Upload
christopher-gullett
View
59
Download
1
Embed Size (px)
Citation preview
Renewability Review
CRITICAL SUSTAINABILITYPERIMETER ROADS
CIVIL ENGINEERING AND CRITICAL PROCESS-THIS PERIMETER ROAD WAS REPAVED AND NOT OPEN TO THE PUBLIC YET BEFORE FEELING THE
EFFECTS OF A FRESH RAIN STORM. ~Newport Back Bay.
Modern Approach – Macys South Coast Plaza. One of Henry Segerstroms last gifts ~ 2015
Newport Coast Estuary – Cautionary Environments ~EXPANDING AND CONTRACTING OF THE TIDES~
CLIMATE –Jury is still out but surf is up in Huntington Beach 2015.
WIND TURBINES Captains of the Renewable Team
Architecture and Design
Wineries
Snapshots
Libraries
Airports
UTILITY SCALE GRID UPGRADES
SKY NOON