www.qualsurv.co.uk RENEWABLE ENERGY GENERATION INTERNATIONAL Commercial Solutions in Construction

RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

  • Upload
    lydang

  • View
    216

  • Download
    1

Embed Size (px)

Citation preview

Page 1: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

www.qualsurv.co.uk

RENEWABLE ENERGY GENERATION

INTERNATIONAL

Commercial Solutions in Construction

Page 2: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

INTERNATIONALwww.qualsurv.co.uk

WIND ENERGY PROJECTS

RENEWABLE ENERGY PROJECTS

•BarrowoffshoreWindFarm,90MWe / 2006

•Q7PrincessAmaliaWindPark,120MWe / Completed July 2008

•Belwindphase1,165MWe / Completed December 2010

•Northwind,216MWe / Financial Close May 2012

•Belwindphase2,165MWe / Project Initiation

Page 3: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

INTERNATIONALwww.qualsurv.co.uk

RENEWABLEENERGYPROJECTS

Q7 PRINCESS AMALIA WIND PARK

The Princess Amalia offshore Windfarm is located in

block Q7 of the Dutch Continental Shelf. This block is

located 23 km from the shore where the water is 19

to 24 metres deep. This project was the first offshore

windfarm to be constructed in deep waters and at such

a distance from the shore (beyond the 12-mile limit).

The Princess Amalia comprised 65 no. wind turbine

structures on mono-pile foundations linked by a low

voltage cable network to an offshore high voltage

substation, with a 30km HV export cable to the land

base.

QUALSURV provided contract and commercial advice

on behalf of the employer throughout the construction

phase of the project including defence of contractor

claims, forensic planning, dispute resolution and delay

analysis.

Page 4: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

INTERNATIONALwww.qualsurv.co.uk

RENEWABLEENERGYPROJECTS

BELWIND 1 OWF

Belguim’s largest energy project consists of 55 no.

Vestas V90 3MW turbines with a maximum output

of 165 MW. Belwind covers a surface of 17 km² and

is set up on the Bligh Bank, 46 km off the coast of

Zeebrugge. This sandbank is outside the shipping

routes and outside territorial waters, the area the

government delimited for wind farms.

The 55 turbines are connected by 33 kV sea cables

to an offshore high-voltage station. A 150 kV cable

connects the station to an onshore high-voltage

station, and then to the Belgian high-voltage grid in

Zeebrugge.

QUALSURV provided contract specialist services to

the project team including the provision of advice and

assistance in respect of the use and interpretation

of FIDIC yellow book form of contract, commercial

support, assistance with change management and

control, preparation and management of client

claims, defense of contractor claims, report writing for

management and participation in project management

tasks.

Page 5: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

INTERNATIONALwww.qualsurv.co.uk

RENEWABLEENERGYPROJECTS

ENERGY from WASTE PROJECTS

•DeesideCHPEnergyfromWastePlant

•IntegratedWasteManagementProjects–MiddleEast

•AtherstoneRenewableEnergyPark •AnaerobicDigestion

•Biomass

•SandwellCHPEnergyfromWastePlant

Page 6: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

INTERNATIONALwww.qualsurv.co.uk

RENEWABLEENERGYPROJECTS

DEESIDE CHP ENERGY FROM WASTE PLANT

QUALSURV are co-developing a 12 MWe combined heat and power plant with CHO

Power for a major international industrial conglomerate in the UK. The advanced

gasification plant will run on 50,000t/year of Solid Recovered Fuel sourced from

Commercial and Industrial Waste streams.

Page 7: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

INTERNATIONALwww.qualsurv.co.uk

RENEWABLEENERGYPROJECTS

INTEGRATED WASTE MANAGEMENT

The existing waste management arrangements in

many Middle Eastern countries require improvement

and QUALSURV have produced an Integrated

Waste Management Strategy which will promote the

introduction of world-class collection, processing

and disposal systems. Qualsurv are managing the

development design, procurement, construction and

operation of these systems to provide long-term

environmentally sustainable waste management

solutions for a number of Middle Eastern countries,

their people, visitors and the environment. Schemes

include waste collection and recycling stations, Material

Recovery Facilities and CHP Energy from Waste Plants.

Page 8: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

INTERNATIONALwww.qualsurv.co.uk

RENEWABLEENERGYPROJECTS

ATHERSTONE RENEWABLE ENERGY PARK

This project is for the redevelopment of a disused

shale tip adjacent to the site of a former colliery into a

renewable energy park.

This £20m brownfield development consists of the

design and construction of a 3ha platform suitably

prepared for the installation of 2MWe Anaerobic

Digestion and 4.5 MWe Biomass waste to energy

plants. The infrastructure phase consists of a 500,000

m3 earthworks operation, deep drainage and the

construction of access roads and service corridors

together with extensive landscape planting.

QUALSURV is providing strategic advice, project

management and construction services to the client.

Activities includes an overall development planning,

budget preparation and forecasting, procurement

and supervision of a ground investigation contract,

procurement and management of the infrastructure

design contract, and procurement and supervision of

infrastructure construction contracts.

Page 9: RENEWABLE ENERGY GENERATION - · PDF fileclaims, forensic planning, dispute resolution and delay analysis. INTERNATIONAL ... renewable energy park. This £20m brownfield development

INTERNATIONALwww.qualsurv.co.uk

RENEWABLEENERGYPROJECTS

SANDWELL ENERGY FROM WASTE PLANT

QUALSURV is preparing a feasibility study for a 9MWe Energy from Waste plant in the

West Midlands. The fuel source for a gasification plant will be SRF from commercial

and industrial waste.