceed issued for construction to Las Vegas Paving Page 1 of 52 Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details. Items added/revised on this date are highlighted RPTATPforWebHighlighted

Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Regional Transportation Commission of Southern NevadaFuel Revenue Index Project List - Approved Authorizations to Proceed

Entity RTC Project NameRTC Project #

Boulder City 060AV-FTI I-11 Boulder City Bypass Utility CrossingsFRI Projects Included in Interlocal Contract:

214-Utility Sleeves Construction along I-11 [Construction]Project Events

7/9/2015 Authorization to Proceed for Construction approved by RTC7/14/2015 Agreement approved with Las Vegas Paving1/19/2016 Notice to Proceed for Construction issued

Boulder City 177A-FTI Interstate 11, US-95/Hoover Dam BridgeFRI Projects Included in Interlocal Contract:

1-Interstate 11, US-95 to Hoover Dam Bridge [Design/Build]Project Events

4/12/2012 Design contract awarded: Louis Berger Group (Also funded with Q10)4/12/2012 Notice to Proceed for Design issued

10/10/2013 Design/Build RFQ Advertise #14-011 (Issued by RTC)10/24/2013 Pre-proposal meeting11/25/2013 Statement of Qualifications Due

1/9/2014 RFQ Short List Approved by RTC Board: Ames Fisher Joint Venture; Eldorado Mountain Constructors Joint Venture; Las Vegas Paving2/10/2014 Draft RFP No. 14-011A, PWP No. CL-2014-149 issued to short listed firms4/10/2014 RTC Board Approved issuance of final RFP4/14/2014 Final RFP No. 14-011A, PWP No. CL-2014-149 Issued

10/16/2014 Design/Build proposals due12/11/2014 Authority to negotiate final contract with Las Vegas Paving, Inc. approved by RTC Board2/12/2015 Construction management services contract with 4Leaf Consulting LLC approved by RTC Board2/12/2015 Design/Build contract approved with Las Vegas Paving, Inc. approved by RTC Board2/17/2015 Notice to Proceed issued for construction phase to Louis Berger2/17/2015 Notice to Proceed issued to 4Leaf Consulting LLC4/20/2015 Notice to Proceed issued for construction to Las Vegas Paving

Page 1 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 2: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 002AA-FTI Eastern Ave, Wigwam Pkwy to Warm Springs RdFRI Projects Included in Interlocal Contract:

204-Eastern Ave, Wigwam Pkwy to Warm Springs Rd [Design/Construction]Project Events

4/7/2015 Design contract awarded: CA Group, Inc.4/20/2015 Notice to Proceed for Design issued5/21/2015 Authorization to Proceed for Design approved by RTC10/8/2015 Authorization to Proceed for Construction approved by RTC

10/27/2015 Invitation to bid issued by Clark County. Bid No. 603879-1510/27/2015 Notice of Substantial Completion issued for Design11/10/2015 Pre-Bid Conference3/10/2016 Bid Opening5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc.

4/21/2017 Notice to Proceed for Construction issued

Clark County 002AB-FTI Eastern Ave, Warm Springs Rd to Desert Inn RdFRI Projects Included in Interlocal Contract:

13-Eastern Ave, Warm Springs Rd to Desert Inn Rd [Construction]Project Events

10/13/2016 Authorization to Proceed for Construction approved by RTC10/18/2016 Invitation to bid issued by Clark County Water Reclamation District. Bid No. ITB-735-0-2016/LS10/27/2016 Pre-Bid Conference12/15/2016 Bid Opening

2/7/2017 Construction contract awarded: Las Vegas Paving Corporation6/11/2017 Notice to Proceed for Construction issued

Clark County 003Y-FTI Maryland Pkwy, Russell Rd to Twain AveFRI Projects Included in Interlocal Contract:

25-Maryland Pkwy, Russell Rd to Twain Ave [Design/Construction]Project Events

1/1/2016 Notice to Proceed for Design issued2/11/2016 Authorization to Proceed for Design approved by RTC2/11/2016 No award deadline. Project to be designed in-house5/18/2017 Authorization to Proceed for Construction approved by RTC9/12/2017 Invitation to bid issued by Clark County. Bid No. 604503-179/12/2017 Notice of Substantial Completion issued for Design9/26/2017 Pre-Bid Conference

10/13/2017 Bid Opening

Page 2 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 3: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 006J-FTI Tropicana Ave: Hualapai Wy/Ft. Apache RdFRI Projects Included in Interlocal Contract:

32-Tropicana Ave, Hualapai Wy to Fort Apache Rd [Design/Construction]Project Events

5/6/2014 Supplemental No. 2, for Professional Engineering services approved by Clark County: Slater Hanifan Group (Also funded by Clark County)5/15/2014 Notice to Proceed Issued for Supplemental No. 26/12/2014 Authorization to Proceed for additional Design funding approved by RTC

Clark County 007M-FTI Decatur Blvd: Cactus Ave/Warm Springs RdFRI Projects Included in Interlocal Contract:

9-Decatur Blvd, Cactus Ave to Warm Springs Rd [Design]Project Events

7/10/2014 Authorization to Proceed for Design approved by RTC10/7/2014 Design contract awarded: Stanley Consultants, Inc.

10/21/2014 Notice to Proceed for Design issued

Clark County 010K-FTI Rainbow Blvd: Warm Springs Rd/Tropicana AveFRI Projects Included in Interlocal Contract:

123-Rainbow Blvd, Warm Springs Rd to Tropicana Ave [Construction]Project Events

5/15/2015 Invitation to bid issued by Clark County: Bid No.603657-155/29/2015 Pre-Bid Conference6/26/2015 Bid Opening9/10/2015 Authorization to Proceed for Construction approved by RTC9/15/2015 Construction Management contract awarded: CH2M Hill9/28/2015 Construction contract awarded: Las Vegas Paving Corp.2/16/2016 Notice to Proceed for Construction issued6/7/2017 Notice of Substantial Completion issued

Clark County 010M-FTI PH1 Rainbow Blvd: Erie Ave/Blue Diamond RdFRI Projects Included in Interlocal Contract:

28-Rainbow Blvd, Erie Ave to Blue Diamond Rd (Phase 1: Punch Thru-Access to Cactus Ave) [Construction]Project Events

10/10/2014 Change Order #2 Approved to Las Vegas Paving for paving of 2 lanes to allow access to Cactus Ave from Rainbow Bl. Full improvements will be constructed at a later date (See Phase 2)

11/13/2014 Authorization to Proceed for Construction approved by RTC11/13/2014 No bid advertise. Project to be constructed under Change Order #2: Las Vegas Paving Corp.11/26/2014 Notice of Substantial Completion issued

Page 3 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 4: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 010M-FTI PH2 Rainbow Blvd: Erie Ave/Blue Diamond RdFRI Projects Included in Interlocal Contract:

28-Rainbow Blvd, Erie Ave to Blue Diamond Rd (Phase 2: Design/Construct Full Improvements) [Design/Construction]Project Events

7/10/2014 Authorization to Proceed for Design approved by RTC8/19/2014 Design contract awarded: VTN Nevada9/3/2014 Notice to Proceed for Design issued

8/13/2015 Authorization to Proceed for Construction approved by RTC10/22/2015 Invitation to bid issued by Clark County. Bid No. 603846-1510/22/2015 Notice of Substantial Completion issued for Design11/12/2015 Pre-Bid Conference4/15/2016 Bid opening6/7/2016 Construction contract awarded: Aggregate Industries

9/26/2016 Notice to Proceed for Construction issued4/12/2017 Notice of Substantial Completion issued

Clark County 016H-FTI Carey Ave, Nellis Blvd to Toiyabe StFRI Projects Included in Interlocal Contract:

2-Carey Ave, Nellis Blvd to Toiyabe St [Design]Project Events

8/14/2014 Authorization to Proceed for Design approved by RTC8/19/2014 Design contract awarded: The Louis Berger Group, Inc.9/2/2014 Notice to Proceed for Design issued

Clark County 033Q-FTI Jones Blvd, Blue Diamond Rd to Windmill LnFRI Projects Included in Interlocal Contract:

18-Jones Blvd, Blue Diamond Rd to Windmill Ln [Design]Project Events

7/14/2016 Authorization to Proceed for Design approved by RTC8/2/2016 Design contract awarded: R2H Engineering Inc.

9/14/2016 Notice to Proceed for Design issued

Page 4 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 5: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 050M-FTI Traffic Signal: Fort Apache Rd at Maule Ave and Warm Springs RdFRI Projects Included in Interlocal Contract:

16-Fort Apache Rd/Maule Ave [Construction]17-Fort Apache Rd/Warm Springs Rd [Construction]

Project Events4/1/2014 Invitation to bid issued by Clark County. Bid No. 603279-144/8/2014 Pre-bid Conference

4/10/2014 Authorization to Proceed for Construction approved by RTC4/14/2014 Bid opening5/6/2014 Construction contract awarded: Aggregate Industries - SWR, Inc.6/9/2014 Notice to Proceed for Construction issued for Ft. Apache/Maule Signal

7/16/2014 Notice of Substantial Completion issued for Ft. Apache/Maule Signal9/22/2014 Notice to Proceed for Construction issued for Ft. Apache/Warm Springs Signal

10/22/2014 Notice of Substantial Completion issued for Ft. Apache/Warm Springs Rd

Clark County 050N-FTI Traffic Improvements at Lake Mead Blvd and Sloan LaFRI Projects Included in Interlocal Contract:

20-Lake Mead Blvd/Sloan La [Design/Construction]Project Events

6/12/2014 Authorization to Proceed for Design approved by RTC8/19/2014 Design contract awarded: VTN Nevada9/3/2014 Notice to Proceed for Design issued2/4/2015 Design complete

3/12/2015 Authorization to Proceed for Construction approved by RTC5/8/2015 Invitation to bid issued by Clark County: Bid No. 603680-15

5/20/2015 Pre-Bid conference6/4/2015 Bid opening8/3/2015 Construction contract awarded: Fast Trac Electric

10/12/2015 Notice to Proceed for Construction issued9/28/2016 Notice of Substantial Completion issued

Page 5 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 6: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 050P-FTI Traffic Signal/Intersection Improvements: Tenaya Wy/Warm Springs RdFRI Projects Included in Interlocal Contract:

31-Tenaya Wy/Warm Springs Rd [Construction]Project Events

3/12/2015 Authorization to Proceed for Construction approved by RTC5/8/2015 Invitation to bid issued by Clark County: Bid No. 603676-15

5/20/2015 Pre-Bid conference6/4/2015 Bid opening

7/23/2015 Construction contract awarded: TAND, Inc.11/16/2015 Notice to Proceed for Construction issued2/15/2016 Notice of Substantial Completion issued

Clark County 050Q-FTI Traffic Improvements: Decatur Bl/Tropicana Ave and Tropicana Ave/Lindell RdFRI Projects Included in Interlocal Contract:

200-Decatur Blvd/Tropicana Ave Traffic Signal [Construction]201-Lindell Rd/Tropicana Ave Traffic Signal [Construction]

Project Events7/9/2015 Authorization to Proceed for Construction approved by RTC9/4/2015 Invitation to bid issued by Clark County. Bid #603812-15

9/16/2015 Pre-bid conference10/9/2015 Bid Opening

11/30/2015 Construction contract awarded: Fast Trac Electric3/27/2016 Notice to Proceed for Construction issued8/24/2016 Notice of Substantial Completion issued

Clark County 054F-FTI Desert Inn Rd: Paradise Rd/Mojave RdFRI Projects Included in Interlocal Contract:

10-Desert Inn Rd, Paradise Rd to Mojave Rd [Construction]Project Events

10/10/2013 Authorization to Proceed for Construction approved by RTC12/9/2013 Invitation to bid issued by Clark County. Bid No. 603169-13 (Combined with Lamb Bl, Owens Ave to Las Vegas Bl)

12/18/2013 Pre-bid conference1/31/2014 Bid Opening3/18/2014 Construction contract awarded: Aggregate Industries SWR, Inc.6/16/2014 Notice to Proceed for Construction issued2/12/2015 Notice of Substantial Completion issued

Page 6 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 7: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 055H-FTI Lamb Blvd: Owens Ave/Las Vegas BlFRI Projects Included in Interlocal Contract:

21-Lamb Blvd, Owens Ave to Las Vegas Blvd [Construction]Project Events

10/10/2013 Authorization to Proceed for Construction approved by RTC12/9/2013 Invitation to bid issued by Clark County. Bid No. 603169-13 (Combined with Desert Inn Rd, Paradise Rd to Mojave Rd)

12/18/2013 Pre-bid conference1/31/2014 Bid Opening3/18/2014 Construction contract awarded: Aggregate Industries SWR, Inc.6/16/2014 Notice to Proceed for Construction issued2/12/2015 Notice of Substantial Completion issued

Clark County 070K-FTI Durango Dr: Tropicana Ave/Spring Mountain RdFRI Projects Included in Interlocal Contract:

12-Durango Dr, Tropicana Ave to Spring Mountain Rd [Design/Construction]Project Events

2/13/2014 Authorization to Proceed for Design approved by RTC2/13/2014 No award deadline. Project to be designed in-house

11/13/2014 Authorization to Proceed for Construction approved by RTC2/11/2015 Design complete2/11/2015 Invitation to Bid Issued by Clark County: Bid No. 603579-152/24/2015 Pre-Bid Conference3/19/2015 Bid Opening5/18/2015 Construction contract awarded: Aggregate Industries7/8/2015 Notice to Proceed for Construction issued

11/17/2015 Notice of Substantial Completion issued7/19/2016 Revised Notice of Substantial Completioin Issued

Page 7 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 8: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 076V-FTI CC-215: Decatur Blvd/N. 5th StFRI Projects Included in Interlocal Contract:

4-CC-215, Decatur Blvd to N 5th St [Construction]Project Events

10/10/2013 Authorization to Proceed for Construction approved by RTC12/2/2013 Invitation to bid issued by Clark County. Bid No. 603168-1312/9/2013 Pre-bid conference2/18/2014 Construction Management Services contract awarded: CM Works6/27/2014 Bid Opening7/15/2014 Professional Surveying Services contract awarded: G.C. Wallace8/19/2014 Construction contract awarded: Las Vegas Paving11/3/2014 Notice to Proceed for Construction issued

10/31/2016 Notice of Substantial Completion issued

Clark County 076W-FTI CC-215: Ft. Apache Rd Bridge/Durango Dr BridgeFRI Projects Included in Interlocal Contract:

6-CC-215, Ft. Apache Rd Bridge/Durango Dr Bridge [Construction]Project Events

10/10/2013 Authorization to Proceed for Construction approved by RTC12/16/2013 Invitation to bid issued by Clark County. Bid No. 603188-13

1/6/2014 Pre-Bid Conference2/20/2014 Bid Opening4/15/2014 Construction contract awarded: Las Vegas Paving Corp.4/15/2014 Survey services contract awarded: Horizon Surveys, LLC5/6/2014 Construction management service contract awarded: The WLB Group, Inc.

6/20/2014 Notice to Proceed for Construction issued7/13/2015 Notice of Substantial Completion issued for Construction

Clark County 076Y-FTI CC-215: Airport Connector, Phase IIFRI Projects Included in Interlocal Contract:

5-CC-215, Airport Connector Ph. II [Construction]Project Events

8/14/2014 Authorization to Proceed for Construction approved by RTC2/18/2015 Construction Management contract awarded: HDR Engineering, Inc.3/6/2015 Invitation to bid issued by Clark County: Bid No. 603609-15

3/18/2015 Pre-Bid Conference4/3/2015 Bid Opening6/4/2015 Construction contract awarded: Las Vegas Paving Corporation8/3/2015 Notice to Proceed issued

8/29/2017 Notice of Substantial Completion issued

Page 8 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 9: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 076Z-FTI CC-215: Grand Montecito Parkway BridgeFRI Projects Included in Interlocal Contract:

7-CC-215, Grand Montecito Pkwy Bridge [Construction]Project Events

9/10/2015 Authorization to Proceed for Construction approved by RTC11/10/2015 Invitation to bid issued by Clark County. Bid No. 603891-1511/16/2015 Pre-Bid Conference11/25/2015 Bid Opening2/25/2016 Construction contract awarded: Las Vegas Paving Corp.5/11/2016 Notice to Proceed for Construction issued5/10/2017 Notice of Substantial Completion issued

Clark County 089E-FTI Las Vegas Blvd, St. Rose Pkwy to Silverado Ranch BlvdFRI Projects Included in Interlocal Contract:

22-Las Vegas Blvd, St. Rose Pkwy to Silverado Ranch Blvd [Construction]Project Events

2/11/2016 Authorization to Proceed for Construction approved by RTC5/27/2016 Invitation to bid issued by Clark County. Bid No. 604083-166/28/2016 Pre-Bid Conference

10/14/2016 Bid Opening12/20/2016 Construction contract awarded: Las Vegas Paving12/20/2016 Construction Management contract awarded: URS Corporation

1/3/2017 Construction Surveying Services awarded: Tri State Surveying4/3/2017 Notice to Proceed for Construction issued

Clark County 113B-FTI Fort Apache Rd, Warm Springs Rd. to Tropicana AveFRI Projects Included in Interlocal Contract:

14-Fort Apache Rd, Warm Springs Rd to Tropicana Ave [Design]Project Events

6/9/2016 Authorization to Proceed for Design approved by RTC12/6/2016 Design contract awarded: Poggemeyer Design Group, Inc.

Page 9 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 10: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 116B-FTI Hacienda Ave: Durango Dr/Rainbow BlFRI Projects Included in Interlocal Contract:

203-Hacienda Ave, Durango Dr to Buffalo Dr [Construction]Project Events

7/9/2015 Authorization to Proceed for Construction approved by RTC8/4/2015 Invitation to bid issued by Clark County: Bid #603766-15

8/19/2015 Pre-Bid Conference9/14/2015 Bid Opening11/6/2015 Construction contract awarded: Aggregate Industries - SWR, Inc.2/16/2016 Notice to Proceed for Construction issued6/22/2016 Notice of Substantial Completion issued

Clark County 175D-FTI Neighborhood Rehab: Casa Linda/Pebble CanyonFRI Projects Included in Interlocal Contract:

27-Pebble Canyon: South of Pebble Rd, between Eastern Ave and Pecos Rd [Design/Construction]3-Casa Linda: Between Spring Mountain Rd and Twain Ave; between Rainbow Blvd and Torrey Pines Dr [Design/Construction]

Project Events8/14/2014 Authorization to Proceed for Design approved by RTC8/14/2014 No award deadline. Project to be designed in-house4/14/2016 Authorization to Proceed for Construction approved by RTC6/28/2016 Invitation to bid issued by Clark County: Bid No.604152-166/28/2016 Notice of Substantial Completion issued for Design7/6/2016 Pre-Bid Conference

7/29/2016 Bid opening9/6/2016 Construction contract awarded: Aggregate Industries-SWR, Inc.1/3/2017 Notice to Proceed for Construction issued4/3/2017 Notice of Substantial Completion issued

Clark County 175E-FTI Neighborhood Rehab: Rancho Las BrisasFRI Projects Included in Interlocal Contract:

29-Rancho Las Brisas: North of Tropicana Ave, between Durango Dr and Buffalo Dr [Design/Construction]Project Events

11/13/2014 Authorization to Proceed for Design approved by RTC11/13/2014 No award deadline. Project to be designed in-house

2/4/2015 Design complete3/12/2015 Authorization to Proceed for Construction approved by RTC4/21/2015 Change Order #1 with American Pavement Preservation LLC was approved by Board of County Commissioners7/6/2015 Notice to Proceed for Construction issued

8/31/2015 Notice of Substantial Completion issued

Page 10 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 11: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 175F-FTI Neighborhood Rehab: Craig Park and Paradise PalmsFRI Projects Included in Interlocal Contract:

26-Paradise Palms: Between Desert Inn Rd and Twain Ave; between Maryland Pkwy and Spencer St [Design/Construction]8-Craig Park 1 and 2: North of Alexander Rd, between Pecos Rd and Walnut Ave [Design/Construction]

Project Events11/13/2014 Authorization to Proceed for Design approved by RTC11/13/2014 No award deadline. Project to be designed in-house4/14/2016 Authorization to Proceed for Construction approved by RTC6/28/2016 Invitation to bid issued by Clark County. Bid No. 604152-167/6/2016 Pre-Bid Conference

7/22/2016 Bid Opening9/1/2016 Invitation to bid issued by Clark County. Bid No. 604208-169/6/2016 Construction contract awarded: Aggregate Industries-SWR, Inc.9/7/2016 Pre-Bid Conference

9/30/2016 Bid Opening11/15/2016 Construction contract awarded: CG&B Enterprises, Inc.

1/3/2017 Notice to Proceed for Construction issued3/6/2017 Notice to Proceed for Construction issued4/3/2017 Notice of Substantial Completion issued

Clark County 176B-FTI Complete Streets: Desert Inn Rd, Sir George Dr and Winterwood BlvdFRI Projects Included in Interlocal Contract:

205-Desert Inn Rd, Lamb Blvd to Nellis Blvd [Design/Construction]206-Sir George Dr, Nellis Blvd to Stewart Ave [Design/Construction]207-Winterwood Blvd, Club House Dr to Sahara Ave [Design/Construction]

Project Events5/21/2015 Authorization to Proceed for Design approved by RTC6/2/2015 Design contract awarded: Atkins North America

6/18/2015 Notice to Proceed for Design issued10/8/2015 Authorization to Proceed for Construction approved by RTC

10/28/2015 Invitation to bid issued by Clark County. Bid No. 603873-1510/28/2015 Notice of Substantial Completion issued for Design11/18/2015 Pre-Bid Conference8/26/2016 Bid opening11/1/2016 Construction contract awarded: Unicon, LLC1/24/2017 Notice to Proceed for Construction issued6/13/2017 Notice of Substantial Completion issued

Page 11 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 12: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Clark County 189A-FTI Los Feliz St, Sahara Ave to Charleston BlvdFRI Projects Included in Interlocal Contract:

24-Los Feliz St, Sahara Ave to Charleston Blvd [Design]Project Events

10/8/2015 Authorization to Proceed for Design approved by RTC10/8/2015 No award deadline. Project to be designed in-house7/13/2017 Notice of Substantial Completion issued for Design

Henderson 002AC-FTI2 Eastern Ave Improvements, Coronado Center Dr to I-215 (Ph I)FRI Projects Included in Interlocal Contract:

228-Eastern Ave Improvements, Coronado Center Dr to I-215 (Ph I) [Design/Construction]Project Events

5/18/2017 Authorization to Proceed for Design approved by RTC7/1/2017 Design contract award deadline

Henderson 002Z-FTI Eastern Ave: Coronado Center Dr/Silverado Ranch BlvdFRI Projects Included in Interlocal Contract:

46-Eastern Ave, Coronado Center Pkwy to Silverado Ranch Blvd [Design/Construction]Project Events

10/15/2013 Design contract awarded: Poggemeyer Design Group, Inc. (Also funded with Motor Vehicle Fuel Tax)10/16/2013 Notice to Proceed for Design issued11/14/2013 Authorization to Proceed for additional design funding approved by RTC3/13/2014 Authorization to Proceed for construction approved by RTC5/5/2014 Notice of Substantial Completion issued for Design

5/11/2014 Invitation to bid issued by City of Henderson: Contract No. 131-14-ST-214-002 (16958) PWP-CL-2014-1865/20/2014 Pre-bid conference5/28/2014 Bid Opening6/17/2014 Construction contract awarded: Las Vegas Paving9/14/2014 Notice to Proceed for Construction issued2/5/2015 Notice of Substantial Completion issued for Construction

Henderson 008V-FTI Sunset Rd, Annie Oakley Dr to Sunset WayFRI Projects Included in Interlocal Contract:

66-Sunset Rd, Annie Oakley Dr to Sunset Way [Design]Project Events

8/14/2014 Authorization to Proceed for Design approved by RTC10/21/2014 Design Contract Awarded: G.C. Wallace10/28/2014 Notice to Proceed for Design issued10/31/2016 Notice of Substantial Completion issued for Design

Page 12 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 13: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 008V-FTI PH1 Sunset Rd, Annie Oakley Dr to Sunset WayFRI Projects Included in Interlocal Contract:

67-Sunset Rd, Annie Oakley Dr to Sunset Way (Phase I: Sunset Rd, Annie Oakley Dr to Mountain Vista St) [Construction]Project Events

6/11/2015 Authorization to Proceed for Construction approved by RTC6/15/2015 Invitation to bid issued by City of Henderson: Bid No. ITB-ST-223 (17984)-0-2015/PWE6/23/2015 Pre-Bid Conference7/2/2015 Bid Opening

8/18/2015 Construction contract awarded: Aggregate Industries3/14/2016 Notice to Proceed for Construction issued4/10/2017 Notice of Substantial Completion issued

Henderson 008V-FTI PH2 Sunset Rd, Annie Oakley to Sunset WayFRI Projects Included in Interlocal Contract:

67-Sunset Rd, Annie Oakley to Sunset Way (Phase II: Sunset Rd @ Marks St, I-515 Ramp and Marks St/Sunset Rd) [Construction]Project Events

10/19/2016 Invitation to bid issued by City of Henderson Bid No. ITB-ST-213(18954)-0-2016/PWE10/26/2016 Pre-Bid Conference11/9/2016 Bid Opening

11/10/2016 Authorization to Proceed for Construction approved by RTC1/17/2017 Construction contract awarded: Tand, Inc.

Henderson 011B-FTI Center St: Burkholder Blvd/Lake Mead PkwyFRI Projects Included in Interlocal Contract:

42-Center St, Burkholder Blvd to Lake Mead Pkwy [Design]43-Center St, Burkholder Blvd to Lake Mead Pkwy [Construction]

Project Events12/12/2013 Authorization to Proceed for Design approved by RTC2/12/2014 Design contract executed: G. C. Wallace2/12/2014 Notice to Proceed for Design issued3/10/2016 Authorization to Proceed for Construction approved by RTC5/9/2016 Notice of Substantial Completion issued for Design

1/31/2017 Invitation to bid issued by City of Henderson Bid No. ITB-ST-163 (18890)-0-2017-PWE2/8/2017 Pre-Bid Conference3/1/2017 Bid Opening

4/11/2017 Construction contract awarded: Las Vegas Paving Corp.

Page 13 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 14: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 015P-FTI Gibson Rd: Horizon Ridge Pkwy/I-215FRI Projects Included in Interlocal Contract:

48-Gibson Rd, Horizon Ridge Pkwy to I-215 [Design/Construction]Project Events

5/15/2014 Authorization to Proceed for Design approved by RTC7/1/2014 Design contract awarded: Slater Hanifan Group Inc.

7/14/2014 Notice to Proceed issued for Design2/23/2015 Design complete3/12/2015 Authorization to Proceed for Construction approved by RTC5/8/2015 Invitation to bid issued by City of Henderson. Bid #ITB-17727-0-2015/PWE

5/13/2015 Pre-Bid Conference5/28/2015 Bid Opening7/21/2015 Construction contract awarded: Aggregate Industries8/25/2015 Notice to Proceed for Construction issued

10/31/2016 Notice of Substantial Completion issued

Henderson 015Q-FTI Gibson Rd, Warm Springs Rd to Sunset RdFRI Projects Included in Interlocal Contract:

212-Gibson Rd, Warm Springs Rd to Sunset Rd [Construction]Project Events

4/2/2015 Invitation to bid issued by City of Henderson. Bid #ITB-ST-215 (17715)-0-2015/PWE4/9/2015 Pre-bid conference

4/21/2015 Bid opening5/21/2015 Authorization to Proceed for Construction approved by RTC6/2/2015 Construction contract awarded: Las Vegas Paving Corporation

8/10/2015 Notice to Proceed for Construction issued10/9/2015 Notice of Substantial Completion issued

Henderson 024M-FTI Pecos Rd, Windmill Ln to Robindale RdFRI Projects Included in Interlocal Contract:

211-Pecos Rd, Windmill Ln to Robindale Rd [Construction]Project Events

4/2/2015 Invitation to bid issued by City of Henderson. Bid #ITB-ST-215 (17411)-0-2015/PWE4/9/2015 Pre-Bid Conference

4/21/2015 Bid opening5/19/2015 Construction contract awarded: Las Vegas Paving5/21/2015 Authorization to Proceed for Construction approved by RTC8/10/2015 Notice to Proceed issued for Construction1/28/2016 Notice of Substantial Completion issued

Page 14 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 15: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 046J-FTI PH1 Warm Springs Rd: Arroyo Grande Blvd/Boulder HwyFRI Projects Included in Interlocal Contract:

72-Warm Springs Rd, Arroyo Grande Blvd to Boulder Hwy (Phase I: Arroyo Grande to Stephanie) [Construction]Project Events

3/13/2014 Authorization to Proceed for construction approved by RTC5/11/2014 Invitation to bid issued by City of Henderson: Contract No. 131-14-ST-213-001 (16601) PWP-CL-2014-242 (Phase I: Arroyo Grande Pkwy to Stephanie St)5/20/2014 Pre-bid conference5/29/2014 Bid opening6/17/2014 Construction contract awarded: Aggregate Industries9/22/2014 Notice to Proceed for Construction issued3/5/2015 Notice of Substantial Completion issued for Phase I

Henderson 046J-FTI PH2 Warm Springs Rd: Arroyo Grande Blvd/Boulder HwyFRI Projects Included in Interlocal Contract:

72-Warm Springs Rd, Arroyo Grande Blvd to Boulder Hwy (Phase II: Stephanie to Boulder Highway) [Design/Construction]Project Events

11/19/2013 Design contract awarded: VTN Nevada (Also funded with Motor Vehicle Fuel Tax)11/20/2013 Notice to Proceed for Design issued12/12/2013 Authorization to Proceed for Design approved by RTC

2/3/2015 Invitation to bid issued by City of Henderson. Bid No. ITB-ST-213 (17645)-0-2015/PWE2/3/2015 Notice of Substantial Completion issued for Design

2/10/2015 Pre-bid conference2/12/2015 Authorization to Proceed for Construction approved by RTC2/19/2015 Bid opening3/17/2015 Construction contract awarded: Las Vegas Paving5/11/2015 Notice to Proceed for Construction issued2/11/2016 Notice of Completion issued for Phase 2

Henderson 046K-FTI Warm Springs Rd, Lake Mead Pkwy to Racetrack RdFRI Projects Included in Interlocal Contract:

73-Warm Springs Rd, Lake Mead Pkwy to Racetrack Rd [Design]Project Events

8/14/2014 Authorization to Proceed for Design approved by RTC10/21/2014 Design Contract Awarded: Stanley Consultants10/23/2014 Notice to Proceed for Design issued

Page 15 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 16: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 049E-FTI Racetrack Rd: Boulder Hwy/Athens AveFRI Projects Included in Interlocal Contract:

59-Racetrack Rd, Boulder Hwy to Athens Ave w/ Newport Bridge @ C1 Channel [Design]60-Racetrack Rd, Boulder Hwy to Athens Ave w/ Newport Bridge @ C1 Channel [Construction]

Project Events11/14/2013 Authorization to Proceed for Design approved by RTC1/21/2014 Design contract awarded: Louis Berger Group2/3/2014 Notice to Proceed for Design issued

6/23/2015 Invitation to bid issued by City of Henderson: Bid No. ITB-17963-0-206/PWE6/23/2015 Notice of Substantial Completion issued for Design7/2/2015 Pre-bid conference7/9/2015 Authorization to Proceed for Construction approved by RTC

8/11/2015 Bid opening11/17/2015 Construction contract awarded: Las Vegas Paving Corporation1/11/2016 Notice to Proceed for Construction issued5/31/2017 Notice of Substantial Completion issued

Henderson 097E-FTI PH1 Stephanie St: Russell Rd/Galleria DrFRI Projects Included in Interlocal Contract:

63-Stephanie St, Russell Rd to Galleria Dr (Phase I: Bridge Embankment) [Construction]Project Events

3/13/2014 Authorization to Proceed for construction approved by RTC4/1/2014 City Council approval for project to be constructed as Construction Manager at Risk (CMAR)

5/12/2014 Request for CMAR proposals issued by City of Henderson: Bid No. RFP-16955-0-2014/PWE5/19/2014 Pre-proposal conference6/3/2014 Proposals due8/5/2014 CMAR pre-construction contract awarded: Las Vegas Paving Corporation8/6/2014 Notice to Proceed for pre-construction services issued

12/16/2014 Guarantee Maximum Price issued1/13/2015 Notice to Proceed for Construction issued4/24/2017 Notice of Substantial Completion issued

Page 16 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 17: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 097E-FTI PH2 Stephanie St: Russell Rd/Galleria DrFRI Projects Included in Interlocal Contract:

63-Stephanie St, Russell Rd to Galleria Dr (Phase II: Roadway/Bridge) [Design/Construction]Project Events

3/13/2014 Authorization to Proceed for design and construction approved by RTC4/1/2014 City Council approval for project to be constructed as Construction Manager at Risk (CMAR)

5/12/2014 Request for CMAR proposals issued by City of Henderson: Bid No. RFP-16955-0-2014/PWE5/19/2014 Pre-proposal conference6/3/2014 Proposals due8/5/2014 CMAR pre-construction contract awarded: Las Vegas Paving Corporation8/6/2014 Notice to Proceed for pre-construction services issued

12/16/2014 Professional Services (Design) Agreement Amendment approved: Atkins North America3/5/2015 Independent Cost Estimate Services contract awarded: HDR Engineering

4/21/2015 Guarantee Maximum Price approved by City of Henderson6/15/2015 Notice to Proceed for construction issued2/2/2016 Notice of Substantial Completion issued for Design

4/24/2017 Notice of Substantial Completion issued

Henderson 097F-FTI2 Stephanie St, I-215 to Dragonridge Country ClubFRI Projects Included in Interlocal Contract:

232-Stephanie St, I-215 to Dragonridge Country Club [Design/Construction]Project Events

8/10/2017 Authorization to Proceed for Design approved by RTC10/9/2017 Design contract award deadline

Henderson 100D-FTI I-15/I-215 Interchange ImprovementsFRI Projects Included in Interlocal Contract:

226-I-15/I-215 Interchange Improvements [Design]Project Events

7/13/2017 Authorization to Proceed for Design approved by RTC9/11/2017 Design contract award deadline

Page 17 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 18: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 110C-FTI Horizon Ridge Pkwy: Gibson Rd/Las Palmas EntradaFRI Projects Included in Interlocal Contract:

52-Horizon Ridge Pkwy, Gibson Rd to Las Palmas Entrada Ave [Design/Construction]Project Events

5/15/2014 Authorization to Proceed for Design approved by RTC7/1/2014 Design contract awarded: Slater Hanifan Group Inc.

7/14/2014 Notice to Proceed issued for Design2/23/2015 Design complete3/12/2015 Authorization to Proceed for Construction approved by RTC5/8/2015 Invitation to bid issued by City of Henderson. Bid #ITB-17727-0-2015/PWE

5/13/2015 Pre-Bid Conference5/28/2015 Bid Opening7/21/2015 Construction contract awarded: Aggregate Industries8/25/2015 Notice to Proceed for Construction issued

10/31/2016 Notice of Substantial Completion issued

Henderson 124K-FTI PH1 I-515 and I-215 Interchanges StudiesFRI Projects Included in Interlocal Contract:

65-Study- SB I-515 Galleria Dr to I-215, Pecos Rd at I-215, Eastern Ave at I-215 (Phase I: I-515, Galleria Dr to I-215, Gibson Road) [Design]Project Events

11/13/2014 Authorization to Proceed for Design approved by RTC1/6/2015 Study contract awarded: Atkins North America, Inc.

1/13/2015 Notice to Proceed for Design issued

Henderson 124K-FTI PH2 I-515 and I-215 Interchanges StudiesFRI Projects Included in Interlocal Contract:

65-Study- SB I-515 Galleria Dr to I-215, Pecos Rd at I-215, Eastern Ave at I-215 (Phase II: I-215, Eastern Ave to Green Valley Pkwy) [Design]Project Events

11/13/2014 Authorization to Proceed for Design approved by RTC1/6/2015 Study contract awarded: Parsons Brinckerhoff, Inc.

1/13/2015 Notice to Proceed for Design issued

Page 18 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 19: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 136B-FTI Paseo Verde Pkwy: St. Rose Pkwy/Green Valley PkwyFRI Projects Included in Interlocal Contract:

209-Paseo Verde Pkwy, St. Rose Pkwy to Green Valley Pkwy [Design/Construction]Project Events

9/10/2015 Authorization to Proceed for Design approved by RTC3/1/2016 Notice of Substantial Completion issued for Design3/8/2016 Invitation to bid issued by Clark County. Bid No. ITB-18788-0-2016/PWE

3/10/2016 Authorization to Proceed for Construction approved by RTC3/15/2016 Pre-Bid Conference3/29/2016 Bid Opening5/17/2016 Construction contract awarded: Las Vegas Paving Corp.7/25/2016 Notice to Proceed for Construction issued

12/22/2016 Notice of Substantial Completion issued

Henderson 152C-FTI Starr Rd, Las Vegas Blvd to St. Rose ParkwayFRI Projects Included in Interlocal Contract:

64-Starr Rd, Las Vegas Blvd to St. Rose Parkway [Design/Construction]Project Events

8/14/2014 Authorization to Proceed for Design approved by RTC10/7/2014 Notice to Proceed for preliminary design issued10/7/2014 Preliminary design contract signed: CA Group4/8/2015 Notice to Proceed for Design issued

4/14/2015 Final design contract awarded to CA Group3/10/2016 Authorization to Proceed for Construction approved by RTC5/31/2016 Invitation to bid issued by City of Henderson. Bid No. ITB-ST-139 (18125)-0-2016/PWE6/8/2016 Pre-Bid Conference

7/20/2016 Bid opening9/6/2016 Construction contract awarded: Las Vegas Paving Corp.

2/13/2017 Notice to Proceed for Construction issued

Henderson 161B-FTI Pueblo Blvd: Newport Dr/Warm Springs RdFRI Projects Included in Interlocal Contract:

58-Pueblo Blvd, Newport Dr to Warm Springs Rd [Design]Project Events

10/10/2013 Authorization to Proceed for Design approved by RTC12/17/2013 Design contract awarded: Stantec1/22/2014 Notice to Proceed for Design issued

Page 19 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 20: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 164C-FTI Volunteer Blvd, Las Vegas Blvd to Anthem Boundary and Executive Airport Dr, Volunteer Blvd tFRI Projects Included in Interlocal Contract:

47-Executive Airport Dr, Volunteer Blvd to St. Rose Pkwy [Construction]71-Volunteer Blvd, Las Vegas Blvd to Anthem Boundary and Executive Airport Dr, Volunteer Blvd to Bruner Ave [Construction]

Project Events2/12/2015 Authorization to Proceed for Construction approved by RTC4/9/2015 Invitation to bid issued by City of Henderson. Bid # ITB-ST-212 (17720)-0-2015/PWE

4/15/2015 Pre-bid conference5/28/2015 Bid opening9/1/2015 Bids rejected by City of Henderson, project will re-advertise.

11/17/2015 Construction contract awarded: Las Vegas Paving Corporation11/30/2015 Notice to Proceed for Construction issued

Henderson 174A-FTI Whitney Ranch Dr: Arroyo Grande Blvd/Russell RdFRI Projects Included in Interlocal Contract:

74-Whitney Ranch Dr, Sunset Rd to Russell Rd [Construction]Project Events

3/13/2014 Authorization to Proceed for construction approved by RTC5/11/2014 Invitation to Bid issued by City of Henderson: Contract No. 131-14-ST-214-001 (16957) PWP-CL-2014-1855/20/2014 Pre-bid conference5/29/2014 Bid opening6/17/2014 Construction contract awarded: Las Vegas Paving7/23/2014 Notice to Proceed for Construction issued

12/20/2014 Notice of Substantial Completion issued for Construction

Henderson 175A-FTI Neighborhood Rehab: AnthemFRI Projects Included in Interlocal Contract:

33-Anthem Parkway at Anthem Country Club Entry [Design]35-Anthem Pkwy/Eastern Ave/Pecos Ridge Pkwy [Design]61-Reunion Dr, Anthem Pkwy to Anthem Pkwy (loop) [Design]

Project Events10/10/2013 Authorization to Proceed for Design approved by RTC12/17/2013 Design contract awarded: Kimley-Horn and Associates1/22/2014 Notice to Proceed for Design issued6/15/2015 Design complete for Reunion Dr, Anthem Pkwy to Anthem Pkwy (loop)

Page 20 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 21: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 175A-FTI PH1 Neighborhood Rehab: Anthem (Reunion Dr, Anthem Pkwy to Anthem Pkwy Loop)FRI Projects Included in Interlocal Contract:

62-Reunion Dr, Anthem Pkwy to Anthem Pkwy (loop) [Construction]Project Events

6/16/2015 Invitation to Bid issued by City of Henderson: Bid No. ITB-18035-0-2015/PWE6/23/2015 Pre-bid conference6/30/2015 Bid opening7/21/2015 Construction contract awarded: Aggregate Industries7/22/2015 Notice to Proceed issued for construction8/13/2015 Authorization to Proceed for Construction approved by RTC9/2/2015 Project substantially complete

Henderson 175A-FTI PH2 Neighborhood Rehab: Anthem (Anthem Parkway at Anthem Country Club Entry)FRI Projects Included in Interlocal Contract:

34-Anthem Parkway at Anthem Country Club Entry [Construction]Project Events

8/13/2015 Authorization to Proceed for Construction approved by RTC5/10/2017 Invitation to bid issued by City of Henderson Bid No. ITB-18807-0-2017/PWE5/16/2017 Pre-Bid Conference5/31/2017 Bid Opening7/11/2017 Construction contract awarded: Wadley Construction, Inc.9/20/2017 Notice to Proceed for Construction issued

Page 21 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 22: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 175B-FTI Neighborhood Rehab: Green ValleyFRI Projects Included in Interlocal Contract:

50-High View Dr, Green Valley Pkwy to Valle Verde Dr [Design]51-High View Dr, Green Valley Pkwy to Valle Verde Dr [Construction]69-Valle Verde Dr, Warm Springs Rd to High View Dr [Design]70-Valle Verde Dr, Warm Springs Rd to High View Dr [Construction]

Project Events10/10/2013 Authorization to Proceed for Design approved by RTC12/17/2013 Design contract awarded: CH2M Hill Engineers, Inc.1/21/2014 Notice to Proceed for Design issued5/12/2015 Design Complete5/12/2015 Invitation to bid issued by City of Henderson. Bid #ITB-16799-0-2015/PWE5/19/2015 Pre-Bid Conference5/21/2015 Authorization to Proceed for Construction approved by RTC5/26/2015 Bid Opening7/7/2015 Construction contract awarded: Aggregate Industries

8/17/2015 Notice to Proceed for construction issued3/17/2016 Notice of Substantial Completion issued

Henderson 175C-FTI Neighborhood Rehab: Green Valley - Arroyo Grande BlvdFRI Projects Included in Interlocal Contract:

36-Arroyo Grande Blvd, Horizon Ridge Pkwy to Sunset Rd [Design]37-Arroyo Grande Blvd, Horizon Ridge Pkwy to Sunset Rd [Construction]38-Arroyo Grande Blvd/Mayan Dr, Helmsdale Dr/Harwick Dr, Sunset Rd near Scimitar Dr (Ground Water Repairs) [Design]

Project Events2/13/2014 Authorization to Proceed for Design approved by RTC5/20/2014 Design contract awarded: Jacobs Engineering Group5/22/2014 Notice to Proceed for Design issued8/13/2015 Authorization to Proceed for Construction approved by RTC9/1/2015 Design complete5/5/2017 Invitation to bid issued by City of Henderson. Bid No. ITB-ST-219 (17955)-0-2017

5/16/2017 Pre-Bid Conference6/20/2017 Bid Opening

Page 22 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 23: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 175C-FTI PH1 Neighborhood Rehab: Green Valley - Arroyo Grande BlvdFRI Projects Included in Interlocal Contract:

39-Arroyo Grande Blvd/Mayan Dr, Helmsdale Dr/Harwick Dr, Sunset Rd near Scimitar Dr (Emergency Ground Water Repairs at Arroyo Grande/Mayan) [Construction]Project Events

12/12/2013 Authorization to Proceed for Construction approved by RTC12/12/2013 Emergency Repairs for groundwater flow/pavement failure. Will not advertise for bid.12/17/2013 Change Order #4 issued to American Pavement Preservation for emergency repairs4/11/2014 Notice of Substantial Completion issued

Henderson 175C-FTI PH2 Neighborhood Rehab: Green Valley - Arroyo Grande BlvdFRI Projects Included in Interlocal Contract:

39-Arroyo Grande Blvd/Mayan Dr, Helmsdale Dr/Harwick Dr, Sunset Rd near Scimitar Dr (Ground Water Repairs Helmsdale/Harwick) [Construction]Project Events

12/11/2014 Authorization to Proceed for Construction approved by RTC12/11/2014 Project will not advertise. Work to be completed under annual contract

3/3/2015 Change Order #3 approved to Wells Cargo, Inc. for repairs3/12/2015 Notice to Proceed issued for construction7/15/2015 Letter of Substantial Completion issued

Henderson 175C-FTI PH3 Neighborhood Rehab: Green Valley - Arroyo Grande BlvdFRI Projects Included in Interlocal Contract:

39-Arroyo Grande Blvd/Mayan Dr, Helmsdale Dr/Harwick Dr, Sunset Rd near Scimitar Dr (Pavement Patch Work at Sunset/Scimitar) [Construction]Project Events

12/5/2013 Work Order #5 issued to J and J Enterprises for repairs12/12/2013 Authorization to Proceed for Construction issued12/13/2013 Project will not advertise. Work to be completed under annual contract9/10/2014 Notice of Completion issued

Henderson 175C-FTI PH4 Neighborhood Rehab: Green Valley - Arroyo Grande BlvdFRI Projects Included in Interlocal Contract:

39-Arroyo Grande Blvd/Mayan Dr, Helmsdale Dr/Harwick Dr, Sunset Rd near Scimitar Dr (Final/Full Repairs Sunset/Scimitar) [Construction]Project Events

10/8/2015 Authorization to Proceed for Construction approved by RTC5/5/2017 Invitation to bid issued by City of Henderson. Bid No. ST-219 (17955); PWP-CL-2017-218

5/16/2017 Pre-Bid Conference6/20/2017 Bid Opening

Page 23 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 24: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 175G-FTI Neighborhood Rehab: Mission Paradise StabilizationFRI Projects Included in Interlocal Contract:

44-College Dr, Paradise Hills Dr to I-515 [Design/Construction]57-Paradise Hills Dr, Greenway Rd to College Dr [Design/Construction]

Project Events8/14/2014 Authorization to Proceed for Design approved by RTC10/7/2014 Notice to Proceed for preliminary design issued10/7/2014 Preliminary design contract signed: Poggemeyer2/17/2015 Design contract awarded for Paradise Hills Dr: Poggemeyer Design Group2/17/2015 No design award College Dr. project to be designed in-house2/25/2015 Notice to Proceed issued for full design for Paradise Hills Dr.9/10/2015 Authorization to Proceed for Construction approved by RTC10/5/2015 Invitation to bid issued by City of Henderson. Bid No. ITB-ST-229 (18223)-0-2015/PWE10/5/2015 Notice of Substantial Completion issued for Design

10/13/2015 Pre-Bid Conference10/28/2015 Bid Opening12/1/2015 Construction contract awarded: Aggregate Industries SWR Inc.2/22/2016 Notice to Proceed for Construction issued9/2/2016 Notice of Substantial Completion issued

Henderson 175H-FTI Neighborhood Rehab: West Henderson RoadsFRI Projects Included in Interlocal Contract:

40-Bermuda Rd, Volunteer Blvd to St. Rose Pkwy [Design]41-Bruner Rd, Gilespie St to Executive Airport Dr [Design]49-Gilespie St, Volunteer Blvd to St. Rose Pkwy [Design]

Project Events8/14/2014 Authorization to Proceed for Design approved by RTC10/8/2014 Notice to Proceed for preliminary design issued10/8/2014 Preliminary design contract signed: VTN

Page 24 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 25: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 176A-FTI Downtown Henderson Complete StreetsFRI Projects Included in Interlocal Contract:

45-Downtown Henderson Complete Streets [Design/Construction]Project Events

10/10/2013 Authorization to Proceed for Design approved by RTC12/17/2013 Design contract awarded: C-A Group1/27/2014 Notice to Proceed for Design issued2/12/2015 Authorization to Proceed for Construction approved by RTC4/13/2015 Notice of Substantial Completion issued for Design4/13/2015 Request for Proposal issued by City of Henderson. Bid #RFP-17825-0-2015/PWE.4/22/2015 Pre-bid conference5/12/2015 Bid Opening8/18/2015 CMAR pre-construction contract awarded: Las Vegas Paving Corporation3/15/2016 Final Design Awarded: C-A Group2/21/2017 Guarantee Maximum Price issued3/27/2017 Notice to Proceed for Construction issued

Henderson 183A-FTI Valle Verde Dr, Horizon Ridge Pkwy to Warm Springs RdFRI Projects Included in Interlocal Contract:

68-Valle Verde Dr, Horizon Ridge Pkwy to Warm Springs Rd [Design/Construction]Project Events

8/14/2014 Authorization to Proceed for Design approved by RTC10/21/2014 Design Contract Awarded: Horrocks Engineers10/22/2014 Notice to Proceed for Design issued

Henderson 184A-FTI Montelago Blvd and Lake Las Vegas PkwyFRI Projects Included in Interlocal Contract:

56-Montelago Blvd and Lake Las Vegas Pkwy Loop [Construction]Project Events

8/14/2014 Authorization to Proceed for Construction approved by RTC8/14/2014 No construction award deadline. Project to be completed under existing contract - Las Vegas Paving9/9/2014 Change Order #1 with Las Paving approved by Henderson City Council9/9/2014 Notice to Proceed issued

2/18/2016 Notice of Substantial Completion issued

Page 25 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 26: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Henderson 201A-FTI2 Roma Hills DrFRI Projects Included in Interlocal Contract:

229-Roma Hills Dr [Design/Construction]Project Events

5/18/2017 Authorization to Proceed for Design approved by RTC7/1/2017 Design contract award deadline

Las Vegas 009K-FTI PH1 Charleston Blvd, Grand Central Pkwy to Fremont StFRI Projects Included in Interlocal Contract:

91-Charleston Blvd, Grand Central Pkwy to Fremont St (Phase I: Grand Central Pkwy to Maryland Pkwy) [Design]Project Events

1/8/2015 Authorization to Proceed for Design approved by RTC2/18/2015 Study Contract Awarded: CA Group, Inc.2/25/2015 Notice to Proceed issued

Las Vegas 009K-FTI PH2 Charleston Blvd, Grand Central Pkwy to Fremont StFRI Projects Included in Interlocal Contract:

91-Charleston Blvd, Grand Central Pkwy to Fremont St (Phase II: Fremont St to Maryland Pkwy) [Design]Project Events

1/8/2015 Authorization to Proceed for Design approved by RTC2/18/2015 Study Contract Awarded: G.C. Wallace, Inc.2/25/2015 Notice to Proceed issued

Las Vegas 009M-FTI Charleston Blvd, Rancho Dr to Martin Luther King BlvdFRI Projects Included in Interlocal Contract:

92-Charleston Blvd, Rancho Dr to Martin Luther King Blvd [Design]Project Events

2/11/2016 Authorization to Proceed for Design approved by RTC4/20/2016 Design contract awarded: HDR Engineering

Las Vegas 037B-FTI Rancho Dr, Bonanza Rd to Rainbow BlvdFRI Projects Included in Interlocal Contract:

126-Rancho Dr, Bonanza Rd to Rainbow Blvd [Design/Construction]Project Events

7/20/2011 Design contract awarded: Stanley Consultants (Ph. 2 Decatur to Rainbow)10/19/2011 Design contract awarded: PB Americas Inc. (Ph. 1 Bonanza to Decatur)11/7/2011 Notice to Proceed for Design issued for PB Americas Inc.7/27/2014 Notice to Proceed for Design issued for Stanley Consultants

12/11/2014 Authorization to Proceed for Design approved by RTC (also funded with Question 10 funds)

Page 26 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 27: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 037D-FTI Rancho Dr/Decatur Bl Intersection ImprovementsFRI Projects Included in Interlocal Contract:

127-Rancho Dr/Decatur Blvd Intersection Improvements (1) [Construction]128-Rancho Dr/Decatur Blvd Intersection Improvements (2) [Construction]

Project Events5/13/2014 Invitation to bid issued by City of Las Vegas: Bid No. ITB-14.35426-TB-0-2014/TMB5/21/2014 Pre-bid Conference6/11/2014 Bids Due6/12/2014 Authorization to Proceed for Construction approved by RTC7/16/2014 Construction Manager as Agent contract awarded: VTN Nevada8/6/2014 Construction contract awarded: Las Vegas Paving

10/6/2014 Notice to Proceed for Construction issued4/24/2015 Notice of Substantial Completion issued for Construction

Las Vegas 051P-FTI City of Las Vegas Traffic Signals - Package 1FRI Projects Included in Interlocal Contract:

119-Lamb Blvd/Owens Ave [Construction]78-Alexander Rd/Torrey Pines Dr [Construction]84-Bonanza Rd/Page St [Construction]

Project Events1/9/2014 Authorization to Proceed for Construction approved by RTC1/9/2014 Project will not advertise. Negotiating guaranteed maximum price with contractor.

4/16/2014 CMAR construction contract awarded: Las Vegas Electric, Inc.7/7/2014 Notice to Proceed for Construction issued1/5/2015 Notice of Substantial Completion issued for Construction

Las Vegas 078C-FTI Oakey Blvd/Wyoming Ave, Rainbow Blvd to Industrial Rd (Railroad Crossing Improvements)FRI Projects Included in Interlocal Contract:

125-Oakey Blvd/Wyoming Ave, Rainbow Blvd to Industrial Rd (UPRR Safety Improvements) [Construction]Project Events

9/10/2015 Authorization to Proceed for Construction approved by RTC.9/15/2015 Invitation to bid issued by City of Las Vegas: Bid No. ITB-14.46820-TB-0-2016/TMB (Bicycle, Pedestrian, and Vehicle Safety Upgrade at UPRR Crossing of Wyoming

Ave/Oakey Boulevard)9/24/2015 Mandatory pre-bid conference.

10/19/2015 Bid opening12/9/2015 Construction contract awarded: Aggregate Industries - SWR Inc.4/12/2016 Notice to Proceed for Construction issued9/20/2016 Notice of Substantial Completion issued

Page 27 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 28: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 078C-FTI PH2 Oakey Blvd/Wyoming Ave, Rainbow Blvd to Industrial Rd (Overlay project)FRI Projects Included in Interlocal Contract:

125-Oakey Blvd/Wyoming Ave, Rainbow Blvd to Industrial Rd (Overlay project) [Construction]Project Events

9/10/2015 Authorization to Proceed for Construction approved by RTC9/10/2015 No bid advertise. Projects to be constructed under annual contract: Las Vegas Paving Corp.9/21/2015 Notice to Proceed for Construction issued6/2/2016 Notice of Substantial Completion issued

Las Vegas 089K-FTI Las Vegas Blvd, Stewart Ave to Sahara AveFRI Projects Included in Interlocal Contract:

120-Las Vegas Blvd, Stewart Ave to Sahara Ave [Design]Project Events

1/8/2015 Authorization to Proceed for Design approved by RTC4/1/2015 Design contract awarded: CA Group

4/23/2015 Notice to Proceed issued for design

Las Vegas 092C-FTI PH1 Summerlin Pkwy, CC-215 to US-95FRI Projects Included in Interlocal Contract:

145-Summerlin Pkwy, CC-215 to US-95 (Ph I: Cable Barrier Safety Project) [Design/Construction]Project Events

10/1/2014 Design contract awarded: GC Wallace10/16/2014 Notice to Proceed issued for Design12/11/2014 Authorization to Proceed for Design approved by RTC (also funded with Question 10 funds)11/12/2015 Authorization to Proceed for Construction approved by RTC12/28/2015 Invitation to bid issued by City of Las Vegas: Bid No. ITB-15.54648-TF-0-2016/tf

1/7/2016 Pre-bid conference1/11/2016 Notice of Substantial Completion issued for Design1/21/2016 Bid opening3/16/2016 Construction contract awarded: Las Vegas Paving Corp.6/6/2016 Notice to Proceed for Construction issued

10/20/2016 Notice of Substantial Completion issued

Page 28 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 29: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 092C-FTI PH2 Summerlin Pkwy, CC-215 to US-95FRI Projects Included in Interlocal Contract:

145-Summerlin Pkwy, CC-215 to US-95 (Ph II: Traffic Capacity and Safety Improvements) [Design/Construction]Project Events

10/1/2014 Design contract awarded: GC Wallace10/16/2014 Notice to Proceed issued for Design8/10/2016 Invitation to bid issued by City of Las Vegas. Bid No. 16.61090-TF8/10/2016 Notice of Substantial Completion issued for Design8/18/2016 Pre-Bid Conference9/1/2016 Bid Opening

10/19/2016 Construction contract awarded: Las Vegas Paving Corp.12/5/2016 Notice to Proceed for Construction issued

Las Vegas 092C-FTI PH3 Summerlin Pkwy, CC-215 to US-95 (Ph III: Auxiliary Lane Improvements)FRI Projects Included in Interlocal Contract:

145-Summerlin Pkwy, CC-215 to US-95 (Ph III: Auxiliary Lane Improvements) [Design]Project Events

10/1/2014 Design contract awarded: GC Wallace10/16/2014 Notice to Procede issued for Design

Las Vegas 093E-FTI Alta Dr, Rancho Dr to Main StFRI Projects Included in Interlocal Contract:

81-Alta Dr, Rancho Dr to Main St [Design]Project Events

5/21/2015 Authorization to Proceed for Design approved by RTC8/19/2015 Design contract awarded: VTN Nevada8/31/2015 Notice to Proceed issued for design.

Las Vegas 093F-FTI Casino Center Blvd: Stewart Ave/US-95FRI Projects Included in Interlocal Contract:

218-Casino Center Blvd, Stewart Ave to US-95 [Construction]Project Events

10/2/2015 Invitation to bid issued by City of Las Vegas: Bid No. ITB-16.56119-TF-0-2015/tf10/14/2015 Pre-bid conference11/9/2015 Construction contract awarded: Las Vegas Paving Corp.

11/12/2015 Authorization to Proceed for Construction approved by RTC11/12/2015 Bid opening4/11/2016 Notice to Proceed for Construction issued8/8/2016 Notice of Substantial Completion issued

Page 29 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 30: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 124J-FTI I-15 Frontage Roads Study: Washington Ave/Lake Mead BlvdFRI Projects Included in Interlocal Contract:

113-I-15 Frontage Roads, Washington Ave to Lake Mead Blvd [Design]Project Events

6/12/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Study contract awarded: Louis Berger Group, Inc.8/13/2014 Notice to proceed issued

Las Vegas 128H-FTI Kyle Canyon Interchange at US-95FRI Projects Included in Interlocal Contract:

114-Kyle Canyon @ US-95 [Design/Construction]Project Events

8/13/2015 Authorization to Proceed for Design approved by RTC10/21/2015 Design contract awarded: GCW, Inc.10/25/2015 Notice to Proceed for Design issued

Page 30 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 31: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 135T-FTI City of Las Vegas Arterial Reconstruction Program - Package 1FRI Projects Included in Interlocal Contract:

101-Decatur Blvd, US-95 to Lake Mead Blvd [Design/Construction]104-Decatur Blvd/Westmoreland Dr (Ped Actuated Flasher) [Construction]105-Eastern Ave, Sahara Ave to Cedar Ave [Design/Construction]106-Eastern Ave/Exley Ave (Ped Actuated Flasher) [Construction]115-Lake Mead Blvd, Hills Center Dr to Rock Springs Dr [Design/Construction]116-Lake Mead Blvd, Rainbow Blvd to Rancho Dr [Design/Construction]117-Lake Mead Blvd/Arpa Wy (Ped Actuated Flasher) [Construction]118-Lake Mead Dr/James Bilbray Dr (Ped Actuated Flasher) [Construction]

Project Events1/9/2014 Authorization to Proceed for Design approved by RTC1/9/2014 No award deadline. Project to be designed under annual contract: G. C. Wallace, Inc.1/9/2014 No award deadline. Project to be designed under annual contract: Slater Hanifan Group

2/13/2014 Authorization to Proceed for Construction approved by RTC2/13/2014 Decatur Blvd: Notice to Proceed for construction issued2/13/2014 No bid advertise. Projects to be constructed under annual contract: Las Vegas Paving Corp.3/1/2014 Notice of Substantial Completion issued for Design3/4/2014 Latest Notice to Proceed for Design issued for Packaged Project 135T-FTI (Also funded with Motor Vehicle Fuel Tax and City funds)

3/20/2014 Lake Mead Blvd: Notice to Proceed for construction issued7/7/2014 Eastern Avenue: Notice to Proceed for Construction issued

12/15/2014 Decatur Blvd: Notice of Substantial Completion issued for Construction12/15/2014 Lake Mead Blvd: Notice of Substantial Completion issued for Construction3/31/2015 Eastern Avenue: Certificate of Substantial Completion issued8/1/2015 Lake Mead Dr/James Bilbray Dr Ped Actuated Flasher will be designed and constructed in-house.

12/10/2015 In-house design complete4/21/2016 Notice of Substantial Completion issued

Page 31 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 32: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 135U-FTI City of Las Vegas Arterial Reconstruction Program - Package 2FRI Projects Included in Interlocal Contract:

134-Smoke Ranch Rd, Jones Blvd to Rancho Dr [Design/Construction]135-Smoke Ranch Rd, Rainbow Blvd to Jones Blvd [Design/Construction]136-Smoke Ranch Rd/James Bilbray Dr (Ped Actuated Flasher) [Design]137-Smoke Ranch Rd/James Bilbray Dr (Ped Actuated Flasher) [Construction]138-Smoke Ranch Rd/Maverick St (Ped Actuated Flasher) [Design]139-Smoke Ranch Rd/Maverick St (Ped Actuated Flasher) [Construction]151-Valley View Blvd, US-95 to Washington Dr [Design/Construction]153-Washington Ave, Rainbow Blvd to Martin Luther King Blvd [Design/Construction]79-Alta Dr, Decatur Blvd to Valley View Blvd [Design/Construction]80-Alta Dr, Rainbow Blvd to Decatur Blvd [Design/Construction]

Project Events1/9/2014 Authorization to Proceed for Design approved by RTC1/9/2014 No award deadline. Project to be designed under annual contract: G. C. Wallace, Inc.1/9/2014 No award deadline. Project to be designed under annual contract: Slater Hanifan Group2/5/2014 Latest Notice to Proceed for Design issued for Packaged Project 135U-FTI (Also funded with Motor Vehicle Fuel Tax and City funds)1/8/2015 Authorization to Proceed for Construction approved by RTC

1/27/2015 Smoke Ranch Rd: Design complete1/27/2015 Valley View Blvd: Design complete1/27/2015 Washington Ave: Design complete2/11/2015 Alta Dr: Design complete2/25/2015 Invitation to bid issued by City of Las Vegas. Bid #ITB-15.1762.02-JH-0-2015/jwh3/5/2015 Pre-bid conference

3/24/2015 Bid opening4/15/2015 Construction contract awarded: Las Vegas Paving Corp.5/25/2015 Valley View Blvd: Notice to Proceed for construction issued5/25/2015 Washington Ave: Notice to Proceed for construction issued6/15/2015 Alta Dr: Notice to Proceed for construction issued6/15/2015 Alta Dr: Notice to Proceed for construction issued7/1/2015 Smoke Ranch Rd: Notice to Proceed for construction issued

Las Vegas 135U-FTI PH1 Alta Dr., Rainbow Blvd. to Rancho Dr. (concrete and large patch work)FRI Projects Included in Interlocal Contract:

80-Alta Dr., Rainbow Blvd. to Rancho Dr. (concrete and large patch work) [Construction]Project Events

3/17/2014 Notice to Proceed issued for concrete repair work5/15/2014 Authorization to Proceed for Construction approved by RTC for concrete/patch work on Alta Dr.5/15/2014 Concrete work will not advertise. Work to be completed under annual contract: Drew Asphalt Paving Inc.

12/18/2014 Notice of Substantial Completion issued for concrete repair work

Page 32 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 33: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 135V-FTI City of Las Vegas Arterial Reconstruction Program - Package 3FRI Projects Included in Interlocal Contract:

107-Elkhorn Rd, US-95 to Tenaya Wy [Design/Construction]146-Town Center Dr/Crestdale La (Ped Actuated Flasher) [Design]147-Town Center Dr/Crestdale La (Ped Actuated Flasher) [Construction]150-Town Center Dr, Charleston Blvd to Summerlin Pkwy [Design/Construction]85-Buffalo Dr, Sky Pointe Dr to Grand Teton Dr [Design/Construction]94-Cimarron Rd, Sky Pointe Dr to Grand Teton Dr [Design/Construction]

Project Events1/9/2014 Authorization to Proceed for Design approved by RTC1/9/2014 No award deadline. Project to be designed under annual contract: G. C. Wallace, Inc.1/9/2014 No award deadline. Project to be designed under annual contract: Slater Hanifan Group3/3/2014 Latest Notice to Proceed for Design issued for Packaged Project 135V-FTI

5/21/2015 Authorization to Proceed for Construction (concrete work) approved by RTC5/21/2015 Concrete work to be completed under annual contract: Drew Asphalt and Paving.2/25/2016 Notice of Substantial Completion issued for Design4/14/2016 Notice of Substantial Completion issued for Design5/21/2016 Authorization to Proceed for Construction approved by RTC7/18/2016 Construction contract awarded: Las Vegas Paving7/18/2016 Construction contract awarded: Las Vegas Paving Corp7/18/2016 Notice to Proceed for Construction issued8/1/2016 Notice to Proceed for Construction issued

11/8/2016 Notice of Substantial Completion issued11/18/2016 Notice of Substantial Completion issued

Las Vegas 135V-FTI PH1 City of Las Vegas Arterial Reconstruction Program - Package 3 (Concrete Work)FRI Projects Included in Interlocal Contract:

85-Arterial Reconstruction #3 (Concrete Work) [Construction]Project Events

5/21/2015 Authorization to Proceed for Construction Issued (concrete work) approved by RTC5/21/2015 Concrete work to be completed under annual contract: Drew Asphalt and Paving9/17/2015 Notice to Proceed for Construction issued12/9/2015 Notice of Substantial Completion issued

Page 33 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 34: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 146M-FTI Bus Turnouts: Charleston Blvd, Boulder Hwy/Nellis BlvdFRI Projects Included in Interlocal Contract:

90-Charleston Blvd, Boulder Hwy to Nellis Blvd [Construction]Project Events

1/9/2014 Authorization to Proceed for Construction approved by RTC3/11/2014 Invitation to bid issued by City of Las Vegas. Bid number ITB-14.51169-DC-0-20143/17/2014 Pre-bid conference3/26/2014 Bid opening5/21/2014 Construction management service contract awarded: G. C. Wallace, Inc.6/5/2014 Construction contract awarded: Fab 5 Construction

8/18/2014 Notice to Proceed for Construction issued2/12/2015 Certificate of Substantial Completion issued

Las Vegas 155B-FTI Cliff Shadows Pkwy/Novat StFRI Projects Included in Interlocal Contract:

95-Cliff Shadows Pkwy/Novat St [Construction]Project Events

2/11/2016 Authorization to Proceed for Construction approved by RTC4/8/2016 Invitation to bid issued by City of Las Vegas. Bid No. ITB-15.47514-DC-0-2016/dmc

4/25/2016 Pre-Bid Conference5/31/2016 Bid Opening7/20/2016 Construction contract awarded: Las Vegas Paving Corp.

10/24/2016 Notice to Proceed for Construction issued4/21/2017 Notice of Substantial Completion issued

Las Vegas 169D-FTI PH1 Main St./Commerce St. One-Way CoupletFRI Projects Included in Interlocal Contract:

122-Main St/Commerce St Downtown Couplet, I-515 to Las Vegas Blvd (Phase I: Main-I-515 to Bonneville) [Construction]Project Events

2/13/2014 Authorization to Proceed for Construction approved by RTC for Phase I (I-515 to Bonneville Ave)2/13/2014 Project will not advertise. Negotiating guaranteed maximum price with contractor.4/16/2014 CMAR construction contract awarded for Phase I: Las Vegas Paving Corporation7/14/2014 Notice to Proceed for Construction issued9/16/2015 Notice of Substantial Completion issued for Construction

Page 34 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 35: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 169D-FTI PH2 Main St./Commerce St. One-Way CoupletFRI Projects Included in Interlocal Contract:

122-Main St/Commerce St Downtown Couplet, I-515 to Las Vegas Blvd (Phase II: Main/Commerce - Bonneville to Las Vegas Blvd) [Design/Construction]Project Events

10/6/2010 Design contract awarded: C-A Group (Also funded with Motor Vehicle Fuel Tax and Senate Bill 5)10/6/2010 Notice to Proceed for Design issued1/9/2014 Authorization to Proceed for additional Design funding approved by RTC for Phase II (Bonneville Ave to Las Vegas Blvd)5/2/2014 CMAR RFP Issued for Phase II

6/11/2014 Phase II RFP Due10/9/2014 Authorization to Proceed for Construction approved by RTC

10/15/2014 CMAR pre-construction contract awarded: Las Vegas Paving Corporation3/4/2015 Partnering facilitation services awarded: Total Quality Resources

3/16/2016 Guarantee Maximum Price issued: Las Vegas Paving Corp.5/9/2016 Notice to Proceed for Construction issued

6/16/2016 Notice of Substantial Completion issued for Design

Las Vegas 175J-FTI Meadows Neighborhood RehabilitationFRI Projects Included in Interlocal Contract:

124-Meadows Neighborhood Rehabilitation [Construction]Project Events

8/13/2015 Authorization to Proceed for Construction approved by RTC10/26/2015 Invitation to bid issued by City of Las Vegas: Bid No. ITB-15.45377-TF-0-2016/tf11/4/2015 Pre-Bid Conference1/7/2016 Bid Opening

1/14/2016 Construction contract awarded: Unicon, LLC5/9/2016 Notice to Proceed for Construction issued

11/8/2016 Notice of Substantial Completion issued

Page 35 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 36: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 178A-FTI City of Las Vegas Pedestrian Safety Upgrades - Package 1FRI Projects Included in Interlocal Contract:

102-Decatur Blvd/Eldora Ave (HAWK Signal) [Design]103-Decatur Blvd/Eldora Ave (HAWK Signal) [Construction]110-Gowan Rd/Shermcrest Wy (Ped Actuated Flasher) [Design]111-Gowan Rd/Shermcrest Wy (Ped Actuated Flasher) [Construction]129-Rancho Dr/Redondo Ave (Ped Actuated Flasher) [Design]130-Rancho Dr/Redondo Ave (Ped Actuated Flasher) [Construction]131-Sahara Ave/Las Verdes St (Ped Actuated Flasher) [Design]132-Sahara Ave/Las Verdes St (Ped Actuated Flasher) [Construction]148-Town Center Dr/Spring Gate La (Ped Actuated Flasher) [Design]149-Town Center Dr/Spring Gate La (Ped Actuated Flasher) [Construction]82-Bonanza Rd/Lillian St (Ped Actuated Flasher) [Design]83-Bonanza Rd/Lillian St (Ped actuated flasher) [Construction]86-Buffalo Dr/Gilmore Ave (Ped Actuated Flasher) [Design/Construction]

Project Events1/9/2014 Authorization to Proceed for Design approved by RTC3/5/2014 Design contract awarded: Kimley-Horn and Associates3/5/2014 Gowan Rd/Shermcrest Wy and Buffalo Dr/Gilmore Ave to be designed in-house

3/19/2014 Notice to Proceed for Design issued9/24/2015 Notice of Substantial Completion for Design issued

12/10/2015 Authorization to Proceed for Construction approved by RTC12/10/2015 In-house design complete1/28/2016 Invitation to bid issued by City of Las Vegas. Bid No. ITB-15.52607-TF-0-2016/tf2/4/2016 Pre-Bid Conference2/8/2016 No advertise deadline. Project to be constructed in-house.

2/18/2016 Bid Opening4/6/2016 Construction contract awarded: MC4 Construction

7/16/2016 Notice to Proceed for Construction issued7/21/2016 Notice to Proceed for Construction issued3/2/2017 Notice of Substantial Completion issued

Page 36 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 37: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 178B-FTI City of Las Vegas Pedestrian Safety Upgrades - Package 2FRI Projects Included in Interlocal Contract:

100-Curb Extensions (2) [Design/Construction]98-Curb Extensions (7) [Design/Construction]99-Curb Extensions (3) [Design/Construction]

Project Events1/9/2014 Authorization to Proceed for Design approved by RTC for Phase 2A (10 of 24)3/5/2014 Design contract awarded for Phase 2A (10 of 24): Parsons Brinckerhoff

3/20/2014 Notice to Proceed for Design issued2/25/2015 Design Complete

11/12/2015 Authorization to Proceed for Construction approved by RTC12/10/2015 Invitation to bid issued by City of Las Vegas: Bid #ITB-16.52608-TF-0-2016/tf12/15/2015 Pre-Bid Conference

1/7/2016 Bid Opening4/6/2016 Construction contract awarded: Drew Asphalt Paving Inc.

5/16/2016 Notice to Proceed for Construction issued11/22/2016 Notice of Substantial Completion issued

Las Vegas 178D-FTI City of Las Vegas Pedestrian Safety Street Lighting UpgradesFRI Projects Included in Interlocal Contract:

140-Street Lighting Upgrades (63) [Design/Construction]141-Street Lighting Upgrades (24) [Design/Construction]142-Street Lighting Upgrades (32) [Design/Construction]143-Street Lighting Upgrades (33) [Design/Construction]144-Street Lighting Upgrades (79) [Design/Construction]

Project Events6/12/2014 Authorization to Proceed for Design approved by RTC6/12/2014 No award deadline. Project to be designed in-house2/4/2015 Design Complete2/4/2015 Intersection assessment complete

3/12/2015 Authorization to Proceed for Construction approved by RTC3/12/2015 No advertise deadline. Lighting installation to be completed in-house.5/11/2015 Notice to Proceed for Construction issued

Page 37 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 38: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 178F-FTI Downtown Pedestrian Streetlight UpgradesFRI Projects Included in Interlocal Contract:

219-Downtown Pedestrian Streetlight Upgrades [Construction]Project Events

10/8/2015 Authorization to Proceed for Construction approved by RTC12/11/2015 Invitation to Bid issued by City of Las Vegas: Bid Number ITB-15.46348-JH-0-2016/jwh12/17/2015 Pre-bid conference1/13/2016 Bid Opening4/6/2016 Construction contract awarded: MC47/6/2016 Notice to Proceed for Construction issued3/2/2017 Notice of Substantial Completion issued

Las Vegas 179A-FTI 6th Street: Bridger Ave/Stewart AveFRI Projects Included in Interlocal Contract:

76-6th St, Bridger Ave to Stewart Ave [Design]Project Events

6/12/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Design contract awarded: Poggemeyer Design Group, Inc.7/23/2014 Notice to Proceed for Design issued

Las Vegas 180A-FTI Carson Ave: Casino Center Blvd/9th StFRI Projects Included in Interlocal Contract:

87-Carson Ave, Casino Center Blvd to 9th St [Design]Project Events

6/12/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Design contract awarded: Atkins North America7/29/2014 Notice to Proceed for Design issued

Las Vegas 181A-FTI Coolidge Ave: Main St/4th StFRI Projects Included in Interlocal Contract:

96-Coolidge Ave, Main St to 4th St [Design]Project Events

6/12/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Design contract awarded: Slater Hanifan Group7/23/2014 Notice to Proceed for Design issued

Page 38 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 39: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Las Vegas 182A-FTI Gass Ave: Main St/Charleston BlvdFRI Projects Included in Interlocal Contract:

108-Gass Ave, Main St to Charleston Blvd [Design]109-Gass Ave, Main St to Charleston Blvd [Construction]

Project Events6/12/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Design contract awarded: CH2M Hill7/28/2014 Notice to Proceed for Design issued2/9/2017 Authorization to Proceed for Construction approved by RTC4/6/2017 Invitation to bid issued by City of Las Vegas. Bid No. ITB-16.53543-JH-0-2017/jwh

4/12/2017 Pre-Bid Conference5/2/2017 Bid Opening

Las Vegas 187A-FTI Shadow La, Alta Dr to Charleston BlvdFRI Projects Included in Interlocal Contract:

133-Shadow La, Alta Dr to Charleston Blvd [Design/Construction]Project Events

12/11/2014 Authorization to Proceed for Design approved by RTC1/21/2015 Design contract awarded: Horrocks Engineers, Inc.2/2/2015 Notice to Proceed for Design issued

Las Vegas 198A-FTI2 3rd St, Fremont St to Charleston BlvdFRI Projects Included in Interlocal Contract:

227-3rd St, Fremont St to Charleston Blvd [Design/Construction]Project Events

5/18/2017 Authorization to Proceed for Design approved by RTC7/1/2017 Design contract award deadline

Mesquite 063AF-FTI PH1 Exit 118 Interchange/I-15FRI Projects Included in Interlocal Contract:

154-Exit 118 (117.5) and Lower Flat Top Mesa, I-15 to Pioneer Blvd (Phase I: Rough Grading of Lower Flat Top Dr, Pioneer Blvd to I-15) [Construction]Project Events

9/16/2014 Invitation to bid issued by City of Mesquite (Also funded with Senate Bill 5)10/14/2014 Construction contract awarded: Mesquite General Contracting, Inc.11/13/2014 Authorization to Proceed for Construction approved by RTC12/17/2014 Notice to Proceed for Construction issued

4/7/2015 Notice of Substantial Completion issued

Page 39 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 40: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

Mesquite 063AF-FTI PH2 Exit 118 Interchange/I-15FRI Projects Included in Interlocal Contract:

154-Exit 118 (117.5) and Lower Flat Top Mesa, I-15 to Pioneer Blvd (Phase II: Design/Build Interchange and Lower Flat Top) [Design/Build]Project Events

10/14/2014 Design-Build Program Management Services contract awarded: Horrocks Engineers10/17/2014 Notice to Proceed for Design-Build Program Management Services issued11/13/2014 Authorization to Proceed for Design approved by RTC2/12/2015 RFQ for Design-Build Services issued by City of Mesquite3/11/2015 SOQ submittal deadline4/9/2015 Authorization to Proceed for Construction approved by RTC for Phase II

8/11/2015 Selection of Construction Team for Design/Build, Phase II approved: Meadow Valley Construction9/8/2015 Design/Build Contract Awarded to Meadow Valley Contractors

12/9/2015 Notice to Proceed for Construction issued4/30/2016 Notice of Substantial Completion issued for Design9/2/2017 Notice of Substantial Completion issued for Construction

NDOT 128J-FTI US-95, Ann Rd to Durango DrFRI Projects Included in Interlocal Contract:

156-US-95, Ann Rd to Durango Dr [Construction]Project Events

1/8/2015 Authorization to Proceed for Construction approved by RTC2/25/2015 Invitation to bid issued by NDOT: Contract #35833/16/2015 Mandatory Pre-Bid conference4/9/2015 Bid opening6/8/2015 Construction contract awarded: Las Vegas Paving

10/12/2015 Notice to Proceed for Construction issued

NDOT 177B-FTI Interstate 11, I-515/US-95FRI Projects Included in Interlocal Contract:

155-Interstate 11, I-515 to US-95 [Construction]Project Events

11/5/2014 Invitation to bid issued by Nevada Department of Transportation11/19/2014 Pre-bid conference12/23/2014 Bid opening

2/9/2015 Construction contract awarded: Fisher Sand and Gravel Co.5/11/2015 Notice to Proceed issued

Page 40 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 41: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 007N-FTI Decatur Blvd, Chuckwagon Ave to Lone Mountain RdFRI Projects Included in Interlocal Contract:

172-Decatur Blvd, Chuckwagon Ave to Lone Mountain Rd [Design/Construction]Project Events

8/14/2014 Authorization to Proceed for Design approved by RTC10/1/2014 Design contract awarded: Stanley Consultants (Combined with 166B-FTI: Valley Dr., Cheyenne Ave. to Tropical Pkwy)11/6/2014 Notice to Proceed for Design issued1/20/2016 Invitation to bid issued by City of North Las Vegas. Bid No. ITB-1482-0-2016/CS1/26/2016 Pre-Bid Conference2/10/2016 Bid Opening4/6/2016 Construction contract awarded: Las Vegas Paving Corp.

5/31/2016 Notice to Proceed for Construction issued7/19/2017 Notice of Substantial Completion issued

North Las Vegas 007P-FTI Decatur Bl: Craig Rd/Lone Mountain RdFRI Projects Included in Interlocal Contract:

208-Decatur Blvd, Craig Rd to Lone Mountain Rd [Design/Construction]Project Events

6/11/2015 Authorization to Proceed for Design approved by RTC6/11/2015 No award deadline. Project to be designed in-house9/1/2015 Notice of Substantial Completion issued for Design

9/20/2015 Invitation to bid issued by City of North Las Vegas: Bid No. 14779/24/2015 Pre-Bid Conference10/8/2015 Authorization to Proceed for Construction approved by RTC

10/14/2015 Bid Opening12/16/2015 Construction contract awarded: Las Vegas Paving, Inc.2/29/2016 Notice to Proceed for Construction issued3/29/2016 Notice of Substantial Completion issued

North Las Vegas 016J-FTI Carey Ave: Revere St/I-15FRI Projects Included in Interlocal Contract:

161-Carey Ave, Revere St to I-15 [Construction]Project Events

12/12/2013 Authorization to Proceed for Construction/Engineering approved by RTC2/2/2014 Invitation to bid issued by City of North Las Vegas. Bid No. 1440

2/18/2014 Pre-bid conference3/5/2014 Bid Opening

4/16/2014 Construction contract awarded: Aggregate Industries, SWR, Inc.6/11/2014 Notice to proceed for Construction issued

10/21/2015 Notice of Completion issued for Construction

Page 41 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 42: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 016K-FTI Carey Ave, Revere Rd to Pecos StFRI Projects Included in Interlocal Contract:

162-Carey Ave, Revere Rd to Pecos St [Design]Project Events

8/14/2014 Authorization to Proceed for Design approved by RTC10/15/2014 Design contract awarded: Advantage Civil Design Group, LLP11/13/2014 Notice to Proceed for Design issued

North Las Vegas 035E-FTI Losee Rd: Craig Rd./CC-215FRI Projects Included in Interlocal Contract:

185-Losee Rd, Craig Rd to CC-215 (Roadway) [Construction]186-Losee Rd, Craig Rd to CC-215 (Traffic Signals) [Construction]

Project Events1/9/2014 Authorization to Proceed for Construction/Engineering approved by RTC

2/23/2014 Invitation to bid Issued by The City of North Las Vegas. Bid No. 14323/4/2014 Pre-Bid conference

3/19/2014 Bid Opening5/7/2014 Construction contract awarded: Aggregate Industries SWR, Inc.5/7/2014 Construction Management contract awarded: 4Leaf Consulting, LLC

7/14/2014 Notice to Proceed for Construction issued12/7/2016 Notice of Substantial Completion issued

North Las Vegas 035F-FTI Losee Rd/Lone Mountain Rd Pedestrian BridgeFRI Projects Included in Interlocal Contract:

184-Losee Rd at Lone Mountain Road (Ped Bridge) [Construction]Project Events

12/12/2013 Authorization to Proceed for Construction/Engineering approved by RTC1/26/2014 Invitation to bid issued by The City of North Las Vegas. Bid No. 14362/11/2014 Pre-bid Conference2/26/2014 Bid Opening4/16/2014 Construction contract awarded: Capriati Construction, Inc.4/16/2014 Construction management contract awarded: HDR Engineering, Inc.5/28/2014 Notice to Proceed for Construction issued8/5/2015 Notice of Substantial Completion issued for Construction

Page 42 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 43: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 052G-FTI North Las Vegas Traffic Signal ImprovementsFRI Projects Included in Interlocal Contract:

159-Alexander Rd/Clayton Rd [Design/Construction]160-Ann Rd/Commerce St [Design/Construction]173-Gowan Ave/Commerce St [Design/Construction]222-Bruce St/Centennial [Design/Construction]

Project Events5/15/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Design contract awarded: Slater Hanifan Group7/29/2014 Notice to Proceed for Design issued5/19/2016 In-House Design7/1/2016 Notice of Substantial Completion issued for Design

9/20/2016 Invitation to bid issued by City of North Las Vegas10/5/2016 Pre-Bid Conference

10/19/2016 Bid Opening12/7/2016 Construction contract awarded: Las Vegas Electric5/18/2017 Authorization to Proceed for Construction approved by RTC

North Las Vegas 089H-FTI Las Vegas Bl N: Evans St/Pecos RdFRI Projects Included in Interlocal Contract:

179-Las Vegas Blvd N, Evans St to Pecos Rd [Design]180-Las Vegas Blvd N, Evans St to Pecos Rd [Construction]

Project Events5/15/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Design contract awarded: Poggemeyer Design Group7/24/2014 Notice to Proceed for Design issued3/2/2016 Notice of Substantial Completion issued for Design

3/16/2016 Invitation to bid issued by City of Las Vegas: Bid # ITB-1491-0-2016/CS3/16/2016 Pre-Bid Conference4/13/2016 Bid Opening4/14/2016 Authorization to Proceed for Construction approved by RTC5/18/2016 Construction contract awarded: Addison, Inc.6/7/2016 Notice to Proceed for Construction issued

Page 43 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 44: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 089J-FTI Las Vegas Blvd, Tonopah Ave to Carey AveFRI Projects Included in Interlocal Contract:

181-Las Vegas Blvd, Tonopah Ave to Carey Ave [Design]182-Las Vegas Blvd, Tonopah Ave to Carey Ave [Design/Construction]

Project Events9/11/2014 Authorization to Proceed for Design approved by RTC11/5/2014 Design contract awarded: C.A. Group, Inc.12/8/2014 Notice to Proceed for Design issued8/13/2015 Authorization to Proceed for additional design funding approved by RTC.

North Las Vegas 133B-FTI Clayton Rd: Centennial Pkwy/Hammer LaFRI Projects Included in Interlocal Contract:

169-Clayton Rd, Centennial Pkwy to Hammer La [Design]Project Events

11/13/2014 Authorization to Proceed for Design approved by RTC1/7/2015 Design contract awarded: HDR Engineering, Inc.

1/15/2015 Notice to Proceed for Design issued2/11/2016 Notice of Substantial Completion issued for Design

North Las Vegas 148D-FTI PH1 Simmons St: Cheyenne Ave/Red Coach Ave.FRI Projects Included in Interlocal Contract:

190-Simmons St, Cheyenne Ave to Red Coach Ave (Phase I: Cheyenne Ave to Alexander Rd) [Construction]Project Events

1/9/2014 Authorization to Proceed for Construction/Engineering approved by RTC2/27/2014 Invitation to bid issued by The City of North Las Vegas. Bid No. 1433 - Phase I3/12/2014 Pre-bid conference4/2/2014 Bid opening5/7/2014 Construction contract awarded: Aggregate Industries SWR, Inc.

6/23/2014 Notice to Proceed for Construction issued

Page 44 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 45: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 148D-FTI PH2 Simmons St: Cheyenne Ave/Red Coach Ave.FRI Projects Included in Interlocal Contract:

190-Simmons St, Cheyenne Ave to Red Coach Ave (Phase II: Alexander Rd to Red Coach Ave) [Construction]Project Events

1/9/2014 Authorization to Proceed for Construction/Engineering approved by RTC9/7/2014 Invitation to bid issued by The City of North Las Vegas. Bid No. 1446 - Phase II

9/16/2014 Pre-bid conference10/8/2014 Bid opening

11/19/2014 Construction Management contract awarded: VTN Nevada12/3/2014 Construction contract awarded: Pace Contracting1/26/2015 Notice to Proceed for Construction issued

North Las Vegas 166B-FTI Valley Dr, Cheyenne Ave to Tropical PkwyFRI Projects Included in Interlocal Contract:

191-Valley Dr, Cheyenne Ave to Tropical Pkwy [Design/Construction]Project Events

8/14/2014 Authorization to Proceed for Design approved by RTC10/1/2014 Design contract awarded: Stanley Consultants (Combined with 007N-FTI: Decatur Blvd, Chuckwagon Ave to Lone Mountain Rd)11/6/2014 Notice to Proceed for Design issued12/2/2015 Notice of Substantial Completion issued for Design1/20/2016 Invitation to bid issued by City of North Las Vegas. Bid No. ITB-1482-0-2016/CS1/26/2016 Pre-Bid Conference2/10/2016 Bid Opening4/6/2016 Construction contract awarded: Las Vegas Paving Corp.

5/31/2016 Notice to Proceed for Construction issued7/19/2017 Notice of Substantial Completion issued

Page 45 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 46: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 170B-FTI Centennial Pkwy: Camino Eldorado/Lamb BlFRI Projects Included in Interlocal Contract:

163-Centennial Pkwy, Camino Eldorado to Lamb Blvd [Construction]167-Centennial/Black Oaks St [Construction]

Project Events5/15/2014 Authorization to Proceed for Construction approved by RTC6/12/2014 Invitation to bid issued by the City of North Las Vegas. Bid No. 14346/24/2014 Pre-bid Conference7/15/2014 Bid opening8/6/2014 Construction management support service contract awarded: G.C. Wallace9/3/2014 Construction contract awarded: Meadow Valley

10/1/2014 Construction Management contract awarded: CM Works, Inc.1/5/2015 Notice to Proceed for Construction issued

4/15/20169/7/2016 Notice of Substantial Completion issued

North Las Vegas 173B-FTI Sawtooth Infill: N. 5th St: Alexander Rd/Centennial PkwyFRI Projects Included in Interlocal Contract:

187-N. 5th St, Alexander Rd to Centennial Pkwy [Construction]Project Events

12/12/2013 Authorization to Proceed for Construction/Engineering approved by RTC1/26/2014 Invitation to bid issued by The City of North Las Vegas. Bid No. 14422/4/2014 Pre-bid conference

2/12/2014 Bid Opening5/21/2014 Construction contract awarded: Aggregate Industries, SWR8/19/2014 Notice to Proceed for Construction issued7/19/2017 Notice of Substantial Completion issued

Page 46 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 47: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 173C-FTI PH1 Sawtooth Roads II - Alexander RdFRI Projects Included in Interlocal Contract:

157-Alexander Rd, N. 5th St to Losee Rd [Design]215-Alexander Rd, N. 5th St to Losee Rd [Construction]

Project Events5/15/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Alexander Rd: Design contract awarded: Kimley-Horn and Associates7/29/2014 Notice to Proceed for Design issued5/3/2016 Invitation to bid issued by City of North Las Vegas. Bid No. ITB-1486-0-2016/CS5/3/2016 Notice of Substantial Completion issued for Design

5/17/2016 Pre-Bid Conference5/31/2016 Bid Opening7/14/2016 Authorization to Proceed for Construction approved by RTC8/17/2016 Construction contract awarded: Tand, Inc.

11/16/2016 Construction Management Services contract awarded: 4LEAF Consulting LLC

North Las Vegas 173C-FTI PH2 Sawtooth Roads II - Commerce RdFRI Projects Included in Interlocal Contract:

170-Commerce St, Cheyenne Ave to Centennial Pkwy [Design]171-Commerce St, Cheyenne Ave to Centennial Pkwy [Construction]

Project Events5/15/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Commerce St: Design contract awarded: CH2M Hill Engineers, Inc.7/29/2014 Notice to Proceed for Design issued7/14/2016 Authorization to Proceed for Construction approved by RTC3/7/2017 Invitation to bid issued by City of North Las Vegas. Bid No. ITB-1487-0-2017/CS (Commerce)

3/22/2017 Pre-Bid Conference (Commerce)4/11/2017 Bid Opening (Commerce)5/15/2017 Notice of Substantial Completion issued for Design6/21/2017 Construction contract awarded: Las Vegas Paving

Page 47 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 48: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 173C-FTI PH3 Sawtooth Roads II - Gowan RdFRI Projects Included in Interlocal Contract:

174-Gowan Rd, Allen La to Losee Rd [Design]175-Gowan Rd, Allen La to Losee Rd [Construction]

Project Events5/15/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Gowan Rd: Design contract awarded: Jacobs Engineering Group7/29/2014 Notice to Proceed for Design issued

12/14/2016 Notice of Substantial Completion issued for Design5/18/2017 Authorization to Proceed for Construction approved by RTC

North Las Vegas 173C-FTI PH4 Sawtooth Roads II - Revere StFRI Projects Included in Interlocal Contract:

189-Revere St, Carey Ave to Colton Rd [Design]Project Events

5/15/2014 Authorization to Proceed for Design approved by RTC7/16/2014 Revere St: Design contract awarded: Parsons Brinckerhoff7/29/2014 Notice to Proceed for Design issued

North Las Vegas 173C-FTI PH5 Sawtooth Roads II - N. 5th StFRI Projects Included in Interlocal Contract:

224-N. 5th St/Centennial Pkwy [Design]225-N. 5th St/Centennial Pkwy [Construction]

Project Events7/14/2016 Authorization to Proceed for Construction approved by RTC

Page 48 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 49: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 178C-FTI Pedestrian Upgrades: Rapid Flashing Crossing ImprovementsFRI Projects Included in Interlocal Contract:

158-Alexander Rd/Arcata Wy [Design/Construction]164-Centennial Pkwy/Bruce St [Design/Construction]165-Centennial Pkwy/Donna St [Design/Construction]166-Centennial Pkwy/Goldfield St [Design/Construction]178-Lake Mead Blvd/Bassler St [Design]183-Las Vegas Blvd/McCarran St [Design]188-N. 5th St/Las Vegas Wash (N. of Craig Rd) [Design/Construction]216-Pecos Rd/Geist Ave [Design]217-Martin L King Blvd/June Ave [Design/Construction]223-Martin Luther King Blvd/Brooks Ave [Construction]

Project Events5/15/2014 Authorization to Proceed for Design approved by RTC7/2/2014 Design contract awarded: Stanley Consultants, Inc.

7/22/2014 Notice to Proceed for Design issued3/12/2015 Authorization to Proceed for Construction approved by RTC6/3/2015 Notice of Substantial Completion issued for Design6/8/2015 Invitation to bid issued by City of North Las Vegas. Bid #1467

6/24/2015 Pre-Bid conference7/14/2015 Bid opening8/19/2015 Construction contract awarded : Mc4 Construction8/19/2015 Construction contract awarded: Mc4 Construction

12/14/2015 Notice to Proceed for Construction issued2/3/2016 Design contract awarded: Stanley Consultants, Inc.2/3/2016 Notice to Proceed for Design issued

4/15/2016 Notice of Substantial Completion issued4/15/2016 Notice of Substantial Completion issued for Construction5/19/2016 Authorization to Proceed for Construction approved by RTC5/31/2016 Notice of Substantial Completion issued for Design8/19/2016 Construction contract awarded: Mc4 Construction

11/28/2016 Notice of Substantial Completion issued12/21/2016 Notice of Substantial Completion issued

Page 49 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 50: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

North Las Vegas 178G-FTI Neighborhood Rehab: Donna St and Tonopah AveFRI Projects Included in Interlocal Contract:

221-Donna St (McCall Elementary) and Tonopah Ave (JD Smith Middle) Pedestrian Upgrades [Design/Construction]Project Events

2/8/2016 Notice to Proceed for Design issued2/11/2016 Authorization to Proceed for Design approved by RTC2/25/2016 Design Contract Awarded: HDR Engineering Inc.4/30/2017 Invitation to bid issued by the City of North Las Vegas. Bid No. 15185/9/2017 Pre-Bid Conference

5/30/2017 Bid Opening7/13/2017 Authorization to Proceed for Construction approved by RTC

North Las Vegas 188B-FTI Tropical Pkwy/Hollywood Blvd, Linn Ln to I-15FRI Projects Included in Interlocal Contract:

176-Tropical Pkwy/Hollywood Blvd, Linn Ln to I-15 [Design/Construction]Project Events

3/10/2016 Authorization to Proceed for Design approved by RTC5/18/2016 Design contract awarded: The Louis Berger Group, Inc.5/24/2016 Notice to Proceed for Design issued

RTC 003X-FTI Maryland Pkwy, Stewart Ave to Russell RdFRI Projects Included in Interlocal Contract:

193-Maryland Pkwy, Stewart Ave to Russell Rd [Design]Project Events

2/9/2015 Request for Proposals Advertise #15-056 (Issued by RTC)5/21/2015 NEPA and preliminary engineering contract awarded: Parsons Transportation Group6/1/2015 Notice to Proceed issued

RTC 013D-FTI Transportation Investment Strategy StudyFRI Projects Included in Interlocal Contract:

194-Paradise Rd/Swenson St, Russell Rd to Sahara Ave [Design]Project Events

11/12/2013 Professional Services RFP Advertise #14-089 (Issued by RTC)11/21/2013 Pre-proposal meeting12/18/2013 Proposal submission deadline3/13/2014 Top rated firm approved by RTC: Michael Gallis and Associates4/10/2014 Study contract awarded: Michael Gallis and Associates4/14/2014 Notice to Proceed issued

12/31/2015 Notice of Substantial Completion issued for Design

Page 50 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 51: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

RTC 157D-FTI Flamingo Rd: Boulder Hwy/Hualapai WyFRI Projects Included in Interlocal Contract:

192-Flamingo Rd, Boulder Hwy to Hualapai Wy [Design/Construction]Project Events

5/16/2013 Design contract awarded: GC Wallace4/3/2014 RFP Advertise #14-106 (Issued by RTC)

4/10/2014 Pre-proposal meeting4/24/2014 Proposal submission deadline6/12/2014 CMAR Phase I Pre-Construction services contract awarded: Las Vegas Paving7/1/2014 NTP issued for CMAR Phase I Pre-Construction services

3/12/2015 CMAR Guarantee Maximum Price approved by RTC Board: Las Vegas Paving3/12/2015 Special Inspections contract awarded by RTC Board: GES, Inc.4/6/2015 Notice to Proceed for Construction issued

RTC FAST 144R-FTI Western/Southern 215 Beltway and Arterial ITSFRI Projects Included in Interlocal Contract:

195-CC-215, I-15 to Cheyenne Ave [Construction]196-CC-215, I-15 to I-515 [Construction]

Project Events2/13/2014 RFSOQ Advertise #14-095, CL-2014-136 (Issued by RTC)2/20/2014 Pre-proposal meeting3/12/2014 Statement of Qualifications Due4/10/2014 RFQ Short List Approved by RTC Board: Las Vegas Electric, The Acme Electric, TransCore4/16/2014 RFP issued to short listed firms5/14/2014 Proposals due6/12/2014 Design-Build contract awarded to: TransCore ITS LLC7/1/2014 Notice to Proceed for Design-Build issued

9/25/2015 Notice of Substantial Completion issued for Construction12/31/2016 Notice of Substantial Completion issued

Page 51 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted

Page 52: Regional Transportation Commission of Southern Nevada Fuel ... · 5/3/2016 Construction contract awarded: Aggregate Industries SWR, Inc. 4/21/2017 Notice to Proceed for Construction

Entity RTC Project NameRTC Project #

RTC FAST 144S-FTI Northern 215 Beltway and Arterial ITSFRI Projects Included in Interlocal Contract:

197-CC-215, Tenaya Way to Aliante Pkwy [Construction]198-Nellis Blvd, Lake Mead Dr to Flamingo Rd [Construction]199-Stewart Ave, Pecos Rd to Nellis Blvd [Construction]

Project Events2/13/2014 RFSOQ Advertise #14-094, CL-2014-135 (Issued by RTC)2/20/2014 Pre-proposal meeting3/12/2014 Statement of Qualifications Due4/10/2014 RFQ Short List Approved by RTC Board: Las Vegas Electric, The Acme Electric, TransCore4/16/2014 RFP issued to short listed firms5/14/2014 Proposals due6/12/2014 Design-Build contract awarded to: Las Vegas Electric, Inc7/1/2014 Notice to Proceed for Design-Build issued

9/25/2015 Notice of Substantial Completion issued for Construction6/14/2016 Notice of Substantial Completion issued

Total # of FRI Projects with approved Authorization to Proceed: 205(Project phases listed are counted as a single project)

Page 52 of 52Updated: 10/3/2017 Dates and information shown are subject to change. Please contact the entity issuing the bid for the latest details.Items added/revised on this date are highlighted

RPTATPforWebHighlighted