25
2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 7326591000 www.renovaenviro.com MBE / SBE / 8(a) Certified Primary NAICS Code 562910 DUNS 042451981 CAGE Code 688J7 DSBS P1464090 8(a) Case 305549 Remediation | Environmental Construction | Engineering | Project Management

Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

  

 

 2017 

CAPABILITIES STATEMENT   

  

RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 www.renovaenviro.com MBE / SBE / 8(a) Certified 

Primary NAICS Code   562910 DUNS       042451981 CAGE Code     688J7 DSBS       P1464090 8(a) Case    305549 

   Remediation    |    Environmental Construction    |    Engineering    |    Project Management 

 

Page 2: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

 

Table of Contents 1.0  INTRODUCTION .................................................................................................................... 1 

1.1  Mission Statement ....................................................................................................... 1 

2.0  PROFESSIONAL SERVICES DESCRIPTION .............................................................................. 1 

2.1  Environmental Remediation and Project Management Services .............................. 1 

2.2  Underground Storage Tank (UST) Management ........................................................ 2 

2.3  Geotechnical Construction Services ............................................................................ 2 

2.4  Due Diligence ............................................................................................................... 3 

2.5  Cost Recovery ............................................................................................................... 3 

3.0  SAFETY AND TRAINING PROGRAMS .................................................................................... 3 

3.1   Corporate Health and Safety Program ........................................................................ 3 

Appendix I  SUMMARY INFORMATION ................................................................................ 4 

Appendix II  PROFESSIONAL PROFILES .................................................................................. 5 

Appendix III  CASE STUDIES ................................................................................................. 6 

   

  

Page 3: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Page 1 Capabilities Statement 

1.0  INTRODUCTION  RENOVA  is  an  8(a)‐certified,  small  business  with  core  competencies  as  a  self‐performing environmental  remediation,  construction, engineering, and project management  firm  serving our clients since 2006.   We employ an experienced team of project managers, environmental scientists and engineers, and heavy equipment and CDL operators.  We welcome projects ranging from  residential  oil  tank  removals  and  site  investigations  to  large‐scale  remediation implementations  incorporating geotechnical construction.   We have a proven  track  record of delivering  projects  on  time,  on  budget,  and  with  an  excellent  safety  record.  Through  our successful  teaming  partnerships with  large  businesses  and  independently,  RENOVA  supports various  Federal  agencies  in  accomplishing  their missions.    At  the  federal,  commercial,  and residential levels – we handle all of your environmental needs, licensed, bonded and insured for peace of mind.  

Mission Statement Our mission is to provide cost‐effective environmental and project management services through process‐driven systems to protect human health and the environment, and to support our clients by maximizing the overall value of their project. 

2.0  PROFESSIONAL SERVICES DESCRIPTION    RENOVA offers a wide variety of cost‐effective and responsive consulting and contracting services to  residential,  commercial, and  industrial  clients.   We are proficient at working with  Federal agencies, environmental consulting and engineering firms, insurance companies, environmental attorneys, general contractors, and residential homeowners.    RENOVA offers value engineering as well as  turnkey, complete project management services.  Our  experienced,  in‐house  crews  consist  of OSHA‐30  construction  supervisors  and OSHA‐40 HAZWOPER‐trained equipment operators, CDL drivers, and field technicians.   We are  licensed, insured, and bonded.  RENOVA is proud to consider itself an expert in offering the following services:  

2.1  Environmental Remediation, Engineering and Project Management Services RENOVA offers turnkey environmental contracting and project management services. We self‐perform on our work, which results in services being performed more efficiently, cost effectively, and most importantly – safely.  RENOVA provides custom solutions for the remediation of contaminated media from hazardous and non‐hazardous sources.  Each project presents a unique set of circumstances which RENOVA 

Page 4: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Page 2 Capabilities Statement 

uses to tailor a remediation plan that’s both effective and cost‐efficient.  Since we have a strong background in consulting, we provide services to our clients that go beyond what is stated in the scope  of  work;  we  understand  their  objectives  and  work  with  them  to  facilitate  their achievement. We are also committed to staying on the cutting edge of industry techniques to get the job done right.  Services include: 

Underground Storage Tank Management 

Soil Excavation 

Transportation and Disposal 

Soil and Groundwater Investigation 

Due Diligence Phase I and II Investigation 

Preliminary Assessment and Site Investigation 

Dewatering and Groundwater Pump and Treat 

Operation and Maintenance (O&M) of Remediation Systems 

Landfill Capping 

Passive Gas Mitigation System Installation 

In Situ Chemical Oxidation and Bioremediation Applications 

LNAPL Monitoring and Recovery 

Vapor Intrusion Investigation  

2.2  Underground Storage Tank (UST) Management RENOVA  is an expert at UST  location,  investigation, and closure.   Our services and experience include working with  a wide  array of  tank  sizes,  volumes,  and  contents, both  regulated  and unregulated.  Our expertise includes: remote tank locating and inspections of size and contents, tank  decommissioning  or  abandonment‐in‐place,  collection  of  UST  closure  samples, investigation, delineation and remediation of contaminated media.  

2.3  Geotechnical Construction Services RENOVA  provides  structural  support  and  geotechnical  construction  services  for  federal, commercial, and residential clients.  We are certified and experienced in implementing effective structural support systems for environmental and general construction applications.  We work with  licensed  professional  engineers  to  design  systems  which  offer  the  safest  protection required.    Pile expertise includes helical piles, drilled mini piles, sheet piles, H‐Piles, pipe piles, and timber piles with the following applications: 

Foundation support for elevated homes; 

Shoring up of sinking foundations; 

Shore of excavation; 

Sliderail and trenchbox system installation; 

Environmental walkways; 

Page 5: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Page 3 Capabilities Statement 

Ground‐based solar panel foundations; 

Slope stabilization and retaining walls; and 

Various other deep foundation applications.  

2.4  Due Diligence RENOVA  is  experienced  in  performing  due  diligence  inquiries  and  identifying  potential environmental liabilities at sites throughout New Jersey.  Our scientists offer sound, professional advice on how to identify and mitigate environmental risk factors.  Our expertise includes: ASTM Phase I Environmental Site Assessments and Phase II Environmental Site Investigations, NJDEP Industrial  Site  Recovery  Act  (ISRA)  Preliminary  Assessments  and  Site  Investigations  and Preliminary Assessments for child care facilities.  

2.5  Cost Recovery RENOVA has assisted clients recoup over $2M  in environmental  investigation and remediation expenses.  Our experience in working with private insurance companies and state grant programs enables  us  to  help  our  clients  offset  the  potential  high  cost  of  achieving  environmental compliance.    Our  expertise  includes:    insurance  claim  oversight  and  subrogation,  insurance archaeology, and State grant and loan assistance. 

3.0  SAFETY AND TRAINING PROGRAMS  

3.1   Corporate Health and Safety Program RENOVA’s  top  priority  is  always  the  safety  of  our  team members  and  of  others who may encounter  our  project  sites. Our  entire  organization  embraces  a  culture  of  safety  to  ensure everyone’s health and to ensure compliance with regulatory requirements.  All team members are trained in the latest OSHA safety and construction standards and participate in periodic re‐training and certification programs. Toolbox Talks are  regularly given with all  field personnel. Independent, 3rd party safety audits provide a fresh set of eyes and ideas to make sure RENOVA’s Health and Safety Program is effective.  Certification and Training Programs include: 

OSHA  40  Hour  Hazardous  Waste  Operations  and  Emergency  Response  (HazWoper) Training 

OSHA 30 Hour Construction Safety and Health Training 

OSHA Confined Space Entry Training 

US EPA Hazardous/Toxic Waste Management Training 

US DOT Hazardous Materials Transportation Certification 

First Aid/ CPR Certification 

Commercial Driver’s License – Class A and Hazardous Materials Endorsements 

Page 6: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Page 4 Capabilities Statement 

Appendix I  SUMMARY INFORMATION A. Summary Information  

Primary NAICS Code:  562910 

DUNS #:     042451981 

CAGE Code:     688J7 

DSBS #:     P1464090 

8(a) Case #:     305549 

Bonding Capacity:   7.5M/7.5M 

EMR:       .908 (through 12/6/17)  B. Certifications and Licenses 

NJ Business Registration Certification #:  128874 

NJ Home Improvement License #:    13VH03863000 

NJ Public Works Contractor Certification #:  687204 

NJDEP UST Certification #:      US331315  o for Closure, Subsurface Evaluation, and Tank Testing 

NJ SBE Certification #:       A0009‐03 

NJ MBE Certification #:      65428‐20 

NJDEP Solid Waste Transporter (A‐901 exempt)  C. Insurance Information 

Commercial General Liability/Professional Liability/Contractors Pollution Liability o Carrier:  Admiral Insurance Company o Coverage:  $2MM Each Occurrence / $2MM General Aggregate 

Commercial Automobile Insurance o Carrier:  New Jersey Manufacturers Insurance Company o Coverage:  $1MM Combined Single Limit (CSL) Each Accident Liability 

Workers Compensation o Carrier:  Applied Underwriters o Coverage:  $1MM Each Accident / $1MM Policy Limit (per statutory limits)  

 D. Affiliations and Memberships 

Society of American Military Engineers 

Environmental Business Council of New Jersey 

Better Business Bureau 

New Jersey Business Industry Association 

Deep Foundations Institute        

Page 7: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Page 5 Capabilities Statement 

Appendix II  PROFESSIONAL PROFILES  

OUR TEAM 

RENOVA’s in‐house team consists of project managers, environmental scientists, and heavy 

equipment and CDL operators. 

 

ORGANIZATIONAL CHART 

  

 

 

   

PRESIDENT AND FOUNDER

Paulo Heyman

OPERATIONS COORDINATOR

Kristin Scicutella, MBA

ADMINISTRATIVE COORDINATOR

Laura Dlugokecki, MBA

PROJECT MANAGERS

Stacey Felts‐Bock, PE

Amanda Jagger

STAFF SCIENTISTS

Kelly Giles, Erik Charette, & Ryan Bilgrav

FIELD OPERATIONS SUPERVISOR

Mikhail Gutchigian

FOREMAN

Jim Matulis, Anthony Denora, & Eric Scholey

Page 8: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave., Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com

 PAULO HEYMAN President and Founder 

Mr. Heyman specializes in remediation planning, implementation, and project management. He is recognized for his technical and process-driven management expertise in the environmental construction industry, specifically for his ability to manage large, complex task orders and multiple concurrent projects. He offers more than twelve years’ experience as an owner/senior project manager of environmental remediation for federal, commercial, and residential projects. His knowledge and skills encompass several areas within the environmental management field including, but not limited to, remedial action operations, operations and maintenance, long-term monitoring, and environmental restoration. Select Project Experience  Environmental Services Contract at Fort Devens Range Complex, Massachusetts  2015 – current Mr. Heyman serves as Program Manager for an LTM and Annual Reporting project within the South Post Impact Area (SPIA) of Fort Devens South Post for U.S. Army Corps of Engineers (USACE), New England District.   As part of this contract, he serves as the primary contact to client and regulatory officials and oversees the development of project specific regulatory submittals and the implementation of the field program which includes LTM sampling throughout SPIA, a perchlorate investigation in the area of an active firing range, and perfluorinated compound (PFC) sampling of three existing drinking water wells located throughout South Post.    

Water Supply Well Drilling, Design and Construction at Fort Devens Range Complex, Massachusetts 2015 – current Mr. Heyman serves as Program Manager for a water supply system design‐build project at Fort Devens South Post for USACE, New England District.   As part of  this project,  two new public water supply wells will be  installed  to provide drinking water to two training facilities located within South Post, and services on this project include the installation of test wells and gravel‐packed wells, the implementation of 4‐hour and 48‐hour pump tests, the design of both water systems including water treatment technologies as applicable, regulatory permitting, the oversight of the water system construction, and water system operator training.  As part of this contract, he serves as the primary contact  to  client  and  regulatory  officials  and  oversees  the  development  of  project  specific  regulatory  permit submittals and the implementation of the field program.    

Naval Facilities Engineering Command (NAVFAC) Mid Atlantic ‐ Ordered Remedial Action Area 9, Former Building 

70 Naval Station (NAVSTA) Newport, Rhode Island  2015 Mr. Heyman served as Project Manager for a pipeline and soil removal project at the Naval Station in Newport, RI.  As part of this project, Mr. Heyman managed the emptying and cutting/capping of an on‐site abandoned product pipe.   Following the capping of the abandoned pipe, two previously characterized areas were excavated, totaling approximately 3,700 square feet and approximately 750 tons of disposed soil.  In addition, Mr. Heyman coordinated soil management and disposal and reviewed all project plans.   

 

Remedial Investigation and Remedial Action Operation; Detachment Sandy Hook, NJ   2015 – 2016 

Mr. Heyman  served as  the Project Manager as  the prime  contractor  for  the U.S. Coast Guard  to delineate and 

remediate 1900 tons of impacted soil from a fuel oil release. Renova designed, constructed, operated a maintained 

a 1,000‐gpm groundwater extraction and treatment system with over 12 million gallons treated. All sampling and 

technical reporting completed in‐house. Over 700 man hours completed with zero safety incidents or accidents.  

 

Education Bachelor of Arts, Biology; Boston University (1999)

Training/Certifications NJDEP Subsurface Evaluation, UST Closure, and Testing

Class A CDL License

OSHA 40 HazWoper

USACE Construction Quality Management (CQM)

Helical Pile Certified Installer

Professional Memberships and Affiliations USACE Construction Quality Management (CQM) Deep Foundations Institute Vice President, Society of American Military Engineers, New Jersey Post

Page 9: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Operations and Maintenance of Remediation System; Vapor Barrier Install – Philadelphia, PA   2015 – current 

Mr. Heyman currently serves as the Project Manager for a long‐term remediation project for the U.S. Army Corps of 

Engineers to remediate a historic spill  in an ongoing effort to close the site under ACT 2 under the PA DEP. As a 

certified Liquid Boot® Applicator, RENOVA is self‐performing vapor barrier installations at multiple residential sites. 

 

Environmental Services IDIQ – DoD Military Installation, NJ   2014 – current 

Mr. Heyman currently serves as a Task Manager on environmental services tasks under a 5‐year  IDIQ for service 

areas  that  address  emergency  response,  storage  tanks,  restoration,  hazardous  materials  and  petroleum, 

environmental program management, and site support.   Multiple  task orders have been  issued and successfully 

completed to the client’s satisfaction. 

 

Regulated UST Removals and Soil Remediation – DoD Military Installation, NJ   Winter, 2013 

Mr. Heyman served as the Project Manager on a project as the prime contractor for a DoD client, which included the 

removal of two (2) 25,000‐gallon and two (2) 10,000 gallon USTs, in addition to removal and disposal of 190 tons of 

impacted soil.  The project was completed safely and on schedule to the client’s satisfaction. 

 

Historic Landfill Capping & Passive Gas System Installation – Newark, NJ   Winter/Spring, 2015 

RENOVA was  responsible  for  the  trenching and  installation of a 2,200‐linear  foot passive gas mitigation system, 

comprised of 6” HDPE piping  joined with butt  fusion.   Site civil work  included segregating C&D debris scattered 

throughout the site for disposal, capping of the former  landfill with  imported, certified clean fill and grading and 

restoring the site with topsoil. 

 

Municipal Landfill – Monmouth County, New Jersey  Fall, 2014 

Mr. Heyman managed the implementation of a geotechnical construction project comprised of the installation of 

162 timber piles for a deep foundation for two (2) bioreactor tanks at a municipal landfill.  The project was completed 

safely, on budget, and ahead of schedule to the client’s satisfaction. 

 

Industrial Site – Keasbey, New Jersey   2013 – 2014 

Mr. Heyman managed the implementation of a geotechnical construction project comprised of the installation of a 

550‐linear foot sheet pile retaining wall to shore an excavation for the remediation contractor and two (2) sheet pile 

weir walls as part of an ecosystem restoration project at the site. 

Page 10: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave., Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com

 

STACEY L. FELTS‐BOCK, P.E. Senior Project Manager 

Ms.  Felts‐Bock  has  over  20  years  of  experience  and  progressive responsibility  in environmental and civil engineering consulting. Her qualifications  include  extensive  hands‐on  planning,  design, permitting,  cost  estimating,  project  management,  construction management  and  field  investigation, Ms.  Felts‐Bock’s  background includes  service  to  public  and  private‐sector  clientele  including Fortune 100  companies, AFCEE, New  Jersey  Transit, and Middlesex County.   She currently serves as a Senior Project Manager, working with  clients  to  achieve  their  remedial  goals  by  providing  program management, cost estimates, staffing allocation, deliverable review, and strategy support.  Select Project Experience  Remedial Investigation and Remedial Action; Petrochemical Facility – New Jersey (2012 – 2016) Ms. Felts‐Bock was  responsible  for  supporting  the  implementation of  remedial actions at a  large petrochemical facility located in New Jersey, averaging about $4M in revenue in labor per year.  The sites were in various stages ranging  from  feasibility  study,  to  remedial  action  work  planning/front  end  engineering,  to  implementing construction.    She worked with multiple  teams  across  all  three  sectors  of  the  company  (energy,  environment, infrastructure) to provide quality services and deliverables to the client on time and within budget.  Project highlights include a feasibility study for remediation of a pitch disposal area and remedial design of a barrier wall for a four‐landfill area.   Ms. Felts‐Bock also oversaw scheduling of activities and tracking of deadlines  for all phases of  the program, including remedial investigations and operations & maintenance.    Environmental Construction, Operations, and Services; Air Force Center  for Engineering and  the Environment, Environmental Construction, and Operations & Services 2009 and Worldwide Environmental Restoration and Construction (2010 – 2012)  Ms. Felts‐Bock was responsible for evaluating opportunities with teaming partners, executing teaming agreements during proposal efforts, managing the proposal effort, reviewing the proposal and associated estimate for firm fixed price, performance based projects, and executing contracts.   Ms. Felts‐Bock managed a stream bank stabilization contract at Dover Air Force Base (AFB), DE and an excavation and land farming project at Campion Air Station, AK.  Projects  under Ms.  Felts‐Bock’s  authority  included  Long  Term Monitoring  at  multiple  AFBs,  completion  of  a Community Involvement Plan, and Operations and Maintenance of a groundwater remedial system.  

UST Closure and Remedial Actions; NJ Transit Hudson‐Bergen Light Rain Transit System (HBLRTS) – New Jersey (2010 – 2012) Ms. Felts‐Bock supported New Jersey Transit through various phases of the Hudson‐Bergen Light Rail Transit System (HBLRTS) while utilizing PAECETrakTM and MatTrakTM.  Ms. Felts‐Bock performed oversight during construction of a HBLRTS extension and submitted Remedial Action Progress Reports (RAPRs) to the NJDEP during this time.  Upon discovery of a waste oil UST during construction, Ms. Felts‐Bock performed the closure of the tank through the LSRP process.  When construction was complete, Ms. Felts‐Bock prepared the Remedial Action Report, Deed Notice and Classification Exception Area.  Groundwater Containment and Treatment; Kinder Morgan – Carteret, New Jersey (2008 – 2010) The presence of LNAPL, DNAPL, and other dissolved contaminants with the potential to migrate to the Arthur Kill tidal strait presented unique challenges for the containment and treatment of groundwater at this site.  Ms. Felts‐Bock designed and coordinated an approach to address the groundwater, including installation of recovery wells, 

Education B.E. Environmental Engineering; Stevens Institute of Technology (1994) M.E., Environmental Engineering; Stevens Institute of Technology (2001)

Training/Certifications Professional Engineer, NJ (#4GE04351500) OSHA 40 HazWoper OSHA Supervisory Training Confined Space Entry Trenching and Excavating Safety Hazardous Materials Emergency Response

Page 11: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Professional Resume Stacey Felts‐Bock, P.E., Senior Project Manager 

hydrogeologic pump  tests, bulkhead  improvements, and  installation of a groundwater extraction and  treatment system.    RCRA Facility Investigation; Confidential Client – Waterloo, NY (2007‐2009) Implementing a RCRA facility investigation concurrently with corrective measures studies at an operational facility owned by a third party. Scope includes remedial investigation, vapor intrusion investigation for on‐site buildings, soil gas investigation towards off‐site residences, and canal sediment characterization to determine nature and extent of contamination and ultimately corrective measures.  As a part of the investigation, both HHRA and ERA have also been completed. Because the site is owned by others, close coordination with the current owner on behalf of our client is necessary.   Corrective measures will  include  engineering  and  institutional  controls  to  reduce  the  client’s  future  liabilities.  Corrective measure for the canal sediments will likely be dredging, dewatering with geotubes, and off‐site disposal to reduce the contamination in the canal and reduce the footprint of client liability. Defined the extent of PCBs in soil on‐site, and excavated and disposed of the PCB contaminated (non‐TSCA hazardous) soil outside of the facility fence.  

Confidential Client, Demolition Preparation – Piscataway, New Jersey (Project Manager: 2007)  Prepared  site  development  permits  including  a  Freshwater Wetlands General  Permit  4  (Hazardous Waste  Site Investigation and Remediation) Flood Hazard Area Permit to support completion of building demolition followed by remediation of various areas of concern, including mitigation of sediments in a creek. Remediation of the soils and creek resulted in reduction of client liability.  Borough of Northvale, Northvale, New Jersey (Program Manager: 2005 – 2006)  Provided  engineering  services  to  the  Borough,  primarily  with  funding  from  the  Hazardous  Discharge  Site Remediation Fund. Two sites owned by the Borough through foreclosure are impacted with tetrachloroethene (PCE) and their degradation compounds. At one of the sites, an estimated 20,000 gallons were released to the subsurface. Managed two phases of remedial investigation, which determined that the plume extends more than 200 feet below ground surface (bedrock  is  located about 50 feet below ground surface), and has migrated off‐site onto multiple properties. The $1.2 MM  investigation  involved the use of  innovative Westbay multiport monitoring wells which saved  the  client  $200k.  Consulting  services  to  the  Borough  also  included  negotiation  with  the  New  Jersey Department of Environmental Protection (NJDEP), during which we successfully segregated responsibility (soil versus groundwater) at the site. This segregation of responsibility along with defining the extent of contamination allowed a redeveloper to acquire the site and return the property to the tax rolls.   The other site was a former dry cleaner located in a residential neighborhood.  Investigation activities determined the extents of PCE and LNAPL plume, and also  required vapor  intrusion assessments of  the adjacent  residential properties to determine if there was unacceptable risk to the residents.  Panattoni Development Corporation, iPort 440 Redevelopment Project – Perth Amboy, New Jersey (Engineering Task Manager: 2004 – 2006)  Project involves the redevelopment of 176 acres comprised of three parcels.  In addition, one parcel has a previous property owner who is responsible for remediation. Therefore, access coordinated for site assessments and remedial investigations with three separate property owners, the other responsible party, the attorneys and consultants for the property owners/responsible party, as well as tenants   Utilized an  internet‐based GIS program to cost‐effectively share data with the various  levels of property owners, responsible parties, attorneys and consultants. This method enabled our client to quickly gain permission to release data  to  the  regulators  to support  the  triad approach  for  investigation, which allowed  the client  to expedite  the project while meeting  regulatory  and  project  objectives.    The  site  is  impacted with  battery  casings  from  lead reclamation, process waste  from smelting operations, polychlorinated biphenyls, and heavily  impacted with slag from smelting operations, Intensive negotiations with NJDEP have resulted in a remedy consisting of limited source removal,  installation of  an upgradient  cut off wall  to  limit  groundwater  flow  through  the  site,  a downgradient permeable  reactive  barrier wall  to  treat  groundwater discharging  from  the  site,  a  site‐wide  cap,  and wetlands 

Page 12: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Professional Resume Stacey Felts‐Bock, P.E., Senior Project Manager 

mitigation.  Implementation  of  these  remedies  will  allow  the  development  project  to  not  be  hindered  by  its environmental condition.  United  Technologies Corporation, Underground  Storage  Tank Closure  and  Subsurface  Evaluation  –  Lodi, New Jersey (Task Manager: 2004)  Closure of eighteen underground  storage  tanks  (12,000 gallon  to 18,000 gallon)  that previously  stored  raw and finished products at a  former pigments and dyes  facility  in Lodi, New  Jersey. Sequencing of  the closure was an important management aspect of the project. One of the underground storage tanks contained a substance that exhibited a lower explosive limit of 35% and a flash point less than 84 degrees Fahrenheit, requiring additional safety measures and careful  implementation of  the  tank closure regulations. Despite these challenges,  the project was completed without incident.   Air Force Center for Environmental Excellence, Andrews Air Force Base – Maryland (Program Manager 2004)  Under a Performance‐Based contract, designed and  implemented a remedial action of  injecting oxygen releasing compounds to the subsurface to treat MTBE‐contaminated groundwater from leaking underground storage tanks. By  implementing  this  project,  the  contamination was  significantly  reduced,  and  a  no  further  action  letter was received 3 years ahead of schedule.  Study of oil/water separators base‐wide to recommend demolition of oil/water separators that are no longer in use/or not permitted.  Design and construction of secondary containment at bulk fuel off‐loading areas, to help the facility come into compliance with SPCC regulations and to minimize the client’s liability in the event of a future discharge.  NJ  Transit,  Hudson‐Bergen  Light  Rail  Transit  System  –  Hudson  County,  New  Jersey  (Field  Operations Manager/Senior Environmental Engineer: 1998 – 2004)    Coordinated  with  the  client  and  the  design‐build‐operate‐maintain  (DBOM)  contractor  from  an  engineering perspective for the following:   

Classification and quantity of material that will be encountered/managed during construction based on the current design  

Coordination with various regulatory agencies  including NJDEP,  local Municipal Utilities Authorities, and disposal/recycling facilities for dewatering and hazardous and non‐hazardous soils/waste  

Litigation Support as a Fact Witness 

Property acquisition sampling to establish the environmental baseline for the property transfer 

Remedial investigation sampling to define the nature and extent of contamination 

Decontamination  and  demolition  compliance  including  asbestos  and  lead  abatement  from  multiple buildings for effective management of these materials and compliance with regulations 

UST removals  

Construction  oversight  in  implementing  NJDEP  approved  soil  and  groundwater  management  plans (remedial action work plans) to protect the client’s liability 

 Middlesex County Engineers Office, Middlesex Greenway – Middlesex County, NJ (Project Manager, 2006‐2007)  Managed the design of a rails‐to‐trails project.  The Middlesex Greenway is a bicycle path between the municipalities of Metuchen, Edison and Woodbridge.   Design  involves the remediation of soil  impacted by railroad operations, installation of a cap (asphalt bicycle path), and restoration of drainageways, as well as preparation of specifications.  Middlesex County Utilities Authority, 102‐inch Sanitary Force Main Monitoring and Maintenance – Sayreville, NJ (Project Manager, 2006‐2007)  The 102‐inch prestressed cylinder concrete piping was compromised due to degradation associated with acidic soils.  Project  involved monitoring a sanitary force main constructed with this piping.   The force main was surveyed for existing status of each length of pipe, and then monitored for wire breaks to determine if repair or replacement was necessary.   Managed  the  contract  associated with  these  repairs or  replacements.   Repairs  included  excavating around the piping, reinforcing with post‐tensioned cable, encased in concrete and backfilled with suitable excavated material mixed with  lime.   Replacement required round‐the‐clock coordination to minimize the time the sanitary force main was out‐of‐service.  

Page 13: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave., Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com

 MIKHAIL A. GUTCHIGIAN Field Operations Supervisor 

Mr.  Gutchigian  has  twelve  years  of  experience  in  the  environmental construction,  remediation contracting, and geotechnical construction  fields.  He has performed numerous field activities associated with site remediation at  hazardous  waste  and  contaminated  sites  for  federal,  commercial,  and residential  sites  to  address  environmental  regulatory  requirements.    Mr. Gutchigian  has  experience with  underground  storage  tanks  (USTs),  fuel oil spills,  contaminated  soil  reuse  and  disposal,  geotechnical  construction, emergency  response, and health and  safety  issues. He has done  it all  from remediation  implementation  to  estimating and  scoping  jobs.   He has been employed with Renova since 2010 and leads the Contracting Division.  

Select Project Experience  

Vapor Barrier Installation – Philadelphia, Pennsylvania   2015 – current 

Mr. Gutchigian is currently serving as the Construction Quality Manager for a long‐term remediation project 

for the U.S. Army Corps of Engineers to remediate a historic spill in an effort to close the site under ACT 2 

under the PA DEP. 

 

Historic Landfill Capping & Passive Gas System Installation – Newark, NJ   Winter/Spring, 2015 

Mr. Gutchigian  lead a crew  in the trenching and  installation of a 2,200‐linear foot passive gas mitigation 

system, comprised of 6” HDPE piping  joined with butt  fusion.   Site civil work  included segregating C&D 

debris scattered throughout the site  for disposal, capping of the  former  landfill with  imported, certified 

clean fill and grading and restoring the site with topsoil. 

 

Municipal Landfill – Monmouth County, New Jersey   Fall, 2014 

Mr. Gutchigian directed a crew to install 162 timber piles for a deep foundation for two (2) bioreactor tanks 

at a municipal landfill.  The project was completed ahead of schedule. 

 

Industrial Site – Keasbey, New Jersey   2013–2014 

Mr. Gutchigian directed a crew to install a 550‐linear foot sheet pile retaining wall, to shore an excavation 

for the remediation contractor, and two (2) 30‐foot sheet pile weir walls as part of an ecosystem restoration 

project at the site. 

 

Regulated UST Removals and Soil Remediation – DoD Military Installation, NJ   Winter, 2013 

Mr. Gutchigian directed a crew to remove two (2) 25,000‐gallon and two (2) 10,000 gallon USTs, in addition 

to removal and disposal of 190 tons of impacted soil.  The project was completed on schedule to the client’s 

satisfaction. 

 

Heavy Site Civil Construction – Fort Tilden Beach, New York   Spring, 2014 

Mr.  Gutchigian  directed  a  crew  of  heavy  equipment  operators  and  laborers  to  safely  and  efficiently 

complete restoration work pursuant to Hurricane Sandy.   The work involved removal of   large chunks of 

debris broken off from a nearby road Shore Road,  loading more than 175 tractor trailers of concrete for 

disposal, grading the existing beach, and protecting existing historic features.  

 

1000+ UST Removals  2003 – current 

As  a  Foreman  and  Field Operations  Supervisor, Mr. Gutchigian has  conducted over 1000 underground 

storage tank removals. 

Training/Certifications: OSHA 40-hour HAZWOPER

OSHA 30-hour Construction

Helical Pile Certification

Confined Space Entry

Class A CDL

First Aid/CPR

USACE Construction Quality Management (CQM)

Page 14: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave., Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com

Education Bachelor of Science, Natural Resource Management; Cook College (1999)

Training/Certifications NJDEP Subsurface Evaluator and UST Closure

OSHA 40 HazWoper

 AMANDA B. JAGGER Project Manager 

Ms.  Jagger  has  more  than  13  years  of  experience  in  the  environmental remediation  field,  including  the management  of  complex  site  remediations and  leaking  underground  storage  tank  sites.    This  work  includes  retail petroleum  sites,  commercial  facilities,  and  residential  properties.  Her experience  also  includes  regulatory  compliance  issues  and  due  diligence  to address requirements under the regulatory guidelines.  Select Project Experience  Industrial Property, Middlesex County, New Jersey After  triggering  the  Industrial Site Recovery Act  (ISRA) by  sale of  the property, Ms.  Jagger managed  the project which included identifying multiple areas of concern (AOCs) through conducting a Preliminary Assessment (PA) and conducting  the  subsequent  Site  Investigation  (SI)  of  the  AOCs  and  remedial  investigation  of  the  soil  and groundwater  onsite.   Ms.  Jagger  completed  the  regulatory  reporting  for  the  PA/SI  and  the  created  Remedial Investigation Workplan (RIW) for the site. 

 

Residential Property, Camden County, New Jersey As the Project Manager, Ms. Jagger investigated the release of a heating oil underground storage tank (UST) after oil was observed  in  the sump pump of  the adjacent property owner.   The  remedial  investigation confirmed  the release extended beneath both homes requiring underpinning of the foundations of both structures.   Conditions for an Immediate Environmental Concern (IEC) were met through conducting a vapor intrusion investigation.  Ms. Jagger managed  the  site  through  the  foundation  support,  remediation of over 1600  tons of  impacted  soil  and treatment of over one million  gallons of  impacted groundwater,  and  case  closure.   The budget  for  the project exceeded one million dollars.  Retail Petroleum Station, Hudson County, New Jersey Ms.  Jagger  oversaw  the  remedial  investigation  of  a  retail  gas  station  with  gasoline,  diesel,  kerosene  and polychlorinated biphenyls (PCB) contamination from current and former uses.  The investigation was completed by delineation of each contaminant through soil and groundwater sampling and data review and analysis. Ms. Jagger worked with engineers on the design of a remediation system and completed the reporting requirements. 

 

Former Petroleum Terminal, Middlesex County, New Jersey 

At a site  located adjacent to a sensitive receptor, a  large water body,  free product #6 oil was observed and was 

believed to be from a tank failure that had occurred in the 1990s.  Ms. Jagger managed the emergency response to 

address  the  remediation  in  an  effort  to minimize  impacts  to  the  sensitive  receptor.   Ms.  Jagger  prepared  the 

Interim Remedial Measures report and conducted historical research for the site and the surrounding area. 

 Current Petroleum Terminal, Middlesex County, New Jersey Ms.  Jagger  managed  a  Petroleum  Terminal  Site  containing  approximately  16  areas  of  concern  (AOCs)  and approximately 20 historic  spill  locations. Work on  this  site  included  research and  review of data  to confirm  the Remediation Priority System  (RPS) ranking determined by  the NJDEP. Ms.  Jagger also researched over 100 wells located  at  the  site  and  incorporated  the  information  into  the  Remedial  Investigation  Reports  and  Remedial Investigation Workplans for the AOCs located on the property to meet regulatory compliance.   Wetlands Delineation and Permitting, Ocean County, New Jersey Ms.  Jagger managed a project consisting of wetlands delineation and permitting.   The site consisted of over 30 acres of  land  comprised of approximately 70% wetlands and  transition areas. Following onsite delineation, Ms. Jagger completed all necessary mapping and wetland permitting and reporting requirements. 

Page 15: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Professional Resume Amanda Jagger, Project Manager 

 CAFRA Permitting, NJ Coastline Ms. Jagger has overseen the preparation and submission of over 50 CAFRA permits to the New Jersey Department of Environmental Protection  Land Use Regulation Program. The CAFRA  sites  required  coordination with  clients, architects, engineers and the NJDEP.  Permits ranged from new construction within the CAFRA area to removal of tanks or other environmental concerns within the CAFRA zone.  Residential Fuel Oil Tank Removal and Remediation – New Jersey (Statewide) Ms. Jagger has overseen the  investigation, removal, and remediation of over 500 residential fuel oil tanks  in the State of New Jersey.  As Project Manager, Ms. Jagger interacted and facilitated the removal of tanks between the homeowners, state and local authorities, and insurance companies.  Ms. Jagger also assisted in the acquisition of funds  through  State  grant programs  and  any  applicable  insurance policies  to minimize  the  financial burden on homeowners.

Page 16: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

Page 6 Capabilities Statement 

Appendix III CASE STUDIES  

    

Page 17: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

REMEDIAL INVESTIGATION AND REMEDIAL ACTION OPERATION  

Site:      Detachment Sandy Hook 

Location:    Sandy Hook, New Jersey 

Client:      U.S. Coast Guard 

Date:      Winter 2015 – Winter 2016  

 

 

 

 

 

 

 

 

 

RENOVA was selected as the prime contractor by the U.S. Coast Guard (USCG) to complete soil 

investigative and  remedial actions and groundwater  removal and  treatment activities  for  the 

Detachment  (DET)  Sandy  Hook.    The  Remedial  Action  Operation  (RAO)  included  utility 

infrastructure  relocation,  federal  and  state  regulatory  permitting  and  coordination,  remedial 

action  investigation,  design  and  execution,  and  regulatory  reporting.    Further,  the  project 

encountered the distinct challenge of taking place within an ecologically sensitive habitat while 

also being subject to a compressed schedule due to the client’s need to prepare the site for an 

upcoming renovation.   

Renova was responsible to delineate the nature and extents of a 2012 diesel fuel release from an 

emergency generator tank comingled with a historic, circa 1994,  fuel oil release  from two  (2) 

5,000‐gallon diesel Underground Storage Tanks (USTs).  Subsequent to site investigation, Renova 

was responsible  for remedial action operation planning, removal actions and LNAPL recovery, 

groundwater treatment, regulatory compliance, site maintenance and technical reporting.   

“The Contractor hit every milestone on time; 

tremendous benefit to our Organization; top 

choice for future project consideration.” – 

USCG COR 

Page 18: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

OPERATIONS & MAINTENANCE REMEDIATION AND VAPOR BARRIERS INSTALLATION 

 

Site:      Former Defense Supply Center 

Location:    Philadelphia, Pennsylvania 

Client:      U.S. Army Corps of Engineers 

Date:      Winter 2015 – Ongoing 

 

 

The RENOVA‐PARS  Joint Venture, LLC was selected as  the prime contractor by  the U.S. Army 

Corps of Engineers (USACE) as part of a long‐term monitoring and mitigation project to address 

an  underground  free‐phase  hydrocarbon  plume  of  petroleum  product  situated  beneath  the 

Former Defense Supply Center.  All work is being performed in an ongoing effort to close the site 

under ACT 2 under the Pennsylvania Department of Environmental Protection.  To prevent the 

accumulation  of  potentially  harmful  vapors,  RENOVA,  a  certified  Liquid  Boot®  contractor, 

installed vapor barriers beneath townhome units in a new housing development situated atop 

the  hydrocarbon  plume  and  a  historic  landfill.    In  addition,  RENOVA‐PARS  performed  tasks 

associated with operations and maintenance of the vacuum‐enhanced skimming system (VES), 

in place at the site for more than 12 years and designed to remove petroleum LNAPL from the 

shallow aquifer.   

 

 

  

“Management is fully engaged in all 

facets of the project” – USACE COR 

Page 19: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

SURVEY, ANALYZE, AND DISPOSE OF HISTORIC CHEMICAL COLLECTION 

 

Site:      Thomas Edison National Historical Park 

Location:    West Orange, New Jersey 

Client:      National Park Service 

Date:      Fall 2014 – Fall 2015 

 

Thomas  Edison  National  Historical  Park  is 

located  in  West  Orange,  New  Jersey,  and 

encompasses  two  sites  –  the  Laboratory 

Complex  and  the  Glenmont  Estate,  former 

home to Thomas and Mina Edison. For 44 years, 

from  1887  to  1931,  the  site  served  as  the 

inventor’s  research  and  development  center. 

With  his  team  of  scientists  and  technicians, 

Edison earned 1,093 U.S. patents in his lifetime, most for inventions that originated in the West 

Orange  labs.     The National Park Service  retained RENOVA  to compile a current  inventory of 

chemicals and identify those that pose a hazard to staff and visitors based on their contents and 

make recommendations for disposal and storage options, and included surveying four locations 

at the Site where chemicals are stored. 

A  professional  chemical  inventory  was 

last  conducted  at  the  Site  circa  1980.  

There  are  more  than  1,600  historic 

bottles  which  hold  chemicals  in  the 

museum  collection.    In  addition  to  the 

chemical  inventory,  the  scope  of  work 

included  area  and  personal  air 

monitoring  for  asbestos,  mercury,  and 

volatile  organic  compounds  with 

recommendations  for  further  action 

provided in a final project report. 

The tasks completed by RENOVA included: 

Site‐specific Health & Safety Plan 

Project Work Plan including Guidelines for Handling Containers and Museum Objects 

Survey Historic Chemical Collection 

Historic Chemicals Sampling Analysis and Report 

Historic Chemical Disposal 

Page 20: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

HISTORIC LANDFILL CAPPING AND PASSIVE GAS SYSTEM INSTALLATION  Site:    Former Multi‐Plex Theatre; 1.8‐Acre Former Landfill Location:  Newark, New Jersey Client:    Confidential Date:    Winter/Spring, 2015  

 

 

At the tail end of a long‐term project, RENOVA was selected as the contractor to bring the 1.8‐

acre former  landfill site to completion  in order to allow for a property transfer.   RENOVA self‐

performed on the trenching and installation of a 2,200‐linear foot passive gas mitigation system, 

comprised  of  6”  HDPE  piping  joined with  butt  fusion, which  RENOVA’s  crew  is  certified  to 

perform.    Site  civil work  included  segregating  C&D  debris  scattered  throughout  the  site  for 

disposal, capping of the former landfill with imported, certified clean fill and finally grading and 

restoring the site with topsoil and hydroseeding.  The work was awarded with little notice, as the 

previous contractor did not perform as expected.  RENOVA completed the project to the client’s 

satisfaction, within the time and weather constraints, and with zero safety incidents. 

“Other  than  the  typical  challenges of working on  an old/closed  landfill  site, RENOVA had  to 

become very familiar with and commence the project and in short order. RENOVA came to our 

rescue to complete a very important phase of the project which we unfortunately learned at the 

worst time could never be completed by the prior contractor.” – Confidential client 

“RENOVA came  to our rescue.” 

Page 21: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

REGULATED UST REMOVALS AND SOIL REMEDIATION  

Site:    Military Installation (Confidential) 

Location:  New Jersey 

Client:    Department of Defense (Confidential) 

Date:    Fall/Winter, 2013 

 

RENOVA  was  selected  as  the 

prime  contractor  by  a 

Department of Defense  client 

for  the  removal  and  disposal 

of underground  storage  tanks 

(USTs)  and  contaminated  soil 

removal  at  a  military 

installation  in New  Jersey.    In 

an  effort  to  remove  an 

outdated  fuel  system  and 

mitigate  the  spread  of 

discharged  product,  RENOVA 

removed  two  (2)  25,000‐

gallon No. 2  fuel oil USTs and 

two  (2)  10,000  gallon  kerosene  USTs.    Additionally,  RENOVA  removed  and  disposed  of 

approximately one hundred  eighty  (180)  tons of  fuel‐impacted  soil.    The  site was backfilled, 

compacted, and restored to its original condition. 

All work was  completed  pursuant  to  a  negotiated,  firm‐fixed‐price  contract.    The  proposed 

timeline and allotted budget were strictly adhered to.  RENOVA completed the work with zero 

reportable incidents or safety concerns.  The results from the soil sample collection and analysis 

were  incorporated  into a UST Closure Report, which assisted the Client  in  future planning  for 

the site.   

RENOVA  was  asked  to  bid  on  additional  work  at  the  installation  by  the  Client  due  to  the 

successful completion of this project. 

An overall rating of “Above Average,” with all ratings either “Outstanding” or “Above Average,” 

was received from the Client on the Performance Evaluation form.   

“Project was completed safely. There were no lost time injuries. The project was completed on 

time  and  within  budget.  Project  personnel  were  professional  and  courteous.”  –  DOD 

Contracting Officer 

“Project was completed safely, 

on time and within budget.” – 

DoD Contracting Officer 

Page 22: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

HEAVY CIVIL DISASTER REMEDIATION  

Site:      Fort Tilden Beach 

Location:  Gateway National Park, New York 

Client:    Undisclosed Federal prime contractor  

Date:      Spring, 2014 

 

 

The National Park Service awarded a contract to remove debris and remediate hazards caused 

by  Superstorm  Sandy  at  Fort  Tilden Beach  and  Floyd Bennett  Field  at  the Gateway National 

Recreation  Area  in  Jamaica  Bay,  NY.  The  project  was  of  an  emergency  nature  because  of 

threatened  and  endangered  species‐related  environmental  restrictions,  and  was  completed 

within a short 10‐day time frame. 

The prime contractor tasked with the remediation selected RENOVA as a key subcontractor to 

provide heavy equipment operators and laborers.  RENOVA’s crew safely and efficiently removed 

large chunks of debris broken off from nearby Shore Road, loaded more than 175 tractor trailers 

of concrete for disposal, graded the existing beach, and protected existing historic features.  Site 

work was accomplished with a 70‐ton CAT excavator, a “Euclid” off‐road CAT dump truck, and a 

20‐ton articulating wheel loader.  

The project was delivered to the prime contractor and National Park Service’s satisfaction and 

the beach was open for the public’s safe enjoyment in time for summer. 

“The Team completed this project ahead of schedule and received an “Exceptional” CPARS rating.”  – NPS Contracting Officer 

Page 23: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

UST MANAGEMENT AND REMEDIATION  Site:    Welsbach & General Gas Mantle Superfund Site Location:  Gloucester City, New Jersey Client:    Sevenson Environmental Services, Inc. Date:    Summer, 2013 – Winter, 2014  

  

As the subcontractor working for Sevenson Environmental Services, RENOVA was called upon to 

assist with an “orphan” fuel‐oil underground storage tank (UST) that was encountered at the tail 

end of the long‐term remedial action of a radiologically‐contaminated Superfund site.  RENOVA 

was responsible  for  the UST closure under our NJDEP Closure  license, which entailed cutting, 

cleaning, and disposing of  the  liquid contents.   The UST was determined  to have  leaked, and 

follow‐on work was  issued  to RENOVA  to collect UST closure samples, delineated  the plume, 

develop a remediation strategy, and work with Sevenson to implement the remedial action. 

All work was  completed pursuant  to  a  competitive,  firm  fixed‐price  subcontract  and was  an 

excellent opportunity  for RENOVA  to grow  its  federal experience at an active Superfund  site 

under the oversight of the U.S. Army Corps of Engineers and a seasoned prime federal contractor.  

The proposed timeline, scope, and cost were strictly adhered to.  RENOVA completed the work 

with zero reportable incidents or safety concerns.  The results from the soil sample collection and 

analysis were sufficient to close the incident with the NJDEP and for site restoration to continue, 

moving the long‐term project one step closer to completion. 

“Our expectations were met by Renova during all stages of project that they contributed to. The 

work was completed efficiently and cost‐effectively.  RENOVA's price was competitive and they 

provided excellent value to the project.  I was pleased with the level of professionalism and value 

that  RENOVA  brought  to  the  referenced  project  and  recommend  them  for  similar work.”  – 

Michael Lacker, Project Manager, Sevenson Environmental Services, Inc. 

“RENOVA provided excellent 

value to the project.”  

– M. Lacker, Project Manager

Page 24: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

DESIGN‐BUILD SHEET PILE TIEBACK WALL AND ECOSYSTEM RESTORATION  

Site:      Old Nuodex Site 

Location:  Keasbey, New Jersey 

Client:    USA Environment, LP 

Date:      2013 – 2014 

 

 

RENOVA  self‐performed  on  the  construction  of  a  550‐linear‐foot  sheet  pile  tieback  wall, 

constructed  to  allow  the  prime  contractor  to  safely  and  effectively  excavate  radiologically‐

contaminated  soil,  while  preventing  the  costly  and  unnecessary  soil  disposal  caused  by 

sloughing of the excavation walls. 

RENOVA  initially designed  the wall  to  incorporate helical pile  tiebacks.   Heavy debris  layers, 

previously  unidentified  in  the  limited  geotechnical  investigations, were  impenetrable  by  the 

helical piles.  RENOVA proposed an alternate design to account for the subsurface obstructions.  

The revised design incorporated HP‐piles serving as “deadmen” and connected to the sheet pile 

wall with  threaded  rod.    RENOVA  first  pre‐drilled  to  28’  below  grade with  a  down‐the‐hole 

hammer, along the entire transect of the sheet pile wall and at each HP pile location, in order to 

penetrate piling through the heavy debris layers.  All piling was installed utilizing a track‐mount 

pile driving rig with a vibratory hammer. 

Though  previously  unidentified  subsurface  obstructions  were  encountered,  requiring  a  re‐

design, RENOVA completed the installation of the sheet pile tieback wall ahead of schedule and 

with  zero health and  safety  incidents.   Additionally, RENOVA  received  follow‐on work, which 

included  the  installation  of  several  permanent  sheet  pile  walls  on  the  site  as  part  of  the 

ecosystem restoration. 

Page 25: Renova Capabilities Statement · 2018. 8. 24. · 2017 CAPABILITIES STATEMENT RENOVA Environmental Services, LLC 3417 Sunset Avenue Ocean Township, NJ 07712 732‐659‐1000 MBE

3417 Sunset Ave. Ocean Twp., NJ 07712 | 800.414.3046 | 732.659.1000 | fax 732.659.1034 www.renovaenviro.com 

DEEP FOUNDATION INSTALLATION – TIMBER PILES  

Site:     Monmouth County Landfill Location:  Tinton Falls, New Jersey Client:    Confidential Date:    Fall, 2014  

  

RENOVA  self‐performed on  the  installation of 162  timber piles  to provide a deep  foundation 

suitable for the construction of two (2) bioreactor tanks being used to capture leachate from the 

county  landfill.    Utilizing  a  110‐ton  off‐road  truck  crane  and  a  15,000‐pound  diesel  impact 

hammer  with  60’  leads,  RENOVA  installed  the  piles  according  to  the  requirements  and 

specifications outlined by the engineer of record.  RENOVA completed the project safely, on time, 

and on budget, while offering value engineering to the client to ensure that the project would be 

done right the first time.  

“I wish we had more  subcontractors  like RENOVA,  as  it would make  life easier.   RENOVA’s 

proposal clearly delineated scope, schedule and cost. Project was executed on time, safely and 

on budget. Crew was competent and all knew what needed  to be done.   RENOVA  identified 

additional requirements for successful execution early in project (prior to proposal signing) that 

were not considered by design team.” – A. Larsen, Project Engineer 

“I wish we had more subcontractors like RENOVA.” – A. Larsen, Project Engineer