ENMAS ANDRITZ PRIVATE LIMITEDTECHNICAL SERVICES POWER BOILER
CHENNAI, INDIA
BIRLA CELLULOSIC KHARACH (WB029M) 1 x 120 TPH AFBC BOILER
REPORT ON BIRLA CELLULOSIC SITE VISIT
Self has reached the site on 17-06-09 @ 7.00 PM and the elaborate operating
problems & issues has been discussed ith !irla cellulosic operation team &
Maintenance team
"he issues and root cause has been stated belo
Problem1. #efractor$ insulation at clinger seal bo% area has been eroded and the bed
material has been pops outside @ 160609 11.10 pm ith a !oiler load of
10'-10( "P) and bed temp of 9*0-9(0 deg +. ,fter this incident 1st
compartment has been slumped off and all other compartment here in
operation e%pect 6thcompartment ith boiler load of 7'-7* "P)
Causes and suggested solution:
1. rosion of refractor$ started from clinger door seal bo% area and the
boiler as under near full load operation from 0*0609 to till this incident. t
has been obser/ed that !+ personnels didnt place a refractor$ !ric2 lining at
clinger door area as it as clearl$ shon in ,rrg. 3f #efractor$ draing.
4rg 5o-00-7'-01-00700
'. ,ll other area of refractor$ ill be cooled b$ ater alls b$ conducti/e
heat transfer ith tube. !ut areas li2e clinger door8 here the heat transfer is
predominantl$ b$ radiation should be insulated ith refractor$ bric2 lining.
Problem
1. !+ informed that some of the coal feeders ere cant able to ta2e in auto
mode
REPORT No: EAPLWB029M1!0"0901 TECHNICAL SER#ICES PB B$: RAA%A REUBEN R
DATE : 200"09 ENMAS ANDRIT& P#T LTD E'ECUTI#E ENINEER
7/23/2019 Report on Birla Cellulosic Site Visit 200609
2/3
ENMAS ANDRITZ PRIVATE LIMITEDTECHNICAL SERVICES POWER BOILER
CHENNAI, INDIA
BIRLA CELLULOSIC KHARACH (WB029M) 1 x 120 TPH AFBC BOILER
Causes and suggested solution:
1. "his problem as due to con/erter on :4 panel8 since the feeder
motor rpm is mandator$ for auto mode. !+ ants all failed ,M"+) supplied
:4 panels +,53P;S con/erter to be replaced ith M,S!;S con/erter
'. !+ replaced +,53P;S con/erter of coal feeder ith M,S!;S
con/erter from
7/23/2019 Report on Birla Cellulosic Site Visit 200609
3/3
ENMAS ANDRITZ PRIVATE LIMITEDTECHNICAL SERVICES POWER BOILER
CHENNAI, INDIA
BIRLA CELLULOSIC KHARACH (WB029M) 1 x 120 TPH AFBC BOILER
1. Ahile on B100C!M+# ?1'6"P) on 060609 ith drum Pressure of (7
gcm'. "he flo of the steam as recorded as 1*6"P) hich is lasted for fe
seconds8 since flo is pressure compensated. Soon be$ond the set /alue of
1*("P)8 the has been sitched o/er to manual mode. n response to that
drum le/el has a ide fluctuation and finall$ M:" acted for 4rum le/el )).
Suggested solution:
1. +ontroller should ha/e the pro/ision to sitch o/er from to 1 hile on
boiler normal operation itself. Pro/iding a selection button for 1 for 100C
+ in !oiler normal operation. f there is hea/$ fluctuation on drum le/el
because of abo/e stated issue8 operator can sitch o/er to 1 to a/oid
fluctuation and folloed boiler tripping.
Problem
1. Safet$ /al/e passing
Response
1. 5M,S ill send an e%pert soon regarding this issue ?as con/e$ed b$ Mr.
#MD
Problem
1. ,P) side casing plate tears off and ha/ing hea/$ /ibration
Response
1. "his ill be attended hile on forthcoming boiler shutdon schedule ?as in
M3M on 09-06-09
REPORT No: EAPLWB029M1!0"0901 TECHNICAL SER#ICES PB B$: RAA%A REUBEN R
DATE : 200"09 ENMAS ANDRIT& P#T LTD E'ECUTI#E ENINEER