LOT B
7/29/2019 Rehabailitation Clarification 2012.3.27
2/22
* note : No tree planting is Permitted on areas where the topopgraphic gradient exceeds 30 degre
7/29/2019 Rehabailitation Clarification 2012.3.27
3/22
7/29/2019 Rehabailitation Clarification 2012.3.27
4/22
s.
7/29/2019 Rehabailitation Clarification 2012.3.27
5/22
Plant Estimated Qty & Soil Condition
plantEffluent Pit B1
(Type 1A)
uen
B2 (TypeEffluent Pit
B3 (Type 1B)
Gatch Pit B1
(Type 2)
Gatch Pit B2
(Type 2)
Soil Condition (refer to Table 1) Uncontaminated Soil
Alternate
Ecotoxicity
Primary
Ecotoxicity
Primary
Ecotoxicity
Primary
Ecotoxicity
Area (m2) 51,138 62,398 47,658 112,443 112,838
Soil Amendment (m2) 51,000 31,200 24,000
High irrigation : 50cm long anf
10cm diameter at 2m spacing72 1,750 1,750 2,150 2,900
Low irrigation : 50cm long anf
7.5cm diameter72 1,750 1,750
Plant as per plant list : Nurserygrown, 1 growing seasov old at2m spacing
Plant as per
plant list :
Nursery grown,
1 growingseasov old at
2m spacing
Plants and
Materials Six
planting
blocks 48m x
48m to
include
Nursery
grown plants,1 growing
season old,
at 1m
spacing
incorporating:
Plants and
Materials Six
planting
blocks 48m x
48m to
include
Nursery
grown plants,1 growing
season old,
at 2m
spacing
incorporating:
Nurserygrown, 1growingseasov old at2m spacing :2,000ea
Nurserygrown, 1growingseasov old at2m spacing :2,650ea
S1 : Rhanterium epapposum 25 600 600
S2 : Nitraia retusa 25 600 600
G1 : Panicum turgidum 25 600 600
G2 : Cyperus conglomeratus 25 600 600
L1 : Astragalus spinosus 50 1,200 1,200
Trees : Nursery grown, 1 growing
season old at minimum 3m
s acinT1: Acacia gerrardii(Pachyceras) 17 23
T2 : Prosopis Farcath 17 23
T3 : Ziziphus spina-christi 17 23
7/29/2019 Rehabailitation Clarification 2012.3.27
6/22
7/29/2019 Rehabailitation Clarification 2012.3.27
7/22
Sludge Pit B1
(Type 1C)Sludge Pit B2
on am na e
d total
Primary
Ecotoxicity
Primary
Ecotoxicity
Primary
Ecotoxicity
13,751 149,249 2,972 552,447
7,000 149,000 262,200
430 9,052
430 4,002
Plants and
Materials Six
planting
blocks 24m x
24m to
include
Nursery
grown plants,1 growing
season old,
at 2m
spacing
incorporating:
4,650
150 1,375
150 1,375
150 1,375
150 1,375
300 2,750
40
40
40
7/29/2019 Rehabailitation Clarification 2012.3.27
8/22
Rebabilitation Characterisation Plan(Monitoring)_ Lot B
1. Testing and assessment frequency
Sampling / AssessmentTime
Soil Pollutionsuite
Soil suite Survivorshipper species
Plant height
and width perspecies
Pre - installation of
plants (one week before
planting)
1 1
Installation of plants
(November to January)1
End of first Growing
season (April only)1 1 1
Start of second growing
season (December only) 1 1 1
End of Second growing
Season (April only)1 1 1 1
Total Testing 2 4 3 4
From each Composite sample, remove approximately 1 kg of
soil and place into a sample bag. Seal the bags with an
identification number. A polyethylene bag or glass jar is
permitted.
Soil Sample Botanical Survey
2. Soil Sampling methodology
Each composite sample shall consist of 10 sub-samples taken
from randomised locations within the block. Collect the sample
as follows:
Depth 1 Surface.; collect 10 sub samples from a depth of
0cm 25 cm. If using a soil probe, each sub-sample will
consist of one (1) core. If using a shovel each sub-sample
will consist of approximately 125g of soil.
Depth 2 - Sub surface collect 10 sub samples from a depth
of 25 cm 60 cm. If using a soil probe, each sub-sample will
consist of one (1) core. If using a shovel each sub-sample
will consist of approximately 125g of soil.
7/29/2019 Rehabailitation Clarification 2012.3.27
9/22
7/29/2019 Rehabailitation Clarification 2012.3.27
10/22
Pre Post
ItemMoM
Ref.Description Remarks
Estimated
Q'ty
Estimated
Q'tyTotal Q'ty Unit
Rate
(KD)
1 Soil Sample
1.1 Soil Pollution Suite
1.1.1 Depth 1 Surface(0-25cm) EPB1 1 1 2 ea
EPB2 6 6 12 eaEPB3 6 6 12 ea
SPB1 6 6 12 ea
GPB1 6 6 12 ea
GPB2 6 6 12 ea
1.1.2 Depth 2 Sub-Surface(25-60cm) EPB1 1 1 2 ea
EPB2 6 6 12 ea
EPB3 6 6 12 ea
SPB1 6 6 12 ea
GPB1 6 6 12 ea
GPB2 6 6 12 ea
1.2 Soil suite
1.2.1 Depth 1 Surface(0-25cm) EPB1 1 3 4 ea
EPB2 6 18 24 ea
EPB3 6 18 24 ea
SPB1 6 18 24 ea
GPB1 6 18 24 ea
GPB2 6 18 24 ea
1.2.2 Depth 2 Sub-Surface(25-60cm) EPB1 1 3 4 ea
EPB2 6 18 24 ea
EPB3 6 18 24 eaSPB1 6 18 24 ea
GPB1 6 18 24 ea
GPB2 6 18 24 ea
7/29/2019 Rehabailitation Clarification 2012.3.27
11/22
Total
Amount
KD
7/29/2019 Rehabailitation Clarification 2012.3.27
12/22
Planting Schedule
PIT Type Planting Schedule
EPB1 1A 15th November 2012 to 15th December 2012
EPB2 1B 15th November 2013 to 15th December 2013
EPB3 1B 15th November 2013 to 15th December 2013
SPB1 1C 15th November 2013 to 15th December 2013GPB1 2 1th November 2013 to 31th January 2014
GPB2 2 1th November 2013 to 31th January 2014
* note : Aftercare & Maintenance period (18month)
Until 24th March 2015
7/29/2019 Rehabailitation Clarification 2012.3.27
13/22
* note :
7/29/2019 Rehabailitation Clarification 2012.3.27
14/22
* Irrgation Water
7/29/2019 Rehabailitation Clarification 2012.3.27
15/22
7/29/2019 Rehabailitation Clarification 2012.3.27
16/22
refer to Drawing
Submit the certificate of Irrigation Water
7/29/2019 Rehabailitation Clarification 2012.3.27
17/22
1. IRRIGATION TYPE AND INSTALLATION
2. PLANT PROCUREMENT AND DELIVERY
7/29/2019 Rehabailitation Clarification 2012.3.27
18/22
7/29/2019 Rehabailitation Clarification 2012.3.27
19/22
3. PLANTING PROCEDURES AND LAYOUT
7/29/2019 Rehabailitation Clarification 2012.3.27
20/22
4. AFTERCARE AND MAINTENANCE