PROJECT MANUAL

Replace Classroom Unit Ventilators

United Technical Center

Clarksburg, West Virginia

July 10, 2012

MSES consultants, inc.

PROJECT MANUAL

Bid Documents

Replace Classroom Unit Ventilators United Technical Center Clarksburg, West Virginia

July 10, 2012

OWNER: United Technical Center

Route 3, Box 43-C Clarksburg, WV 26301 Phone: 304-326-7580 Fax: 304-622-6138

ENGINEER MSES consultants, inc.

Engineers and Environmental 609 W. Main Street - Building 2

Clarksburg, WV 26302 Phone: 304-624-9700

Fax: 304-622-0981 http://www.msesinc.com

(C) 2012, MSES consultants, inc.

TABLE OF CONTENTS 1

Replace Classroom Unit Ventilators

United Technical Center

PROJECT MANUAL -TABLE OF CONTENTS

Replace Classroom Unit Ventilators

United Technical Center

COVER TABLE OF CONTENTS AND DRAWING SHEET INDEX

BIDDING REQUIREMENTS AND CONTRACT FORMS

INVITATION TO BID

INSTRUCTIONS TO BIDDERS (AIA DOCUMENT A701)

SBA SUPPLEMENTAL CONDITIONS TO INSTRUCTIONS TO BIDDERS

PREVAILING WAGE RATES

BID FORM

BID BOND (AIA DOCUMENT A310)

GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION (AIA DOCUMENT A201)

SBA SUPPLEMENTAL CONDITIONS TO GENERAL CONDITIONS OF THE CONTRACT

SBA CRITERIA FOR SELECTION OF LOWEST QUALIFIED BIDDERS – AWARD OF BIDS

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR, STIPULATED SUM (AIA

DOCUMENT A101)

PERFORMANCE BOND AND PAYMENT BOND (AIA DOCUMENT A312)

CHANGE ORDER (AIA DOCUMENT G701)

APPLICATION AND CERTIFICATE FOR PAYMENT AND CONTINUATION SHEET (AIA DOCUMENT G702/703)

CERTIFICATE OF SUBSTANTIAL COMPLETION (AIA DOCUMENT G704)

SUPPLEMENTAL CONDITIONS – INSURANCE REQUIREMENTS

CERTIFICATE OF PROPERTY INSURANCE (ACORD 24)

CERTIFICATE OF LIABILITY INSURANCE (ACORD 25)

SUPPLEMENTAL ATTACHMENT FOR ACORD CERTIFICATE OF INSURANCE 25 (AIA DOCUMENT G715)

CONTRACTOR’S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS (AIA DOCUMENT G706)

CONTRACTOR’S AFFIDAVIT OF PAYMENT OF RELEASE OF LIENS (AIA DOCUMENT G706A)

CONSENT OF SURETY TO FINAL PAYMENT (AIA DOCUMENT G707)

CONSENT OF SURETY TO REDUCTION IN OR PARTIAL RELEASE OF RETAINAGE (AIA DOCUMENT G707A)

WORK CHANGES PROPOSAL REQUEST (AIA DOCUMENT G709)

ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS (AIA DOCUMENT G710)

CONSTRUCTION CHANGE DIRECTIVE (AIA DOCUMENT G714)

CONTRACTOR’S QUALIFICATION STATEMENT AND CONTRACTOR’S FINANCIAL STATEMENT (SBA FORM

105)

LIST OF PROPOSED SUBCONTRACTORS EQUIPMENT/MATERIAL SUPPLIERS (SBA FORM 123)

BID CERTIFICATION FORM (SBA FORM 157)

VERIFICATION OF HVAC TRAINING (SBA FORM 159)

WVDE AND SBA CERTIFICATE OF PROJECT COMPLETION (WVDE BP-13-A)

AFFIDAVIT OF DEBT PAID (SBA FORM 177)

AFFIDAVIT OF NON-COLLUSION

PRIME CONTRACTOR’S CERTIFICATION OF WORKER COMPLIANCE WITH WV CODE & SBA POLICY (SBA

FORM 181)

SUB-CONTRACTOR’S CERTIFICATION OF WORKER COMPLIANCE WITH WV CODE & SBA POLICY (SBA FORM

182)

TABLE OF CONTENTS 2

Replace Classroom Unit Ventilators

United Technical Center

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY

012500 SUBSTITUTION PROCEDURES

SUBSTITUTION REQUEST FORM

012600 CONTRACT MODIFICATION PROCEDURES

012900 PAYMENT PROCEDURES

013100 PROJECT MANAGEMENT AND COORDINATION

013200 CONSTRUCTION PROGRESS DOCUMENTATION

013300 SUBMITTAL PROCEDURES

014000 QUALITY REQUIREMENTS

014200 REFERENCES

015000 TEMPORARY FACILITIES AND CONTROLS

016000 PRODUCT REQUIREMENTS

017300 EXECUTION

017700 CLOSEOUT PROCEDURES

017823 OPERATION AND MAINTENANCE DATA

017839 PROJECT RECORD DOCUMENTS

017900 DEMONSTRATION AND TRAINING

DIVISION 23 - HEATING VENTILATION AND AIR CONDITIONING

238126 SPLIT-SYSTEM HVAC SYSTEMS

DIVISION 26 - ELECTRICAL

260500 BASIC ELECTRICAL MATERIALS AND METHODS

DRAWINGS

M101 HVAC PLAN AND NOTES

E101 ELECTRICAL PLAN AND NOTES

END OF TABLE OF CONTENTS AND DRAWING LIST

INVITATION TO BID 001116 - 1

Replace Classroom Unit Ventilators United Technical Center

DOCUMENT 001116 - INVITATION TO BID

1.1 PROJECT INFORMATION

A. Notice to Bidders: Qualified bidders are invited to submit bids for Project as described in this Document according to the Instructions to Bidders.

B. Project Identification: Replace Classroom Unit Ventilators, United Technical Center, Clarksburg, West Virginia.

1. Project Location: Route 3, Box 43-C, Clarksburg, West Virginia 26301.

C. Owner: United Technical Center, Route 3, Box 43-C, Clarksburg, West Virginia.

1. Owner's Representative: Joan E. Smith. Phone: 304-326-7580.

D. Engineer: MSES consultants, inc., 609 West Main St., Clarksburg, WV 26301. Phone: 304-264-9700.

E. Project Description: Bids will be received for the following Work: Remove existing HVAC equipment serving four classrooms and provide new HVAC equipment and associated refrigerant piping, temperature controls and electrical work.

F. Construction Contract: Project will be constructed under a single prime contract.

1.2 BID SUBMITTAL AND OPENING

A. Owner will receive sealed bids until the bid time and date at the location indicated below. Owner will consider bids prepared in compliance with the Instructions to Bidders issued by Owner, and delivered as follows:

1. Bid Date: September 11, 2012. 2. Bid Time: 1:30 PM, local time. 3. Location: United Technical Center, Route 3, Box 43-C, Clarksburg, West

Virginia.

B. Bids will be thereafter publicly opened and read aloud.

INVITATION TO BID 001116 - 2

Replace Classroom Unit Ventilators United Technical Center

1.3 BID SECURITY

A. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 30 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities.

1.4 MANDATORY PRE-BID MEETING

A. A mandatory pre-bid meeting for all bidders will be held at United Technical Center, Route 3, Box 43-C, Clarksburg, West Virginia on August 27, 2012 at 1:30 PM, local time. Prospective bidders are required to attend.

1.5 DOCUMENTS

A. Printed Procurement and Contracting Documents: Printed copies of Construction Documents shall be available for purchase after August 17, 2012 from Clarksburg Blue-Print Company, 302 Duff Ave., Clarksburg, WV 26301; Phone: 304-623-5702; Email: [email protected]. Only complete sets of documents will be available. No partial sets or individual drawings can be purchased.

B. Online Procurement of Construction Documents: Digital copies of Construction Documents shall be available for download at no charge after August 17, 2012 at http://www.wvarchitects.com/utc. A list of plan houses who have received Project Documents may be found by visiting http://www.wvarchitects.com/Plan-Houses.pdf.

1.6 TIME OF COMPLETION AND LIQUIDATED DAMAGES

A. Bidders shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the sixty (60) calendar days. Work is subject to liquidated damages.

1.7 BIDDER'S QUALIFICATIONS

A. Pursuant to Chapter 21-Article 11 of the “West Virginia Contractor Licensing Act” of 1991, all Contractors doing business in West Virginia must be licensed to perform work in the State; the Contractor’s W.V. License Number must be affixed to all submitted construction Bids and fully executed and binding construction Contracts or Agreements.

INVITATION TO BID 001116 - 3

Replace Classroom Unit Ventilators United Technical Center

B. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, a separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder.

END OF DOCUMENT 001116

99

THE FOLLOWING SBA SUPPLEMENTAL CONDITIONS CHANGE, DELETE

FROM OR ADD TO THE AIA SUPPLEMENTAL CONDITIONS AND SHALL

BE INCORPORATED INTO THE PROJECT MANUAL UNDER THE

INSTRUCTION TO BIDDERS. THIS DOCUMENT SHALL BE PRINTED ON

NON-WHITE PAPER TO BE DISTINGUISHED FROM OTHER

SPECIFICATION PAGES.

I. PRE-BID MEETING ATTENDANCE

Add the following to Article 2 Bidders Representation

Failure to have representation at the pre-bid meeting will disqualify contractors from

bidding the project.

II. BID BOND

Add the following to article 4 Bidding Procedures, Section 4.2 Bid Security

A. Each Bid shall be accompanied by a Bid Bond payable to the Owner for five

percent (5%) of the total Bid issued by a solvent surety company with a rating of

A.M. Best, A- or better rated and listed on the most current Federal Register,

Circular 570, and authorized to do business in the State of West Virginia. Should

the Bidder refuse to enter into a contract with the Owner on the terms stated in the

Bidding Document or fail to furnish bonds covering faithful performance of the

Contract and all obligations arising there under, the full amount of the Bid

Security shall be forfeited to the Owner as liquidated damages, not as a penalty.

No Bid Bond is required for projects of $25,000 or less.

B. Irrevocable Letter of Credit is not acceptable as a Bid Bond.

C. A certified cashiers’ check is not acceptable as a Bid Bond.

D. Personal securities are not acceptable as a Bid Bond.

III. BIDS WITHDRAWAL

Add the following to Article 4.4 Modification or Withdrawal of Bid:

Bids may not be withdrawn for a minimum period of thirty (30) days following the date

of receipt of Bids without forfeiture of bid security as liquidated damages, not as a

penalty. Should the actual bid documents indicate additional time for bid withdrawal, the

bid documents shall prevail.

100

IV. REJECTION OF BIDS

Article 5 Consideration of Bids, delete Paragraph 5.2 in its entirety and replace with the

following:

The Owner shall have the right to reject any or all Bids and to reject a Bid not

accompanied by the required bid security, or by other data required by the Bidding

Documents, or to reject a Bid which is in any way incomplete or irregular.

V. AWARD OF CONTRACT

Article 5 Consideration of Bids, Section 5.3 Acceptance of Bid, revise to read as follows:

A. It is the intent of the Owner to award a Contract to the lowest responsible Bidder

provided the Bid has been submitted in accordance with the requirements of the

Bidding Documents and does not exceed the funds available. The Owner shall

have the right to accept the Bid or Bids which, in his judgment, is in his own best

interest.

B. The Bidder will note that Bids consist of the Base Bid and several related add or

deduct Alternate items, all comprising items entering into the project and forming

the contract as a whole.

C. These several parts of the Proposal furnish the basis of arriving at the awarding of

the contract. The Owner may award the contract on the basis of the Base Bid

alone, or if and when conditions warrant, accept such Alternate items appearing

on the proposal, thereby reducing or increasing the amount of the Base Bid.

D. The contract shall be deemed as having been awarded when formal notice of

award has been duly served upon the intended awardee (i.e., the bidder to whom

the Owner contemplates awarding the contract) by an authorized individual

representing the agency receiving bids. Terms of the contract shall not be deemed

to have been perfected until a satisfactory surety bond equal to 100% of the

contract sum has been furnished to the owner by the successful bidder, at his own

expense as a guarantee of contract performance.

VI. CONTRACTOR QUALIFICATION AND FINANCIAL

STATEMENT

Article 6 Post Bid Information, delete Section 6.1 and replace with the following:

A completed Contractor Qualification Statement will be required of any Contractor

and/or subcontractor to be submitted to the School Building Authority for review. This

confidential information will be used by the SBA for evaluation of the low bid

contractors on the project. The contractor qualification statement will only be required

once annually and updated documents will be required from low bid contractors once the

current contractor qualification statement has expired. The Qualification Statement must

101

be submitted 72 hours after the close of the bid opening and prior to the award of bids

and will be used in the bid review process by the owner and SBA.

The confidential reviewed financial statement section of this document shall be required

of the lowest qualified bidder(s) being considered for award of the contract. In addition

to the financial statement, the successful low bid contractor(s) shall submit a completed

Affidavit of Debt Paid (SBA Form 177) to the owner and SBA within 72 hours of the

close of the bid.

Construction contractors or subcontractors or equipment/material suppliers whose

demonstrated pattern of poor and/or non-compliant work performance has been

documented by the SBA, project administrators and/or designers, or whose infractions of

the State Prevailing Wage Rate codes has been documented by multiple citations from

the West Virginia Department of Labor or whose contract has been terminated for just

cause as described in the latest SBA approved AIA Contract Document General

Conditions, will be placed on probation and prohibited from bidding any additional

projects funded by the SBA for a minimum period of one year beginning at the time of

probationary status. Such contractor may be removed from probationary status pending

review of their continued work history performance by the SBA at the conclusion of their

probationary period.

In order to provide opportunity for any contracting, subcontracting or equipment/material

firm cited for poor or non-compliant work to appreciably improve the quality of their

performance prior to being placed on probation, the SBA staff will utilize the following

procedure:

a. The cited firm shall be noticed in writing of the SBA’s concern, with appropriate

documentation to illustrate the poor or non-compliant work, and advise the firm

as to the possibility of being placed on probation.

b. Upon continued poor/non-compliant work performance, the firm cited shall

appear before the Executive Director of the SBA to present his reasons for failure

to respond positively with improved performance after the initial notice.

c. Continued failure to improve poor or non-compliant performance will result in the

probation. The contractor will be invited to appear at the SBA meeting to discuss

the citations and justify his uninterrupted participation.

d. Probationary status of a firm may be revoked or continued by the SBA’s

Construction Committee upon review and deliberation of any SBA staff

recommendation at the conclusion of the probationary period.

VII. SUBMITTAL OF SUBCONTRACTORS AND MAJOR EQUIPMENT AND

MATERIAL SUPPLIERS

Article 6.3 Submittals, delete 6.3.1 through 6.3.4 in their entirety and replace with the

following:

A. The bidder(s) submitting the lowest qualified bid(s) as determined by the results

of the bid opening shall submit a listing of all subcontractors and all major

102

equipment and material suppliers proposed for each major branch of work

itemized and described in the contract documents for the project. This information

shall be provided to the SBA office on SBA Form #123 within two hours after the

completion of the bid opening. If the apparent low bidder is not evident at the

close of bidding, all prime contractors must submit the completed SBA Form 123

to the SBA office within two hours of the completion of bids if they feel under

any bidding combination their bid may be considered as the low bid. Bidding

contractors are required to be present at the bid opening or obtain bid results from

the owner in order to determine the bid results and the apparent low bidder(s).

B. Each bidder is required to establish the reliability and responsibility of all

subcontracts and equipment/material suppliers being proposed to perform the

work. Contractors, Subcontractors and/or equipment/material suppliers on SBA

Probationary Status are prohibited from bidding any SBA project for a period of

at least one year from the date the contractor is notified. It is the responsibility of

any contractor soliciting bids or quotes from subcontractors to verify the

eligibility of all proposed subcontractors and equipment/material suppliers being

proposed to perform the work. Additionally, the list of SBA probationary

contractors will be provided to the owner by the SBA and this information will be

communicated by the owner to the contractors, when applicable. A review of the

proposed subcontractors and equipment/material suppliers shall be conducted by

the Architect/Engineer, Owner and representatives of the School Building

Authority. The bidder may be requested to change an unsatisfactory

subcontractor or equipment/material supplier. Proposed subcontractors or

equipment/material suppliers found to be unsatisfactory jointly by the Owner,

Architect/Engineer or School Building Authority and the contractor, shall be

changed to an acceptable subcontractor or equipment/material supplier at no

additional cost to the Owner, as the contractor has full responsibility for execution

of the work.

C. Failure to submit a list of subcontractors and major equipment and material

suppliers to the SBA office as described on the SBA Form #123 within two hours

after the completion of the bid shall result in disqualification of the bid.

D. A copy of all contractors and subcontractors licensing certificate must be

submitted to the agency receiving bids for review prior to the award of

construction contracts.

E. Prior to the award of the contract, the Architect/Engineer will make a preliminary

review of the major equipment and materials lists submitted and advise the bidder

through the Owner, of the acceptance thereof, and of such other actions as may be

necessary in order to meet the requirements of the contract documents. Should it

develop that any of the materials or equipment named in the list do not meet the

requirements and intent of the specifications, the contractor shall be required to

furnish to the Owner other materials or equipment acceptable and fully complying

with the specifications at no change in contract price. Preliminary review and

103

acceptance of the listing provided shall not relieve the Contractor from furnishing

equipment and materials in complete accordance with the specifications.

F. Written approval shall be obtained from the Architect/Engineer covering any

substitution of equipment or materials. Substitutions are permitted in the

following instances:

(1) Failure to meet quality and intent of specification and/or

(2) Failure of the supplier or manufacturer to meet delivery schedules or other

conditions of the contract.

G. The Owner reserves the right to reject the proposal of any bidder who fails to

furnish all required major equipment and material information.

H. A financial statement shall be included in the contractor’s qualification statement

submitted to the SBA by the lowest qualified bidder(s) within 72 hours of the

close of the bid opening and prior to the execution of contracts or agreements

between the local board of education and the contractor(s). The latest available

financial information must be used. Minimum requirements for financial

statements are:

1. Accountants compilation report;

2. Balance sheet;

3. Income statement;

4. Statement of changes in retained earnings;

5. Statement of cash flows; and

6. Notes to the financial statement.

The SBA recommends that all general contractors receiving quotations for bids

require a scope of work letter from all subcontractors be sent to the general

contractor receiving the quotation at least 24 hours before submission of the bid.

The letter should identify the items being quoted and, most importantly, the scope

of work included or not included in the price quotation that will be provided. The

SBA will not allow a subcontractor to change or alter the bid after the bid opening

as a result of miscommunication between the general contractor and

subcontractors or supplier quoting the project.

VIII. BID CERTIFICATION

Add the following to Article 6.3 Submittals:

In accordance with West Virginia Code 5-22-1, Article 22, the lowest qualified

responsible bidder submitting bid on SBA funded projects must certify that all provisions

within this code and SBA provisions that supercede this code have or will be met prior to

execution of the construction contract. Failure to comply with these provisions will result

in the disqualification of the bidder. The Bid Certification Form (SBA 157) must be

submitted within 72 hours of the close of the bid.

104

IX. PAYROLL CERTIFICATION AND EMPLOYMENT REPORTING

Add the following to Article 6.3 Submittals:

In preparation of bids, contractors are reminded that all SBA projects are subject to state

laws regarding payment of prevailing wage rates as in Chapter 21 of the West Virginia

Code.

X. CONTRACTOR REGISTRATION CERTIFICATE AND TAX RELEASES Add the following to Section 6.3 Submittals:

A. Each Bidder must be registered with the West Virginia Department of Tax and

Revenue prior to the time and date for Receipt of Bids in order for his Bid to be

considered.

B. If any Bidder is not registered with the Tax and Revenue Department, application

should be made to West Virginia Department of Tax and Revenue, Capitol

Complex, Charleston, WV 25305, and complete Form 801, so that a registration

number may be assigned prior to the time and date for receipt of Bids.

XI. CONTRACTOR LICENSING

Add the following to Section 6.3 Submittals:

All contractors doing business in West Virginia must be licensed to perform work in the

state as required by the West Virginia Contractor Licensing Act. The ACT requires but is

not limited to the following:

A. A contractor’s license number shall be included in all contracting advertisements

and all fully executed and binding contracts.

B. All approved subcontractors must be licensed and a copy of their current license

number must be submitted with all quotations to the general contractor. Pursuant

to the ACT, general contractors are required to only accept quotations from

subcontractors licensed to perform work in West Virginia. Additionally, the SBA

Form 123 requires the subcontractor’s name, address and license number to be

submitted to the SBA office within two hours of the close of bids and a copy of

all general and subcontractors licensing certificates must be submitted to the

agency receiving bids for review prior to the award of construction contracts.

WEST VIRGINIA DIVISION OF LABOR BUILDING CONSTRUCTION RATES Page 1 of 1

Replace Classroom Unit Ventilators United Technical Center

WEST VIRGINIA DIVISION OF LABOR The West Virginia Division of Labor can be contacted at the address below to obtain Building Construction Rates and Prevailing Wage Classification. This information is provided for reference only. Neither the Architect nor the Owner guarantees the accuracy of the information. Contractor(s) shall be responsible for obtaining the most current information. West Virginia Division of Labor 749-B Building 6, Capitol Complex Charleston, WV 25305 304-558-7890 http://www.sos.wv.gov/administrative-law/wagerates/Pages/default.aspx

BID FORM – Page 1 Replace Classroom Unit Ventilators

United Technical Center

BID FORM

1.1 BID INFORMATION

A. Bidder: ___________________________________________________________.

B. Project Name: Replace Classroom Unit Ventilators, United Technical Center, Clarksburg, West Virginia.

C. Project Location: United Technical Center, Route 3, Box 43-C, Clarksburg, West Virginia.

D. Owner: United Technical Center.

E. Architect: Blackwood Associates, Inc.

1.2 CERTIFICATIONS AND BASE BID

A. Base Bid, Single-Prime Contract for Replace Classroom Unit Ventilators, United Technical Center, Clarksburg, West Virginia: The undersigned Bidder, having carefully examined the Procurement and Contracting Requirements, Conditions of the Contract, Drawings, Specifications, and all subsequent Addenda, as prepared by MSES consultants, inc. and Engineer's consultants, having visited the site, and being familiar with all conditions and requirements of the Work, hereby agrees to furnish all material, labor, equipment, and services, including all scheduled allowances, necessary to complete the construction for above-named Project, according to the requirements of the Procurement and Contracting Documents, for the stipulated sum of: _________________________________________________________ Dollars

Amount in words

$____________________________. Amount in figures

B. In the event of a discrepancy between the wording of the Base Bid amount and the figure of the Base Bid amount, the wording shall govern.

1.3 BID GUARANTEE

A. Bid shall be accompanied by a Bid Bond payable to the Owner constituting five percent (5%) of the Base Bid amount above. Bid Bond shall be issued by a solvent company with a rating of A.M. Best, A- or better rated and listed on the most current Federal Register, Circular 570, and authorized to do business in the State of West Virginia. Should the undersigned Bidder refuse to enter into a contract with the Owner for this Work or fail to furnish bonds covering faithful

BID FORM – Page 2 Replace Classroom Unit Ventilators

United Technical Center

performance of the Contract and all obligations arising there under, within 10 days after a written Notice of Award, if offered within 30 days after receipt of bids, Bidder agrees to forfeit to Owner the attached Bid Bond, as liquidated damages for such failure, in the following amount: _________________________________________________________ Dollars Amount in words

$________________________. Amount in figures

B. In the event Owner does not offer a Notice of Award within the time limits stated above, Owner will return to the undersigned bid bond.

1.4 PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND

A. The contractor to whom the Contract is awarded, shall pay for, execute and deliver to the Owner via the Architect, within ten (10) days after award of contract by Owner and before signing the Contract a corporate surety Performance and Labor and Material Payment Bond on AIA Document A311 (or equivalent form), to be executed by an A.M. Best, A- or better rated surety company listed on the most current Federal Register, Circular 570, and authorized to do business in the State of West Virginia in the sum of one hundred percent (100%) of the amount of the Contract. The Labor and Material Payment Bond shall be in the sum of one hundred percent (100%) of the Contract amount.

1.5 TIME OF COMPLETION

A. The undersigned Bidder proposes and agrees hereby to commence the Work of the Contract Documents on a date specified in a written Notice to Proceed to be issued by Architect, and shall fully complete the Work within sixty (60) calendar days.

B. Liquidated Damages: The Bidder also agrees, for each calendar day of delay in completion of the Project beyond the stated length construction period to be liable for and pay to the Owner liquidated damages in the amount of $500.00 per day, subject to allowances for delays beyond the control of the Contractor, all reasons for delays properly documented and verified.

1.6 ACKNOWLEDGEMENT OF ADDENDA

A. The undersigned Bidder acknowledges receipt of and use of the following Addenda in the preparation of this Bid:

1. Addendum No. 1, dated ____________________. 2. Addendum No. 2, dated ____________________.

BID FORM – Page 3 Replace Classroom Unit Ventilators

United Technical Center

1.7 CONTRACTOR'S LICENSE

A. The undersigned further states that it is a duly licensed contractor, for the type of work proposed, in West Virginia, and that all fees, permits, etc., pursuant to submitting this proposal have been paid in full.

1.8 CONTRACTOR QUALIFICATION AND FINANCIAL STATEMENT A. In submitting this Bid, Bidder agrees to submit a Contractor’s Qualification

Statement and Financial Statement as stated in the Supplementary Instructions to Bidders.

B. SUBMISSION OF BID

Respectfully submitted this _________ day of _________________, 2011.

Submitted By: _______________________________

(Name of bidding firm or corporation)

Authorized Signature: _______________________________

(Handwritten signature)

Signed By: _______________________________

(Type or print name)

Title: _______________________________

(Owner/Partner/President/Vice President)

Street Address: _______________________________

City, State, Zip _______________________________

Phone: _______________________________

WV Registration No.: _______________________________

WV Contractor License No.: _______________________________

106

THE FOLLOWING SBA SUPPLEMENTAL CONDITIONS CHANGE, DELETE

FROM OR ADD TO THE AIA SUPPLEMENTAL CONDITIONS AND SHALL

BE INCORPORATED INTO THE PROJECT MANUAL UNDER THE

GENERAL CONDITIONS. THIS DOCUMENT SHALL BE PRINTED ON NON-

WHITE PAPER TO BE DISTINGUISHED FROM OTHER SPECIFICATION

PAGES.

I. RETAINAGES

Add the following to Article 9 Payments and Completion, Section 9.3 Applications for

Payment:

A. A 5% retainage will be maintained throughout the construction period. The

Owner will pay 95% of the portion of the Contract Sum properly allocable to

labor, material and equipment incorporated in the work, and of materials and

equipment suitably stored at the site or at some other location agreed upon in

writing, for the period covered by the most current submitted Application for

Payment, less the aggregate of previous payments.

B. The School Building Authority (SBA) of West Virginia reserves the right to

review all contractors’ applications for payment and request additional

documentation to substantiate the request and in cooperation with the Owner

make adjustments as deemed appropriate.

Add the following to Article 9.8 Substantial Completion, Section 9.8.5:

C. The Owner will pay upon Substantial Completion of the Contracted Work, a sum

sufficient to increase the total payments to 95% of the Contract Sum, less such

amounts as the Architect and the Owner shall determine for all incomplete work,

rejected work and unsettled claims as provided in the contract documents. The

final 5% retainage shall not be released until the Grant Recipient,

Architect/Engineer and the School Building Authority have received satisfactory

evidence of the completion of all work required by the contract documents,

including all rejected work and the resolution of all unsettled claims.

II. PROCESSING OF PAYMENT APPLICATIONS Article 9 Payments and Completion, section 9.3.5 shall read as follows:

Applications for payments from the SBA must be accompanied by an SBA Exhibit B

Requisition Form, SBA 104A and a copy of the invoice and a description of work

completed including materials/equipment used for the project. Requisitions must be

received by the depository and the SBA by the 5th

day of the month in which payment is

being requested. Payments will be processed and mailed to the grant recipient on the 15th

day of the same month. The SBA reserves the right to review requests for payment and

107

make adjustments when they deem necessary. Note: An approved construction schedule

must be in place prior to the second pay application being requested. Failure to comply

with this provision will result in delayed processing of this and all future pay applications

until the owner and SBA approved schedule is in place.

III. STATE TAX RELEASE & AFFIDAVIT OF DEBT PAID

Article 9.10 Final Completion and Payment, add the following:

A. A State tax release form will be filed with the West Virginia Department of Tax

and Revenue by the local board of education upon receipt of the final payment

request from the contractor. Final payment will only be processed after the local

board of education has received evidence from the Department of Tax and

Revenue indicating appropriate state taxes has been paid on completed

construction projects in West Virginia.

B. Affidavit of Debt Paid – In accordance with West Virginia Code 5A-3-10a,

contractors are required to submit an Affidavit of Debt Paid SBA Form 177. This

form shall be submitted to the county board of education or contracting agency

along with other closeout documents.

IV. FINAL COMPLETION AND FINAL PAYMENT

Article 9.10 Final Completion and Payment, add the following:

Should the architect determine during the final inspection that the remaining work is not

completed in accordance with the terms and conditions of the contract documents, the

contractor shall be responsible for all costs associated with the architects return visits.

Costs shall include, but are not limited to, hourly wage, mileage reimbursement,

accommodations and miscellaneous reimbursables.

V. LIQUIDATED DAMAGES

Add the following to Article 9.11 Liquidated Damages:

The contractor agrees that from the compensation otherwise to be paid, the Owner may

retain a sum in accordance with the following schedule for each day thereafter, Sundays

and holidays, included, that the work remains uncompleted, which sum is agreed upon as

the proper measure of liquidated damages which the Owner will sustain per diem by the

failure of the contractor to complete the work at the stipulated time, and the sum is not to

be construed in any sense a penalty.

Liquidated damages will be assessed as follows:

Project Cost Liquidated Damage

Up to $1,000,000 $ 500.00/per day

$1,000,000 to $5,000,000 $ 750.00/per day

Over $5,000,000 $1,000.00/per day

108

VI. PERFORMANCE BOND

Add the following to Article 11.4 Performance Bond and Payment Bond

A. The contractor to whom any contract is awarded, shall pay for, execute and

deliver to the Owner via the Architect, within ten (10) days after award of

contract by Owner and before signing the contract a corporate surety Performance

and Labor and Material Payment Bond on AIA Document A311 (or equivalent

form), to be executed by an A.M. Best, A- or better rated surety company listed

on the most current Federal Register, Circular 570, and which is authorized to do

business in the State of West Virginia and which is satisfactory to and approved

by the Owner and the SBA in the sum of one hundred percent (100%) of the

amount of the contract, insuring the full and faithful performance of the work and

payment in full for all materials, machinery, equipment and labor, and covering

all the guarantees called for in the specifications and all other obligations arising

there under. The Labor and Material Payment Bond shall be in the sum of one

hundred percent (100%) of the contract amount. All contractors performing work

on SBA projects must be covered by a performance bond and must be included on

the list of subcontractors submitted to the SBA (Form 123). The Owner will not

accept responsibility for direct payments to subcontractors performing work on

projects by way of consignment. No Performance Bond is required for projects of

$25,000 or less.

B. Should the successful Bidder fail or refuse to deliver the required bond and all

other Contract Documents, properly executed within ten (10) days after receipt of

the Owner’s letter of intent to award a Contract, the

successful Bidder shall forfeit the security deposited with his Bid as liquidated

damages, not as a penalty.

C. Irrevocable Letter of Credit is not acceptable as a Performance Bond.

D. A certified cashiers’ check is not acceptable as a Performance Bond.

E. Personal securities are not acceptable as a Performance Bond.

F. Failure of a construction firm to satisfactorily perform the work specified in the

contract documents will result in the owner executing their rights, pursuant to the

conditions of the contract documents, to declare a construction contract default

under the provisions of the AIA General Conditions of the Contract for

Construction established for this project. If the construction firm’s surety

company is notified of their responsibility for the completion or remediation of

incomplete or non-compliant work, said firm will no longer be eligible to bid

future projects funded by the School Building Authority of West Virginia.

109

VII. WORKERS COMPENSATION

Workers Compensation Coverage shall be provided on the project by all Contractors.

Proof of continued Workers Compensation coverage throughout the duration of the

project shall be provided on the certificate of coverage.

VIII. CONTRACTOR INSURANCE

Add the following to Section 11.5 Contractor’s Insurance:

A. In furtherance of Article 11 of General Conditions, each contractor furnishing

labor and materials shall provide insurance in the following categories and for the

stated minimum amounts. All insurance shall be written to show evidence of the

following: The Architect and the Owner shall be ADDITIONALLY INSURED

on the contractor’s policy. The Contractor shall be the NAMED INSURED.

(1) Worker’s Compensation/Employer’s Liability

Contractors shall purchase and maintain workers’ compensation insurance from a

licensed carrier authorized to provide such coverage in the State of West Virginia.

Employer’s Liability – Limits Required:

$500,000 – bodily injury by accident/each accident

$500,000 – bodily injury by disease/per policy

$500,000 – bodily injury disease/each employee

Coverage must include broad form employer’s liability and a waiver of

subrogation from workers’ compensation carrier.

(2) Contractor’s Public Liability Insurance Limits Required:

$2,000,000 – General Aggregate

$1,000,000 – Products Complete Operations Aggregate

$1,000,000 – Personal & Advertising Injury Limit

$1,000,000 – Each Occurrence Limit

Commercial General Liability must include:

Explosion, Collapse and Underground Property Damage. Coverage required if

contractor’s operations warrant such coverage.

Also, if blasting operations, separate blasting coverage is required.

(3) Automobile Liability Insurance

Limits Required:

$1,000,000 – Per Accident

Provide “Any Auto” Coverage

(4) Excess Liability Insurance

Limits Required:

$2,000,000 – Combined Single Limit Occurrence

$2,000,000 – Aggregate

110

(5) Builders Risk and Property Insurance – The general contractor is

responsible for providing coverage for contractors under the single prime

bidding scenario. The owner will provide builders risk insurance for

multiple prime contracts and for projects involving additions to existing

buildings.

100% Completed Value Form

Coverage Format:

All Risk including theft

Coverage shall include transit and off-site storage/secondary location limit

amount that exceeds any shipment or off-site storage material value before

payments to contractor for off-site stored materials are approved. Proof of

coverage limits exceeding accumulated value of materials stored is required.

Names Insured shall be Owner, CM or CA, Architect, Contractor and all

Subcontractors ATIMA.

Deductibles shall be stated in the Certificate of Insurance. Payment of deductible

shall be the responsibility of the contractor.

The Owner will provide Builders Risk and Property Insurance coverage for

renovation projects during construction by adding the contractor and all

subcontractors, ATIMA to the permanent property policy unless otherwise stated

in the bidding documents.

B. Certificate of Insurance

The Certificate of Insurance shall be provided by the Contractor to the Owner and

Architect at the current address of said parties with a transmittal cover indicating

the project name, location of project, type of work to be performed and the nature

of the documents transmitted.

The Certificate of Insurance shall contain a provision that coverage afforded will

not be canceled until at least sixty (60) days prior written notice has been given to

the Owner and Architect.

The Owner shall be the Certificate Holder.

The Certificate shall be prepared on “Acord” Form 25-5 (7/90) or an equivalent

form.

The Certificate shall indicate that the Owner and Architect are ADDITIONAL

INSUREDS under the Contractor’s policy.

The Certificate of Insurance shall indicate the carrier’s financial rating. The

rating must be an A.M. Best, A- or better rated surety company listed on the most

111

current Federal Register, Circular 570 and is authorized to do business in the State

of West Virginia and approved by the owner and the SBA.

IX. WAGE RATES AND EMPLOYMENT REPORTING Add the following to Article 16 Special Conditions:

All contractors and subcontractors shall pay West Virginia Department of Labor fair

minimum rate of wages for the county in which the work of this contract is performed.

The SBA requires that a certified payroll be submitted with each contractor’s pay-

application using the U.S. Department of Labor Form WH-347 or SBA other approved

document. Certified payrolls must include names, addresses and social security numbers

of all workers, including those of any subcontractors, in order to assure compliance with

West Virginia’s Prevailing Wage laws and the SBA’s Supplemental, General and Special

Conditions. Upon request, counties will be required to submit the certified payroll report

to the SBA for review.

Each contractor shall be responsible to obtain correct and fair minimum rate of wages as

established by the West Virginia Department of Labor.

In accordance with West Virginia Code 18-5-15c, contractors or their employees may not

make direct, unaccompanied contact with students or access school grounds

unaccompanied when students are present if it cannot be verified that the contractors or

employees have not previously been convicted of a qualifying child abuse, child neglect

or child assault offense, as defined in section two, article twelve, chapter fifteen of the

West Virginia Code. A contractor is defined as any vendor, individual or entity under

contact with a county school board for services. County school boards may require

contractors and service providers to verify the criminal records of their employees before

granting the above mentioned contact access to the construction site. If the county board

requires verification of previous convictions for qualifying offenses, this requirement will

be delineated within the bidding documents. Where prior written consent is obtained,

county school boards may obtain information from the Central Abuse Registry regarding

contractors and service providers. Where a contractor or service provider gives his or her

prior written consent, the county school board also may share information provided by

the Central Abuse Registry with other county school boards of education.

X. PERMITS AND LICENSES

Add the following to Article 16 Special Conditions:

For the Owner’s records, submit copies of permits, licenses, certifications, inspection

reports, releases, notices, receipt for fee payments, correspondence and records

established in conjunction with compliance with standards and regulations bearing upon

performance of the work.

112

XI. STANDARD OF QUALITY AND CODES Add the following to Article 16 Special Conditions:

A. All work, labor, materials and equipment specified, constructed and installed are

to be of first-class quality. To help insure this occurs, all work and equipment

designed and specified shall conform to the latest applicable codes and standards

including but not limited to the following:

a. West Virginia State Building Code

b. American Society for Testing Materials (ASTM)

c. American National Standards Institute (ANSI)

d. West Virginia State Fire Code

e. National Electrical Code (NEC)

f. American Society of Heating, Refrigerating and Air Conditioning Engineers

(ASHRAE)

B. All work must also have the approval of all West Virginia governmental

authorities and agencies having jurisdiction over the project including but not

limited to the following:

1. West Virginia State Fire Marshal

2. West Virginia Department of Health

3. West Virginia Department of Natural Resources

4. West Virginia Department of Highways

5. West Virginia Department of Education

6. West Virginia Division of Labor

7. School Building Authority of West Virginia

8. West Virginia Division of Environmental Protection

XII. PAYROLL CERTIFICATION AND EMPLOYMENT REPORTING

A. All contractors and subcontractors shall pay West Virginia Department of Labor

fair minimum rate of wages for the county in which the work of this contract is

performed. The term “fair minimum rate of wages” shall be set forth in 21-5A-3

of the West Virginia Code. The SBA’s requirement for submission of certified

payrolls, supercedes the requirements of current state law. The SBA requires that

a certified payroll be submitted with each contractor’s pay application using U.S.

Department of Labor Form WH-347 (formerly DOL 184). Contractors may

provide this information in an alternative format provided all required information

on the WH-347 is included on the alternative document. Each certified payroll

must include names, addresses and social security numbers of all workers,

including those of any subcontractors, in order to assure compliance with West

Virginia’s prevailing wage laws and the SBA’s Supplemental, General and

Special Conditions. Upon request, counties will be required to submit the

certified payroll report to the SBA for review.

113

B. All contractors and subcontractors must comply with the “West Virginia Jobs

Act” requirements found in Chapter 21, Article 1C of the West Virginia Code and

all Department of Labor regulations.

C. In accordance with West Virginia Code 18-5-15c, contractors or their employees

may not make direct, unaccompanied contact with students or access school

grounds unaccompanied when students are present if it cannot be verified that the

contractors or employees have not previously been convicted of a qualifying child

abuse, child neglect or child assault offense, as defined in section two, article

twelve, chapter fifteen of WV Code. A contractor is defined as any vendor,

individual or entity under contract with a county school board for services.

County school boards may require contractors and service providers to verify the

criminal records of their employees before granting the above mentioned contact

or access to the construction site. If the county board requires the verification of

previous convictions for qualifying offenses, this requirement will be delineated

within the bidding documents. Where prior written consent is obtained, county

school boards may obtain information from the Central Abuse Registry regarding

contractors and service providers. Where a contractor or service provider gives

his or her prior written consent, the county school board also may share

information provided by the Central Abuse Registry with other county school

boards of education.

D. The successful low bid prime contractor and all subcontractors performing work

on the project shall comply with the latest West Virginia Code chapter 21 article

contractors shall maintain records verifying the legal status of workers and shall,

upon request by the Commissioner of Labor, surrender all employee records,

including all records relating to the payment of State and Federal taxes, for

verification of their legal status. If upon examination of records, the

Commissioner determines that a contractor is in violation of the provisions of this

code, the Commissioner may enter and order that imposes disciplinary action as

provided for in article 21-1B-7 of the West Virginia Code.

E. Provide at Project Close-out the following documentation, but not limited to:

Contractor’s Affidavit of Payment of Debts and Claims (AIA G706)

Contractor’s Affidavit of Release of Liens (AIA G706A)

Consent of Surety Company to Final Payment (AIA G707)

Certificate of Insurance (Acord Form and AIA G715) Covering required/specified

products and completed operation

Certificate of Release from the Department of Tax and Revenue stating all appropriate

taxes have been paid

Verification from the Owner (county superintendent) that all Owner training required by

the contract documents has been conducted (SBA 159)

Fire Marshall’s Certificate of Occupancy Affidavit of Debt Paid (SBA 177)

Prepare quality training videos

114

XIII. SBA PROJECT OBSERVATION

A. The School Building Authority reserves the right to visit projects at intervals

deemed necessary to observe the progress of the construction. The SBA field

representative shall have such responsibilities as the SBA may delegate.

B. The School Building Authority reserves the right to review all Contractors

Applications for Payment and request additional documentation to substantiate

the request and in cooperation with the owner make adjustments as deemed

appropriate.

C. The responsible contractor shall notify the SBA office two weeks in advance of:

1. The Testing, Adjusting & Balancing of the HVAC system.

2. The training of the county maintenance and custodial personnel on new

building components.

3. The scheduled punch list walk-thru of the new or renovated school.

D. County boards of education, before accepting the HVAC contractor’s work, shall

receive complete training regarding the operation and maintenance of the

mechanical equipment and building controls. Training shall be completed prior to

occupying the building. There shall also be a one (1) day follow-up training in six

months or during the succeeding heating/cooling season after the facility has been

occupied to insure training on both heating and cooling operations of the system.

Where specified, the installation contractor shall provide two year

maintenance and operations for HVAC equipment and other components as

described in the bidding documents. The State Department of Education’s HVAC

Technicians shall be notified of the date and location of any and all training

sessions in order to assure its ability to fulfill their responsibilities as delineated in

WV Code 18-9E-3(F) & (G). At the conclusion of the training, the grant recipient

shall submit the verification of HVAC Training Form (SBA Form 159) to the

SBA office.

basuppgenspecial Revised 9/11

115

SBA Criteria for Selection of Lowest Qualified Bidders AWARD OF BIDS

Pursuant to the laws of the State of West Virginia, the School Building Authority of West

Virginia must award bids only to the lowest qualified bidder. Therefore, when utilizing any

portion of state funds for a project, county boards of education must consider the following

factors, and the information from the Contractors Qualification Statement, when making a

determination as to whether a contractor’s bid is not only the lowest, but the most qualified.

1. The years of experience the bidder has in the construction, renovation or building repair

business.

2. The bidder’s participation in a drug program that meets the objectives, applicable laws

and regulations for a drug free workplace including the use of tobacco and alcohol on

school properties.

3. The continuity, experience and skill of the bidder’s work force and that of the bidder’s

designated subcontractors.

4. The bidder’s performance on similar construction projects.

5. The bidder’s ability to successfully complete projects within the proposed schedules and

deadlines.

6. The bidder’s participation in a bonafide joint apprenticeship program that is approved by

the US Department of Labor, US Bureau of Apprenticeship Training and is administered

in compliance with the rules and regulations of the WV Department of Labor. [See DOL

42-7-3.1(i)]

7. The bidder’s history of compliance with Worker’s Compensation and Unemployment

Compensation laws.

8. The bidder’s history of compliance with OSHA requirements.

9. The bidder’s history of compliance with Federal and State Prevailing Wage as well as

Fair Labor Standards and Wage Payment laws.

10. The bidder’s subcontractors compliance with state regulatory agencies.

11. The bidder’s history of compliance with fringe benefit contributions, i.e., health

insurance and pension benefits.

12. The bidder’s local hiring plan and history of compliance with the WV Jobs Act, (WV

Code, Chapter 21, Article 1C) regarding use of the local labor market.

13. The bonding record of the bidder.

116

14. The bidder’s participation as a party in any legal action where an awarded liability could

negatively impact the ability of the bidder to complete this project.

15. The bidder’s financial stability and its impact on the company’s ability to complete the

project.

16. The bidder can demonstrate it is not in default on a debt to the State or its political

subdivision in aggregate more than $1,000.

17. The bidder’s history of change order requests.

18. Response from bidder’s references and recommendations of other owners for whom the

bidder has worked.

All of the above factors, as supported by the accompanying Contractors Qualification

Statement, will be considered by the county board of education in determining the “best” most

qualified bid. No single criteria will be considered the controlling factor in determining whether

a bid is, or is not the “best” bid.

awardofbids Revised 9/11

SUPPLEMENTARY GENERAL CONDITIONS – INSURANCE REQUIREMENTS 1

Replace Classroom Unit Ventilators United Technical Center

SUPPLEMENTARY CONDITIONS – INSURANCE REQUIREMENTS

1.1 SUPPLEMENTARY GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION

A. General Conditions of the Contract for Construction consists of the following:

1. AIA Document A201, "General Conditions of the Contract for Construction."

2. SBA Supplemental Conditions. 3. The following Supplementary Conditions that modify and add to the

General Conditions.

1.2 SUPPLEMENTARY GENERAL CONDITIONS, GENERAL

A. The following supplements modify AIA Document A201, "General Conditions of the Contract for Construction." Where a portion of the General Conditions is modified or deleted by these Supplementary Conditions, unaltered portions of the General Conditions shall remain in effect.

1.3 ARTICLE 11 - INSURANCE AND BONDS

A. Workers Compensation Coverage shall be provided on the project by all Contractors. Proof of continued Workers Compensation coverage throughout the duration of the project shall be provided on the certificate of coverage.

B. Add the following to Section 11.5 Contractors Insurance:

1. In furtherance of Article 11 of General Conditions, each contractor furnishing labor and materials shall provide insurance in the following categories and for the stated minimum amounts. All insurance shall be written to show evidence of the following: The Architect / Engineer and the Owner shall be ADDITIONALLY INSURED on the contractor’s policy. The Contractor shall be the NAMED INSURED.

2. Worker’s Compensation / Employer’s Liability: Contractors shall purchase and maintain worker’s compensation insurance from a licensed carrier authorized to provide such coverage in the State of West Virginia.

a. Employer’s Liability – Limits Required:

1) Bodily injury by accident/each accident: $500,000.00. 2) Bodily injury by disease/per policy: $500,000.00

SUPPLEMENTARY GENERAL CONDITIONS – INSURANCE REQUIREMENTS 2

Replace Classroom Unit Ventilators United Technical Center

3) Bodily injury/disease / each employee: $500,000.00 b. Coverage must include broad form employer’s liability and a waiver

of subrogation from worker’s compensation carrier.

3. Contractor’s Public Liability Insurance – Limits Required:

a. General Aggregate: $2,000,000.00. b. Products Complete Operations Aggregate: $1,000,000.00. c. Personal & Advertising Injury Limit: $1,000,000.00. d. Each Occurrence Limit: $1,000,000.00.

4. Commercial General Liability must include: Explosion, Collapse and Underground Property Damage. Coverage required if contractor’s operations warrant such coverage. Also if blasting operations, separate blasting coverage is required.

5. Automobile Liability Insurance Limits Required:

a. Per Accident: $1,000,000.00. b. Provide “Any Auto” Coverage.

6. Excess Liability Insurance Limits Required:

a. Combined Single Limit Occurrence: $2,000,000.00. b. Aggregate: $2,000,000.00.

7. Deductibles shall be stated in the Certificate of Insurance. Payment of

deductibles shall be the responsibility of the Contractor.

8. Builders Risk and Property Insurance – The Owner will provide builders risk insurance.

a. 100% Completed Value Form. b. Coverage Format: All Risk including theft. c. Owner will add the Contractor and all subcontractors, ATIMA to the

permanent property policy.

C. Certificate of Insurance

1. The Certificate of Insurance shall be provided by the Contractor to the Owner and Architect at the current address of said parties with a transmittal cover indicating the project name, location of project, type of work to be performed and the nature of the documents transmitted.

2. The Certificate of Insurance shall contain a provision that coverage afforded will not be cancelled until at least sixty (60) days prior to written notice has been given to the Owner and Engineer/Architect.

SUPPLEMENTARY GENERAL CONDITIONS – INSURANCE REQUIREMENTS 3

Replace Classroom Unit Ventilators United Technical Center

3. The Owner shall be the Certificate Holder. 4. The Certificated shall be prepared on “Acord” Form 25 or an equivalent

form.

5. The Certificate shall indicate the Owner and Engineer/Architect are ADDITIONAL INSUREDS under the Contractor’s policy.

6. The Certificate of Insurance shall indicate the carrier’s financial rating. The rating must be an A.M. Best, A- or better rated surety company listed on the most current Federal Register, Circular 570 and is authorized to do business in the State of West Virginia.

134

School Building Authority of West Virginia

CONTRACTOR’S QUALIFICATION STATEMENT

The undersigned certified under oath that the information provided herein is true and sufficiently

complete so as not to be misleading. This document must be submitted by the apparent low

bidder(s) within three (3) days after the bid opening and will be used in the bid evaluation

process.

SUBMITTED TO: School Building Authority of West Virginia

2300 Kanawha Boulevard, East

Charleston, WV 25311

SUBMITTED BY: Firm Name: _______________________________________

Address: _______________________________________

_______________________________________

Phone: _______________________________________

Fax: _______________________________________

Email: _______________________________________

Principal Office Location: ___________________________

QUALIFICATION STATEMENT SUBMITTED FOR

(INSERT PROJECT NAME):

___________________________________________________

___________________________________________________

___________________________________________________

TYPE OF WORK:

Site Preparation _____ General Construction _____

Roofing _____ Plumbing _____

HVAC _____ Sprinkler _____

Electrical _____ Other _____

(File separate form for each classification of work)

ORGANIZATION:

Please provide the following information concerning your organization:

TYPE OF ENTITY:

Corporation _____ Individual _____

Partnership _____ Other _____

Revised 9/11

135

NAME OF PRINCIPAL, OWNERS OR PARTNERS:

Years of Service

Name Position with Organization

___________________ ______________________ _______________

___________________ ______________________ _______________

___________________ ______________________ _______________

___________________ ______________________ _______________

Number of years this organization has been in business? _______________

Have members of this organization operated under former Yes ___ No ___

names/businesses? If “yes,” list name, type of entity

and names of principal, owners or partners.

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

Provide a brief description of the general type of construction the firm performs.

_____________________________________________________________________

_____________________________________________________________________

Please indicate the work you intend to subcontract or perform for this project.

Perform Subcontract Perform Subcontract

Earthwork _____ _________ Plumbing _____ _________

Concrete _____ _________ HVAC _____ _________

Masonry _____ _________ Electrical _____ _________

Structural _____ _________ Other_____ _____ _________

Roofing _____ _________ Other_____ _____ _________

Sprinkler _____ _________ _________ _____ _________

Please provide information regarding your company’s participation in a drug program that meets

the objectives, applicable laws and regulations for a drug free workplace including the use of

tobacco and alcohol on school properties.

_____________________________________________________________________

_____________________________________________________________________

Revised 9/11

136

Please provide information regarding the experience and skill of the bidder’s work force and that

of the bidder’s designated subcontractors. Attach additional information, if required. (Marked

as Attachment __.)

________________________________ _________________________________

________________________________ _________________________________

________________________________ _________________________________

________________________________ _________________________________

EXPERIENCE:

If you have completed school construction work or similar construction, or completed work on

SBA projects, provide a list of projects with individual references that can verify the quality of

your work, your ability to construct within budget and your ability to work within the proposed

schedule. Attach additional information, if required. (Marked as Attachment __.)

Project Reference

_______________________________ __________________________________

_______________________________ __________________________________

_______________________________ __________________________________

Please list (marked as Attachment __) all major construction projects (schools or other projects)

your organization has in progress providing the name of project, owner, architect, contract

amount, bonding company, insurance carrier, percentage complete and scheduled completion

date.

Please list (marked as Attachment __) major projects (schools or other projects) your

organization has completed in the past five years, giving the name of project, owner, architect,

contract amount, bonding company, date of completion and percentage of the cost of the work

performed with your own forces. Note whether or not each project was completed on schedule.

APPRENTICESHIP PROGRAM:

Please provide information regarding your company’s and subcontractor’s participation in a

bonafide apprenticeship program that is approved by the U.S. Department of Labor, U.S. Bureau

of Apprenticeship Training and is administered in compliance with the rules and regulations of

the WV Department of Labor. [See DOL 42-7-3.1(i)] (Marked as Attachment __)

Revised 9/11

137

REGULATORY COMPLIANCE:

At any time during the past five years, has your firm, or any of its owners or officers been found

in violation or in default in any of the following categories: (Attach detailed explanation for all

Yes answers.)

Worker’s Compensation Laws Yes _____ No _____

Unemployment Compensation Laws Yes _____ No _____

Federal and State Prevailing Wage Laws Yes _____ No _____

Fair Labor Standards Act Yes _____ No _____

Compliance with fringe benefit contributions Yes _____ No _____

(i.e., health insurance and pension benefits)

Immigration Reform and Control Act (IRCA) Yes _____ No _____

INSURANCE AND BONDS:

Please list name of current insurance carrier and number of projects insured by carrier:

Insurance Carrier Number of Projects

_______________________________ _________________________________

(Marked as Attachment __, if required)

Please list name of bonding company(s)/agent(s) utilized for projects constructed during the last

five years:

Bonding Company Bonding Company/Agent

_______________________________ _________________________________

_______________________________ _________________________________

_______________________________ _________________________________

CLAIMS AND SUITS: (Attach detailed explanation for all Yes answers)

Has your organization ever failed to complete any Yes ____ No ____

Construction work it has been awarded?

Within the last five years, has any officer or principal Yes ____ No ____

of your organization ever been an officer or principal

of another organization when it failed to complete a

construction contract? (If the answer is yes, please

describe in full)

Revised 9/11

138

Has there been in the last ten (10) years, or is there Yes ____ No ____

now pending or threatened, any litigation, arbitration,

investigation, or governmental or regulatory proceeding

involving claims in excess of $100,000 or requesting a

declaratory judgment or injunctive relief with respect

to the construction or operation of any building which

your firm, its principals, predecessors or affiliates

constructed?

Is there any potential claim, demand, litigation Yes ____ No ____

arbitration, investigation, governmental proceeding or

regulatory proceeding involving your firm, or its

principals, predecessors or affiliates? If the answer

to either of the preceding questions is “yes,” please

describe in full in an attachment.

In addition to the litigation, arbitration, investigation Yes ____ No ____

or governmental or regulatory proceeding referred to in

the preceding paragraphs, is there any litigation,

arbitration, investigation or governmental or regulatory

proceeding now pending or threatened to which your firm

is or may be a party, or are you aware of any potential

claim or demand, which might otherwise affect the

capacity of your firm to perform with respect to your

involvement with the School Building Authority of

West Virginia, whether or not it concerns other work

which you have undertaken? If so, please describe in full.

Is your company currently in default on any departments Yes ____ No ____

to the state or political subdivisions that in aggregate

exceeds $1,000? See WV Code 5A-3-10a.

At any time during the past five (5) years has Yes ____ No ____

your firm, or any of its owners or officers, been

debarred or otherwise deemed ineligible to bid

on or be awarded a public works contract or

perform work as a subcontractor on a public works

contract, under the laws of the federal government,

state, county or municipal authority?

At any time during the last five (5) years has your Yes ____ No ____

firm, or any of its owners or officers, been

convicted of a crime relating to the awarding of

a contract for a public works construction project,

Revised 9/11

139

or the bidding or performance of a public works

project?

Is there any person owing ten (10) percent or Yes ____ No ____

more of this company, or officer of the company,

that is currently, or at the time of the bid, on the

Worker’s Compensation Employer Violator

System? If yes, provide name of individual. ______________________________

______________________________

BANKRUPTCY:

Has your firm, its principals, predecessors, or Yes ____ No ____

affiliates been the subject of any proceeding under the

federal bankruptcy laws or any other proceeding under

state or federal law in which a court or government agency

has assumed jurisdiction over any of the assets or

business of your firm, its principals, predecessors or

affiliates? If so, please identify the proceedings, the

court or governmental body and the date such

jurisdiction was assumed in an attachment.

FINANCIAL CONDITION:

*Financial Statements are required for every contractor and subcontractor working on an

SBA funded project. This confidential statement is kept on file in the SBA office and is

valid for one calendar year. Once expired, a new statement will be required as a condition

of future bid awards.

Please attach your organization’s last two (2) years financial statements including your latest

balance sheet and income statement showing the following:

Current Assets (e.g., cash, joint venture accounts, accounts receivable, accrued income, deposits,

materials inventory and prepaid expenses);

Net Fixed Assets;

Other Assets;

Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for

income taxes, advances, accrued salaries and accrued payroll taxes);

Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned

surplus and retained earnings).

Name and address of firms attached financial statement and date thereof. Revised 9/11

140

CHANGE ORDER HISTORY:

Describe each instance within the last five (5) years where change orders applied for during

construction amounted in the aggregate to more than five percent (5%) of the

(Revised 6/09)

contract price for any building which your firm constructed, or in which actual construction costs

exceeded the contract price by more than five percent (5%). (Exclude owner requested change

orders). (Marked as Attachment __, if required)

Change Order/Construction

Project Cost Overrun Amounts

____________________________ _________________________________

____________________________ _________________________________

____________________________ _________________________________

REFERENCES:

Please list below trade references:

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Please list below bank references:

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Please list below completed project owner references:

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Revised 9/11

141

SIGNATURE AND NOTARY:

Dates at __________ this _____ day of ___________________, 20__.

Name of Organization: _____________________________________________

_____________________________________________

_____________________________________________

By: _____________________________________________

Title: _____________________________________________

State of __________, County of ___________________________________________

Subscribed and sworn before me this _____ day of __________, 20__.

Notary Public: _____________________________________________

My Commission Expires: _____________________________________________

Notary Seal

SBA 105 – Contractors Qualification Statement Revised 6/11

155

LIST OF PROPOSED SUBCONTRACTORS EQUIPMENT/MATERIAL SUPPLIERS

(This form must be submitted to the SBA

within two hours of the close of bid)

Failure to comply with the two hour submission requirement will result in disqualification of

the bid.

Phone: 558-2541 Fax: 558-2539

List below each category of work and equipment/material for this proposal and the

subcontractor or supplier selected for that category of work, also provide the contractor’s

complete name, address and license number for each subcontractor as required by the “West

Virginia Contractor Licensing Act.” If the branch of work is to be completed solely by an

equipment/material supplier, indicate by notation below in the contractor license number

column. If the branch of work is to be completed by the general (or prime) contractor submitting

the bid, indicate on each division where this occurs provide the name, complete address and

contractor license number of the contractor that will be performing the work. If no

subcontractors will be used to complete the project indicate on the SBA Form 123 that all work

will be self-performed and provide the name, complete address and contractor license number of

the contractor that will be performing the work. DO NOT list multiple contractors for the

same category of work. If this occurs, it must be corrected within the two hour submission

time frame or the bid will be rejected. The contractor is responsible for selecting

subcontractor(s) and/or equipment/material suppliers/contractors. However, the Owner,

Architect/Engineer and/or School Building Authority may indicate their concerns about any

entity listed which they have reason to believe past experience indicates poor performance may

be expected. Therefore, the bidder may be requested to change an unsatisfactory subcontractor or

equipment/material supplier should the owner, A/E or SBA determine an unsatisfactory sub-

contractor is listed.

It is the responsibility of any contractor soliciting bids or quotes from the subcontractors

to verify the eligibility of all proposed subcontractors and equipment/material suppliers being

proposed to perform the work and to verify in writing the scope of work proposed by a

subcontractor or supplier. The Contractor has full responsibility for satisfactory execution of all

work in accordance with the contract documents. Any proposed change of subcontractors or

material suppliers must have prior written approval from the SBA and shall be at no additional

cost to the Owner, as the Contractor has full responsibility for execution of the work.

Contractors, subcontractors and equipment/material suppliers that are on SBA Probation are

prohibited from bidding any school project. List all subcontractors including your company

as the prime contractor along with WV contractor license number and the category of

work each will perform.

Revised 9/11

156

I, ___________________________ representing __________________________

(Signature of Responsible Company) (Company Name)

on this date _______________ submit the following list of subcontractors and major material

suppliers for your review and comment. This is the final and complete list of companies who will

be performing work or supplying materials for ____________________________________.

(Project Name)

I agree that once the subcontractors and material suppliers listed are submitted to the SBA, no

other subcontractors or substitute for any subcontractors listed below, will be used in the

performance of the contract without written approval of the Owner and SBA. I further agree

that if non-approved subcontractors or suppliers are used my company shall be placed on

probation, unless in its reasonable discretion, the SBA determines otherwise. I understand that,

as a result of being placed on probation by the SBA, my company shall be prohibited from

bidding SBA projects for a minimum of one year.

Category of Complete Name and Address Contractor

Work/Material Subcontractor/Supplier License Number

1. ____________________ ___________________________ ______________

___________________________

2. ____________________ ___________________________ _______________

___________________________

3. ____________________ ___________________________ _______________

___________________________

4. ____________________ ___________________________ ________________

___________________________

5. ____________________ ___________________________ ________________

___________________________

6. ____________________ ___________________________ ________________

___________________________

7. ____________________ ___________________________ ________________

___________________________

8. ____________________ ___________________________ ________________

___________________________

9. ____________________ ___________________________ ________________

___________________________

10. ___________________ ___________________________ ________________

___________________________ Revised 9/11

157

11. ___________________ ___________________________ ________________

___________________________

12. ___________________ ___________________________ ________________

___________________________

13. ___________________ ___________________________ ________________

___________________________

14. ___________________ ___________________________ ________________

___________________________

15. ____________________ ___________________________ ______________

___________________________

16. ____________________ ___________________________ _______________

___________________________

17. ____________________ ___________________________ _______________

___________________________

18. ____________________ ___________________________ ________________

___________________________

19. ____________________ ___________________________ ________________

___________________________

20. ____________________ ___________________________ ________________

___________________________

21. ____________________ ___________________________ ________________

___________________________

22. ____________________ ___________________________ ________________

___________________________

23. ____________________ ___________________________ ________________

___________________________

24. ___________________ ___________________________ ________________

___________________________

25. ___________________ ___________________________ ________________

___________________________

(Use additional pages, if required) SBA 123 Revised 9/11

244

BID CERTIFICATION FORM

I, hereby certify that the bid requirement found in Article 22, Section 5-22-1 of the West Virginia

State Code have or will be met should I be awarded the construction contract for the project

referenced below. I further certify that all requirements found in the School Building Authority,

Supplemental General Conditions applicable to this project and bound within the bidding

documents for this project will be complied with prior to the execution of the construction

contract. I understand that if the SBA requirements exceed those of West Virginia Code, the

more stringent requirements will apply to this project.

Project Name: ________________________________ Date: ________________

Name of Contractor’s Company: ________________________________________

Signature of Responsible Contractor: ________________________________________

Notary’s Signature: ________________________________________

Notary Seal

SBA 157

Revised 9/11

248

Verification Of HVAC Training (Required closeout document to be submitted by the county board of education)

Project Name:___________________________________________________________

Architect/Engineer: ______________________________________________________

Responsible Contractor(s): ________________________________________________

Date(s) of Training: ______________________________________________________

HVAC training was provided by the responsible contractor for the above referenced

project. This training was performed in accordance with the contract documents. All owner’s

manuals and operating instructions for the HVAC system(s) were provided to the owner for

future use. The following individuals were present for the training:

NAME REPRESENTING NAME REPRESENTING

___________________________________________ __________________________________________

___________________________________________ __________________________________________

___________________________________________ __________________________________________

___________________________________________ __________________________________________

___________________________________________ __________________________________________

___________________________________________ __________________________________________

___________________________________________ __________________________________________

___________________________________________ __________________________________________

The following have verified that the required HVAC training has been satisfactorily

completed:

__________________________________________ _______________________

(Responsible Contractor’s signature) (Date)

__________________________________________ _______________________

(Responsible Contractor’s signature) (Date)

__________________________________________ _______________________

(County Superintendent’s signature) (Date)

__________________________________________ _______________________

(DOE HVAC technician’s signature) (Date) SBA 159 Revised 9/11

351

WEST VIRGINIA DEPARTMENT OF EDUCATION AND

SCHOOL BUILDING AUTHORITY OF WEST VIRGINIA CERTIFICATE OF PROJECT COMPLETION

Upon completion of a facilities project, submit duplicate copies to the State Department of Education and the School Building Authority to initiate close-out procedures.

County ________________ Substantial Completion Date ____________ Project/School Name _________________ Final Inspection Date __________________ Project Number _________________ Fire Marshal – Date ___________________ Enrollment _________________ of Occupancy Permit # Teaching Stations _________________ (If Required)

Sources of Funds: Summary of Project Data: State Funds Sq.Ft. in Building ______________ SBA “MIP” $_____________ Site Acquisition $_____________ SBA “Needs” $_____________ Site Preparation $_____________ Local Funds (Bond) $_____________ Building Construction Costs – Total $_____________ Local Funds (Other) $_____________ *Renovation Costs $_____________ Vocational (State) $_____________ Building Construction Vocational (Federal) $_____________ Costs – per sq.ft. $_____________ Federal (Other) $_____________ Building Renovation Other Funds (List) $_____________ Costs – per sq.ft. $_____________ ____________________ Moveable Eq. Cost $_____________ ____________________ A&E Fees $_____________ ____________________ **Misc. Costs $_____________ Total Funds $_____________ Total Project Cost $_____________ *A project may include both new construction/addition and renovation costs. **Geotech, Site Survey, Deed Search, Technology Equipment (Explain on Back)

______________________________________ ____________________________________ Architect Date ______________________________________ ____________________________________ Contractor Date ______________________________________ ____________________________________ Clerk-of-the-Works/Construction Manager Date ______________________________________ ____________________________________ Superintendent Date

***Inspected this date by a representative of the School Building Authority or the West Virginia Department of Education. ______________________________________ ____________________________________ WVDE BP-13-A

AFFIDAVIT OF NON-COLLUSION Page 1 of 1

Replace Classroom Unit Ventilators United Technical Center

AFFIDAVIT OF NON-COLLUSION THIS AFFIDAVIT IS TO BE FILLED OUT AND EXECUTED BY THE BIDDER: IF THE BID IS MADE BY A CORPORATION, THEN BY ITS PROPERLY AUTHORIZED AGENT ----------------------------------------------- State of West Virginia, County of Harrison: (Name of Authorized Individual Making Bid) residing at , being duly sworn does depose and say that (Give Name of Bidder or Bidders) (Business Address) , and, (Give Names and Addresses of All Other Persons, Firms or Corporations Interested in the Bid.) is or are the only person or persons interested with sharing in the profits of the herein contained Bid; that the said Bid is made without any connection or interest in the profits thereof with any other persons making any bid or proposal for said work; that said bid is on our part, in all respects fair and without collusion or fraud; and also that no member of, head of any department or Bureau, or employee therein, or any Officers of United Technical Center is directly or indirectly interested therein. (Signature of Authorized Individual Making Bid) Subscribed and sworn to this day of , 20 , before (Notary Public)

343

School Building Authority of West Virginia

AFFIDAVIT OF DEBT PAID

West Virginia Code §5A-3-10a states: No contract or renewal of any contract may be awarded by the state or any

of its political subdivisions to any vendor or prospective vendor when the vendor or prospective vendor or a related

party to the vendor or prospective vendor is a debtor and the debt owed is an amount greater than one thousand

dollars in the aggregate.

DEFINITIONS: “Debt” means any assessment, premium, penalty, fine, tax or other amount of money owed to the state or any of its

political subdivisions because of a judgment, fine, permit violation, license assessment, defaulted workers’

compensation premium, penalty or other assessment presently delinquent or due and required to be paid to the state

or any of its political subdivisions, including any interest or additional penalties accrued thereon.

“Debtor” means any individual, corporation, partnership, association, limited liability company or any other form or

business association owing a debt to the state or any of its political subdivisions. “Political subdivision” means any

county commission; municipality; county board of education; any instrumentality established by a county or

municipality; any separate corporation or instrumentality established by one or more counties or municipalities, as

permitted by law; or any public body charged by law with the performance of a government function or whose

jurisdiction is coextensive with one or more counties or municipalities. “Related party” means a party, whether an

individual, corporation, partnership, association, limited liability company or any other form or business association

or other entity whatsoever, related to any vendor by blood, marriage, ownership or contract through which the party

has a relationship of ownership or other interest with the vendor so that the party will actually or by effect receive or

control a portion of the benefit, profit or other consideration from performance of a vendor contract with the party

receiving an amount that meets or exceed five percent of the total contract amount.

EXCEPTION: The prohibition of this section does not apply where a vendor has contested any tax administered

pursuant to chapter eleven of this code, workers’ compensation premium, permit fee or environmental fee or

assessment and the matter has not become final or where the vendor has entered into a payment plan or agreement

and the vendor is not in default of any of the provisions of such plan or agreement.

Under penalty of law for false swearing (West Virginia Code §61-5-3), it is hereby certified that the vendor affirms

and acknowledges the information in this affidavit and is in compliance with the requirements as stated.

WITNESS THE FOLLOWING SIGNATURE

Vendor’s Name: ________________________________________________________________________

Authorized Signature: ___________________________________________ Date: ___________________

State of __________________________________

County of ___________________________ to wit:

Taken, subscribed, and sworn to before me this ____ day of _____________________, 20_____.

My Commission expires ______________________________, 20_____.

AFFIX SEAL HERE NOTARY PUBLIC _________________________________

sba177 9/11

355

PRIME CONTRACTOR’S CERTIFICATION

OF WORKER COMPLIANCE WITH WV CODE & SBA POLICY

COUNTY ______________________________ DATE _________________________

PROJECT/SCHOOL NAME

The undersigned, Prime Contractor for the above referenced project, does hereby

certify that it has fully complied with the requirements of West Virginia Code 21- 1B with

regard to verifying the legal status and authorization to work of all its employees that will be present on

the construction site. Additionally, the undersigned for the above referenced project, does hereby certify

that it has verified the criminal records of all its employees who will work on this project and that none

of such employees have been required to register as a sex offender under West Virginia Code 15-12-2.

The undersigned has required each employee to produce one valid picture I.D. to substantiate

their name and address. The undersigned further certifies that it will require each of its sub-contractors

to execute a certificate (SBA Form 182) containing all of the above matters prior to such sub-contractor

beginning work on the above referenced project and that it will retain each of these certificates on file and

make them available for inspection by the proper authority .

__________________________________

PRIME CONTRACTOR SIGNATURE

REPRESENTING________________________________________

COMPANY NAME

STATE OF WEST VIRGINIA,

COUNTY OF _________ TO-WIT:

I, the undersigned Notary Public, within and for the County and State as aforesaid,

do hereby certify that______________________________ for the above listed project, has

(CONTRACTOR NAME)

this day personally acknowledged the same before me in my said County and State.

Taken, subscribed and sworn to before me on this the ________________day of

_________________________________.

My commission expires:

___________________________________

NOTARY PUBLIC SBA FORM 181

(Submit this form to the owner)

357

SUB-CONTRACTOR’S CERTIFICATION

OF WORKER COMPLIANCE WITH WV CODE & SBA POLICY

County ____________________________________ Date __________________________

Project/School Name ______________________________________________

The undersigned, Sub-Contractor for the above referenced project, does hereby certify to

the Prime Contractor that it has fully complied with the requirements of West Virginia Code 21-

1B with regard to verifying the legal status and authorization to work of all its employees that

will be present on this construction site. Additionally, the undersigned, for the above referenced

project, does hereby certify that it has verified the criminal records of all its employees who will

work on this project and that none of such employees have been required to register as a sex

offender under West Virginia Code 15-12-2.

The undersigned has required each employee to produce at least one valid picture I.D. to

substantiate their name and address.

____________________________________

SUB-CONTRACTOR

____________________________________

Company Name

STATE OF WEST VIRGINIA,

COUNTY OF _____________ TO-WIT:

I, the undersigned Notary Public, within and for the County and State as aforesaid, do

hereby certify that _______________________________, Sub-Contractor in the above listed Subcontractor Name

project, has this day personally acknowledged the same before me in my said County and State.

Taken, subscribed and sworn to before me on this the ____________________________

Day of ________________________________.

My commission expires: ________________________________________

____________________________________

NOTARY PUBLIC

SBA FORM 182

(Submit this form to the prime contractor)

SUMMARY011000 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes:

1. Project information.2. Work covered by Contract Documents.3. Access to site.4. Coordination with occupants.5. Work restrictions.6. Specification and drawing conventions.

B. Related Section:

1. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.2 PROJECT INFORMATION

A. Project Identification: Replace Two Rooftop HVAC Units, United Technical Center.

1. Project Location: Route 3, Box 43-C, Clarksburg, West Virginia 26301.

B. Owner: United Technical Center, Route 3, Box 43-C, Clarksburg, West Virginia 26301.

1. Owner's Representative: Joan E. Smith

C. Architect: Blackwood Associates, Inc., 611 East Park Avenue, Fairmont, WV 26554.

D. Engineer: MSES consultants, inc., 609 West Main Street, Clarksburg, WV 26301.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of the Project is defined by the Contract Documents and consists of the following:

SUMMARY011000 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

1. Remove existing HVAC equipment serving four classrooms and provide new HVAC equipment and associated refrigerant piping, temperature controls and electrical work.

2. Type of Contract: Project will be constructed under a single prime contract.

1.4 ACCESS TO SITE

A. General: Contractor shall have limited use of Project site for construction operations as indicated by requirements of this Section.

B. Use of Site: Limit use of Project site to prevent disturbance of normal school operations. Do not disturb portions of Project site beyond areas in which the Work is in progress.

1. Limits: Limit site disturbance with equipment, to 40 feet beyond building perimeter; 10 feet beyond surface walkways and surface parking.

2. Driveways, Walkways and Entrances: Keep driveways, loading areas,and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

C. Condition of Existing Building: Maintain portions of existing building affected by overhead construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

1.5 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy site and existing building during normal school session: late August through early June. Rooms scheduled for renovation will not be occupied during construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct existing building exiting without permission from Owner and approval of authorities having jurisdiction.

SUMMARY011000 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

2. Notify the Owner not less than 72 hours in advance of activities that will affect Owner's operations.

1.6 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and other requirements of authorities having jurisdiction.

B. On-Site Work Hours: There are no limits on work hours except as otherwise indicated by the Owner.

C. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.

1. Notify Owner not less than two days in advance of proposed disruptive operations.

2. Obtain Architect's written permission before proceeding with disruptive operations.

D. Nonsmoking Building: Smoking is not permitted on school property. No exceptions.

E. Controlled Substances: Use of tobacco products and other controlled substances is not permitted on school property.

1.7 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

SUMMARY011000 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

C. Drawing Coordination: Requirements for materials and products identified on the Drawings are described in detail in the Specifications. One or more of the following are used on the Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard.

3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

SUBSTITUTION PROCEDURES012500 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 012500 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Section:

1. Division 01 Section "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.

1.2 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

1.3 SUBMITTALS

A. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Substitution Request Form: Use facsimile of form provided in the Project Manual.

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication or installation cannot be provided, if applicable.

b. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Include annotated copy of applicable specification section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features

SUBSTITUTION PROCEDURES012500 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.f. Certificates and qualification data, where applicable or requested.g. List of similar installations for completed projects with project names

and addresses and names and addresses of architects and owners.h. Material test reports from a qualified testing agency indicating and

interpreting test results for compliance with requirements indicated.i. Research reports evidencing compliance with building code in effect

for Project, from IBC.j. Detailed comparison of Contractor's construction schedule using

proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum.

l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's Supplemental Instructions for minor changes in the Work.

b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.

SUBSTITUTION PROCEDURES012500 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

1.4 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage qualified testing agency to perform compatibility tests recommended by manufacturers.

PART 2 - PRODUCTS

2.1 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately upon discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Requested substitution will not adversely affect Contractor's construction schedule.

c. Requested substitution has received necessary approvals of authorities having jurisdiction.

d. Requested substitution is compatible with other portions of the Work.e. Requested substitution has been coordinated with other portions of

the Work.f. Requested substitution provides specified warranty.g. If requested substitution involves more than one contractor,

requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: Not allowed, unless otherwise indicated.

PART 3 - EXECUTION (Not Used)

END OF SECTION 012500

SUBSTITUTION REQUEST FORM

Project: Substitution Request Number:

From:

To: Date:

A/E Project Number:

Re: Contract For:

Specification Title: Description:

Section: Page Article/Paragraph

Proposed Substitution:

Manufacturer: Address: Phone:

Trade Name: Model No.:

Installer: Address: Phone:

History: New Product 2-5 yrs. Old 5-10 yrs. Old More than 10 yrs. Old

Differences between proposed substitution and specified product:

Point-by-point comparative data attached - REQUIRED BY A/E

Reason for not providing specified item:

Similar Installation:

Project: Architect:

Address: Owner:

Date Installed:

Product substitution affects other parts of Work: No Yes; explain

Savings to Owner for accepting substitution: ($ )

Proposed substitution changes Contract Time: No Yes Add Deduct days.

Supporting Data Attached: Drawings Product Data Samples Tests Reports Other

SUBSTITUTION REQUEST FORM (Continued)

The Undersigned certifies:

• Proposed substitution has been fully investigated and determined to be equal or superior in all respects tospecified product.

• Same warranty will be furnished for proposed substitution as for specified product.• Same maintenance service and source of replacement parts, as applicable, is available.• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress

schedule.• Cost data as stated above is complete. Claims for additional costs related to accepted substitution which

may subsequently become apparent are to be waived.• Proposed substitution does not affect dimensions and functional clearances.• Payment will be made by Contractor for necessary changes for building design, including A/E design,

detailing, and construction costs caused by the substitution. • Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete

in all aspects.

Submitted by:

Signed by:

Firm:

Address:

Telephone:

Attachments:

A/E’s REVIEW AND ACTION

Substitution approved - Make submittals in accordance with Specification Section 01330.

Substitution approved as noted - Make submittals in accordance with Specification Section 01330.

Substitution rejected - Use specified materials.

Substitution Request received too late - Use specified materials.

Signed by: Date:

Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E Other

CONTRACT MODIFICATION PROCEDURES012600 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 012600 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing Contract modifications.

1.2 MINOR CHANGES IN THE WORK

A. Architect will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710, "Architect's Supplemental Instructions."

1.3 PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.

1. Proposal Requests issued by Architect are not instructions either to stop work in progress or to execute the proposed change.

2. Within time specified in Proposal Request or 20 days, when not otherwise specified, after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change.

d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

e. Quotation Form: Use forms acceptable to Architect.

CONTRACT MODIFICATION PROCEDURES012600 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Architect.

1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

4. Include costs of labor and supervision directly attributable to the change.5. Include an updated Contractor's construction schedule that indicates the

effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

6. Comply with requirements in Division 01 Section "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.

7. Proposal Request Form: Use form acceptable to Architect.

1.4 ADMINISTRATIVE CHANGE ORDERS

A. Allowance Adjustment: Refer to Division 01 Section "Allowances" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect actual costs of allowances.

B. Unit Price Adjustment: Refer to Division 01 Section "Unit Prices" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect measured scope of unit price work.

1.5 CHANGE ORDER PROCEDURES

A. On Owner's approval of a Proposal Request, Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G701.

1.6 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.

CONTRACT MODIFICATION PROCEDURES012600 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 012600

PAYMENT PROCEDURES012900 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 012900 - PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment.

1.2 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Correlate line items in the schedule of values with other required administrative forms and schedules, including the following:

a. Application for Payment forms with continuation sheets.b. Submittal schedule.c. Items required to be indicated as separate activities in Contractor's

construction schedule.

2. Submit the schedule of values to Architect at earliest possible date but no later than seven days before the date scheduled for submittal of initial Applications for Payment.

3. Subschedules for Phased Work: Where the Work is separated into phases requiring separately phased payments, provide subschedules showing values correlated with each phase of payment.

B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the schedule of values:

a. Project name and location.b. Name of Architect.c. Architect's project number.d. Contractor's name and address.e. Date of submittal.

2. Arrange schedule of values consistent with format of AIA Document G703.

PAYMENT PROCEDURES012900 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide multiple line items for principal subcontract amounts in excess of five percent of Contract Sum.

4. Round amounts to nearest whole dollar; total shall equal the Contract Sum.

5. Provide a separate line item in the schedule of values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

6. Provide separate line items in the schedule of values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.

7. Allowances: Provide a separate line item in the schedule of values for each allowance. Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by measured quantity. Use information indicated in the Contract Documents to determine quantities.

8. Each item in the schedule of values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at Contractor's option.

9. Schedule Updating: Update and resubmit the schedule of values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.

1.3 APPLICATIONS FOR PAYMENT

A. Each Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner.

1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements.

B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction work covered by each Application for Payment is the period indicated in the Agreement.

PAYMENT PROCEDURES012900 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

C. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form for Applications for Payment.

D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action.

1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.

2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

E. Transmittal: Submit three signed and notarized original copies of each Application for Payment to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.

F. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from entities lawfully entitled to file a mechanic's lien arising out of the Contract and related to the Work covered by the payment.

1. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage, on each item.

2. When an application shows completion of an item, submit conditional final or full waivers.

3. Owner reserves the right to designate which entities involved in the Work must submit waivers.

4. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner.

G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors.2. Schedule of values.3. Contractor's construction schedule (preliminary if not final).4. Schedule of unit prices.5. Submittal schedule (preliminary if not final).6. List of Contractor's staff assignments.7. List of Contractor's principal consultants.8. Copies of building permits.

PAYMENT PROCEDURES012900 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

9. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.

10. Initial progress report.11. Report of preconstruction conference.12. Certificates of insurance and insurance policies.

H. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This application shall reflect Certificates of Partial Substantial Completion issued previously for Owner occupancy of designated portions of the Work.

I. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.2. Insurance certificates for products and completed operations where

required and proof that taxes, fees, and similar obligations were paid.3. Updated final statement, accounting for final changes to the Contract

Sum.4. AIA Document G706-1994, "Contractor's Affidavit of Payment of Debts

and Claims."5. AIA Document G706A-1994, "Contractor's Affidavit of Release of Liens."6. AIA Document G707-1994, "Consent of Surety to Final Payment."7. Evidence that claims have been settled.8. Final meter readings for utilities, a measured record of stored fuel, and

similar data as of date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work.

9. Final liquidated damages settlement statement.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 012900

PROJECT MANAGEMENT AND COORDINATION013100 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Coordination drawings.2. Requests for Information (RFIs).3. Project meetings.

B. Related Sections:

1. Division 01 Section "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

1.2 DEFINITIONS

A. RFI: Request from Owner, Architect, or Contractor seeking information from each other during construction.

1.3 COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

PROJECT MANAGEMENT AND COORDINATION013100 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.2. Preparation of the schedule of values.3. Installation and removal of temporary facilities and controls.4. Delivery and processing of submittals.5. Progress meetings.6. Preinstallation conferences.7. Project closeout activities.8. Startup and adjustment of systems.9. Project closeout activities.

1.4 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Architect will return RFIs submitted to Architect by other entities controlled by Contractor with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name.2. Project number.3. Date.4. Name of Contractor.5. Name of Architect.6. RFI number, numbered sequentially.7. RFI subject.8. Specification Section number and title and related paragraphs, as

appropriate.

PROJECT MANAGEMENT AND COORDINATION013100 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

9. Drawing number and detail references, as appropriate.10. Field dimensions and conditions, as appropriate.11. Contractor's suggested resolution. If Contractor's solution(s) impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

12. Contractor's signature.13. Attachments: Include sketches, descriptions, measurements, photos,

Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

C. RFI Forms: Software-generated form with substantially the same content as indicated above, acceptable to Architect.

D. Architect's Action: Architect will review each RFI, determine action required, and respond. Allow seven working days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m. will be considered as received the following working day.

1. The following RFIs will be returned without action:

a. Requests for approval of submittals.b. Requests for approval of substitutions.c. Requests for coordination information already indicated in the

Contract Documents.d. Requests for adjustments in the Contract Time or the Contract Sum.e. Requests for interpretation of Architect's actions on submittals.f. Incomplete RFIs or inaccurately prepared RFIs.

2. Architect's action may include a request for additional information, in which case Architect's time for response will date from time of receipt of additional information.

3. Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to Division 01 Section "Contract Modification Procedures."

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Architect in writing within 10 days of receipt of the RFI response.

E. On receipt of Architect's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Architect within seven days if Contractor disagrees with response.

F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number, including the following:

PROJECT MANAGEMENT AND COORDINATION013100 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

1. Project name.2. Name and address of Contractor.3. Name and address of Architect.4. RFI number including RFIs that were dropped and not submitted.5. RFI description.6. Date the RFI was submitted.7. Date Architect's response was received.8. Identification of related Minor Change in the Work, Construction Change

Directive, and Proposal Request, as appropriate.9. Identification of related Field Order, Work Change Directive, and Proposal

Request, as appropriate.

1.5 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Entity responsible for conducting meeting will record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Architect, within three days of the meeting.

B. Preconstruction Conference: Schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Architect, but no later than 15 days after execution of the Agreement.

1. Attendees: Authorized representatives of Owner, Architect, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule.b. Phasing.c. Critical work sequencing and long-lead items.d. Designation of key personnel and their duties.e. Procedures for processing field decisions and Change Orders.f. Procedures for RFIs.

PROJECT MANAGEMENT AND COORDINATION013100 - 5

Replace Classroom Unit VentilatorsUnited Technical Center

g. Procedures for testing and inspecting.h. Procedures for processing Applications for Payment.i. Distribution of the Contract Documents.j. Submittal procedures.k. Preparation of record documents.l. Use of the premises.m. Work restrictions.n. Working hours.o. Owner's occupancy requirements.p. Responsibility for temporary facilities and controls.q. Procedures for moisture and mold control.r. Procedures for disruptions and shutdowns.s. Construction waste management and recycling.t. Parking availability.u. Office, work, and storage areas.v. Equipment deliveries and priorities.w. First aid.x. Security.y. Progress cleaning.

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Architect of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.b. Options.c. Related RFIs.d. Related Change Orders.e. Purchases.f. Deliveries.g. Submittals.h. Review of mockups.i. Possible conflicts.j. Compatibility problems.k. Time schedules.

PROJECT MANAGEMENT AND COORDINATION013100 - 6

Replace Classroom Unit VentilatorsUnited Technical Center

l. Weather limitations.m. Manufacturer's written recommendations.n. Warranty requirements.o. Compatibility of materials.p. Acceptability of substrates.q. Temporary facilities and controls.r. Space and access limitations.s. Regulations of authorities having jurisdiction.t. Testing and inspecting requirements.u. Installation procedures.v. Coordination with other work.w. Required performance results.x. Protection of adjacent work.y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Conduct progress meetings at two-week intervals until the project achieves Substantial Completion.

1. Attendees: In addition to representatives of Owner and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

PROJECT MANAGEMENT AND COORDINATION013100 - 7

Replace Classroom Unit VentilatorsUnited Technical Center

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.2) Sequence of operations.3) Status of submittals.4) Deliveries.5) Off-site fabrication.6) Access.7) Site utilization.8) Temporary facilities and controls.9) Progress cleaning.10) Quality and work standards.11) Status of correction of deficient items.12) Field observations.13) Status of RFIs.14) Status of proposal requests.15) Pending changes.16) Status of Change Orders.17) Pending claims and disputes.18) Documentation of information for payment requests.

3. Minutes: Record the meeting minutes.4. Reporting: Distribute minutes of the meeting to each party present and to

parties who should have been present.

a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013100

CONSTRUCTION PROGRESS DOCUMENTATION013200 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's Construction Schedule.2. Submittals Schedule.3. Daily construction reports.4. Field condition reports.

B. See Division 01 Section "Payment Procedures" for submitting the Schedule of Values.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.

C. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

D. Float: The measure of leeway in starting and completing an activity.

1. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a jointly owned, expiring Project resource available to

CONSTRUCTION PROGRESS DOCUMENTATION013200 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

both parties as needed to meet schedule milestones and Contract completion date.

E. Fragnet: A partial or fragmentary network that breaks down activities into smaller activities for greater detail.

F. Major Area: A story of construction, a separate building, or a similar significant construction element.

1.3 SUBMITTALS

A. Submittals Schedule: Submit three copies of schedule. Arrange the following information in a tabular format:

1. Scheduled date for first submittal.2. Specification Section number and title.3. Submittal category (action or informational).4. Name of subcontractor.5. Description of the Work covered.6. Scheduled date for Architect's final release or approval.

B. Contractor's Construction Schedule: Submit two opaque copies of initial schedule, large enough to show entire schedule for entire construction period.

1. Submit an electronic copy of schedule, using software indicated, on CD-R, and labeled to comply with requirements for submittals. Include type of schedule (Initial or Updated) and date on label.

C. Daily Construction Reports: Submit two copies at monthly intervals.

D. Field Condition Reports: Submit two copies at time of discovery of differing conditions.

1.4 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.

B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from parties involved.

CONSTRUCTION PROGRESS DOCUMENTATION013200 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

2.1 SUBMITTALS SCHEDULE

A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates.

1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's Construction Schedule.

2. Submit concurrently with the first complete submittal of Contractor's Construction Schedule.

2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established for the Notice to Proceedto date of Final Completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.

B. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. Comply with the following:

1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by Architect.

2. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

3. Submittal Review Time: Include review and resubmittal times indicated in Division 01 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule.

4. Startup and Testing Time: Include not less than 14 days for startup and testing.

5. Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and allow time for Architect's

CONSTRUCTION PROGRESS DOCUMENTATION013200 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

administrative procedures necessary for certification of Substantial Completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.2. Work under More Than One Contract: Include a separate activity for each

contract.3. Work by Owner: Include a separate activity for each portion of the Work

performed by Owner.4. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction.b. Limitations of continued occupancies.c. Uninterruptible services.d. Partial occupancy before Substantial Completion.e. Use of premises restrictions.f. Provisions for future construction.g. Seasonal variations.h. Environmental control.

5. Work Stages: Indicate important stages of construction for each major portion of the Work.

2.3 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site:

1. List of subcontractors at Project site.2. Equipment at Project site.3. Material deliveries.4. High and low temperatures and general weather conditions.5. Accidents.6. Stoppages, delays, shortages, and losses.7. Meter readings and similar recordings.8. Orders and requests of authorities having jurisdiction.9. Services connected and disconnected.10. Equipment or system tests and startups.

B. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare and submit a detailed report. Submit with a request for interpretation. Include a detailed description of the

CONSTRUCTION PROGRESS DOCUMENTATION013200 - 5

Replace Classroom Unit VentilatorsUnited Technical Center

differing conditions, together with recommendations for changing the Contract Documents.

PART 3 - EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue updated schedule before at each regularly scheduled progress meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate Actual Completion percentage for each activity.

B. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1. Post copies in Project meeting rooms and temporary field offices.2. When revisions are made, distribute updated schedules to the same

parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION 013200

SUBMITTAL PROCEDURES013300 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

B. Related Sections:

1. Division 01 Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's construction schedule.

2. Division 01 Section "Project Record Documents" for submitting record Drawings, record Specifications, and record Product Data.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's responsive action.

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's responsive action. Submittals may be rejected for not complying with requirements.

1.3 ACTION SUBMITTALS

A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or modifications to submittals noted by the Architect and additional time for handling and reviewing submittals required by those corrections.

1.4 SUBMITTAL ADMINISTRATIVE REQUIREMENTS

A. Architect's Digital Data Files: Electronic copies of CAD Drawings of the Contract Drawings will not be provided by Architect for Contractor's use in preparing submittals.

SUBMITTAL PROCEDURES013300 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal.

D. Identification and Information: Place a permanent label or title block on each paper copy submittal item for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 6 by 8 inches on label or beside title block to record Contractor's review and approval markings and action taken by Architect.

3. Include the following information for processing and recording action taken:

a. Project name.b. Date.c. Name of Architect.d. Name of Construction Manager.e. Name of Contractor.f. Name of subcontractor.g. Name of supplier.h. Name of manufacturer.

SUBMITTAL PROCEDURES013300 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

i. Submittal number or other unique identifier, including revision identifier.

1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 061000.01.A).

j. Number and title of appropriate Specification Section.k. Drawing number and detail references, as appropriate.l. Location(s) where product is to be installed, as appropriate.m. Other necessary identification.

E. Identification and Information: Identify and incorporate information in each electronic submittal file as follows:

1. Assemble complete submittal package into a single indexed file with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

a. File name shall use project identifier and Specification Section number followed by a decimal point and then a sequential number (e.g., LNHS-061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., LNHS-061000.01.A).

3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Architect.

4. Include the following information on an inserted cover sheet:

a. Project name.b. Date.c. Name and address of Architect.d. Name of Construction Manager.e. Name of Contractor.f. Name of firm or entity that prepared submittal.g. Name of subcontractor.h. Name of supplier.i. Name of manufacturer.j. Number and title of appropriate Specification Section.k. Drawing number and detail references, as appropriate.l. Location(s) where product is to be installed, as appropriate.m. Related physical samples submitted directly.n. Other necessary identification.

F. Options: Identify options requiring selection by the Architect.

SUBMITTAL PROCEDURES013300 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

G. Deviations: Identify deviations from the Contract Documents on submittals.

H. Additional Paper Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

1. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Architect.

I. Transmittal: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Architect will discard submittals received from sources other than Contractor.

1. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Architect on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same identification information as related submittal.

J. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.2. Note date and content of revision in label or title block and clearly indicate

extent of revision.3. Resubmit submittals until they are marked with approval notation from

Architect's action stamp.

K. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

L. Use for Construction: Use only final submittals that are marked with approval notation from Architect's action stamp.

PART 2 - PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements:

1. Electronic submittals are preferred but paper copies of the submittals are acceptable. Select only one submittal method and use for all project submissions. Indicate proposed submittal procedure in writing to

SUBMITTAL PROCEDURES013300 - 5

Replace Classroom Unit VentilatorsUnited Technical Center

Architect prior to initial submission. Submittals provided in format not approved will be discarded without review.

2. Submit electronic submittals via email as PDF electronic files.

a. Architect will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.

3. Action Submittals: Submit three paper copies of each submittal, unless otherwise indicated. Architect will return two copies.

4. Informational Submittals: Submit two paper copies of each submittal, unless otherwise indicated. Architect will not return copies.

5. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Division 01 Section "Closeout Procedures."

6. Certificates and Certifications Submittals: Provide a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

a. Provide a digital signature with digital certificate on electronically-submitted certificates and certifications where indicated.

b. Provide a notarized statement on original paper copy certificates and certifications where indicated.

7. Test and Inspection Reports Submittals: Comply with requirements specified in Division 01 Section "Quality Requirements."

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.b. Manufacturer's product specifications.c. Standard color charts.d. Statement of compliance with specified referenced standards.e. Testing by recognized testing agency.f. Application of testing agency labels and seals.g. Notation of coordination requirements.h. Availability and delivery time information.

SUBMITTAL PROCEDURES013300 - 6

Replace Classroom Unit VentilatorsUnited Technical Center

4. For equipment, include the following in addition to the above, as applicable:

a. Wiring diagrams showing factory-installed wiring.b. Printed performance curves.c. Operational range diagrams.d. Clearances required to other construction, if not indicated on

accompanying Shop Drawings.

5. Submit Product Data before or concurrent with Samples.6. Submit Product Data in the following format:

a. PDF electronic file.b. Three paper copies of Product Data, unless otherwise indicated.

Architect will return two copies.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products.b. Schedules.c. Compliance with specified standards.d. Notation of coordination requirements.e. Notation of dimensions established by field measurement.f. Relationship and attachment to adjoining construction clearly

indicated.g. Seal and signature of professional engineer if specified.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 42 inches.

3. Submit Shop Drawings in the following format:

a. PDF electronic file.b. Three opaque copies of each submittal. Architect will retain two

copies; remainder will be returned.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

SUBMITTAL PROCEDURES013300 - 7

Replace Classroom Unit VentilatorsUnited Technical Center

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample.b. Product name and name of manufacturer.c. Sample source.d. Number and title of applicable Specification Section.

3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit one full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit three sets of Samples. Architect will retain two Sample sets; remainder will be returned. Mark up and retain one returned Sample set as a Project record sample.

1) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample,

SUBMITTAL PROCEDURES013300 - 8

Replace Classroom Unit VentilatorsUnited Technical Center

submit at least three sets of paired units that show approximate limits of variations.

E. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form:

1. Submit product schedule in the following format:

a. PDF electronic file.b. Three paper copies of product schedule or list, unless otherwise

indicated. Architect will return two copies.

F. Contractor's Construction Schedule: Comply with requirements specified in Division 01 Section "Construction Progress Documentation."

G. Application for Payment: Comply with requirements specified in Division 01 Section "Payment Procedures."

H. Schedule of Values: Comply with requirements specified in Division 01 Section "Payment Procedures."

I. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design.

1. Submit subcontract list in the following format:

a. PDF electronic file.b. Number of Copies: Three paper copies of subcontractor list, unless

otherwise indicated. Architect will return two copies.

J. Coordination Drawings: Comply with requirements specified in Division 01 Section "Project Management and Coordination."

K. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of architects and owners, and other information specified.

L. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification and Procedure Qualification Record on American Welding Society (AWS) forms. Include names of firms and personnel certified.

SUBMITTAL PROCEDURES013300 - 9

Replace Classroom Unit VentilatorsUnited Technical Center

M. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

N. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

O. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

P. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

Q. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

R. Product Test Reports: Submit written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

S. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.

T. Schedule of Tests and Inspections: Comply with requirements specified inDivision 01 Section "Quality Requirements."

U. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

V. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

W. Field Test Reports: Submit reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

SUBMITTAL PROCEDURES013300 - 10

Replace Classroom Unit VentilatorsUnited Technical Center

X. Maintenance Data: Comply with requirements specified in Division 01 Section "Operation and Maintenance Data."

Y. Design Data: Prepare and submit written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect.

B. Project Closeout and Maintenance/Material Submittals: Refer to requirements in Division 01 Section "Closeout Procedures."

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

3.2 ARCHITECT'S ACTION

A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action.

C. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.

D. Incomplete submittals are not acceptable, will be considered nonresponsive, and will be returned without review.

SUBMITTAL PROCEDURES013300 - 11

Replace Classroom Unit VentilatorsUnited Technical Center

E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

END OF SECTION 013300

QUALITY REQUIREMENTS014000 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 014000 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.

2. Requirements for Contractor to provide quality-assurance and -control services required by Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section.

C. Related Sections:

1. Divisions 02 through 49 Sections for specific test and inspection requirements.

1.2 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Architect.

C. Mockups: Full size physical assemblies that are constructed on-site. Mockups are constructed to verify selections made under sample submittals; to demonstrate aesthetic effects and, where indicated, qualities of materials and execution; to review coordination, testing, or operation; to show interface between dissimilar materials; and to demonstrate compliance with specified

QUALITY REQUIREMENTS014000 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved mockups establish the standard by which the Work will be judged.

1. Laboratory Mockups: Full-size, physical assemblies constructed at testing facility to verify performance characteristics.

D. Preconstruction Testing: Tests and inspections performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.

E. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.

F. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

G. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

H. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

I. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Use of trade-specific terminology in referring to a trade or entity does not require that certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade or trades.

J. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.3 CONFLICTING REQUIREMENTS

A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer

QUALITY REQUIREMENTS014000 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

conflicting requirements that are different, but apparently equal, to Architect for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.

1.4 INFORMATIONAL SUBMITTALS

A. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

1.5 REPORTS AND DOCUMENTS

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:

1. Date of issue.2. Project title and number.3. Name, address, and telephone number of testing agency.4. Dates and locations of samples and tests or inspections.5. Names of individuals making tests and inspections.6. Description of the Work and test and inspection method.7. Identification of product and Specification Section.8. Complete test or inspection data.9. Test and inspection results and an interpretation of test results.10. Record of temperature and weather conditions at time of sample taking

and testing and inspecting.11. Comments or professional opinion on whether tested or inspected Work

complies with the Contract Document requirements.12. Name and signature of laboratory inspector.13. Recommendations on retesting and reinspecting.

B. Manufacturer's Field Reports: Prepare written information documenting tests and inspections specified in other Sections. Include the following:

1. Name, address, and telephone number of representative making report.

QUALITY REQUIREMENTS014000 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

2. Statement on condition of substrates and their acceptability for installation of product.

3. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.

4. Results of operational and other tests and a statement of whether observed performance complies with requirements.

5. Other required items indicated in individual Specification Sections.

C. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.6 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar to those indicated for this Project in material, design, and extent.

F. Specialists: Certain Specification Sections require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.

QUALITY REQUIREMENTS014000 - 5

Replace Classroom Unit VentilatorsUnited Technical Center

1. Requirements of authorities having jurisdiction shall supersede requirements for specialists.

G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 329; and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities.

1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.

2. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory Accreditation Program.

H. Manufacturer's Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

I. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for compliance with specified requirements for performance and test methods, comply with the following:

1. Contractor responsibilities include the following:

a. Provide test specimens representative of proposed products and construction.

b. Submit specimens in a timely manner with sufficient time for testing and analyzing results to prevent delaying the Work.

c. Build laboratory mockups at testing facility using personnel, products, and methods of construction indicated for the completedWork.

d. When testing is complete, remove test specimens, assemblies, mockups; do not reuse products on Project.

2. Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and similar quality-assurance service to Architect, with copy to Contractor. Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

J. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:

QUALITY REQUIREMENTS014000 - 6

Replace Classroom Unit VentilatorsUnited Technical Center

1. Build mockups in location and of size indicated or, if not indicated, as directed by Architect.

2. Notify Architect seven days in advance of dates and times when mockups will be constructed.

3. Demonstrate the proposed range of aesthetic effects and workmanship.4. Obtain Architect's approval of mockups before starting work, fabrication, or

construction.

a. Allow seven days for initial review and each re-review of each mockup.

5. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

6. Demolish and remove mockups when directed, unless otherwise indicated.

K. Laboratory Mockups: Comply with requirements of preconstruction testing and those specified in individual Specification Sections in Divisions 02 through 49.

1.7 QUALITY CONTROL

A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.

1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform.

2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Contractor, and the Contract Sum will be adjusted by Change Order.

B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Perform additional quality-control activities required to verify that the Work complies with requirements, whether specified or not.

1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.

a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner.

2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.

QUALITY REQUIREMENTS014000 - 7

Replace Classroom Unit VentilatorsUnited Technical Center

3. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

4. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

5. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

C. Manufacturer's Field Services: Where indicated, engage a manufacturer's representative to observe and inspect the Work. Manufacturer's representative's services include examination of substrates and conditions, verification of materials, inspection of completed portions of the Work, and submittal of written reports.

D. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

E. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.

3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.

6. Do not perform any duties of Contractor.

F. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work.2. Incidental labor and facilities necessary to facilitate tests and inspections.3. Adequate quantities of representative samples of materials that require

testing and inspecting. Assist agency in obtaining samples.4. Facilities for storage and field curing of test samples.

QUALITY REQUIREMENTS014000 - 8

Replace Classroom Unit VentilatorsUnited Technical Center

5. Delivery of samples to testing agencies.6. Preliminary design mix proposed for use for material mixes that require

control by testing agency.7. Security and protection for samples and for testing and inspecting

equipment at Project site.

G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

1.8 SPECIAL TESTS AND INSPECTIONS

A. Special Tests and Inspections: Owner will engage a qualified testing agency to conduct special tests and inspections required by authorities having jurisdiction as the responsibility of Owner, and as follows:

B. Special Tests and Inspections: Conducted by a qualified testing agency as required by authorities having jurisdiction, as indicated in individual Specification Sections, and as follows:

1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures and reviewing the completeness and adequacy of those procedures to perform the Work.

2. Notifying Architect and Contractor promptly of irregularities and deficiencies observed in the Work during performance of its services.

3. Submitting a certified written report of each test, inspection, and similar quality-control service to Architect with copy to Contractor and to authorities having jurisdiction.

4. Submitting a final report of special tests and inspections at Substantial Completion, which includes a list of unresolved deficiencies.

5. Interpreting tests and inspections and stating in each report whether tested and inspected work complies with or deviates from the Contract Documents.

6. Retesting and reinspecting corrected work.

QUALITY REQUIREMENTS014000 - 9

Replace Classroom Unit VentilatorsUnited Technical Center

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply with the Contract Document requirements for cutting and patching in Division 01 Section "Execution."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 014000

REFERENCES014200 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 014200 - REFERENCES

PART 1 - GENERAL

1.1 DEFINITIONS

A. General: Basic Contract definitions are included in the Conditions of the Contract.

B. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the Conditions of the Contract.

C. "Directed": A command or instruction by Architect. Other terms including "requested," "authorized," "selected," "required," and "permitted" have the same meaning as "directed."

D. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated."

E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.

F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.

G. "Install": Operations at Project site including unloading, temporarily storing, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.

H. "Provide": Furnish and install, complete and ready for the intended use.

I. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.

1.2 INDUSTRY STANDARDS

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the

REFERENCES014200 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source.

1.3 ABBREVIATIONS AND ACRONYMS

A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities indicated in Gale's "Encyclopedia of Associations: National Organizations of the U.S." or in Columbia Books' "National Trade & Professional Associations of the United States."

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 014200

TEMPORARY FACILITIES AND CONTROLS015000 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

B. Related Section:

1. Division 01 Section "Summary" for work restrictions and limitations on utility interruptions.

1.2 USE CHARGES

A. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost, including, but not limited to, Architect, testing agencies, and authorities having jurisdiction.

B. Water and Sewer Service from Existing System: Water from Owner's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

C. Electric Power Service from Existing System: Electric power from Owner's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

1.3 INFORMATIONAL SUBMITTALS

A. Site Plan: Show proposed staging areas, and parking areas for construction personnel.

1.4 QUALITY ASSURANCE

A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

TEMPORARY FACILITIES AND CONTROLS015000 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

1.5 PROJECT CONDITIONS

A. Temporary Use of Permanent Facilities: Engage installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities.

PART 2 - PRODUCTS

2.1 TEMPORARY FACILITIES

A. Field Offices, General: Existing office inside renovated area can be used as field office.

B. Storage and Fabrication Area: Existing area to be renovated can be used as material / supply storage.

2.2 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

2.3 PROJECT SIGN

A. 4’ x 8’ wood sign as shown on Drawings at the end of this section.

B. Locate where shown on Site plans.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

1. Locate facilities to limit site disturbance as specified in Division 01 Section "Summary."

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

TEMPORARY FACILITIES AND CONTROLS015000 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service.

1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

B. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water service facilities in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Sanitary Facilities: Provide drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.

1. Toilets: Use of Owner's existing toilet facilities inside renovated area willbe permitted. Provide paper supplies as needed. Upon project completion, restore these facilities to original condition.

D. Electric Power Service: Connect to Owner's existing electric power service. Maintain equipment in a condition acceptable to Owner.

E. Telephone Service: Provide superintendent with cellular telephone or portable two-way radio for use.

3.3 SUPPORT FACILITIES INSTALLATION

A. Traffic Controls: Comply with requirements of authorities having jurisdiction.

1. Protect existing site improvements including curbs, pavement, and utilities.2. Maintain access for fire-fighting equipment and access to fire hydrants.

B. Parking: Use designated areas of Owner's existing parking areas for construction personnel.

C. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Comply with Division 01 Section "Execution" for progress cleaning requirements.

D. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.

TEMPORARY FACILITIES AND CONTROLS015000 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

C. Temporary Egress: Maintain temporary egress from existing occupied facilities as indicated and as required by authorities having jurisdiction.

D. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

3.5 MOISTURE AND MOLD CONTROL

A. Contractor's Moisture Protection Plan: Avoid trapping water in finished work.

END OF SECTION 015000

PRODUCT REQUIREMENTS016000 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 016000 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; and comparable products.

B. Related Section:

1. Division 01 Section "Substitution Procedures" for requests for substitutions.

1.2 DEFINITIONS

A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature, that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis-of-Design Product Specification: A specification in which a specific manufacturer's product is named and accompanied by the words "basis-of-design product," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of additional manufacturers named in the specification.

PRODUCT REQUIREMENTS016000 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

1.3 ACTION SUBMITTALS

A. Comparable Product Requests: Submit request for consideration of each comparable product. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within one week of receipt of a comparable product request. Architect will notify Contractor of approval or rejection of proposed comparable product request within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Form of Approval: As specified in Division 01 Section "Submittal Procedures."

b. Use product specified if Architect does not issue a decision on use of a comparable product request within time allocated.

B. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 01 Section "Submittal Procedures." Show compliance with requirements.

1.4 QUALITY ASSURANCE

A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options.

1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions.

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system,

PRODUCT REQUIREMENTS016000 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to determine compliance with the Contract Documents and to determine that products are undamaged and properly protected.

C. Storage:

1. Store products to allow for inspection and measurement of quantity or counting of units.

2. Store materials in a manner that will not endanger Project structure.3. Store products that are subject to damage by the elements, under cover in

a weathertight enclosure above ground, with ventilation adequate to prevent condensation.

4. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment.

5. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage.

6. Protect stored products from damage and liquids from freezing.

1.6 PRODUCT WARRANTIES

A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

1. Manufacturer's Warranty: Written warranty furnished by individual manufacturer for a particular product and specifically endorsed by manufacturer to Owner.

2. Special Warranty: Written warranty required by the Contract Documents to provide specific rights for Owner.

B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution.

1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed.

2. Specified Form: When specified forms are included with the Specifications, prepare a written document using indicated form properly executed.

3. Refer to Divisions 02 through 49. Sections for specific content requirements and particular requirements for submitting special warranties.

PRODUCT REQUIREMENTS016000 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

C. Submittal Time: Comply with requirements in Division 01 Section "Closeout Procedures."

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, are undamaged and, unless otherwise indicated, are new at time of installation.

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Owner reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," Architect will make selection.

5. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.

B. Product Selection Procedures:

1. Product: Where Specifications name a single manufacturer and product, provide the named product that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or source that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

3. Products:

a. Restricted List: Where Specifications include a list of names of both manufacturers and products, provide one of the products listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will be considered, unless otherwise indicated.

b. Nonrestricted List: Where Specifications include a list of names of both available manufacturers and products, provide one of the

PRODUCT REQUIREMENTS016000 - 5

Replace Classroom Unit VentilatorsUnited Technical Center

products listed, or an unnamed product, that complies with requirements. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product.

4. Manufacturers:

a. Restricted List: Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will be considered.

b. Nonrestricted List: Where Specifications include a list of available manufacturers, provide a product by one of the manufacturers listed, or a product by an unnamed manufacturer, that complies with requirements. Comply with requirements in "Comparable Products" Article for consideration of an unnamed manufacturer's product.

5. Basis-of-Design Product: Where Specifications name a product, or refer to a product indicated on Drawings, and include a list of manufacturers, provide the specified or indicated product or a comparable product by one of the other named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product by one of the other named manufacturers.

C. Visual Matching Specification: Where Specifications require "match Architect's sample", provide a product that complies with requirements and matches Architect's sample. Architect's decision will be final on whether a proposed product matches.

1. If no product available within specified category matches and complies with other specified requirements, comply with requirements in Division 01 Section "Substitution Procedures" for proposal of product.

D. Visual Selection Specification: Where Specifications include the phrase "as selected by Architect from manufacturer's full range" or similar phrase, select a product that complies with requirements. Architect will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.2 COMPARABLE PRODUCTS

A. Conditions for Consideration: Architect will consider Contractor's request for comparable product when the following conditions are satisfied. If the following

PRODUCT REQUIREMENTS016000 - 6

Replace Classroom Unit VentilatorsUnited Technical Center

conditions are not satisfied, Architect may return requests without action, except to record noncompliance with these requirements:

1. Evidence that the proposed product does not require revisions to the Contract Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated.

3. Evidence that proposed product provides specified warranty.4. List of similar installations for completed projects with project names and

addresses and names and addresses of architects and owners, if requested.

5. Samples, if requested.

PART 3 - EXECUTION (Not Used)

END OF SECTION 016000

EXECUTION017300 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 017300 - EXECUTION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following:

1. Construction layout.2. Field engineering and surveying.3. Installation of the Work.4. Cutting and patching.5. Progress cleaning.6. Protection of installed construction.7. Correction of the Work.

1.2 INFORMATIONAL SUBMITTALS

A. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal.

1.3 QUALITY ASSURANCE

A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.

1. Structural Elements: When cutting and patching structural elements, notify Architect of locations and details of cutting and await directions from the Architect before proceeding. Shore, brace, and support structural element during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection

2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.

3. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or

EXECUTION017300 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

that results in increased maintenance or decreased operational life or safety.

4. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

1.4 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Comply with requirements specified in other Sections.

1. For projects requiring compliance with sustainable design and construction practices and procedures, utilize products for patching that comply with requirements of Division 01 Section "Sustainable Design Requirements."

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to the Architect for the visual and functional performance of in-place materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: The existence and location of construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of utilities,mechanical and electrical systems, and other construction affecting the Work.

EXECUTION017300 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

B. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Verify compatibility with and suitability of substrates.2. Examine existing mechanical and electrical systems to verify actual

locations before start of work.3. Examine walls, floors, and roofs for suitable conditions where products

and systems are to be installed.4. Proceed with installation only after unsatisfactory conditions have been

corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing materials. Verify dimensions of existing conditions by field measurements before fabrication.

B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of the Contractor, submit a request for information to Architect according to requirements in Division 01 Section "Project Management and Coordination."

3.3 CONSTRUCTION LAYOUT

A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to existing benchmarks. If discrepancies are discovered, notify Architect promptly.

B. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Architect.

3.4 FIELD ENGINEERING

A. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations.

EXECUTION017300 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

3.5 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level.2. Where space is limited, install components to maximize space available

for maintenance and ease of removal for replacement.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.

F. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.

G. Hazardous Materials: Use products and installation materials that are not considered hazardous.

3.6 CUTTING AND PATCHING

A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Temporary Support: Provide temporary support of work to be cut.

C. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

EXECUTION017300 - 5

Replace Classroom Unit VentilatorsUnited Technical Center

D. Adjacent Occupied Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

E. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.

1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.

3. Proceed with patching after construction operations requiring cutting are complete.

F. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as practicable. Provide materials and comply with installation requirements specified in other Sections, where applicable.

1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate physical integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will minimize evidence of patching and refinishing.

3. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an even-plane surface of uniform appearance.

4. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition.

G. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.

3.7 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold waste materials more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F.

EXECUTION017300 - 6

Replace Classroom Unit VentilatorsUnited Technical Center

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

1. Remove liquid spills promptly.2. Where dust would impair proper execution of the Work, broom-clean or

vacuum the entire work area, as appropriate.

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways.

H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

J. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

3.8 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

EXECUTION017300 - 7

Replace Classroom Unit VentilatorsUnited Technical Center

B. Comply with manufacturer's written instructions for temperature and relative humidity.

3.9 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

B. Restore permanent facilities used during construction to their specified condition.

C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.

D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.

E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.

END OF SECTION 017300

CLOSEOUT PROCEDURES017700 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 017700 - CLOSEOUT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Substantial Completion procedures.2. Final completion procedures.3. Warranties.4. Final cleaning.

B. Related Sections:

1. Division 01 Section "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data.

1.2 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete with request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Owner of pending insurance changeover requirements.3. Submit specific warranties, workmanship bonds, maintenance service

agreements, final certifications, and similar documents.4. Terminate and remove temporary facilities from Project site, along with

construction tools, and similar elements.5. Complete final cleaning requirements, including touchup painting.6. Touch up and otherwise repair and restore marred exposed finishes to

eliminate visual defects.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued.

CLOSEOUT PROCEDURES017700 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for final completion.

1.3 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining final completion, complete the following:

1. Submit a final Application for Payment according to Division 01 Section "Payment Procedures."

2. Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

1.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Organization of List: Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order.

1.5 WARRANTIES

A. Submittal Time: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.

CLOSEOUT PROCEDURES017700 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

PART 2 - PRODUCTS

2.1 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

1. Use cleaning products that meet Green Seal GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Remove tools, construction equipment, machinery, and surplus material from Project site.

d. Remove labels that are not permanent.e. Touch up and otherwise repair and restore marred, exposed finishes

and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

f. Wipe surfaces of mechanical and electrical equipment and similar equipment. Remove excess lubrication, paint, and other foreign substances.

g. Leave Project clean and ready for occupancy.

END OF SECTION 017700

OPERATION AND MAINTENANCE DATA017823 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 017823 - OPERATION AND MAINTENANCE DATA

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following:

1. Emergency manuals.2. Operation manuals for systems, subsystems, and equipment.3. Maintenance manuals for the care and maintenance of products,

materials, finishes and systems and equipment.

B. See Divisions 02 through 49 Sections for specific operation and maintenance manual requirements for the Work in those Sections.

1.2 SUBMITTALS

A. Manual: Submit one copy of each manual in final form at least 15 days before final inspection. Architect will return copy with comments within 15 days after final inspection.

1. Correct or modify each manual to comply with Architect's comments. Submit 3 copies of each corrected manual within 15 days of receipt of Architect's comments.

PART 2 - PRODUCTS

2.1 MANUALS, GENERAL

A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain a title page, table of contents, and manual contents.

B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:

1. Subject matter included in manual.2. Name and address of Project.3. Name and address of Owner.4. Date of submittal.

OPERATION AND MAINTENANCE DATA017823 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

5. Name, address, and telephone number of Contractor.6. Name and address of Architect.7. Cross-reference to related systems in other operation and maintenance

manuals.

C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.

D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.

a. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.

4. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.

a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

2.2 OPERATION MANUALS

A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and equipment descriptions,

OPERATION AND MAINTENANCE DATA017823 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

operating standards, operating procedures, operating logs, wiring and control diagrams, and license requirements.

B. Descriptions: Include the following:

1. Product name and model number.2. Manufacturer's name.3. Equipment identification with serial number of each component.4. Equipment function.5. Operating characteristics.6. Limiting conditions.7. Performance curves.8. Engineering data and tests.9. Complete nomenclature and number of replacement parts.

C. Operating Procedures: Include start-up, break-in, and control procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; and required sequences for electric or electronic systems.

D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.

E. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification.

2.3 PRODUCT MAINTENANCE MANUAL

A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.

B. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.

C. Product Information: Include the following, as applicable:

1. Product name and model number.2. Manufacturer's name.3. Color, pattern, and texture.4. Material and chemical composition.5. Reordering information for specially manufactured products.

OPERATION AND MAINTENANCE DATA017823 - 4

Replace Classroom Unit VentilatorsUnited Technical Center

D. Maintenance Procedures: Include manufacturer's written recommendations and inspection procedures, types of cleaning agents, methods of cleaning, schedule for cleaning and maintenance, and repair instructions.

E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services.

F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

2.4 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL

A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below.

B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.

C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including maintenance instructions, drawings and diagrams for maintenance, nomenclature of parts and components, and recommended spare parts for each component part or piece of equipment:

D. Maintenance Procedures: Include test and inspection instructions, troubleshooting guide, disassembly instructions, and adjusting instructions that detail essential maintenance procedures:

E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.

F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services.

G. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent.

OPERATION AND MAINTENANCE DATA017823 - 5

Replace Classroom Unit VentilatorsUnited Technical Center

H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

PART 3 - EXECUTION

3.1 MANUAL PREPARATION

A. Emergency Manual: Assemble a complete set of emergency information indicating procedures for use by emergency personnel and by Owner's operating personnel for types of emergencies indicated.

B. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work.

C. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

D. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

E. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in Record Drawings to ensure correct illustration of completed installation.

1. Do not use original Project Record Documents as part of operation and maintenance manuals.

F. Comply with Division 01 Section "Closeout Procedures" for schedule for submitting operation and maintenance documentation.

END OF SECTION 017823

PROJECT RECORD DOCUMENTS017839 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 017839 - PROJECT RECORD DOCUMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for project record documents, including the following:

1. Record Drawings.2. Record Specifications.3. Record Product Data.

1.2 CLOSEOUT SUBMITTALS

A. Record Drawings: Comply with the following:

1. Number of Copies: Submit one set(s) of marked-up record prints.2. Number of Copies: Submit copies of record Drawings as follows:

a. Initial Submittal: Submit one paper copy set of marked-up record prints and one set(s) of plots from corrected record digital data files. Architect will indicate whether general scope of changes, additional information recorded, and quality of drafting are acceptable.

b. Final Submittal: Submit one paper copy set of marked-up record prints. Print each Drawing, whether or not changes and additional information were recorded.

c. Final Submittal: Submit one paper copy set of marked-up record prints, one set(s) of record digital data files, and three set(s) of record digital data file plots. Plot each drawing file, whether or not changes and additional information were recorded.

B. Record Product Data: Submit one paper copy of each submittal.

PART 2 - PRODUCTS

2.1 RECORD DRAWINGS

A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop Drawings.

PROJECT RECORD DOCUMENTS017839 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

1. Preparation: Mark record prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to provide information for preparation of corresponding marked-up record prints.

2. Mark the Contract Drawings and Shop Drawings completely and accurately. Utilize personnel proficient at recording graphic information in production of marked-up record prints.

3. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.

4. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.

B. Record Digital Data Files: Immediately before inspection for Certificate of Substantial Completion, review marked-up record prints with Architect. When authorized, prepare a full set of corrected digital data files of the Contract Drawings, as follows:

1. Format: Same digital data software program, version, and operating system as the original Contract Drawings.

2. Incorporate changes and additional information previously marked on record prints. Delete, redraw, and add details and notations where applicable.

3. Refer instances of uncertainty to Architect for resolution.4. Architect will furnish Contractor one set of digital data files of the Contract

Drawings for use in recording information.

C. Format: Identify and date each record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location.

2.2 RECORD SPECIFICATIONS

A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.

1. Mark copy with the proprietary name and model number of products,materials, and equipment furnished, including substitutions and product options selected.

2. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made.

3. Note related Change Orders, record Product Data, and record Drawings where applicable.

PROJECT RECORD DOCUMENTS017839 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

B. Format: Submit record Specifications as paper copy.

2.3 RECORD PRODUCT DATA

A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal.

1. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.

2. Note related Change Orders, record Specifications, and record Drawings where applicable.

B. Format: Submit record Product Data as paper copy.

PART 3 - EXECUTION

3.1 RECORDING AND MAINTENANCE

A. Recording: Maintain one copy of each submittal during the construction period for project record document purposes. Post changes and modifications to project record documents as they occur; do not wait until the end of Project.

B. Maintenance of Record Documents and Samples: Store record documents and Samples in the field office apart from the Contract Documents used for construction. Do not use project record documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project record documents for Architect's reference during normal working hours.

END OF SECTION 017839

DEMONSTRATION AND TRAINING017900 - 1

Replace Classroom Unit VentilatorsUnited Technical Center

SECTION 017900 - DEMONSTRATION AND TRAINING

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for instructing Owner's personnel, including the following:

1. Demonstration of operation of systems, subsystems, and equipment.2. Training in operation and maintenance of systems, subsystems, and

equipment.

B. See Divisions 02 through 49 Sections Sections for specific requirements for demonstration and training for products in those Sections.

1.2 SUBMITTALS

A. Instruction Program: Submit two copies of outline of instructional program for demonstration and training, including a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training module.

1.3 QUALITY ASSURANCE

A. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance personnel in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or education with a record of successful learning performance.

B. Instructor Qualifications: A factory-authorized service representative, complying with requirements in Division 01 Section "Quality Requirements," experienced in operation and maintenance procedures and training.

C. Preinstruction Conference: Conduct conference at Project site. Review methods and procedures related to demonstration and training.

D. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction program until operation and maintenance data has been reviewed and approved by Architect.

DEMONSTRATION AND TRAINING017900 - 2

Replace Classroom Unit VentilatorsUnited Technical Center

PART 2 - PRODUCTS

2.1 INSTRUCTION PROGRAM

A. Program Structure: Develop an instruction program that includes individual training modules for each system and equipment not part of a system, as required by individual Specification Sections.

B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following:

1. Basis of System Design, Operational Requirements, and Criteria: Include system and equipment descriptions, operating standards, regulatory requirements, equipment function, operating characteristics, limiting conditions, and performance curves.

2. Documentation: Review emergency, operations, and maintenance manuals; Project Record Documents; identification systems; warranties and bonds; and maintenance service agreements.

3. Emergencies: Include instructions on stopping; shutdown instructions; operating instructions for conditions outside normal operating limits; instructions on meaning of warnings, trouble indications, and error messages; and required sequences for electric or electronic systems.

4. Operations: Include startup, break-in, control, and safety procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; operating procedures for emergencies and equipment failure; and required sequences for electric or electronic systems.

5. Adjustments: Include alignments and checking, noise, vibration, economy, and efficiency adjustments.

6. Troubleshooting: Include diagnostic instructions and test and inspection procedures.

7. Maintenance: Include inspection procedures, types of cleaning agents, methods of cleaning, procedures for preventive and routine maintenance, and instruction on use of special tools.

8. Repairs: Include diagnosis, repair, and disassembly instructions; instructions for identifying parts; and review of spare parts needed for operation and maintenance.

DEMONSTRATION AND TRAINING017900 - 3

Replace Classroom Unit VentilatorsUnited Technical Center

PART 3 - EXECUTION

3.1 INSTRUCTION

A. Facilitator: Engage a qualified facilitator to prepare instruction program and training modules, to coordinate instructors, and to coordinate between Contractor and Owner for number of participants, instruction times, and location.

B. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.

1. Owner will furnish an instructor to describe Owner's operational philosophy.

C. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal operation, provide similar instruction at start of each season.

1. Schedule training with Owner with at least 14 days' advance notice.

END OF SECTION 017900

SPLIT-SYSTEM HVAC SYSTEMS 238126 - 1

Replace Classroom Unit Ventilators United Technical Center

SECTION 238126 - SPLIT-SYSTEM HVAC SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes split-system air-conditioning including classroom unit ventilators, refrigerant condensing units, controls and refrigerant piping.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product specified.

1.3 INFORMATIONAL SUBMITTALS

A. Warranty: Sample of special warranty.

1.4 CLOSEOUT SUBMITTALS

A. Operation and maintenance data.

1.5 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. ASHRAE Compliance: 1. Fabricate and label refrigeration system to comply with ASHRAE 15,

"Safety Standard for Refrigeration Systems." 2. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1,

Section 4 - "Outdoor Air Quality," Section 5 - "Systems and Equipment," Section 6 - " Procedures," and Section 7 - "Construction and System Start-up.", ASHRAE 90A.

C. Certifications: ETL, AHRI-480, AHRI-350.

SPLIT-SYSTEM HVAC SYSTEMS 238126 - 2

Replace Classroom Unit Ventilators United Technical Center

1.6 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of split-system air-conditioning units that fail in materials or workmanship within specified warranty period. 1. Warranty Period:

a. For Compressor: Five year(s) from date of Substantial Completion. b. For Controls: Three year(s) from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work are limited to, the following: 1. The Trane Company.

2.2 CLASSROOM UNIT VENTILATORS

A. Cabinet: 1. Galvanized steel with rounded corners, electrostatic powder coat finish. 2. Three removable front panels for servicing; controls accessible without

removing entire front panel. 3. Insulation: Closed cell foam. 4. Discharge air grille constructed of rounded edge steel bars with 15 degree

deflection. 5. Minimum 12” wide end pockets 6. Filter rack for MERV 8 filters, standard size. Provide new filters and one

spare set after start-up 7. Airstream Surfaces: Surfaces in contact with the airstream shall comply

with requirements in ASHRAE 62.1.

B. Fans: 1. Rigid fan board constructed of corrosion resistant material. 2. Double width, double inlet forward curved centrifugal fans with galvanized

metal wheels. 3. Fans positioned to blow through heating and cooling coils. 4. Permanent split capacitor with integral thermal overload protection.. 5. Three speed fan switch, unit mounted

C. Drain Pans 1. Double sloped, corrosion resistant material. 2. Removable for cleaning.

SPLIT-SYSTEM HVAC SYSTEMS 238126 - 3

Replace Classroom Unit Ventilators United Technical Center

3. Auxiliary drain pan under cooling coil piping package.

D. Refrigerant Cooling Coil 1. Direct expansion coils with copper tubes and mechanically expanded

aluminum fins. 2. Proof tested and leak tested at factory. 3. Factory installed thermostatic expansion valve.

E. Electric Heating Coil 1. Resistance heating element in extended surface fin-tube bundle. 2. High temperature cutout with continuous sensing element. 3. Contactor for positive disconnect when power to fan is not present. 4. Sub-fusing on circuits as required by NEC.

F. Outside Air/Return Air Damper 1. Linkage free one piece design. 2. Low-leak seal.

G. Controls 1. End device controls with terminal strip. 2. Factory wired damper motor, fan start/stop relay, and electric heat and DX

cooling controls. 3. Control transformer.

2.3 OUTDOOR UNITS

A. Air-Cooled, Compressor-Condenser Components: 1. Casing: Steel, finished with baked enamel, with removable panels for

access to controls, weep holes for water drainage, and mounting holes in base. Provide liquid line dryer, brass service valves, fittings, and gage ports.

2. Compressor: Hermetically sealed with crankcase heater and mounted on vibration isolation device. Compressor motor shall have thermal- and current-sensitive overload devices, start capacitor, relay, and contactor. a. Compressor Type: Scroll. b. Compressor motor with manual-reset high-pressure switch and

automatic-reset low-pressure switch. c. Refrigerant Charge: R-410A. d. Refrigerant Coil: Copper tube, with mechanically bonded aluminum

fins and liquid subcooler. Comply with ARI 210/240. 3. Heat-Pump Components: Reversing valve and low-temperature-air cutoff

thermostat. 4. Fan: Aluminum-propeller type, directly connected to motor. 5. Motor: Permanently lubricated, with integral thermal-overload protection. 6. Low Ambient Kit: Permits operation down to 30 deg F.

SPLIT-SYSTEM HVAC SYSTEMS 238126 - 4

Replace Classroom Unit Ventilators United Technical Center

7. Mounting Base: Polyethylene.

2.4 ACCESSORIES

A. Thermostats: Low voltage with subbase to control compressor, heating and cooling controls, evaporator fan and outside air damper, wall mounted and hard wired.

B. Refrigerant Line Kits: Soft-annealed copper suction and liquid lines factory cleaned, dried, pressurized, and sealed; factory-insulated suction line with flared fittings at both ends.

C. Condensate Pump and Hose where noted.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install units level and plumb.

B. Install components using manufacturer's standard mounting devices securely fastened to building structure.

C. Install ground-mounted, compressor-condenser components on concrete mounting base

D. Install roof-mounted, compressor-condenser components on polyethylene mounting base.

E. Install and connect precharged refrigerant tubing to component's quick-connect fittings. Install tubing to allow access to unit.

3.2 FIELD QUALITY CONTROL

A. Perform tests and inspections. 1. Manufacturer's Field Service: Engage a factory-authorized service

representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.

B. Tests and Inspections: 1. Leak Test: After installation, charge system and test for leaks. Repair

leaks and retest until no leaks exist.

SPLIT-SYSTEM HVAC SYSTEMS 238126 - 5

Replace Classroom Unit Ventilators United Technical Center

2. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.

3. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

C. Remove and replace malfunctioning units and retest as specified above.

D. Prepare test and inspection reports.

3.3 DEMONSTRATION

A. Train Owner's maintenance personnel to adjust, operate, and maintain units.

B. See Division 1 requirements.

END OF SECTION 238126

BASIC ELECTRICAL MATERIALS AND METHODS 260500 - 1

Replace Classroom Unit Ventilators United Technical Center

SECTION 260500 - BASIC ELECTRICAL MATERIALS AND METHODS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Raceways. 2. Building wire and connectors. 3. Supporting devices for electrical components. 4. Electrical identification. 5. Electrical demolition. 6. Cutting and patching for electrical construction. 7. Touchup painting.

1.3 DEFINITIONS

A. EMT: Electrical metallic tubing.

B. FMC: Flexible metal conduit.

C. IMC: Intermediate metal conduit.

D. LFMC: Liquidtight flexible metal conduit.

E. RNC: Rigid nonmetallic conduit.

1.4 SUBMITTALS

A. Field Test Reports: Indicate and interpret test results for compliance with performance requirements.

1.5 QUALITY ASSURANCE

BASIC ELECTRICAL MATERIALS AND METHODS 260500 - 2

Replace Classroom Unit Ventilators United Technical Center

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. Comply with NFPA 70.

1.6 COORDINATION

A. Coordinate chases, slots, inserts, sleeves, and openings with general construction work and arrange in building structure during progress of construction to facilitate the electrical installations that follow.

1. Set inserts and sleeves in poured-in-place concrete, masonry work, and other structural components as they are constructed.

B. Sequence, coordinate, and integrate installing electrical materials and equipment for efficient flow of the Work. Coordinate installing large equipment requiring positioning before closing in the building.

C. Where electrical identification devices are applied to field-finished surfaces, coordinate installation of identification devices with completion of finished surface.

D. Where electrical identification markings and devices will be concealed by acoustical ceilings and similar finishes, coordinate installation of these items before ceiling installation.

PART 2 - PRODUCTS

2.1 RACEWAYS

A. EMT: ANSI C80.3, zinc-coated steel, with set-screw or compression fittings.

B. FMC: Zinc-coated steel.

C. IMC: ANSI C80.6, zinc-coated steel, with threaded fittings.

D. LFMC: Zinc-coated steel with sunlight-resistant and mineral-oil-resistant plastic jacket.

E. RNC: NEMA TC 2, Schedule 40 PVC, with NEMA TC3 fittings.

F. Raceway Fittings: Specifically designed for the raceway type with which used.

BASIC ELECTRICAL MATERIALS AND METHODS 260500 - 3

Replace Classroom Unit Ventilators United Technical Center

2.2 CONDUCTORS

A. Conductors, No. 10 AWG and Smaller: Solid or stranded copper.

B. Conductors, Larger Than No. 10 AWG: Stranded copper.

C. Insulation: Thermoplastic, rated at 75 deg C minimum.

D. Wire Connectors and Splices: Units of size, ampacity rating, material, type, and class suitable for service indicated.

2.3 SUPPORTING DEVICES

A. Material: Cold-formed steel, with corrosion-resistant coating acceptable to authorities having jurisdiction.

B. Metal Items for Use Outdoors or in Damp Locations: Hot-dip galvanized steel.

C. Slotted-Steel Channel Supports: Flange edges turned toward web, and 9/16-inch- diameter slotted holes at a maximum of 2 inches o.c., in webs.

D. Raceway and Cable Supports: Manufactured clevis hangers, riser clamps, straps, threaded C-clamps with retainers, ceiling trapeze hangers, wall brackets, and spring-steel clamps or click-type hangers.

E. Pipe Sleeves: ASTM A 53, Type E, Grade A, Schedule 40, galvanized steel, plain ends.

F. Cable Supports for Vertical Conduit: Factory-fabricated assembly consisting of threaded body and insulating wedging plug for nonarmored electrical cables in riser conduits. Plugs have number and size of conductor gripping holes as required to suit individual risers. Body constructed of malleable-iron casting with hot-dip galvanized finish.

G. Expansion Anchors: Carbon-steel wedge or sleeve type.

H. Toggle Bolts: All-steel springhead type.

I. Powder-Driven Threaded Studs: Heat-treated steel.

PART 3 - EXECUTION

3.1 ELECTRICAL EQUIPMENT INSTALLATION

BASIC ELECTRICAL MATERIALS AND METHODS 260500 - 4

Replace Classroom Unit Ventilators United Technical Center

A. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide the maximum possible headroom.

B. Materials and Components: Install level, plumb, and parallel and perpendicular to other building systems and components, unless otherwise indicated.

C. Equipment: Install to facilitate service, maintenance, and repair or replacement of components. Connect for ease of disconnecting, with minimum interference with other installations.

D. Right of Way: Give to raceways and piping systems installed at a required slope.

3.2 RACEWAY APPLICATION

A. Use the following raceways for outdoor installations:

1. Exposed: IMC. 2. Concealed: IMC. 3. Underground, Single Run: RNC. 4. Underground, Grouped: RNC. 5. Connection to Vibrating Equipment: LFMC. 6. Boxes and Enclosures: NEMA 250, Type 3R or Type 4.

B. Use the following raceways for indoor installations:

1. Exposed: EMT. 2. Concealed: EMT. 3. Connection to Vibrating Equipment: FMC; except in wet or damp

locations, use LFMC. 4. Damp or Wet Locations: IMC. 5. Boxes and Enclosures: NEMA 250, Type 1, unless otherwise indicated.

3.3 RACEWAY AND CABLE INSTALLATION

A. Conceal raceways and cables, unless otherwise indicated, within finished walls, ceilings, and floors.

B. Install raceways and cables at least 6 inches away from parallel runs of flues and steam or hot-water pipes. Locate horizontal raceway runs above water and steam piping.

C. Use temporary raceway caps to prevent foreign matter from entering.

BASIC ELECTRICAL MATERIALS AND METHODS 260500 - 5

Replace Classroom Unit Ventilators United Technical Center

D. Make conduit bends and offsets so ID is not reduced. Keep legs of bends in the same plane and straight legs of offsets parallel, unless otherwise indicated.

E. Use raceway and cable fittings compatible with raceways and cables and suitable for use and location.

3.4 WIRING METHODS FOR POWER, LIGHTING, AND CONTROL CIRCUITS

A. Branch Circuits: Type THW or THHN/THWN insulated conductors in raceway where exposed or above ceiling. Metal-clad cable where concealed gypsum board partitions.

3.5 WIRING INSTALLATION

A. Install splices and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.

B. Install wiring at outlets with at least 12 inches of slack conductor at each outlet.

C. Connect outlet and component connections to wiring systems and to ground. Tighten electrical connectors and terminals, according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A.

3.6 ELECTRICAL SUPPORTING DEVICE APPLICATION

A. Damp Locations and Outdoors: Hot-dip galvanized materials or nonmetallic, U-channel system components.

B. Dry Locations: Steel materials.

C. Support Clamps for PVC Raceways: Click-type clamp system.

D. Selection of Supports: Comply with manufacturer's written instructions.

E. Strength of Supports: Adequate to carry present and future loads, times a safety factor of at least four; minimum of 200-lb design load.

3.7 SUPPORT INSTALLATION

BASIC ELECTRICAL MATERIALS AND METHODS 260500 - 6

Replace Classroom Unit Ventilators United Technical Center

A. Install support devices to securely and permanently fasten and support electrical components.

B. Install individual and multiple raceway hangers and riser clamps to support raceways. Provide U-bolts, clamps, attachments, and other hardware necessary for hanger assemblies and for securing hanger rods and conduits.

C. Support parallel runs of horizontal raceways together on trapeze- or bracket-type hangers.

D. Support individual horizontal raceways with separate, malleable-iron pipe hangers or clamps.

E. Install 1/4-inch- diameter or larger threaded steel hanger rods, unless otherwise indicated.

F. Spring-steel fasteners specifically designed for supporting single conduits or tubing may be used instead of malleable-iron hangers for 1-1/2-inch and smaller raceways serving lighting and receptacle branch circuits above suspended ceilings and for fastening raceways to slotted channel and angle supports.

G. Arrange supports in vertical runs so the weight of raceways and enclosed conductors is carried entirely by raceway supports, with no weight load on raceway terminals.

H. Separately support cast boxes that are threaded to raceways and used for fixture support. Support sheet-metal boxes directly from the building structure or by bar hangers. If bar hangers are used, attach bar to raceways on opposite sides of the box and support the raceway with an approved fastener not more than 24 inches from the box.

I. Install metal channel racks for mounting cabinets, panelboards, disconnect switches, control enclosures, pull and junction boxes, transformers, and other devices unless components are mounted directly to structural elements of adequate strength.

J. Securely fasten electrical items and their supports to the building structure, unless otherwise indicated. Perform fastening according to the following unless other fastening methods are indicated:

1. Wood: Fasten with wood screws or screw-type nails. 2. Masonry: Toggle bolts on hollow masonry units and expansion bolts on

solid masonry units. 3. New Concrete: Concrete inserts with machine screws and bolts.

BASIC ELECTRICAL MATERIALS AND METHODS 260500 - 7

Replace Classroom Unit Ventilators United Technical Center

4. Existing Concrete: Expansion bolts. 5. Instead of expansion bolts, threaded studs driven by a powder charge and

provided with lock washers may be used in existing concrete. 6. Light Steel: Sheet-metal screws. 7. Fasteners: Select so the load applied to each fastener does not exceed

25 percent of its proof-test load.

3.8 DEMOLITION

A. Protect existing electrical equipment and installations indicated to remain. If damaged or disturbed in the course of the Work, remove damaged portions and install new products of equal capacity, quality, and functionality.

B. Accessible Work: Remove exposed electrical equipment and installations, indicated to be demolished, in their entirety.

C. Abandoned Work: Cut and remove buried raceway and wiring, indicated to be abandoned in place, 2 inches below the surface of adjacent construction. Cap raceways and patch surface to match existing finish.

D. Remove demolished material from Project site.

E. Remove, store, clean, reinstall, reconnect, and make operational components indicated for relocation.

3.9 CUTTING AND PATCHING

A. Cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces required to permit electrical installations. Perform cutting by skilled mechanics of trades involved.

B. Repair and refinish disturbed finish materials and other surfaces to match adjacent undisturbed surfaces. Install new fireproofing where existing firestopping has been disturbed. Repair and refinish materials and other surfaces by skilled mechanics of trades involved.

3.10 FIELD QUALITY CONTROL

A. Inspect installed components for damage and faulty work, including the following:

1. Raceways. 2. Building wire and connectors.

BASIC ELECTRICAL MATERIALS AND METHODS 260500 - 8

Replace Classroom Unit Ventilators United Technical Center

3. Supporting devices for electrical components. 4. Electrical demolition. 5. Cutting and patching for electrical construction. 6. Touchup painting.

3.11 CLEANING AND PROTECTION

A. On completion of installation, including outlets, fittings, and devices, inspect exposed finish. Remove burrs, dirt, paint spots, and construction debris.

B. Protect equipment and installations and maintain conditions to ensure that coatings, finishes, and cabinets are without damage or deterioration at time of Substantial Completion.

END OF SECTION 260500