100 Climate Solutions Project Campaign ~ 2016 Waste Water REGIONS OF CLIMATE ACTION Summary Mandating Authority : Expected project CAPEX : Main stakeholders Project Type : Social and environmental impact Location and population Water supply and collection for the Mario Lago community Reduced pollution of the local aquifer; drip irrigation; improved agroforestry productivity. The project seeks to provide a water supply and collection network to a peri-urban com- munity who lives from agroforestry. The project includes rainwater collection and storage; the activation of existing wells and provision of a new one; grey and drainage water reuse; and collection and transport of blackwater to the treatment plant. Riberâo Preto Municipality 450’000 € 264 families, MST SP, Cooperafloresta, Municipality of Hioeirâo Water infrastructure Riberão Preto, Sâo Paulo, Brazil 590’000 inh.

REGIONS OF Mario Lago community€¦ · and collection and transport of blackwater to the treatment plant. Riberâo Preto Municipality 450’000 € 264 families, MST SP, Cooperafloresta,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REGIONS OF Mario Lago community€¦ · and collection and transport of blackwater to the treatment plant. Riberâo Preto Municipality 450’000 € 264 families, MST SP, Cooperafloresta,

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Waste W

ater

REGIONS OFCLIMATE ACTION

Summary

Mandating Authority :

Expected project CAPEX :

Main stakeholders

Project Type :

Social and environmental impact

Location and population

Water supply and collection for the Mario Lago community

Reduced pollution of the local aquifer; drip irrigation; improved agroforestry productivity.

The project seeks to provide a water supply and collection network to a peri-urban com-munity who lives from agroforestry. The project includes rainwater collection and storage; the activation of existing wells and provision of a new one; grey and drainage water reuse; and collection and transport of blackwater to the treatment plant.

Riberâo Preto Municipality

450’000 €

264 families, MST SP, Cooperafloresta, Municipality of Hioeirâo

Water infrastructure

Riberão Preto, Sâo Paulo, Brazil 590’000 inh.

Page 2: REGIONS OF Mario Lago community€¦ · and collection and transport of blackwater to the treatment plant. Riberâo Preto Municipality 450’000 € 264 families, MST SP, Cooperafloresta,

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Comments

STAGE 3 : Feasibility Studies

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study :

Feasibility study :

Engineering, Procurement and Construction Contractor

Operation and Maintenance Contractor

STAGE 5 : Engineering / Construction / Commercial Operation

Building permits signed

STAGE 4 : Permitting / Financing / Contracts

Land concession signed

Environmental impact study

Identified sources of fundings

Project maturity ( IFC / World Bank Categories )

STAGE 1 : Concept Development, Site identification

Technology :

Land identified

Site access :

Expected capacity

Adequate road Rail access Port facilities

Waste water stream data 

STAGE 1 : Concept Development, Site identification

STAGE 2 : Pre-Feasibility Studies

STAGE 3 : Feasibility Studies

STAGE 4 : Permit t ing / Financing / Contracts

STAGE 5 : Engineering/Construction/Commercial Operation

This is a water and sanitation project, not a waste project. Due to the lack of an official form for water projects, this form is used instead. This project is related to (and part of) the Land Rehabilitation Project in the same community.

Low tech for rainwater collection and storage. greywater filtration through plants and bioenergy for the pumps.

Yes 2011

No

Yes

Yes

Not yet specified

Not yet specified

Yes

Not yet specified

40, 150m3/yr in 23km of network

Since a water supply collection system does not exist in the com-munity, there is no data collection

Yes, Mario Lago, Hibelrâo Preto, SP, Brazil