37
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo

Report from KEK H igh gradient study results from Nextef ( + other related activities)

  • Upload
    sanam

  • View
    24

  • Download
    0

Embed Size (px)

DESCRIPTION

Report from KEK H igh gradient study results from Nextef ( + other related activities). LCWS2011, Granada Sep. 27, 2011 T. Higo. Contents. Recent high gradient study at Nextef Structure fabrication status Preparation of another test stand. Recent h igh gradient study at Nextef. - PowerPoint PPT Presentation

Citation preview

Page 1: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Report from KEK

High gradient study results from Nextef(+ other related activities)

LCWS2011, GranadaSep. 27, 2011

T. Higo

Page 2: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Contents

• Recent high gradient study at Nextef

• Structure fabrication status

• Preparation of another test stand.

2011/9/27 LCWS2011, Granada (Higo) 2

Page 3: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Recent high gradient study at Nextef

• T24_Disk_#3– HG study in a usual manner– Earthquake and following deterioration– Total phase advance

• TD24_Disk_#4– Initial processing status

2011/9/27 3LCWS2011, Granada (Higo)

Page 4: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

T24 versus TD24

0 4 8 12 16 20 24240

50

100

150

200

250

iris number

P [

MW

] (b

lack

), E

s (

gre

en),

Ea (

red

) [M

V/m

],

T

[K

] (b

lue)

, S

c*50

[MW

/mm

2 ] (m

agen

ta)

7.5 8.4

176

205

3.03.2

90

108

41.1

23.4

Pinload = 41.1 MW, P

outload = 23.4 MW

Eff = 0.0 % tr = 0.0 ns, t

f = 0.0 ns, t

p = 100.0 ns

0 5 10 15 20 250

50

100

150

200

250

iris number

P [

MW

] (b

lack

), E

s (

gre

en),

Ea (

red

) [M

V/m

],

T

[K

] (b

lue)

, S

c*50

[MW

/mm

2 ] (m

agen

ta)

24.6 21.7

183193

3.3

2.9

94102

44.4

20.6

Pinload = 44.4 MW, P

outload = 20.6 MW

Eff = 0.0 % tr = 0.0 ns, t

f = 0.0 ns, t

p = 100.0 ns

Average unloaded of 100 MV/m

Difference is in pulse heating

Design by A. Grudiev

2011/9/27 4LCWS2011, Granada (Higo)

Page 5: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

HG test result on T24#3

• High gradient performance– BDR evolution– BDR at 100MV/m– Damage

• Deterioration due to earthquake– Air exposure

2011/9/27 5LCWS2011, Granada (Higo)

Page 6: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Processed for 1744 hours.

2011/9/27 6LCWS2011, Granada (Higo)

Page 7: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

T24#3BDR evolution at 252nsnormalized 100MV/m

2011/9/27 7LCWS2011, Granada (Higo)

Assuming the same exponential slope as that at 400hr

We understand the BDR has been kept decreasing.

Page 8: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Comparison of BDR in T18, TD18 and T24

2011/9/27 LCWS2011, Granada (Higo) 8

TD18#21600hrs

T18 T242800hrs

400hrs

1677hrs

T24#3

T18#2

① ② ③

Page 9: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Nextef: before / after earthquake

14:46 on March 11, 2011Unfixed load was fallen

Accelerator structure was found to be atmospheric pressure.

Running T24

2011/9/27 9LCWS2011, Granada (Higo)

Page 10: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

After earthquake

0

200

400

600

800

1000

1200

1400

1600

1800

2000

0

20

40

60

80

100

120

140

160

0 500 1000 1500 2000 2500

Pulse width, # A

CC-BD<E

acc>

MV

/m

RF-On time [hr]

T24#3 History run1-41From Dec. 6, 2010 To Jul. 11, 2011(2206hrs)

F50 width [ns]

<Eacc> MV/m

#ACC-BD

震災

Processed For 2206hours.

Before earthquakeAfter

91ns

2011/9/27 10LCWS2011, Granada (Higo)

Page 11: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

BD location before and after earthquake

Run 32-34 = before at 412nsec, 110-120MV/mRun 38-39 = after 91nsec, ~100 MV/m

Breakdowns are located uniformly over full accelerator structure span. This behavior has been kept.

0

1

2

3

4

5

6

7

8

9

Cell Location of ACC-BD

#ACC-BD by Cell Locations

Before Earthquake

After Earthquake

T24#3 run 32-34 (N=86)T24#3 run 38-39 (N=32)

Before After

2011/9/27 11LCWS2011, Granada (Higo)

Page 12: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Deterioration due to earthquake• WR90 waveguide was ruptured and the

structure was purged to almost 1 atm pressure.

• Processing memory was gone. Frequent breakdowns made it necessary to reach 100 MV/m even pulse width shortened to 91nsec pulse.

• Breakdown location was kept uniform before and after the earthquake.

2011/9/27 12LCWS2011, Granada (Higo)

Page 13: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Trial to estimate the frequency change due to HG operation

Total phase advance from input to output

Received from SLAC Measurement setup at cleanroom

Measurement in cleanroom before HG test2011/9/27 13LCWS2011, Granada (Higo)

Page 14: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

T24#3: Change of total phase shift before to after high-gradient test

Total 2 degrees roughly +0.16MHz2011/9/27 14LCWS2011, Granada (Higo)

Page 15: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Estimated frequency change

120/cell before HG

Freq

up

by H

G

Freq

dn

by

0.3d

egC

Less phase advance after HG

cellNf

f

cvg

/

120

Phase reading

Actual phase

+2 deg

)(exp zktj

Less phase advance

0.3 degC - 0.06MHz2 degree +0.1MHz (<vg/c=1.2% assumed)

2011/9/27 15LCWS2011, Granada (Higo)

Page 16: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Deterioration in 10 years?• Roughly speaking, +0.16MHz over 1000hours at

100MV/m• If the same frequency shift continues at the same rate,

10-year operation results in ~10MHz, too large.• Thanks to the BDR reduction as time, we hope this to be

much smaller! It should be confirmed in the long running evaluation.

• The evaluation should be confirmed with bead pull. It is being prepared now.

• It also should be established in an actual prototypes, damped structures.

2011/9/27 LCWS2011, Granada (Higo) 16

Page 17: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

TD18_Disk

Possible breakdown triggered from high magnetic field area

Milling + Turning + Light etching  <

1mm

Hs maximum point

17

Near max Hs

SEM inspection by CERN on eq. acc str, TD18#3

Markus Aicheler 13. Oct. 2010

Hs max

Pulse heat

damage

Strange shape at highest Hs point2011/9/27 LCWS2011, Granada (Higo)

Page 18: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

TD24 #4 Initial start up

Power monitor

Waveguide VAC input and output

2011/9/27 18LCWS2011, Granada (Higo)

Page 19: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Initial stage of TD24#4 processing at 51nsec

2011/9/27 19LCWS2011, Granada (Higo)

Tentative in EaccPreliminaly estimated to be a little low

Here and following pages for TD24

0 20 40 60 80 100 120 140 160 180 2000

10

20

30

40

50

60

70

80

0

100

200

300

400

500

600

700

800

900

1000

TD24#4 History run1-8From Aug. 10, 2011 To Sep. 21, 2011(176hrs)

<Eacc> MV/m

#ACC-BD

F50 width [ns]

RF-On time [hr]

<Eac

c> M

V/m

Pulse width, # ACC-BD

Processed For 176hours.

Eac

c [M

V/m

] (

pre

lim

inar

y)

RF-ON time [hrs]

Page 20: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Comparison of initial ramp upT24 vs TD24

2011/9/27 20LCWS2011, Granada (Higo)

Page 21: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Comparison of initial ramp upT18 vs TD18

2011/9/27 21LCWS2011, Granada (Higo)

Page 22: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Comparison of initial rampingstarting at 51nsec run

2011/9/27 22LCWS2011, Granada (Higo)

Page 23: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Initial startup characteristics

• Damped is slower than undamped.• 24-cell structures seem faster than 18-cell.

• TD24 #4 are being ramped up at initial shortest pulse width 51nsec.

• The recovery route and speed from BD is determined by the KEK protocol. (Keep Tp)

2011/9/27 23LCWS2011, Granada (Higo)

Page 24: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

2011/9/27 24LCWS2011, Granada (Higo)

Dark current of TD24#4 in its initial stage of processing with 51nsec

Sep.

16-

18

Sep.

27

Page 25: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Comparison of dark currentT18_Disk TD18_Disk T24_Disk

25

Undamped 90~100 MV/m damped 70~80MV/m

TD24_Disk

2011/9/27 LCWS2011, Granada (Higo)

0.01

0.1

1

10

100

50 60 70 80 90100 200

T18_#2 Dark Current evolution081128-081224-090224-090414-090515

FC-Mid [microA] (081128)

FC-Mid [microA] (081224)

FC-Mid microA (253ns, 090225)

FC-Mid microA (253ns, 090414)

FC-Mid microA 090515

FC-Mid microA

Eacc [MV/m]

Eacc for peak dark current of 10 m 90MV/m 70MV/m 100MV/m (80MV/m)

(51ns processing)

Page 26: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

BD Pulse shapes

forward

reflected

transmitted

FC up and Mid

Reflection phase

Reflection I, Q

Page 27: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

BD cell distribution from RF pulse timing

Rather uniform BD location, but maybe two frequent locations?

Page 28: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Rs phase

BD Rs phase mostly in two phases

Input spike as a reference of meas. system

Page 29: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

BD-cell location versus Rs phase

BD cells are uniformly located but Rs in two phases, as described in the previous slides.

Rs phase at its peak Rs phase at BD timing

BD c

ell

BD c

ell

Page 30: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Summary of test result TD24#4

• Processing speed is faster than TD18 and slower than T24

• BD location distribution is roughly uniform• BD reflection phase shows two peaks• Initial-stage dark current is less than TD18 but

higher than T24• It is kept running for 24hr/day need to wait

a month to reach nominal CLIC operation

2011/9/27 30LCWS2011, Granada (Higo)

Page 31: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Structure fabrication• TD24R05 #1--#4

– #1--#2 in assembly at SLAC– #3--#4 on the way to SLAC

• TD24R05 12GHz– Problem found: it prevents from proper stacking– Additional cut is being made

• DDSA 12GHz test cell– Five test cells will delivered to KEK on Sep. 26– Stack measurement is in preparation

• We are struggling to deduce the relation between machining and high-gradient performance.

2011/9/27 31LCWS2011, Granada (Higo)

Page 32: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Recently happened problem

2011/9/27 LCWS2011, Granada (Higo) 32

Cell stacking schematic with self fitting feature

Measurement of TD24R05(12GHz)

Bad corner radius shape in male side

Same problem may happen in other KEK-made cells!?It may enhance BD, though without vacuum problem!?

Page 33: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Toward basic study on high gradient

• Single-cell setups are being prepared• Large-grain material is included as material to

be used to simplify the study• Setup is being prepared at another test stand,

called “shield-B” being driven by a single klystron at KT-1.

2011/9/27 33LCWS2011, Granada (Higo)

Page 34: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Transport line KT1 to B being constructed

2011/9/27 LCWS2011, Granada (Higo) 34

KT1

B

Page 35: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Nextef expansion is being proceeded

2011/9/27 35LCWS2011, Granada (Higo)

Page 36: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Reusable coupler: TM01 Mode Launcher

Surface electric fields in the mode launcher Emax= 49 MV/m for 100 MW

SLAC made a set of launchers for KEK basic tests.KEK will prepare single cell test setups.

2011/9/27 LCWS2011, Granada (Higo) 36

Page 37: Report from KEK H igh gradient study results from  Nextef ( + other related activities)

Conclusion • The high gradient test of T24 was finished

with low-enough BDR value with its continuing evolution.

• Processing of TD24 was recently started. Initial processing speed is slower than T24 but a bit faster than TD18. Sounds reasonably well behaved at 51ns, >80MV/m level now.

• Another test system is being constructed for basic studies at KEK.

2011/9/27 37LCWS2011, Granada (Higo)