Principal Investigator Dr. S. P. SINGH
PROGRESS REPORT Year 2007 – 2013
Biogas Development & Training Centre, Indore(Madhya Pradesh)
Under the auspicious of
NATIONAL BIOGAS AND MANURE MANAGEMENT PROGRAMME
Sponsored By
Ministry of New & Renewable Energy Government of India, New Delhi
By
Centre of Energy Studies & Research,Devi Ahilya University, Khandwa Road Campus,
Indore – 4520 01
Year 2007-08
Venue of the Construction-cum-Maintenance Training
IA. CCM TrainingsSr. No.
Date
From To Venue Block District StateNo. of Trainees
From To
1 19.09.07 05.10.07 Manpur Pratappur Ambikapur CG 10
2 15.10.07 01.11.07 Gandhravpuri Sonkachh Dewas MP 10
3 23.11.07 08.12.07 Kumari Kasdol Raipur CG 10
4 13.12.07 28.12.07 Kariakhad Baikunthpyr koria CG 10
5 05.01.08 20.01.08 Laturi Nalkheda Shajapur MP 10
6 25.01.08 07.02.08 Barukhedi Bamori Guna MP 10
IB. Besides the above trainings, one of our staff members assisted in organization of one 5 days CCM training program in district Kolhapur Maharashtra for PE Dome type DeenBhandhu Plant
Sr. No.Date
From To Vanue Block District StateNo. of Trainees
7 03.03.08 07.03.08 Nandoli Budhargarh Kolhapur MH 23
II. Training for Govt. FunctionariesSr. No.
Venue Duration of the training
Block District Number of Trainees
1- Indore 08.08.2007 to 10.08.2007
Indore Indore 13
2- Raipur 29.09.2007 to 30.09.2007
Raipur Raipur 30
III. Turnkey Workers Training
S No. Duration of the training
Venue of the training Number of Trainees
Agency
1- 05-09-2007
to 25-09-2007
BDTC Indore 9 MPAGRO
2- 05-09-2007
to 25-09-2007
BDTC Indore 9 5 from creda
4 from mpuvn
IV. User’s Training Camps
Number of Trainings 60Duration of Training 01 dayNumber of Trainees 50 to 60Number of Training completed 41
V. Feedback Survey
Sr. No. Name of the district where feedback survey conducted
No. of plants surveyed
1- Badwani 1752- Guna 2273- Neemuch 684- Mandsour 345- Ratlam 10
Total 514
Year 2008-09
Venue of the Construction-cum-Maintenance Training
IA. CCM Training Allocated under NBMMPSr. No.
DateFrom To
Venue Block District Agency No. ofTrainees
1 21.09.08
06.10.0
8 Mohra Bilha Bilaspur CREDA 10
211.10.08
26.10.0
8 Lalitpur Amarpatan Satna MPUVN 10
305.11.08
20.11.0
8 Pipliya Jait hari Anooppur MPAGRO 10
417.12.08
02.01.0
9 Pachama Basoda Vidisha MPAGRO 10
512.01.09
27.01.0
9 Sonpur Khaniadhana Shivpuri MPAGRO 10
IB. Additional CCM Trainings conducted for Agencies
Sr. No.
DateFrom To
Venue Block District Agency No. ofTrainees
104.04.08
19.04.0
8 Malpura Segoan Khargoan
Bio-re
Associatio
n 10
2 11.10.0826.10.08
Mainadongri Jait hari Anooppur MPRLP 10
3 04.11.0819.11.08 Hud hara Jaisingnagar Shahdol MPRLP 10
4 01.12.0816.12.08 Bukdawda Badnawar Dhar MPRLP 06
5 17.12.0802.01.09 Chichba Sendhwa Badwani MPRLP 12
6 17.01.09 02.02.09 Segwal Thikari Badwani MPUVN 06
7 05.02.09 20.02.09 Tiriya Jagadalpur Bastar CREDA 12
8 22.02.09 10.03.09 Sarwani Ratlam Ratlam MPAGRO 10
II. Training for Govt. Functionaries
IIA. Target achieved of Staff Training Allocated under NBMMPSr. No.
Duration of the training
Venue Block District Agency Number of Trainees
129.09.08 to 30.09.08
Bilaspur Bilaspur Bilaspur Agriculture Dept. 32
2 30.03.09 to 31.03.09
Umar ban Umar ban Dhar MPRLP 16
IIB. Additional Staff Trainings conducted for Agencies
Sr. No.
Duration of the training
Venue Block District Agency Number of Trainees
1 18.09.08 to 19.09.08
Dhar Dhar Dhar MPRLP 14
2 26.09.08 to 27.09.08
Rajendra nagar
Rajendra nagar
Anooppur MPRLP 19
3 05.11.08 to 06.11.08
Gohpur Gohpur Shahdol MPRLP 18
4 07.11.08 to 08.11.08
Samnapur Samnapur Dindori MPRLP 16
5 03.12.08 to 04.12.08
Badwani Badwani Badwani MPRLP 16
6 11.01.09 to 12.01.09
Mandla Mandla Mandla MPRLP 15
7 15.01.09 to 16.01.09
Alirajpur Alirajpur Alirajpur MPRLP 14
8 29.01.09 to 30.01.09
Karahal Karahal Sheopur MPRLP 11
III. Turnkey Workers Training
SNo. Duration of the Training Venue of the training Number of Trainees
Agency
1 04-10-2008to
26-10-2008BDTC Indore
11 MPAGRO
2 04-10-2008to
24-10-2008BDTC Indore
050000
CREDAMPUVNK V I C
IV. User’s Training Camps
Number of Trainings 100Duration of Training 01 dayNumber of Trainees 20-30Number of Training completed 49
V. Feedback Survey
Sr. No. Name of the district where feedback survey conducted
No. of plants surveyed
1- Raigarh 2242- Hoshangabad 283
Total 507
VI. Other Activities
1. Literature Development for Public Awareness.A Poster cum Calendar was developed for Trainees, staff, users and the Villagers about Biogas Technology.
2. Publication:Title of the Publication:
Review of Recent Advance in Anaerobic Packed – Bed Biogas Reactors.
Year 2009-10
Venue of the Construction-cum-Maintenance Training
IA. CCM Training Allocated under NBMMPSr. No.
Date
From To
Venue Block District Agency No. of
Trainees
Plants constructe
d
125.10.09 09.11.09 Bada Purda
Dhamandh
a Durg CREDA 10
06
2 15.11.09 30.11.09 Rithorikala Murena Murena MPUVN 10 05
318.12.09 02.01.10
Bafapur Aastha Sehore MPAGRO 10 09
406.01.10 20.01.10
Sarwahikal
a Palee Umaraiya MPAGRO 11
09
515.02.10 28.02.10
Chaudee Anooppur Anooppur MPAGRO 12 05
Total 53 34
IB. Additional CCM Trainings conducted for Agencies
Sr. Date Vanue Block District Agency No. of Plants
No.
From To Trainees
construed
1 07.05.09 22.05.09 Bamoree Karahal Sheopur MPRLP 09 04
2 25.05.09 09.06.09 Majholi Dindori Dindiri MPRLP 12 06
3 06.08.09 21.08.09 TIrathgarh Jagdalpur Bastar CREDA 10 02
4 17.09.09 28.09.09 Barupata Tokapal Bastar CREDA 10 02
5 30.09.09 15.10.09 Sarsala Kareli Narsingpur MPUVN 10 06
6 15.11.09 30.11.09 Kanuadudal Udaygarh Alirajpur MPRLP 12 07
7 09.12.09 24.12.09 Lakhanpur Jaisingnagar Shahdol MPRLP 20 13
8 29.12.09 15.01.10 Dhanpuri Rajendragra
m
Anooppur MPRLP 12 7
9 08.03.10 23.03.10 Deree Chhatarpur Chhatarpur MPAGRO 10 10
Total 105 57
IIA. Training for Govt. Functionaries
SrNo
Duration of the
training
Venue Block District Agency No. of Trainee
s
128.01.10 to 30.01.10
SADO, office,
Obedullaganj Raisen Agriculture Dept. MP 20
205.02.10 to 06.02.10
DDA,Office Sagar Sagar Agriculture Dept. MP 16
IIB. Staff Trainings conducted for Agencies
Sr. No. Duration of the training
Venue Block District Agency Number of
Trainees1 30.09.09 to
01.10.09Sheopur Sheopur Sheopur MPRLP 21
2 14.11.09 to 015.11.09
Alirajpur Alirajpur Alirajpur MPRLP 25
3 25.11.09 to 26.11.09
Badwani Badwani Badwani MPRLP 15
4 27.11.09 & 01.12.09
Dhar Dhar Dhar MPRLP 28
5 01.02.10 to 02.02.10
Mandla Mandla Mandla MPRLP 22
6 03.02.10 to 04.02.10
Dindori Dindori Dindori MPRLP 22
7 12.03.10 to 13.03.10
Shahdol Shahdol Shahdol MPRLP 24
III. Turnkey Workers Training
S No. Duration of the Training Venue of the training Number ofTrainees Agency
1 04.09.09 To 24.09.09 BDTC Indore 11 MPAGRO
2 04.09.09 To 24.09.09 BDTC Indore 10 MPAGRO
IV. User’s Training Camps
1 Number of Trainings 1002 Duration of Training 01 day3 Number of Trainees 20-304 Number of Training completed 48
V. Feedback Survey
Sr. No. Name of the district where feedback survey conducted
No. of plants surveyed
1- Durg CREDA 1202- Ujjain MP 1373. Khargon 878
Total 1135
VI. Other Activities
1. Literature Development for Public Awareness.
A pocket size booklet was developed for users particularly for new beneficiaries to know about primary Biogas Technology.
2. Physical verification of Biogas Plants constructed by MPUVN in the current year.
3. Reconstruction of Damaged retaining wall of existing cut model of biogas plants at centre.
Year 2010-11
Venue of the Construction-cum-Maintenance Training
IA. CCM Training Allocated under NBMMP
Sr.
No.
DateFrom To
Vanue Block District Agency No. ofTraine
es
Plants constru
ed
1 06.09.10 20.09.10 Bhawura Bhind Bhind MPAGRO 10 09
202.10.1
016.10.10 Mau Murar Gwalior MPUVN 10 03
312.10.1
026.10.10 Bodra Nagari Dhamtari CREDA 10 10
419.10.1
002.11.10 Barganwa Devsar Singroli MPAGRO 10 05
515.01.1
129.01.11 Jabda
Badanawa
rDhar MPAGRO 10 09
Total 50 36
IB. Additional CCM Trainings conducted for Agencies
Sr. No.
DateFrom To
Vanue Block District Agency No. ofTrainee
s
Plants construe
d
116.01.1
130.01.11
Sakarra Takhatpur Bilaspur CREDA 09 04
201.02.1
115.02.11
Sikola Patan Durg CREDA 12 06
322.02.1
108.02.11
Magroda Bamori GunaMPAGRO
10 06
414.03.1
128.03.11
Mohada Murar GwaliorMPAGRO 10 13
514.03.1
128.03.11
Charkheda Timarani HaradaMPUVN 10 03
Total 53 32
IIA. Training for Govt. Functionaries
SrNo
Duration of the
training
Venue Block District Agency No. of Trainees
128.01.10 to 30.01.10
SADO, office,Durg
Durg Durg Agriculture Dept. MP 18
225.03.11 to 26.03.11
SADO,OfficeTimarni
Timarni Harada Agriculture Dept. MP 19
IIB. Staff Trainings conducted for Agencies
Sr. No. Duration of the training
Venue Block District Agency
Number of
Trainees
116.07.10 to17.07.10
Meghnagar Meghnagar
Jhabua MPRLP 22
2 23.07.10 to 24.07.10
Jobat Jobat Alirajpur MPRLP 34
3 02.08.10 to 03.08.10
Badwani Badwani Badwani MPRLP 25
4 09.08.10 to 10.08.10
Dindori Dindori Dindori MPRLP 22
5 12.08.10 to 13.08.10
Mandla Mandla Mandla MPRLP 22
IIIA. Turnkey Workers Training
S No. Duration of the Training Venue of the training Number ofTrainees Agency
1 13.09.10 To 27.09.10 BDTC Indore 05 MPAGRO
2 13.09.10 To 27.09.10 BDTC Indore 05 CREDA
3 13.09.10 To 27.09.10 BDTC Indore 10 MPRLP
IIIB. Executive Workers Training (CREDA)
S No. Duration of the Training Venue of the training
Number of
TraineesAgency
1 29.08.10 To 08.09.10 BDTC Indore 12 CREDA
IV. User’s Training Camps
1 Number of Trainings 1002 Duration of Training 01 day3 Number of Trainees 20-304 Number of Training completed 45
V. Feedback Survey
Sr. No. Name of the district where feedback survey conducted
No. of plants surveyed
1- Dhamtari , CREDA 2802- Balaghat, MP 822
Total 1102
VI. Other Activities
1. Literature Development for Public Awareness.
i. A pocket size booklet was developed for users on operational problems.
ii. Hand book on Construction Technology for Deenbandhu Biogas Plants.
2. Steel shuttering for RCC made deenbandhu biogas plant.
Number of beneficiaries was unlike about brick made biogas plants during the feedback survey in last years. They are believed in RCC structure that is more suitable in Black cotton or other similar type of soil. Several biogas plants are in non functioning condition in Malwa region.For the solution of same objective a Steel shuttering mould is fabricated under the training centre during the financial year for the training purpose. A CCM Training in district Dhar was conducted. Estimated cost analysis of RCC plant is more or less same as brick made plant.
3. Preparation of DPR and Proposal for 25 kWh power generations Biogas plant (100 cum) at Asharam bapu goshala, Sheopur, MP.
4. Inspection of biogas based decentralized power plant in Madhyapradesh and Chhattisgarh state.With reference to the MNRE letter underneath file no. 208/25/2007-BM, dated 12th Aug. 2010 and 25-6/2008-BE, dated 28th July 2010.
Inspection report for M/s Bhalla Dairy Farm, Neem Road, Satana (MP) and M/s SRT Form, Village Funda, Durg (CG) are already sent to the MNRE.
5. Physical verification of biogas plants constructed by MPUVN, for the last year in MP.
6. Providing Monitoring and Supervision for construction, Commissioning of 25 CUM Biogas Plant and Installation of Deisal Engine for Power Generation at Laxman Bag Goshala, Rewa MP.
Year 2011-12
Venue of the Construction-cum-Maintenance Training
IA. CCM Training Allocated under NBMMP
Sr. N
DurationFrom To
Village Block District Agency No. of Trainee
Plant constructed
1 02.11.11
16.11.11 Chainpur Chhnera Khandwa MPAGRO 10* 07
2 30.11.11 14.12.11 Sanjara Rehli Sagar MPAGRO 10 083 19.01.12 02.02.12 Khairai Kolaras Shivpuri MPAGRO 10 07
4 07.02.12 21.02.12 BawdikhesRagogar
hGuna MPAGRO 10 04
5 09.11.11 23.11.11 Bamadhi Kathri Janggir CREDA 12 1252 38
IB. Additional CCM Trainings conducted for Agencies
Sr. N
DurationFrom To
Village Block District Agency No. of Trainee
Plant constructed
1 20.05.11 03.06.11 Imaliya Pichhor Shivpuri MPAGRO 11* 07
2
27.02.1203 days
15.03.12 for Holi
Dhanpurl Jat hari Anuppur MPAGRO 10 05
3 16.03.12 31.03.12 Dadari Umariya Umariya MPAGRO 06 07
4 27.01.12 07.02.12 Khamod Patan Jabalpur MPAGRO 10 09
5 07.12.11 20.12.11 Bodra Bajalpur Jabalpur CREDA 09 1246 40
IIA. Training for Govt. Functionaries
SrNo
Duration of the
training
Venue Block District Agency No. of Trainee
s
126.03.12 to 27.03.12
DDA, office, Sagar Sagar Sagar Agriculture Dept. MP 10
226.03.12 to 27.03.12
DDA, office, Sagar Sagar Sagar Agriculture Dept. MP 10
IIB. Staff Trainings conducted for Agencies
Sr. No
Duration Venue Agency No. of Trainee
s1 20.09.11 To
21.09.11BDTC, Indore MP Agro 8
2 20.09.11 To 21.09.11 BDTC, Indore MP Agro 8
III. Turnkey Workers Training
S No. Duration of the Training Venue of the training Number ofTrainees Agency
1 05.09.11 To 19.09.11 BDTC Indore 05 MPAGRO
2 05.09.11 To 19.09.11 BDTC Indore 05 CREDA
3 05.09.11 To 19.09.11 BDTC Indore 05 MPRLP
IV. User’s Training Camps
1 Number of Trainings 1002 Duration of Training 01 day3 Number of Trainees 20-304 Number of Training completed 52
V. Feedback Survey
Sr. No.
Name of the district
Name of the Agencies
No. of plants Constructed No. of plants
surveyed
1 Janjgir CREDA 401 2702
MandsourMP Agro 849 481
3 Satana MP Agro 394 1674 Jhabua MP Agro 231 103
Total 1875 1021
VI. Other Activities1. Design and Development of Biogas Storage Balloon:
Biogas balloon was fabricated of 0.85 cum holding capacity for testing and research purpose. So that it can be used easily in village and also to promote the biogas selling entrepreneurship.
In the earlier development, it requires approximate 40 to 48 kg of variable load to produce pressure of 10 cm of water column for proper flaming of gas stove and after removing of injector jet of the stove, it requires approximate 20 kg wt. But this erecting load also moves in irregular direction. To eliminate this problem, BDTC are trying to develop a battery based exhausts fan next to the outlet of balloon therefore the gas may be release from balloon without any external pressure.
2. Preparation of DPR and Proposal for 10 kWh power generations Biogas plant of 100 cum at Asharam bapu goshala, Sheopur, MP.
3. Physical verification of biogas plants constructed by MPAGRO, for last 03 year in the District of Annoppur, Badwani, Dewas and Sagar in the favor of CESR.
Reporting for the above work to be done to the MPAGRO, Bhopal
Year 2012-13
Venue of the Construction-cum-Maintenance Training
IA. CCM Training Allocated under NBMMP
Sr. No
DurationFrom To
Village Block District Agency No. of Trainees
Plant constructed
1 26.10.1209.11.1
2Majgoan Mungeli Mungeli CREDA 10 07
2 19.11.1203.12.1
2Sanjara Rehli Ujjain
MPAGR
O10 08
3 07.12.1221.12.1
2Pahatkala Khirkiya Harada
MPAGR
O10 07
4 28.12.1211.01.1
3Dhabhi
Pandhan
a
Khandw
a
MPAGR
O10 04
5 27.02.1313.03.1
3
Sarangpur
iNagri Dhamtari CREDA 10 12
Total 50 38
Sr. No.
Description Particulars of Physical verification
Plants constructed during
2008-09 to 2010-11
District Name
Sagar Dewas Badwani
Anooppur
Total
1 No. of plants in District 1321 977 405 680 33832 Surveyed Plants 648 591 212 438 18893 Functional Plants 501 580 187 384 16524 Non functional Plant* 147 11 25 54 237
IB. Additional CCM Trainings conducted for Agencies
Sr. N DurationFrom To
Village Block District Agency No. of Traine
e
Plant constructed
1 17.01.13 01.02.13 Dagarwad Abdulaganj Raisen MPAGRO 10 07
2 13.02.13. 22.02.13 Meethi Jaisinghnagar
Shahdol MPAGRO10 05
3 17.03.13 31.0313 Malkhedi Beena Umariya MPAGRO 10 07
Total 30 19
IIA. Training for Govt. Functionaries
SrNo
Duration of the
training
Venue Block District Agency No. of Trainee
s
115.10.12 to 16.10.12
BDTC, indore Indore Indore Agriculture Dept.Indore
MP10
226.02.13 to 27.02.13
SADO office, Guna Guna Guna Agri.Dept. Guna MP 22
III A. Turnkey Workers Training
Sr. No.
Duration of Training
Venue Agency Requested
Numbers
No. of trainees
1 10.09.12 To 24.09.12
BDTC,Indore
MP Agro 10 10
2 CREDA 10 10
III B. Turnkey Workers Training
Sr. No.
Duration of Training
Venue Agency Requested
Numbers
No. of trainees
1. 26.10.12 To 09.11.12 BDTC MPAGRO 10 10
2. 10.09.12 To 24.09.12 BDTC CREDA 10 03
IV. User’s Training Camps
Sr. No.
Name of State
District Numbers of Course
No. of Beneficiaries
1. MadhyaPradesh 14 59 1779
2. Chhattisgarh 03 10 350
VA. Feedback Survey
VB. Physical verification of biogas plants constructed by MPAGRO, for last 03 year in the District of Annoppur, Badwani, Dewas and Sagar.
Sr. No.
Name of the district
Name of the Agencies
No. of plants Constructed No. of plants
surveyed
1 Raigarh CREDA 1140 367
2 Sehore MP Agro 1130 364
3 Khandwa MP Agro 710 3524 Shivpuri MP Agro 256 125
Total 3236 1208% 100 37.33
VI. Other Activities1. Preparation of DPR and Proposal for 10 goshalas in MP for power
generations with cow dung based Biogas plant for 500 Cum biogas (cumulative) capacity.
Sr No
Name of Goshala Types of Biomass
CapacityCUM
1 Adarsh Goshala, MC, Gwalior Cow dung 852 Pashu Prajanan Parikshetra, Bhadbhada Cow dung 853 Pashu Prajanan Parikshetra,
Aagar ,Shajapur Cow dung 85
4 Pashu Prajanan Parikshetra, Minora, Tikamgarh
Cow dung 85
5 Pashu prajanan Parikshetra, Imlikheda, Chhindwada
Cow dung 25
6 Central Jail, Ujjain Cow dung, KW 457 Central Jail, Sagar Cow dung, KW 258 Pashu Prajanan Parikshetra Jabalpur Cow dung NA
Sr. No.
Description Particulars of Physical verification
Plants constructed during
2008-09 to 2010-11
District Name
Guna Rajgarh Seoni Total1 No. of plants in District 1068 700 2722 44902 Surveyed Plants 411 279 866 15563 Functional Plants 302 192 847 13414 Non functional Plant* 109 87 019 215
9 Central Semen Station, Bhadbhada, Bhopal Cow dung 8510 Bull mother form, Bhadbhada, Bhopal Cow dung 45
Table - 28
2. Preparation of DPR and Proposal for 25 cum Cow dung based Biogas Plant for thermal use at village Guwar, district Narmada, Gujrat.
3. Preparation of DPR and Proposal for 12 cum Kitchen waste* based Biogas plant and 25 cum Cow dung based Biogas Plant for thermal use at Bramhkumari Ashram , Mount Abu, Rajsthan.
4. Construction of 6 cum cow dung based biogas plant for thermal use at Bramhkumari Ashram , Mount Abu, Rajasthan. *12 cum Kitchen waste* based Biogas plant is under construction.
5. Construction and study of new fixed type biogas plant of 1 cum capacity at centre. The same is under construction.
6. Comments on the project entitled:ANAEROBIC TECHNOLOGY FOR BIOGAS RECOVERY AND STABILIZATION OF UNSORTED MUNICIPAL SOLID WASTE.( Dr. V B Manilal, Principal Scientist, PEET,CSIR-Thiruvanathapuram) ( F. No. 19- 16/2007- R&D /BE dated 07.12.2012)
7. Comments on the project entitled:DEVELOPMENT OF A HOUSEHOLD WASTE & SANITATION DEVICE (HWSD) WITH
BIOGAS RECOVERY.( Dr. V B Manilal, Principal Scientist, PEET,CSIR-Thiruvanathapuram) ( F. No. 19- 32/2007- R&D /BE dated 07.12.2012)
8. Comments on the project entitled:DESIGN AND DEVELOPMENT OF PRE-FABRICATED HIGH RATE DIGESTER FOR RAPID BIOGAS PLANT by Johny Joseph, Principal Investigator (Senior Principal Scientist) BeEC,IICT-Hyderabad) ( F. No. 19- 16/2007- R&D /BE dated 23.03.2013)
9. Inspection of 10 KW power projct at Sant Asharm Bapu goshala, Sheopur, MP. (25-15/2011-BE dated 15.03.2013.