Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 1 of 18
Minutes of the 12th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on
10.06.2016 at POWERGRID, Gurgaon
1. The 12th Joint Co-ordination Committee meeting of IPPs in WR was held at POWERGRID Office, Gurgaon on 10th Jun, 2016.
The list of participants of the meeting is enclosed at Annexure-I.
2. CTU welcomed the participants and informed that Minutes of the 11th meeting of the Joint Co-ordination Committee of IPPs granted LTA in WR held on 16.02.2016, were issued vide letter ref. no. C/CTU/W/OA/11JCC dated 03.03.2016. As no observations/comments were received on the minutes, accordingly the minutes of 11th Joint Co-ordination Committee as circulated are confirmed.
3. CTU stressed that generation developers should ensure completion of their dedicated lines to match with the commissioning of transmission network in order to prevent bottling up of power. It was further stated that interim arrangements through LILO of existing lines were provided only as a contingency measure and the IPPs need to implement the final dedicated transmission system as the matter has been very seriously looked into by Hon’ble CERC in Petition no. 112/TT/2013.
4. It was clarified by CTU that JCC forum has been created for co-ordination purposes to attempt matching of generation schedules with the associated transmission system, and accordingly, the information given by generation developers is being taken into cognizance for co-ordination purpose. However, for any substantial issue, it may kindly be submitted by official correspondence addressed to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not clear in the content; therefore it was advised that such communication should strictly follow CERC Regulatory provisions (Regulation 18) specifically regarding notice, clearly therein mentioning the relinquishment quantum, date of relinquishment and consent for payment of applicable relinquishment charges.
5. All the LTA customers were advised to clear the consultancy payment liabilities at the earliest towards implementation of bays for termination of dedicated/connectivity lines for timely implementation of the same. In case of failure the IPPs shall only be responsible towards any delay in implementation of the bays.
6. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and Detailed procedure made therein.
7. It is noted that some of the IPPs/ applicants have been repetitively not attending the JCC Meetings. All such IPPs/ applicants were requested to attend the future meetings so as to have a better co-ordination.
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 2 of 18
8. It was deliberated that all those generation projects that have achieved COD and have also completed dedicated transmission line may not be required to attend JCC as the coordination work has already been over. Therefore they may not be called for further JCC meetings (Details of all such generation projects as per Table T1 –(i) ,(ii) & (iii)
9. As per the 11th JCC meeting, a no. of LTA customers were requested to sign the Transmission Service Agreement (TSA) at the earliest in accordance with CERC Sharing Regulations. However, none of them have signed till date. It was once again advised that the LTA customers shall sign the TSA at the earliest. List of the IPPs who are yet to sign the TSA is enclosed herewith at Annexure - II.
10. The LTA customers were requested to update the progress of their generation projects and the discussion are summarised below :
Status of the Generation Projects
HIGH CAPACITY TRANSMISSION CORRIDOR – IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum (MW) Target Beneficiaries
Firm beneficiary
Comm. schedule (11
th JCC)
Comm. schedule (12
th JCC)
Dedicated / Connectivity line & Status
Remarks
WR NR
All the generation projects in Corridor-IV are commissioned /abandoned and their corresponding dedicated/connectivity transmission lines have also been commissioned.
Hence further participation in JCC is not required. Details provided in Table T1
HIGH CAPACITY TRANSMISSION CORRIDOR – V
(Transmission System Associated with Chhattisgarh IPPs) Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm benefici
ary
Comm. schedule (11
th JCC)
Comm. schedule (12
th JCC)
Dedicated / Connectivity line &
Status
Remarks
WR NR SR
RAIGARH (KOTRA) COMPLEX
1 RKM Powergen Ltd (4X360)
819 419 200 200
UP – 350 MW
Telangana – 200 MW
(Under process)
Not attended (U1/U2: COD in
Nov’15 / Feb’16- as informed through
email)
U1: Nov’15 U2: Feb’16 U3: Sep’16 U4: Oct’16
400kV RKM- Raigarh PS (Near Kotra) D/c (Quad) line – Jul’16
3 Kms OPGW of dedicated TL pending It was advised to submit fresh application for change in Region to supply power to UP
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 3 of 18
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm benefici
ary
Comm. schedule (11
th JCC)
Comm. schedule (12
th JCC)
Dedicated / Connectivity line &
Status
Remarks
WR NR SR
2
Athena Chhattisgarh Power Ltd. (2X600)
683 342 341 Nil U-1: Sep’ 16 U-2: Mar’ 17
U1: Dec’16 U2: Jun’17
400kV Athena - Raigarh PS (Near Kotra) D/c (Quad) line – Line ready and back charged from other end
Representative informed that 92% works of the generation plant are completed.
3 SKS Power Gen. (Ch) Ltd. (4X300)
683 319 364 Nil
Not attended (U1/2/3/4: Sept
16/Dec’16/Sept’18/Dec’18 - as
informed through letter)
U1/2/3/4: Sept 16 / Dec’16 /
Sept’18 / Dec’18
400kV SKS - Raigarh PS (Near Kotra) D/c line (Triple/Quad) - Commissioned in Feb’ 15
4 Visa Power Ltd. (1X600+1X660)
678 478 200
CSPTCL: 424 MW WB: 200 MW with option to increase to 510 MW
U-1: Sep’ 18 U-2: Mar’ 20
U1: Dec’18 U2: Mar’20
400kV Visa Power- Raigarh PS (Near Kotra) D/c (Triple) line - Jun’17 (informed through e-mail)
Project progress slow.
RAIGARH (TAMNAR) COMPLEX
5 TRN Energy Pvt. Ltd (2X300)
393 243
3
150 +
240
UP : 390 MW
U-1: Mar’ 16 U-2: Sept’ 16
U-1: Jun’16 U-2: Sep’16
TRN - Raigarh PS (Tamnar) 400kV D/c line : Commissioned in Jul’15
Against PPA of 390 MW to UP; 150 through target to NR and fresh application for 240 MW for change in beneficiary from target in WR to UP is under issuance
JANJGIR-CHAMPA COMPLEX
6. KSK Mahanadi Power Co. Ltd. (6X600)
2340 2340 840
0 1000
0 500
Tamil Nadu: 500
MW UP: 1000
MW Gujarat : 1010MW
U-1/2: Aug'13/Aug'14
(COD); U-3/4: Sep’16/
Mar’17; U-5/6: Sep/Dec’17
U-1/2: Aug'13/Aug'14
(COD); U-3/4: Sep’16/
Mar’17; U-5/6:
Sep/Dec’17
400kV KSK – Champa Pooling Station 2xD/c (Quad) – 1
st D/c line
expected by Jul’16; 2
nd line by Dec’16
The generation developer was advised to implement the dedicated line and remove the interim arrangement at the earliest Applicant has submitted a fresh application for change in beneficiary from Target WR to UP which is under issuance
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 4 of 18
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm benefici
ary
Comm. schedule (11
th JCC)
Comm. schedule (12
th JCC)
Dedicated / Connectivity line &
Status
Remarks
WR NR SR
7. Bharat Aluminium Co. Ltd. (BALCO-4X300)
200 100
0 100
0 0
200
Tamil Nadu :
200 MW Kerala : 95 MW
Chhattisgarh: 55
MW
10th JCC : U-1/2:
Commissioned, U-3: Nov’15 U4: Mar’16
Not attended
Balco – Dharamjaygarh / Korba PS 400kV D/c (Triple/Quad) line – Aug’16
8.
Lanco Amarkantak Power Pvt. Ltd. (2X660)
858 858 NIL
Not Attended (10
th JCC:
U-1: Aug’16 U-2: Dec’16)
U-1: Dec’16 U-2: Mar’17
LANCO – Champa PS 400kV D/c (Quad) line - expected by Oct’16
Applicant is contemplating signing of PPA with UP; Advised to apply for LTA in advance in such an event
9. Vandana Vidyut Ltd. (2X135 + 1X270)
265 165 100
CSPTCL :
25 MW Telangan
a : 120 MW
Not Attended (10
th JCC
U-1: Apr’14 (COD) ;
U-2:Mar’16 U-3:Apr’19)
Not Attended (10
th JCC
U-1: Apr’14 (COD) ;
U-2:Mar’16 U-3:Apr’19)
Vandana Vidhyut – Dharamjaygarh PS 400kV D/c line : Mar’17
TSA may be signed at the earliest.
Other Generation Projects in Chhattisgarh & Madhya Pradesh
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Comm. schedule (11
th JCC)
Comm. schedule (12
th JCC)
Dedicated / Connectivity line & Status
Remarks
WR NR ER SR
1. 1 Mahan (Essar power Ltd.(2X600)
1200 1200 0 0 0 MP: 150 MW
U-1: Apr’ 13 (COD)
U-2: Jun’ 16
U-1: Apr’ 13 (COD)
U-2: Sep’16
Mahan TPS – WR PS 400kV D/c line - expected by Mar’17
Representative stated that the dedicated transmission line is getting delayed by 5-6 months. Petition filed in CERC for tariff of dedicated line. Applicant was advised to expedite the implementation of dedicated line
2. 2
Karnataka Power Corporation Ltd (Godhna) (2X800)
763 0 0 0 763 NIL
Not Attended (MOEF
clearance awaited-as
informed vide email)
MOEF clearance awaited;
(Not expected
before 2021-22)
KPCL - Champa PS 400kV D/c (Quad) line: to match with Generation project
Representative informed that MOEF clearance for the project still awaited After award, U-1 expected in 48 months and U-2 in 52 months
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 5 of 18
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Comm. schedule (11
th JCC)
Comm. schedule (12
th JCC)
Dedicated / Connectivity line & Status
Remarks
WR NR ER SR
3. 3 Essar Power Gujarat Ltd.
250 0 0 0 250 NIL
Uncertain (No certain date
given despite repetitive
requests) – 3 years from
MoEF Clearance
Project Uncertain;
Salaya TPS - Bachau 400kV D/c (Triple) line - advanced stage of completion
Applicant informed that they have submitted letter for relinquishment of LTA CTU already informing that relinquishment has to be in accordance with CERC Regulations with the consent to pay the relinquishment charges as to be decided by CERC in Petition No. 92/MP/2015
4. 4 Torrent Energy Ltd.
800 400 400 0 0 NIL
Not Attended (9
th JCC: U-
1/2/3: Dec’ 14 (COD))
Not Attended
(Commissioned)
TEL(DGEN) TPS- Navsari 400kV D/c (Triple/Quad) line – commissioned - Jul’13
TSA need to be signed by the developer.
5. 5 NPCIL (Kakrapar) – 2x700 MW
1400 1400 0 0 0 * Not attended U3: Nov’17 U4: Mar’18
Kakrapar NPP - Navsari 400kV D/c (Under ISTS): Oct’16
Quantum firmed up; *Representative informed that the beneficiaries have been finalized NPCIL was requested to forward the break-up of quantum with beneficiaries;
6. 6 NTPC (Lara-I) 1586.51 1586.
51 0 0 0 NIL
U1: Apr’17; U2: Oct’17
Not Attended
Lara - Raigarh PS (Kotra) 400 kV D/c line - commissioned
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 6 of 18
List of generation projects commissioned along with the dedicated/connectivity lines and further coordination not required
HIGH CAPACITY TRANSMISSION CORRIDOR – IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects)
Table T1 (i)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries
Firm beneficiary
Last updated status
Dedicated / Connectivity line & Status
Remarks
WR NR
CHATTISGARH IPP
1 Maruti Clean Coal (1X300)
171 126 45 Rajasthan: 250
MW CSPTCL : 14 MW
U-1: Commissioned, COD in Jul’15
LILO of one ckt of ACB TPS - WR PS(Bilaspur) 400kV D/c line is Commissioned
Against the PPA of 250 MW with Rajasthan ; 45 on Target to NR and fresh application of 205 MW filed in Feb’16 with relinquishment of 126 MW from WR
2 Dheeru Power Gen
450 367.5 82.5 NIL 9
th JCC :
Uncertain
Dheeru gen - WR PS (Bilaspur) 400kV D/c line
Matter is sub judice in High Court
3. Chhattisgarh State Power Trading Co. Ltd
432 260 172 NIL approached CERC for
relinquishment
MADHYA PRADESH IPP
4.
Jaiprakash Power Ventures Ltd. (2X660)
1240.8 465.3
853.5 465.3
387.3 0
MP-465.3 MW (Operational)
9th JCC U-1& 2 : Commissioned in Sep’ 14 & Feb’ 15
Jaiprakash - Satna 400kV D/c (High Capacity) line – commissioned
465.3 MW on Firm basis to MP is under operation and Matter in CERC for keeping the LTA in abeyance for balance quantum (775.5 MW)
5. Aryan MP Power generation Pvt. Ltd (2X600)
1122.0 841.5 280.5 NIL 9
th JCC:
Abandoned Aryan MP - Vindhyachal Pooling station 400kV D/c (High Capacity)
Petition filed for relinquishment of 1122 MW. Order reserved.
6 Bina Power Supply Company Ltd (2X250)
265.35 132.68 132.67 NIL 10th JCC:
Commissioned
Bina TPS - Bina (PG) / Bina (MPPTCL) 400kV D/c line - Commissioned
Matter in CERC for relinquishment of LTA for full quantum.
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 7 of 18
HIGH CAPACITY TRANSMISSION CORRIDOR – V (Transmission System Associated with Chhattisgarh IPPs)
Table T1 (ii) Sl. No.
LTOA / LTA Applicant
LTOA Quantum (MW)
Target Beneficiaries Firm benefici
ary
Last updated status
Dedicated / Connectivity line & Status
Remarks
WR NR SR
RAIGARH (KOTRA) COMPLEX
1. Korba West Power Co. Ltd. (1X600)
240 140 100 CSPTCL:
5% U-1: Mar'14
(COD)
400kV Korba (W)- Raigarh PS (near Kotra) D/c line – Commissioned
2. DB Power Ltd. (2X600)
705 530 322
175
0 208
Tamil Nadu:
208 MW Rajastha
n-250 (matter in RERC)
U-1: Feb’ 14 U-2: Mar’ 15
(COD)
DB Power – Raigarh PS (near Kotra) 400kV D/c (Triple/Quad) line - commissioned
Against PPA of 250 MW to Rajasthan ; 175 MW through Target to NR and request for change in Target region for 75 MW to Rajasthan made to CTU which is under issuance
RAIGARH (TAMNAR) COMPLEX
3. Jindal Power Ltd. (4X600)
1400 700 110
700 557.
5
0 732.
5
Tamil Nadu :
400 MW Kerala: 190 & 142.5 MW
10th JCC: U-1/2: Mar’14
(COD) U-3: Jan’15
(COD) U-4:
Commissioned
JPL – Raigarh PS (near Tamnar) 2xD/c 400kV (Quad) – 3 ckts commissioned, 4th circuit expected by Oct’15 (as informed in 10th JCC)
400 MW to Tamil Nadu under operation
4. Jindal Power Ltd. (400 MW)
400 400 NIL
Commissioned
RAIGARH COMPLEX
5.
GMR Chhattisgarh Energy Pvt. Ltd. (2X685)
816 386 430 NIL U-1: Jun’15
(COD); U-2: Feb’16
GMR - Raipur PS 400kV D/c (Quad) line - commissioned in Jan’14
6.
Chhattisgarh State Power Trading Co. Ltd*
5809 3487 2322 NIL M/s CSPTCL has filed a petition at CERC seeking relinquishment
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 8 of 18
Other Generation Projects in Chhattisgarh & Madhya Pradesh
Table T1 (iii)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Latest updated status
Dedicated / Connectivity line & Status
Remarks
WR NR ER SR
1 PTC(Lanco-II) (1X300)
300 0 300 0 0 Haryana – 300
MW Commissioned
Pathadi TPS - WR PS (near Sipat) 400kV D/c (Quad) line - commissioned
2.
MB Power (Madhya Pradesh) Limited (2X600)
392 200 192 0 0 UP-192 MW (Operational)
U-1: May’ 15 (COD)
U-2: Mar’ 16
MB TPS - Jabalpur PS 400kV D/c (Triple) line – Commissioned
392 MW operational; Representative requested for return of CBG as per Regulations.
3.
Dhariwal Infrastructure Ltd.
300 150 50
150 0 0
100 Tamil Nadu: 100
MW
Not Attended (Commissione
d -submitted
though e-mail)
LILO of one ckt of Bhadravati - Parli 400kV line at Dhariwal TPS - Commissioned
LTA for 100 MW to Tamil Nadu is operational
4 NTPC (Vindhyachal -V)
495.78 495.7
8 0 0 0 GoI Allocation Oct’ 15 (COD)
Interconnection at 400kV Bus of Vindhyachal TPS-IV switchyard
5 Jhabua Power Ltd
210 210 0
0 0 0
204.25
Kerala: 204.25 MW
U-1: May’16 (COD)
Jhabua TPS - Jabalpur PS 400kV D/c (Triple) line - Commissioned
Balance LTA of 5.75 MW relinquished
6 MP Power Management Company Ltd.
246 197.5
246 197.5
0 0 0 NIL
U-1: May’16 (COD – from
Jhabua Power)
Jhabua TPS - Jabalpur Pool 400kV D/c (Triple) line: Commissioned
197.5 MW LTA under operation and balance LTA of 48.5 MW relinquished
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 9 of 18
Status of the Associated Transmission System
HIGH CAPACITY TRANSMISSION CORRIDOR – IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects)
Transmission System under the Scope of POWERGRID:
Transfer of power from generation projects near Bilaspur complex in Chhattisgarh & MP projects
Sl. No.
Tr. System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Indore- Vadodara 765kV S/c Commissioned Commissioned
2 Vadodara – Pirana 400kV D/c (Quad) Commissioned Commissioned
3 Establishment of 765/400kV, 2x1500 MVA substation at Vadodara
Commissioned Commissioned
Status of other associated transmission lines
Sl. No.
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 765 KV S/C Bina - Gwalior line (3rd Ckt) Commissioned Commissioned Commissioned in May' 14.
2 765KV S/C Gwalior-Jaipur line (2nd Ckt) Commissioned Commissioned
3 765 KV S/C Jaipur - Bhiwani line Commissioned Commissioned
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 10 of 18
HIGH CAPACITY TRANSMISSION CORRIDOR – V
(Transmission System Associated with Chhattisgarh IPPs) Transmission System under the Scope of POWERGRID
Establishment of Pooling Stations at Raigarh (Near Kotra) and Raipur for IPP Generation Projects in Chhattisgarh Part-1
Sl. No.
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Raigarh Pooling Station (Near Kotra) – Raipur Pooling Station 765kV D/c 2x240 MVAR line reactors at each end on both circuits
Commissioned Commissioned
2 Raigarh Pooling Station (Near Kotra) – Raigarh 400kV D/c
Commissioned Commissioned
3 Raipur Pooling Station – Raipur 400kV D/c
Commissioned Commissioned
4 Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station (near Kotra) (1x240 MVAR B/R) at 765kV, 1x80 MVAR bus reactor (charged at 400kV)
Commissioned with 1x1500 MVA
transformer
Commissioned
5 Establishment of 765/400kV 1x1500MVA Raipur Pooling Station (1x240 MVAR B/R)
Commissioned Commissioned
Establishment of Pooling Stations at Champa and Raigarh (Near Tamnar) for IPP Generation Projects in Chhattisgarh Part-2
Sl. No.
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Champa Pooling Station – Raipur Pooling Station 765kV D/c -150 KM - 2x240 MVAR line reactors at Raipur
Commissioned Commissioned
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 11 of 18
Sl. No.
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
2 Raigarh Pooling station(near Kotra) – Raigarh pooling station(near Tamnar) 765kV D/c
Commissioned Commissioned
3 Champa Pooling Station – Dharamjaygarh/Korba 765kV S/c
Commissioned Commissioned
4 Raigarh Pooling Station (near Kotra) – Champa Pooling Station 765kV S/c
Commissioned Commissioned
5 Establishment of 765/400kV 6x1500MVA Champa Pooling Station (1x240 MVAR B/R) 1x80 MVAR bus reactor when charged at 400kV)
Commissioned Commissioned
6 Establishment of 765/400kV 3x1500MVA Raigarh Pooling Station(near Tamnar) (1x240 MVAR B/R)
Commissioned Commissioned
Integration of Pooling Stations in Chhattisgarh with Central part of WR for IPP Generation Projects in Chhattisgarh Part-3
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Raipur Pooling Station – Wardha 765kV D/c - 2x240 MVAR line reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha
Commissioned Commissioned
2 Wardha bus reactor – 1x330 MVAR Commissioned Commissioned
Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhattisgarh Part-4
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Wardha – Aurangabad (PG) 765kV D/c - 2x330 MVAR line reactors at Wardha and 2x240 at Aurangabad
Commissioned Commissioned
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 12 of 18
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
2 Aurangabad(PG) – Boisar 400kV D/c (Quad)-300 km - 2x63 MVAR line reactors at each end on both circuits
Dec’16 Dec’16
Severe RoW issues in Nashik Dist. due to grape garden
3 Establishment of 765/400kV 2x1500MVA Aurangabad (PG) S/s (1x240 MVAR B/R)
Commissioned Commissioned
4 Augmentation of transformation capacity at Boisar by 1x500MVA
Commissioned Commissioned
System strengthening in North/West part of WR for IPP Projects in Chhattisgarh Part-5
Sl. No.
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Padghe – Padghe(PG) 400kV D/c (Quad)-25 km
Oct’16 Mar’17 The LILO of under construction 400 kV Tarapur-Padghe line (MSETCL) bypassing Kudus substation is not workable as the work of LILO of 400 kV Tarpur-Padghe line is stopped for the last 2 years due to severe RoW & n0n-avavilability of forest clearance. (Unless Kudus Substation of MSETCL is constructed, Power cannot be evacuated from Padghe)
2 Vadodara – Asoj 400kV D/c(Quad)-15 km -
Commissioned Commissioned
3 Aurangabad (PG) – Padghe(PG) 765kV 1×D/c - 2x240 MVAR line reactors at each end on both circuits
Oct’16 Mar’17
4 Establishment of 765/400kV 2x1500MVA Padghe(PG) S/s [GIS] (1x240 MVAR B/R)
Oct’16
Mar’17
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 13 of 18
System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh Part-6
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Raipur Pooling Station – Wardha 765kV 2nd D/c-380 km - 2x240 MVAR line
Jun’16
Oct’16
2 Reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha
System strengthening in Wardha-Aurangabad corridor for IPP Projects in projects in Chhattisgarh Part-7
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Wardha – Aurangabad (PG) 765kV 2nd D/c – 2x330 MVAR line reactor at Wardha and 2x240 line reactor at Aurangabad
Commissioned
Commissioned
WR-NR HVDC interconnector for IPP Projects in Chhattisgarh Part-9
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra (NR)
1500 MW - Jun’16 1500 MW -Sept’16
Sep’16/ Dec’16
2 Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) one ckt. via 400/220kV Nakodar S/s
Commissioned
Commissioned
3 LILO of Abdullapur – Sonepat 400kV D/c(triple) at Kurukshetra Commissioned
Commissioned
4 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra(NR) respectively:
Mar’18 Mar’18
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 14 of 18
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
to be upgraded to 6000MW
5 Establishment of 400/220kV 2x500 MVA S/s at Kurukshetra
Commissioned
Commissioned
Transmission elements being implemented by transmission licensee through tariff based competitive bidding process. Part-10
[TBCB award placed to succesful bidder Sterlite in Mar ’12 with commissioning schedule of 39 months(June ’15)]
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 Aurangabad(PG) – Dhule (IPTC) 765kV S/c line
Commissioned Commissioned
2 Dhule (IPTC) – Vadodara (PG) 765kV S/c line
Commissioned Commissioned
3 Dhule (IPTC) – Dhule (MSETCL) 400kV D/c Quad line
Commissioned Commissioned
4 Establishment of 765/400kV, 2x1500MVA Dhule(IPTC) S/s
Commissioned Commissioned
Status of other Transmission Lines
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
2 400KV D/C Kurukshetra - Jind line (Q) Mar’18 Mar’18
3 765 KV D/C Jabalpur Pooling Station - Bina line Commissioned Commissioned Line commissioned in Dec'13.
4 Jabalpur PS-Bhopal 765kV S/c Commissioned Commissioned TBCB
5 Bhopal- Indore 765kV S/c Commissioned Commissioned TBCB
6 TEL(DGEN) TPS- Vadodara 400kV D/c May’18 May’18 TBCB (SPV transferred)
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 15 of 18
Sl. No
Transmission System Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
7 220kV Navsari- Besthan May’18 May’18 TBCB
8 765KV D/C Jabalpur Poolin Stn. - Orai line
Apr’18 Apr’18
9 765kV Orai- Aligarh Apr’18 Apr’18
10 765KV D/C Narendra (New Kudgi) - Kolhapur line (initialy charged at 400KV) *
Commissioned Commissioned
11 400KV D/C Kakrapar APP - Vapi line Oct’16 Oct’16
12 Vindhayachal PS- Jabalpur PS 765kV D/c Oct’16 Jun’18 TBCB
13 400KV D/C Lara STPS - Raigarh (Kotra) line Jun’18 Commissioned Commissioned in Apr’16
Sl. No
Name of the Sub-Station Status (as per 11th JCC)
Status (as per 12th JCC)
Remarks
1 765/400 KV Champa Pooling Station
Commissioned Commissioned
2 765/400KV Jabalpur Pooling station (2x1500MVA) Commissioned Commissioned
Sub-station commissioned along with ICT-I in Dec.'13 & ICT-II in Mar'14.
3 1x1500 MVA 765/400kV ICT at Vindhayachal PS Jul’17 Jul’17
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 16 of 18
Annexure-I
List of Participants in the 12th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on 10.06.2016
Sl. No.
Name Designation Organization E-mail
1. Seema Gupta COO (CTU-Plg.) Power Grid Corporation of India Ltd [email protected]
2. Rishika Sharan Director (PSP&A-I) Central Electricty Authority [email protected]
3. Santosh Kumar Dy. Director (PSP&A-II) Central Electricty Authority [email protected]
4. Ashok Pal GM (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]
5. Avinash Pavgi GM (Commercial) Power Grid Corporation of India Ltd. [email protected]
6. R Nagpal GM (CMG) Power Grid Corporation of India Ltd. [email protected]
7. D N Rozekar AGM (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]
8. B P Kundu DGM (BDD) Power Grid Corporation of India Ltd. [email protected]
9. Jyoti Prasad DGM (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]
10. Rajesh Verma CDE (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]
11. Anil Kumar Meena CDE (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]
12. Laxmi Kant Manager (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
13. Anita A. Srivastava Manager, Law (Commercial)
Power Grid Corporation of India Ltd. [email protected]
14. K Jyoth Kumar Officer (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]
15. Manish Pareta Sr. Engineer (CTU-Plg.) Power Grid Corporation of India Ltd [email protected]
16. Swapnil Verma Law Officer (CTU-Plg.) Power Grid Corporation of India Ltd [email protected]
Minutes of the 12th
JCC Meeting of IPPs granted LTA in WR
Page 17 of 18
Sl. No.
Name Designation Organization E-mail
17. Dwaipayen Sen Engineer (CTU – Plg.) Power Grid Corporation of India Ltd [email protected]
18. Pratyush Singh Engineer (CTU – Plg.) Power Grid Corporation of India Ltd [email protected]
19. Rishu Garg AM-Transmission GMR Chhattisgarh Energy Pvt. Ltd. [email protected]
20. N.M. Ambade GM (Project Finance) SKS Power Generation (CG) Ltd. [email protected]
21. P. K. Gupta SME (E) NPCIL (KAPP- 3&4) [email protected]
22. H Sharma AGM DB Power Ltd. [email protected]
23. Mohan Menon Advisor Athena Chhattisgarh Power Ltd. [email protected]
24. T. Rajesh Kumar Manager RKM Powergen Pvt. Ltd. [email protected]
25. S. N. Sharma President- Engineering Karnataka Power Corporation Ltd. [email protected]
26. Vijender Gupta Manager (Projects) TRN Energy Pvt. Ltd. Aryan MP Power Generation Pvt. Ltd.
27. V. Ravindran Dy. Chief Lanco Amarkantak Power Pvt. Ltd. [email protected]
28. S.K. Bhardwaj Sr. DGM Lanco Amarkantak Power Pvt. Ltd. [email protected]
29. C Narasimha Manager KSK Mahanadi Power Company Ltd. [email protected]
30. R. Srinivasan Vice President (Corp.) Athena Chhattisgarh Power Ltd. [email protected]
31. Ranjan Mishra Executive Director Visa Power Ltd. [email protected]
32. S.R. Parida J.G.M. Essar Power MP Ltd. / Essar Power Gujarat Ltd.
33. Roopam bansal Deputy Manager-BDD Jhabua Power Ltd. [email protected]