RELIABILITY & EFFICIENCY OF
DISTRIBUTION TRANSFORMER
FROM WBSEDCL PERSPECTIVE
Since last 3 years, WBSEDCL is
procuring nearly 10,000 DTRs per year
on an average.
At present there are nearly 2.5 Lac
DTRs to cater consumer base of 1.65
crore in WBSEDCL system.
Present Scenario Of WBSEDCL System
10 KVA
16 KVA
25 KVA
50 KVA
63 KVA
100 KVA
150 KVA
160 KVA
200 KVA
250 KVA
315 KVA
400 KVA
500 KVA
630 KVA
1000 KVA
DTRs IN WBSEDCL SYSTEM
Subsequently, WBSEDCL started procuring
DTRs with dynamic loss figures (within IS
Limit) evaluated as per Loss- Capitalisation
formula.
Subsequently, with the Introduction of BEE
Star Rating, WBSEDCL started procuring
energy-efficient transformers with dynamic
loss figures evaluated on Loss- Capitalisation
formula.
Previously, WBSEDCL used to procure DTRs
with No-load Loss & Load-Loss figures as per
relevant IS.
Now, with the enactment of Quality Control
order (BIS Marking), WBSEDCL has just started
procuring BIS compliant Transformers with
Level-2 Loss figure without Loss Capitalization.
WBSEDCL is also procuring DTRs from BIS
certified manufacturers having certification of
BIS Level-2.
Since, last 6 years, WBSEDCL has introduced
testing of DTR after delivery at store.
ALLOWABLE LIMIT OF OIL AND WINDING
TEMPERATURE RISE
Before Now
As per IS 2026 As per IS 1180 Part-I of 2014
WB
SE
DC
L S
YS
TE
M
Preventive measures to arrest failure rate of DTR
1. Sizing of DTR – Twice the calculated Load. This will
reduce the Total Owning Cost of DTR.
2. Avoid single phasing of DTR as far as practicable.
3. Installation of RMU in Urban area at HT side for
better protection of DTR.
4. Periodical Health Checkup of DTR
5. Ensuring better DTR quality by procuring low loss
DTR with low temp. rise
DTR Meter
DTR
As part of energy management scheme WBSEDCL has
started installing DTR meters on each and every DTR
in a phased manner with provision of remote metering
in urban areas.
This facility will be extended to DTRs installed in
rural area through DDUGJY Project
Statistics Of DTR Meter Installed – Urban Area
Total DTR Meter Installed=43502
Reading Through Remote
Sensing=22894
Manual (By LPR)
Reading=20608
As a preventive measure, WBSEDCL is
conducting the following periodical health
checkup of DTRs
Load Balancing from DTR meter data &
physical measurement.
Decision for Augmentation of DTR size
from DTR meter data.
Oil Condition and level of Oil from
Health Check – up data.
Strengthening of DTR Earthing where
required.
Terminal Connection and Protective
Device Checking