RENEWABLE ENERGY INTEGRATION IN TAMILNADU
TN Hydro 8%
TN Thermal 15%
TN GAS 2%
TN IPP 3%
CPP 3%
CGS Thermal 15%
CGS Nuclear 6%
PURCHASE (LTOA, MTOA)
18%
Wind 28%
Solar 6%
Cogen 2%
Biomass 1%
RES 37%
Generator Installed Capacity in
MW
TN Hydro 2308
TN Thermal 4320
TN Gas 516
TN IPP 746
CGS Thermal 4340
CGS Nuclear 1703
Purchase 3190
CPP 986
Wind 7858
Solar 1693
Cogen 690
Biomass 230
Total 28580
Details Achieved On
Consumption 345.617 MU 29th April 2016
Demand 15343 MW 29th April 2016
Wind Energy 102.579 MU 4th August 2017
Wind Generation 5096 MW 27th July 2017
Solar Energy 9.681MU 12th August 2017
Solar Generation 1621 MW 5th July 2017
Solar Roof Top 91 MW 31st July 2017
6386 6778
3538
7649
10471
6411
7634
0
2000
4000
6000
8000
10000
12000Ra
jast
han
Guj
arat MP
Mah
aras
tra
Tam
ilnad
u AP
Karn
atak
a
Upto July 2017
8600 8800 6200 7600
11900 8100
6200
5762 8020
5675
11926 8884
9834
5697
0
25
25
50
75
0
1500
0
288
118
2469 649
543
1420
0
5000
10000
15000
20000
25000
Raja
stha
n
Guj
arat MP
Mah
aras
tra
Tam
ilnad
u AP
Karn
atak
a
Biomass
SHP
Solar
Wind
Conventional and others
63%
Wind & Solar 37%
27-08-2017
Total Day Consumption
255.542 MU
Conventional and others
159.904 MU
Wind & Solar 95.638 MU
Conventional and others
190,443
Wind 102,579
Solar 5,672
Wind & Solar
108.251
04-08-2017
Total Day Consumption
298.694 MU
Conventional and others
190.443 MU
Wind & Solar 108.251 MU
Conventional
307,979
92%
RES 25.420
8%
2017-18 All India
Total 12,42,009 MU
Conventional
29.553 77%
RES 8.880 23%
2017-18 Tamil Nadu
Total 38433 MU
Up to June-17 Up to July-17
May
-17
Jun-
17
Jul-1
7
Aug
-17
0,000
50,000
100,000
150,000
1 4 7 10 13 1619
2225
2831
Month
In M
U
Days
May-17
Jun-17
Jul-17
Aug-17
Total MU May 2017 – 1360 MU June 2017 – 2440 MU July 2017 - 2530 MU
Aug-17Aug-16
0,000
50,000
100,000
150,000
1 4 71013
1619
2225
2831
Month
In M
U
Days
Aug-17
Aug-16
Total MU August 2016 – 2510 MU August 2017 – 2010 MU
Hyd
ro Gas IP
P
CPP,
Cog
en,…
Sola
r
TN T
herm
al
Purc
hase
…
CGS
Win
d
010002000300040005000
00,3005,30
10,30
15,30
20,30
Sources
In M
W
Time
Hydro
Gas
IPP
CPP, Cogen, Biomass
Solar
TN Thermal
Purchase (LTOA, MTOA, STOA,Exchange)
CGS
Wind
Day Consumption – 298.694 MU Wind Generation - 102.579 MU
Hyd
ro Gas IP
P
CPP,
Cog
en,…
Win
d
Sola
r
TN T
herm
al
Purc
hase
…
CGS
010002000300040005000
00,3005,30
10,30
15,30
20,30
Sources
In M
W
Time
Hydro
Gas
IPP
CPP, Cogen, Biomass
Wind
Solar
TN Thermal
Day Consumption – 266.86 MU Wind Generation - 10.599 MU
Demand Curve for 2016 & 2017
13580
14538 14534
15343 15163
14643 14689
14443 14571 14699
14278
13779
14027
14082
14781 15240 15043
14687 14938
13958
10000
11000
12000
13000
14000
15000
16000
17000
18000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Demand Actual met for 2016, 2017 &
Demand Forecast for 2017
2016 2017
Forecasted Demand for 2017
Demand Actual met for 2016
1
• Tamilnadu Backbone Network 1495 CKMS – Rs.2186.15 crores
2
• Tamilnadu Wind Power Corridor 846 CKMS – Rs.1418.18 crores
33
• Tamil Nadu Inter State transfer of Power 696 CKMS - Rs. 993.43 crores
TANTRANSCO developed the 400 KV Transmission corridors in order to
accommodate the wind energy
Accommodation of maximum wind generation results
• Deviation Settlement Mechanism
• Surrendering of Central Generating Stations power.
• Backing down power purchase from LTA/MTOA Generators.
• Purchase of high cost power from IPPs.
• Intraday purchase during sudden withdrawal of wind generation
• Backing down the TANGEDCO Thermal Stations.
• Compensation charges towards Backing down
To improve spinning reserve in Tamil Nadu control area, the following Hydro pumped storage projects are under pipeline.
• Kundah – 500 MW (4 X 125 MW) – expected by 2020-21
• Sillahalla - 2000 MW (4 x 500 MW) – expected by 2021-22
• Mettur – 500 MW (4 X 125 MW)
• Tamilnadu experiencing much difficulty as there is no spinning reserve from Hydro generation, deprival of monsoon / very low hydro storage and due to less gas allocation for gas stations
Suggestions
1. Forecasting and Balancing mechanism are an essential tools to aid the integration of the increasing amount of wind energy.
2. Proper Forecasting helps us to make Renewable Energy appear more like a conventional power station.
3. Storage technology to store the renewable energy have to be cost effective. Regulations have to made. Cost for Energy Storage to be included during bidding of PPA itself.
4. Available Transfer Capability (ATC) margin between Regions to be revised practically.
5. Metering and Data storage for State and for the Country for all Generations and Demand.
6. Compensation have to be considered by MNRE for accommodating Renewable Energy in Tamilnadu control area for the following items for maintaining thermal units at low PLF
Commercial losses to TANGEDCO on various accounts indirectly including compensation paid for the Central Generating Stations
Expenditure made on to increase the Transmission corridor capability
7. Future Conventional generating plants have to be designed for low operating flexibility.
8. Strict adherence LVRT & HVRT
9. Facility / Delegation of power for real time trading of power to System Operation to avoid undue delay atleast during wind season with viable commercial implications.
Hyd
ro Gas IP
P
Sola
r
CPP
& O
ther
s
Win
dTN
EB T
herm
alCG
S &
Pur
chas
e
0100020003000400050006000700080009000
Jan.
17Fe
b.17
Mrz
.17
Apr
.17
Mai
.17
Jun.
17
Jul.1
7
Aug
.17
Sources
In M
W
Month
Back
Hyd
ro Gas IP
P
Sola
r
CPP
& O
ther
sW
ind
TNEB
The
rmal
CGS
& P
urch
ase
0100020003000400050006000700080009000
Jan.
16Fe
b.16
Mrz
.16
Apr
.16
Mai
.16
Jun.
16Ju
l.16
Aug
.16
Sep.
16
Okt
.16
Nov
.16
Dez
.16
Sources
In M
W
Month
Back