Textron, Inc. Former Gorham Manufacturing Facility, Providence, RI Remedial Action Completion Report: Phase II Area – Mashapaug Inner Cove, Phase III Area – Northeast Upland And Parcel C Project No.: 3652160001 February 12, 2016
FIGURES
SITELOCATION
¯ 0 2,0001,000Feet
Former Gorham Manufacturing Site333 Adelaide Avenue
Providence, RI
1:24,000 scale digital topographic mapobtained from Rhode Island GeographicInformation System (RIGIS) at:http://www.edc.uri.edu/rigis
Figure 1Project 3652-16-0001
Site Location Map
H:\Textron-Gorham\Providence_RI\Task3\MXD\Fig1_SiteLocationMap.mxd January 20, 2016 DWN: emily.gardiner CHKD: AKN
Mashapaug Inner Cove
Mashapaug Pond
Parcel C-1
Parcel CPlanned Grass Fields
Parcel BHigh School
Parking Lot
Parcel ARetail
Adelaide Avenue
Railroad Tracks
Storm WaterDetention Basin
Crescent Street
AccessGate
AccessGate
AccessGate
Mashapaug Outer Cove
FormerSlag Area
LegendApproximate Parcel Boundary
¯ 0 15075Feet
Site PlanFormer Gorham Manufacturing Site425 Adelaide Avenue
Providence, RI Project 3652-16-0001 Figure 2
Note: 2011 Ortho photo obtained from Rhode Island Geographic Information System (RIGIS)
H:\Textron-Gorham\Providence_RI\Task3\MXD\Fig2_SitePlan.mxd January 20, 2016 DWN: emily.gardiner CHKD: AKN
DOL
DOL
DOLDO
L
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
D OL
DOLDOL
DOL
DOL
DOL
DOL
DOLDOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
DOL
Detention Basin
LegendDOL Limit of Disturbance
Approximate Site BoundaryPhase III Perimeter Wetland 12'' Soil with Geofabric, Limited Clearing of BrushPhase I Soil Cap with Geofabric Completed Nov. 201212" Soil Cap with GeofabricApproximate EasementApproximate Parcel BoundaryElevation
¯ 0 15075Feet
Three Phased RemediationFormer Gorham Manufacturing Site333 Adelaide Avenue
Providence, RI Project 3652-16-0001 Figure 3
AmtrakAccess Road
Sewer Easement
City Sewer Easement
Perimeter Wetland12 inch soil cap over marker fabricseed and hydromulch woody plants, Limited Clearing
Fringe wetlandup to 12 inch topsoilseed mixshrubs
Inner CoverDredge -2 feet place sand +1 foot1-2 feet organics soil within 10 feet of shore
Former CarriageHouse Area -Inner Cove
Sediment Placement
H:\Textron-Gorham\Providence_RI\Task3\MXD\Fig3_ThreePhasedRemediation.mxd January 26, 2016 DWN: emily.gardiner CHKD: AKN
@A
@A
@A
@A
@A@A@A
@A
@A
@A
@A
@A@A
@A@A
@A
@A
@A
@A@A@A@A
@A@A
@A
SITELOCATIONDP-HDP-C
DP-M
DP-DDP-K
DP-L
DP-J
MW-240
MW-239
MW-241
MW-242
MW-232D
MW-237DMW-236D
MW-236S
MW-235DMW-235S
MW-232S
MW-111D
MW-B/B-2
MW-C/B-3
MW-D/B-4MW-FS/B-6S
MW-FD/B-6D
MW-237S
Detention Basin
¯ 0 14070Feet
Former Gorham Manufacturing Site333 Adelaide Avenue
Providence, RI Figure 4Project 3652-16-0001
Parcel C Groundwater Wells
H:\Textron-Gorham\Providence_RI\Task3\MXD\Fig4_ParcelCGroundwaterWells.mxd January 26, 2016 DWN: emily.gardiner CHKD: AKN
Legend@AExisting Monitoring Wells@AAbandoned Monitoring Wells
Approximate Site BoundaryElevation