29
Principal Investigator Dr. S. P. SINGH

Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

Embed Size (px)

Citation preview

Page 1: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

Principal Investigator Dr. S. P. SINGH

Page 2: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

PROGRESS REPORT Year 2007 – 2013

Biogas Development & Training Centre, Indore(Madhya Pradesh)

Under the auspicious of

NATIONAL BIOGAS AND MANURE MANAGEMENT PROGRAMME

Sponsored By

Ministry of New & Renewable Energy Government of India, New Delhi

By

Centre of Energy Studies & Research,Devi Ahilya University, Khandwa Road Campus,

Indore – 4520 01

Page 3: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

Year 2007-08

Venue of the Construction-cum-Maintenance Training

IA. CCM TrainingsSr. No.

Date

From To Venue Block District StateNo. of Trainees

From To

1 19.09.07 05.10.07 Manpur Pratappur Ambikapur CG 10

2 15.10.07 01.11.07 Gandhravpuri Sonkachh Dewas MP 10

3 23.11.07 08.12.07 Kumari Kasdol Raipur CG 10

4 13.12.07 28.12.07 Kariakhad Baikunthpyr koria CG 10

5 05.01.08 20.01.08 Laturi Nalkheda Shajapur MP 10

6 25.01.08 07.02.08 Barukhedi Bamori Guna MP 10

IB. Besides the above trainings, one of our staff members assisted in organization of one 5 days CCM training program in district Kolhapur Maharashtra for PE Dome type DeenBhandhu Plant

Sr. No.Date

From To Vanue Block District StateNo. of Trainees

7 03.03.08 07.03.08 Nandoli Budhargarh Kolhapur MH 23

II. Training for Govt. FunctionariesSr. No.

Venue Duration of the training

Block District Number of Trainees

1- Indore 08.08.2007 to 10.08.2007

Indore Indore 13

2- Raipur 29.09.2007 to 30.09.2007

Raipur Raipur 30

Page 4: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

III. Turnkey Workers Training

S No. Duration of the training

Venue of the training Number of Trainees

Agency

1- 05-09-2007

to 25-09-2007

BDTC Indore 9 MPAGRO

2- 05-09-2007

to 25-09-2007

BDTC Indore 9 5 from creda

4 from mpuvn

IV. User’s Training Camps

Number of Trainings 60Duration of Training 01 dayNumber of Trainees 50 to 60Number of Training completed 41

V. Feedback Survey

Sr. No. Name of the district where feedback survey conducted

No. of plants surveyed

1- Badwani 1752- Guna 2273- Neemuch 684- Mandsour 345- Ratlam 10

Total 514

Year 2008-09

Page 5: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

Venue of the Construction-cum-Maintenance Training

IA. CCM Training Allocated under NBMMPSr. No.

DateFrom To

Venue Block District Agency No. ofTrainees

1 21.09.08

06.10.0

8 Mohra Bilha Bilaspur CREDA 10

211.10.08

26.10.0

8 Lalitpur Amarpatan Satna MPUVN 10

305.11.08

20.11.0

8 Pipliya Jait hari Anooppur MPAGRO 10

417.12.08

02.01.0

9 Pachama Basoda Vidisha MPAGRO 10

512.01.09

27.01.0

9 Sonpur Khaniadhana Shivpuri MPAGRO 10

IB. Additional CCM Trainings conducted for Agencies

Sr. No.

DateFrom To

Venue Block District Agency No. ofTrainees

104.04.08

19.04.0

8 Malpura Segoan Khargoan

Bio-re

Associatio

n 10

2 11.10.0826.10.08

Mainadongri Jait hari Anooppur MPRLP 10

3 04.11.0819.11.08 Hud hara Jaisingnagar Shahdol MPRLP 10

4 01.12.0816.12.08 Bukdawda Badnawar Dhar MPRLP 06

5 17.12.0802.01.09 Chichba Sendhwa Badwani MPRLP 12

Page 6: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

6 17.01.09 02.02.09 Segwal Thikari Badwani MPUVN 06

7 05.02.09 20.02.09 Tiriya Jagadalpur Bastar CREDA 12

8 22.02.09 10.03.09 Sarwani Ratlam Ratlam MPAGRO 10

II. Training for Govt. Functionaries

IIA. Target achieved of Staff Training Allocated under NBMMPSr. No.

Duration of the training

Venue Block District Agency Number of Trainees

129.09.08 to 30.09.08

Bilaspur Bilaspur Bilaspur Agriculture Dept. 32

2 30.03.09 to 31.03.09

Umar ban Umar ban Dhar MPRLP 16

IIB. Additional Staff Trainings conducted for Agencies

Sr. No.

Duration of the training

Venue Block District Agency Number of Trainees

1 18.09.08 to 19.09.08

Dhar Dhar Dhar MPRLP 14

2 26.09.08 to 27.09.08

Rajendra nagar

Rajendra nagar

Anooppur MPRLP 19

3 05.11.08 to 06.11.08

Gohpur Gohpur Shahdol MPRLP 18

4 07.11.08 to 08.11.08

Samnapur Samnapur Dindori MPRLP 16

5 03.12.08 to 04.12.08

Badwani Badwani Badwani MPRLP 16

6 11.01.09 to 12.01.09

Mandla Mandla Mandla MPRLP 15

7 15.01.09 to 16.01.09

Alirajpur Alirajpur Alirajpur MPRLP 14

8 29.01.09 to 30.01.09

Karahal Karahal Sheopur MPRLP 11

III. Turnkey Workers Training

Page 7: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

SNo. Duration of the Training Venue of the training Number of Trainees

Agency

1 04-10-2008to

26-10-2008BDTC Indore

11 MPAGRO

2 04-10-2008to

24-10-2008BDTC Indore

050000

CREDAMPUVNK V I C

IV. User’s Training Camps

Number of Trainings 100Duration of Training 01 dayNumber of Trainees 20-30Number of Training completed 49

V. Feedback Survey

Sr. No. Name of the district where feedback survey conducted

No. of plants surveyed

1- Raigarh 2242- Hoshangabad 283

Total 507

VI. Other Activities

1. Literature Development for Public Awareness.A Poster cum Calendar was developed for Trainees, staff, users and the Villagers about Biogas Technology.

2. Publication:Title of the Publication:

Review of Recent Advance in Anaerobic Packed – Bed Biogas Reactors.

Page 8: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

Year 2009-10

Venue of the Construction-cum-Maintenance Training

IA. CCM Training Allocated under NBMMPSr. No.

Date

From To

Venue Block District Agency No. of

Trainees

Plants constructe

d

125.10.09 09.11.09 Bada Purda

Dhamandh

a Durg CREDA 10

06

2 15.11.09 30.11.09 Rithorikala Murena Murena MPUVN 10 05

318.12.09 02.01.10

Bafapur Aastha Sehore MPAGRO 10 09

406.01.10 20.01.10

Sarwahikal

a Palee Umaraiya MPAGRO 11

09

515.02.10 28.02.10

Chaudee Anooppur Anooppur MPAGRO 12 05

Total 53 34

IB. Additional CCM Trainings conducted for Agencies

Sr. Date Vanue Block District Agency No. of Plants

Page 9: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

No.

From To Trainees

construed

1 07.05.09 22.05.09 Bamoree Karahal Sheopur MPRLP 09 04

2 25.05.09 09.06.09 Majholi Dindori Dindiri MPRLP 12 06

3 06.08.09 21.08.09 TIrathgarh Jagdalpur Bastar CREDA 10 02

4 17.09.09 28.09.09 Barupata Tokapal Bastar CREDA 10 02

5 30.09.09 15.10.09 Sarsala Kareli Narsingpur MPUVN 10 06

6 15.11.09 30.11.09 Kanuadudal Udaygarh Alirajpur MPRLP 12 07

7 09.12.09 24.12.09 Lakhanpur Jaisingnagar Shahdol MPRLP 20 13

8 29.12.09 15.01.10 Dhanpuri Rajendragra

m

Anooppur MPRLP 12 7

9 08.03.10 23.03.10 Deree Chhatarpur Chhatarpur MPAGRO 10 10

Total 105 57

IIA. Training for Govt. Functionaries

SrNo

Duration of the

training

Venue Block District Agency No. of Trainee

s

128.01.10 to 30.01.10

SADO, office,

Obedullaganj Raisen Agriculture Dept. MP 20

205.02.10 to 06.02.10

DDA,Office Sagar Sagar Agriculture Dept. MP 16

IIB. Staff Trainings conducted for Agencies

Sr. No. Duration of the training

Venue Block District Agency Number of

Trainees1 30.09.09 to

01.10.09Sheopur Sheopur Sheopur MPRLP 21

2 14.11.09 to 015.11.09

Alirajpur Alirajpur Alirajpur MPRLP 25

3 25.11.09 to 26.11.09

Badwani Badwani Badwani MPRLP 15

4 27.11.09 & 01.12.09

Dhar Dhar Dhar MPRLP 28

5 01.02.10 to 02.02.10

Mandla Mandla Mandla MPRLP 22

Page 10: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

6 03.02.10 to 04.02.10

Dindori Dindori Dindori MPRLP 22

7 12.03.10 to 13.03.10

Shahdol Shahdol Shahdol MPRLP 24

III. Turnkey Workers Training

S No. Duration of the Training Venue of the training Number ofTrainees Agency

1 04.09.09 To 24.09.09 BDTC Indore 11 MPAGRO

2 04.09.09 To 24.09.09 BDTC Indore 10 MPAGRO

IV. User’s Training Camps

1 Number of Trainings 1002 Duration of Training 01 day3 Number of Trainees 20-304 Number of Training completed 48

V. Feedback Survey

Sr. No. Name of the district where feedback survey conducted

No. of plants surveyed

1- Durg CREDA 1202- Ujjain MP 1373. Khargon 878

Total 1135

VI. Other Activities

1. Literature Development for Public Awareness.

A pocket size booklet was developed for users particularly for new beneficiaries to know about primary Biogas Technology.

2. Physical verification of Biogas Plants constructed by MPUVN in the current year.

3. Reconstruction of Damaged retaining wall of existing cut model of biogas plants at centre.

Page 11: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

Year 2010-11

Venue of the Construction-cum-Maintenance Training

IA. CCM Training Allocated under NBMMP

Sr.

No.

DateFrom To

Vanue Block District Agency No. ofTraine

es

Plants constru

ed

1 06.09.10 20.09.10 Bhawura Bhind Bhind MPAGRO 10 09

202.10.1

016.10.10 Mau Murar Gwalior MPUVN 10 03

312.10.1

026.10.10 Bodra Nagari Dhamtari CREDA 10 10

419.10.1

002.11.10 Barganwa Devsar Singroli MPAGRO 10 05

515.01.1

129.01.11 Jabda

Badanawa

rDhar MPAGRO 10 09

Total 50 36

Page 12: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

IB. Additional CCM Trainings conducted for Agencies

Sr. No.

DateFrom To

Vanue Block District Agency No. ofTrainee

s

Plants construe

d

116.01.1

130.01.11

Sakarra Takhatpur Bilaspur CREDA 09 04

201.02.1

115.02.11

Sikola Patan Durg CREDA 12 06

322.02.1

108.02.11

Magroda Bamori GunaMPAGRO

10 06

414.03.1

128.03.11

Mohada Murar GwaliorMPAGRO 10 13

514.03.1

128.03.11

Charkheda Timarani HaradaMPUVN 10 03

Total 53 32

IIA. Training for Govt. Functionaries

SrNo

Duration of the

training

Venue Block District Agency No. of Trainees

128.01.10 to 30.01.10

SADO, office,Durg

Durg Durg Agriculture Dept. MP 18

225.03.11 to 26.03.11

SADO,OfficeTimarni

Timarni Harada Agriculture Dept. MP 19

IIB. Staff Trainings conducted for Agencies

Sr. No. Duration of the training

Venue Block District Agency

Number of

Trainees

116.07.10 to17.07.10

Meghnagar Meghnagar

Jhabua MPRLP 22

2 23.07.10 to 24.07.10

Jobat Jobat Alirajpur MPRLP 34

3 02.08.10 to 03.08.10

Badwani Badwani Badwani MPRLP 25

4 09.08.10 to 10.08.10

Dindori Dindori Dindori MPRLP 22

5 12.08.10 to 13.08.10

Mandla Mandla Mandla MPRLP 22

Page 13: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

IIIA. Turnkey Workers Training

S No. Duration of the Training Venue of the training Number ofTrainees Agency

1 13.09.10 To 27.09.10 BDTC Indore 05 MPAGRO

2 13.09.10 To 27.09.10 BDTC Indore 05 CREDA

3 13.09.10 To 27.09.10 BDTC Indore 10 MPRLP

IIIB. Executive Workers Training (CREDA)

S No. Duration of the Training Venue of the training

Number of

TraineesAgency

1 29.08.10 To 08.09.10 BDTC Indore 12 CREDA

IV. User’s Training Camps

1 Number of Trainings 1002 Duration of Training 01 day3 Number of Trainees 20-304 Number of Training completed 45

V. Feedback Survey

Sr. No. Name of the district where feedback survey conducted

No. of plants surveyed

1- Dhamtari , CREDA 2802- Balaghat, MP 822

Total 1102

VI. Other Activities

1. Literature Development for Public Awareness.

Page 14: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

i. A pocket size booklet was developed for users on operational problems.

ii. Hand book on Construction Technology for Deenbandhu Biogas Plants.

2. Steel shuttering for RCC made deenbandhu biogas plant.

Number of beneficiaries was unlike about brick made biogas plants during the feedback survey in last years. They are believed in RCC structure that is more suitable in Black cotton or other similar type of soil. Several biogas plants are in non functioning condition in Malwa region.For the solution of same objective a Steel shuttering mould is fabricated under the training centre during the financial year for the training purpose. A CCM Training in district Dhar was conducted. Estimated cost analysis of RCC plant is more or less same as brick made plant.

Page 15: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

3. Preparation of DPR and Proposal for 25 kWh power generations Biogas plant (100 cum) at Asharam bapu goshala, Sheopur, MP.

4. Inspection of biogas based decentralized power plant in Madhyapradesh and Chhattisgarh state.With reference to the MNRE letter underneath file no. 208/25/2007-BM, dated 12th Aug. 2010 and 25-6/2008-BE, dated 28th July 2010.

Inspection report for M/s Bhalla Dairy Farm, Neem Road, Satana (MP) and M/s SRT Form, Village Funda, Durg (CG) are already sent to the MNRE.

5. Physical verification of biogas plants constructed by MPUVN, for the last year in MP.

6. Providing Monitoring and Supervision for construction, Commissioning of 25 CUM Biogas Plant and Installation of Deisal Engine for Power Generation at Laxman Bag Goshala, Rewa MP.

Page 16: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

Year 2011-12

Venue of the Construction-cum-Maintenance Training

IA. CCM Training Allocated under NBMMP

Sr. N

DurationFrom To

Village Block District Agency No. of Trainee

Plant constructed

1 02.11.11

16.11.11 Chainpur Chhnera Khandwa MPAGRO 10* 07

Page 17: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

2 30.11.11 14.12.11 Sanjara Rehli Sagar MPAGRO 10 083 19.01.12 02.02.12 Khairai Kolaras Shivpuri MPAGRO 10 07

4 07.02.12 21.02.12 BawdikhesRagogar

hGuna MPAGRO 10 04

5 09.11.11 23.11.11 Bamadhi Kathri Janggir CREDA 12 1252 38

IB. Additional CCM Trainings conducted for Agencies

Sr. N

DurationFrom To

Village Block District Agency No. of Trainee

Plant constructed

1 20.05.11 03.06.11 Imaliya Pichhor Shivpuri MPAGRO 11* 07

2

27.02.1203 days

15.03.12 for Holi

Dhanpurl Jat hari Anuppur MPAGRO 10 05

3 16.03.12 31.03.12 Dadari Umariya Umariya MPAGRO 06 07

4 27.01.12 07.02.12 Khamod Patan Jabalpur MPAGRO 10 09

5 07.12.11 20.12.11 Bodra Bajalpur Jabalpur CREDA 09 1246 40

IIA. Training for Govt. Functionaries

SrNo

Duration of the

training

Venue Block District Agency No. of Trainee

s

126.03.12 to 27.03.12

DDA, office, Sagar Sagar Sagar Agriculture Dept. MP 10

226.03.12 to 27.03.12

DDA, office, Sagar Sagar Sagar Agriculture Dept. MP 10

Page 18: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

IIB. Staff Trainings conducted for Agencies

Sr. No

Duration Venue Agency No. of Trainee

s1 20.09.11 To

21.09.11BDTC, Indore MP Agro 8

2 20.09.11 To 21.09.11 BDTC, Indore MP Agro 8

III. Turnkey Workers Training

S No. Duration of the Training Venue of the training Number ofTrainees Agency

1 05.09.11 To 19.09.11 BDTC Indore 05 MPAGRO

2 05.09.11 To 19.09.11 BDTC Indore 05 CREDA

3 05.09.11 To 19.09.11 BDTC Indore 05 MPRLP

IV. User’s Training Camps

1 Number of Trainings 1002 Duration of Training 01 day3 Number of Trainees 20-304 Number of Training completed 52

V. Feedback Survey

Sr. No.

Name of the district

Name of the Agencies

No. of plants Constructed No. of plants

surveyed

1 Janjgir CREDA 401 2702

MandsourMP Agro 849 481

3 Satana MP Agro 394 1674 Jhabua MP Agro 231 103

Total 1875 1021

Page 19: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

VI. Other Activities1. Design and Development of Biogas Storage Balloon:

Biogas balloon was fabricated of 0.85 cum holding capacity for testing and research purpose. So that it can be used easily in village and also to promote the biogas selling entrepreneurship.

In the earlier development, it requires approximate 40 to 48 kg of variable load to produce pressure of 10 cm of water column for proper flaming of gas stove and after removing of injector jet of the stove, it requires approximate 20 kg wt. But this erecting load also moves in irregular direction. To eliminate this problem, BDTC are trying to develop a battery based exhausts fan next to the outlet of balloon therefore the gas may be release from balloon without any external pressure.

2. Preparation of DPR and Proposal for 10 kWh power generations Biogas plant of 100 cum at Asharam bapu goshala, Sheopur, MP.

3. Physical verification of biogas plants constructed by MPAGRO, for last 03 year in the District of Annoppur, Badwani, Dewas and Sagar in the favor of CESR.

Reporting for the above work to be done to the MPAGRO, Bhopal

Page 20: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

Year 2012-13

Venue of the Construction-cum-Maintenance Training

IA. CCM Training Allocated under NBMMP

Sr. No

DurationFrom To

Village Block District Agency No. of Trainees

Plant constructed

1 26.10.1209.11.1

2Majgoan Mungeli Mungeli CREDA 10 07

2 19.11.1203.12.1

2Sanjara Rehli Ujjain

MPAGR

O10 08

3 07.12.1221.12.1

2Pahatkala Khirkiya Harada

MPAGR

O10 07

4 28.12.1211.01.1

3Dhabhi

Pandhan

a

Khandw

a

MPAGR

O10 04

5 27.02.1313.03.1

3

Sarangpur

iNagri Dhamtari CREDA 10 12

Total 50 38

Sr. No.

Description Particulars of Physical verification

Plants constructed during

2008-09 to 2010-11

District Name

Sagar Dewas Badwani

Anooppur

Total

1 No. of plants in District 1321 977 405 680 33832 Surveyed Plants 648 591 212 438 18893 Functional Plants 501 580 187 384 16524 Non functional Plant* 147 11 25 54 237

Page 21: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

IB. Additional CCM Trainings conducted for Agencies

Sr. N DurationFrom To

Village Block District Agency No. of Traine

e

Plant constructed

1 17.01.13 01.02.13 Dagarwad Abdulaganj Raisen MPAGRO 10 07

2 13.02.13. 22.02.13 Meethi Jaisinghnagar

Shahdol MPAGRO10 05

3 17.03.13 31.0313 Malkhedi Beena Umariya MPAGRO 10 07

Total 30 19

IIA. Training for Govt. Functionaries

SrNo

Duration of the

training

Venue Block District Agency No. of Trainee

s

115.10.12 to 16.10.12

BDTC, indore Indore Indore Agriculture Dept.Indore

MP10

226.02.13 to 27.02.13

SADO office, Guna Guna Guna Agri.Dept. Guna MP 22

III A. Turnkey Workers Training

Sr. No.

Duration of Training

Venue Agency Requested

Numbers

No. of trainees

1 10.09.12 To 24.09.12

BDTC,Indore

MP Agro 10 10

2 CREDA 10 10

Page 22: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

III B. Turnkey Workers Training

Sr. No.

Duration of Training

Venue Agency Requested

Numbers

No. of trainees

1. 26.10.12 To 09.11.12 BDTC MPAGRO 10 10

2. 10.09.12 To 24.09.12 BDTC CREDA 10 03

IV. User’s Training Camps

Sr. No.

Name of State

District Numbers of Course

No. of Beneficiaries

1. MadhyaPradesh 14 59 1779

2. Chhattisgarh 03 10 350

VA. Feedback Survey

VB. Physical verification of biogas plants constructed by MPAGRO, for last 03 year in the District of Annoppur, Badwani, Dewas and Sagar.

Sr. No.

Name of the district

Name of the Agencies

No. of plants Constructed No. of plants

surveyed

1 Raigarh CREDA 1140 367

2 Sehore MP Agro 1130 364

3 Khandwa MP Agro 710 3524 Shivpuri MP Agro 256 125

Total 3236 1208% 100 37.33

Page 23: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

VI. Other Activities1. Preparation of DPR and Proposal for 10 goshalas in MP for power

generations with cow dung based Biogas plant for 500 Cum biogas (cumulative) capacity.

Sr No

Name of Goshala Types of Biomass

CapacityCUM

1 Adarsh Goshala, MC, Gwalior Cow dung 852 Pashu Prajanan Parikshetra, Bhadbhada Cow dung 853 Pashu Prajanan Parikshetra,

Aagar ,Shajapur Cow dung 85

4 Pashu Prajanan Parikshetra, Minora, Tikamgarh

Cow dung 85

5 Pashu prajanan Parikshetra, Imlikheda, Chhindwada

Cow dung 25

6 Central Jail, Ujjain Cow dung, KW 457 Central Jail, Sagar Cow dung, KW 258 Pashu Prajanan Parikshetra Jabalpur Cow dung NA

Sr. No.

Description Particulars of Physical verification

Plants constructed during

2008-09 to 2010-11

District Name

Guna Rajgarh Seoni Total1 No. of plants in District 1068 700 2722 44902 Surveyed Plants 411 279 866 15563 Functional Plants 302 192 847 13414 Non functional Plant* 109 87 019 215

Page 24: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)

9 Central Semen Station, Bhadbhada, Bhopal Cow dung 8510 Bull mother form, Bhadbhada, Bhopal Cow dung 45

Table - 28

2. Preparation of DPR and Proposal for 25 cum Cow dung based Biogas Plant for thermal use at village Guwar, district Narmada, Gujrat.

3. Preparation of DPR and Proposal for 12 cum Kitchen waste* based Biogas plant and 25 cum Cow dung based Biogas Plant for thermal use at Bramhkumari Ashram , Mount Abu, Rajsthan.

4. Construction of 6 cum cow dung based biogas plant for thermal use at Bramhkumari Ashram , Mount Abu, Rajasthan. *12 cum Kitchen waste* based Biogas plant is under construction.

5. Construction and study of new fixed type biogas plant of 1 cum capacity at centre. The same is under construction.

6. Comments on the project entitled:ANAEROBIC TECHNOLOGY FOR BIOGAS RECOVERY AND STABILIZATION OF UNSORTED MUNICIPAL SOLID WASTE.( Dr. V B Manilal, Principal Scientist, PEET,CSIR-Thiruvanathapuram) ( F. No. 19- 16/2007- R&D /BE dated 07.12.2012)

7. Comments on the project entitled:DEVELOPMENT OF A HOUSEHOLD WASTE & SANITATION DEVICE (HWSD) WITH

BIOGAS RECOVERY.( Dr. V B Manilal, Principal Scientist, PEET,CSIR-Thiruvanathapuram) ( F. No. 19- 32/2007- R&D /BE dated 07.12.2012)

8. Comments on the project entitled:DESIGN AND DEVELOPMENT OF PRE-FABRICATED HIGH RATE DIGESTER FOR RAPID BIOGAS PLANT by Johny Joseph, Principal Investigator (Senior Principal Scientist) BeEC,IICT-Hyderabad) ( F. No. 19- 16/2007- R&D /BE dated 23.03.2013)

9. Inspection of 10 KW power projct at Sant Asharm Bapu goshala, Sheopur, MP. (25-15/2011-BE dated 15.03.2013.

Page 25: Janjgir report bdtc 2007-12.docx · Web viewPrincipal Investigator Dr. S. P. SINGH PROGRESS REPORT Year 2007 – 2013 Biogas Development & Training Centre, Indore (Madhya Pradesh)