Partner logo here (1cm high) (remove box once partner logo positioned/remove box and ‘bar’ if no partner logo) Client logo here (1cm high) flush right- (remove once logo positioned or if no logo) Report on the CCTV Inspections of the Surface Water Drainage System - 2019 Issue date: Irish Distillers Pernod Ricard Site Projects 2013 IE0311192-30-RP-0010, Issue: A Customer Project Number: Customer Document Number: For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 01-06-2020:04:25:43

Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Partner logo here (1cm high) – (remove box once partner

logo positioned/remove box and ‘bar’ if no partner logo)

Client logo here (1cm high) – flush right-

(remove once logo positioned or if no logo)

Report on the CCTV Inspections of the Surface Water Drainage System - 2019

Issue date:

Irish Distillers Pernod Ricard Site Projects 2013 IE0311192-30-RP-0010, Issue: A Customer Project Number: Customer Document Number:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 2: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

162.TP.009, Issue 7, 16/01/2013 DRAFT - Unchecked - May Be Incomplete

Document Sign Off

Report on the CCTV Inspections of the Surface Water Drainage System - 2019

Irish Distillers Pernod Ricard Site Projects 2013 IE0311192-30-RP-0010, Issue A

Customer Project Number: Customer Document Number:

File No:IE0311192.30.131

CURRENT ISSUE

Issue No: A Date: Reason for issue: For Information

Sign Off Originator Checker Reviewer Approver Customer Approval (if required)

Print Name ALAN.MARSHALL

Signature DRAFT

Date 17/01/2020

PREVIOUS ISSUE

Issue No

Date Originator Checker Reviewer Approver Customer Reason for issue

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 3: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 3 of 16 DRAFT - Unchecked - May Be Incomplete

Contents

1 Introduction 4

2 Defects and Condition Grades 4

2.1 Standards 4

2.2 Defect Classifications 4

2.3 Defect Grade Descriptions 4

3 Drain Cleaning and CCTV Inspections 5

3.1 Overview 5

3.2 Phase 1 5

3.3 Phase 2 9

3.4 Phase 3 11

4 Recommendations for Pipe Rehabilitation or Replacement 13

Attachments 15

Summary of Results

01311192-30-DR-0075 SERVICE DEFECT GRADINGS

01311192-30-DR-0076 STRUCTURAL DEFECT GRADINGS

Appendices

Appendix A – CCTV Inspection Report (Q22613/1) - Storm 2019 (Phase 1)

Appendix B – CCTV Inspection Report (Q22613/2) - Storm 2019 (Phase 2)

Appendix C – CCTV Inspection Report (Q22613/3) - Storm 2019 (Phase 3)

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 4: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 4 of 16 DRAFT - Unchecked - May Be Incomplete

1 Introduction

It is a requirement of Irish Distillers Pernod Ricard’s (IDPR) IPPC Licence (Reg. No. P0442-02) for their Midleton Plant that all surface water drains within the facility’s production area are inspected by CCTV surveys at least once every three years. In compliance with this requirement, Dyno-Rod (Crowley Services Ltd. Cork) carried out the initial surveys under the management of PM Group (PMG) in August and September 2019.

This report details and analyses the findings of the surveys. In addition, it makes recommendations on a programme of works required to rehabilitate or replace the drains currently identified as defective in order to ensure the continued integrity of the surface water drainage system.

The survey sheets are included in the Appendices and a tabulated and graphical representation of the results for both service and structural defects are provided in the attachments.

Also included in the attachments is a table summarising all results and recommendations.

2 Defects and Condition Grades

2.1 Standards

The standard that was followed in reporting on the condition of the surface water drains is based on the UK Water Research Centre’s (WRc) publication “Manual for Sewer Condition Classification Fifth Edition”. This is considered industry Best Practice and has been adopted in the British Standards and the European codes to provide a common language of exchange of this information.

2.2 Defect Classifications

Observed pipe defects are classified into two distinct categories and graded individually in severity of defects from Grade 1 to Grade 5. These categories are:

- Service Defects - A defect that does not affect the integrity of the pipe but could lead to a structural defect if not addressed. E.g. penetrating roots.

- Structural Defects - A defect which affects the integrity of the pipe e.g. a broken pipe.

In the Dyno-Rod reports in the Appendices, defects have been given corresponding colour codes relating to their classification. The grading and associated colour codes are based on the worst defect observed in the individual pipes. This colour coded system was used in the graphical representation of the results on DR-0075 and DR-0076 in the attachments.

Section 2.3 provides a description for each classification code from 1 to 5.

2.3 Defect Grade Descriptions

Defects are classified into 5 distinct grading codes

Grade 1 (Green)

No defects were observed or defect observations without damage, for example lateral joints.

Conclusion: No action required

- Grade 2 (Brown)

Constructional deficiencies or occurrences with insignificant influence to tightness, hydraulic capacity or static pressure of the pipe. Example; Wide joints, minor deformations of plastic pipes, minor corrosion.

Conclusion: Rehabilitation can be scheduled long term.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 5: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 5 of 16 DRAFT - Unchecked - May Be Incomplete

- Grade 3 (Blue)

Construction deficiencies diminishing static safety, hydraulic capacity or tightness e.g. cracks, minor drainage obstructions such as calcite build-up, protruding lateral connections, minor damages to pipe walls, individual root penetrations, corroded pipe walls etc.

Conclusion: Rehabilitation is necessary medium term – within 3 to 5 years.

- Grade 4 (Orange)

Constructional damages with insufficient static safety, hydraulic capacity or tightness. E.g. axial/radial pipe bursts, pipe deformations, visually noticeable infiltration/exfiltration, cavities in pipe-wall, severe protruding laterals, severe root penetrations, severe corrosion of pipe wall etc.

Conclusion: Rehabilitation is urgent and has to be completed within 1 to 2 years. Necessity for emergency operations to be examined.

- Grade 5(Red)

Pipe is already or will shortly be impassable. Example; collapsed pipe, deeply rooted pipe or other drainage obstruction. Pipe loses water or danger of backwater in basement etc.

Conclusion: Rehabilitation is urgent and short-term. In order to prevent further damage, necessary temporary spot repair has to be conducted on emergency level.

3 Drain Cleaning and CCTV Inspections

3.1 Overview

The planning of the CCTV surveys was divided into three phases.

Phase 1 included the surveying of all accessible drains within the production area and the identification of drains with both low levels of siltation (up to 15%) and high levels of siltation (from 15% to almost full blockages). Phase 1 was carried out in August and September 2019.

Phase 2 of the works included the cleaning and resurveying of all drains with siltation levels up to and including 15%. In addition, during this phase, an effort shall be made to locate previously inaccessible/buried manholes for the purpose of making them available for surveying in phase 3. Phase 2 was carried out in January/February 2020.

Phase 3 includes cleaning of pipes with siltation levels of over 15% and the removal of individual objects and blockages. Once cleaned the pipes will be resurveyed to identify any previously unseen defects. Also in this phase any previously inaccessible drains will be surveyed where possible. Phase 3 is planned for February/March 2020.

3.2 Phase 1

Phase 1 of the works was carried out in August/September 2019 and covered the major extent of the total surface water network within the production area. The results of these surveys are included in Appendix A – Phase 1 CCTV Inspections.

A total of 152 No. pipes covering approximately 2,623 lin. m of surface water drain was surveyed phase 1.

Out of these a total of 43 No. pipes were identified of having siltation levels of up to 15% and a total of 21 No. pipes were identified of having siltation levels of over 15%, roots intrusions, coarse settled deposits or pipe impedances due to foreign objects. Some pipes could not be surveyed completely in this phase due to both heavy blockages and obstructions and/or protruding lateral pipe connections. These were identified for future phase 3 cleaning and rehabilitation works respectively.

Table 3.1 lists all pipes surveyed in phase 1 where defects were observed. All other pipes surveyed are deemed to be defect free (Grade 1).

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 6: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 6 of 16 DRAFT - Unchecked - May Be Incomplete

Table 3.1 Phase 1 Summary of Defect Gradings Following Phase 1

Number Dyno-Rod Report

Section No

USMH DSMH Diameter Service Grade

Structural Grade

Status

1 8 S320A S320C 450mm 4 1 Clean-Phase 3

2 11 S319 S318A 600mm 3 1 Clean-Phase 2

3 12 S318A S318 600mm 3 1 Clean-Phase 2

4 13 S318 S317 600mm 1 4 Repair

5 17 S51 S50 225mm 5 4 Clean-Phase 2/Repair

6 18 S50 S49 225mm 4 4 Clean-Phase 2/Repair

7 19 S49 S309 225mm 3 4 Clean-Phase 2/Repair

8 20 S309 FwRT 225mm 2 1 Remove Roots

9 21 A310A S48 600mm 3 4 Clean-Phase 3/Repair

10 23 S54 S312A 600mm 4 4 Clean-Phase 2/Repair

11 24 S315 S54 600mm 4 1 Clean-Phase 3

12 25 S313 S312A 450mm 3 1 Clean-Phase 2

13 30 S44 S308 600mm 4 1 Clean-Phase 3

14 31 S308 S308 600mm 3 1 Clean-Phase 2

15 33 S312B S310 600mm 3 1 Clean-Phase 2

16 36 S311 S310A 300mm 3 1 Clean-Phase 2

17 37 S311 S307 300mm 2 1 Clean-Phase 2

18 38/41 S47 S43 375mm 4 4 Clean-Phase 2/Repair

19 39 S46 S47 375mm 5 1 Clean-Phase 3

20 40 S45 S47 250mm 3 1 Clean-Phase 3

22 42 S43 S308 375mm 2 2 Clean-Phase 2/Repair

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 7: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 7 of 16 DRAFT - Unchecked - May Be Incomplete

Number Dyno-Rod Report

Section No

USMH DSMH Diameter Service Grade

Structural Grade

Status

23 48 S280.5 S282 600mm 2 1 Clean-Phase 2

24 50 S291 S13 450mm 2 1 Clean-Phase 2

25 51 S13 S288.1 450mm 3 1 Clean-Phase 2

26 52 S294 S291 450mm 3 1 Clean-Phase 2

27 54 S290 S291 450mm 2 1 Clean-Phase 2

28 61 AJ287.2 Mainline 100mm 3 1 Clean-Phase 2

29 68 S287 S286 150mm 5 1 Clean-Phase 3

30 70 S297 S296 225mm 3 1 Clean-Phase 2

31 71 S293 S296 225mm 2 1 Clean-Phase 2

32 73 S14 S13 150mm 1 5 Repair/Replace

33 78 S280.2 S280.1 150mm 3 1 Clean-Phase 2

34 86 S277 S277A 450mm 3 1 Clean-Phase 2

35 89 S274 S276 250mm 3 1 Clean-Phase 2

36 90 S273 S274 300mm 2 1 Clean-Phase 2

37 91 S200 S273 150mm 3 1 Clean-Phase 2

38 96 S22 S24 150mm 5 1 Clean-Phase 3

39 97 S21 S22 150mm 5 1 Clean-Phase 3

40 98 S23 S22 150mm 5 1 Clean-Phase 3

41 99 S24.3 S25 375mm 1 4 Repair

42 100 S24.2 S24.3 375mm 3 1 Clean-Phase 2

43 101 S24.1 S24.2 375mm 3 1 Clean-Phase 2

44 104 S27 S301 450mm 3 1 Clean-Phase 2

45 105 S301 S328 450mm 3 1 Clean-Phase 2

46 108 S302 S27 450mm 3 1 Clean-Phase 2

47 109 S326A S326 450mm 2 1 Clean-Phase 2

48 110 S303A S326A 450mm 2 1 Clean-Phase 2

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 8: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 8 of 16 DRAFT - Unchecked - May Be Incomplete

Number Dyno-Rod Report

Section No

USMH DSMH Diameter Service Grade

Structural Grade

Status

49 111 S303 S303A 450mm 3 1 Clean-Phase 2

50 113 S304 S303B 450mm 3 1 Clean-Phase 2

51 117 S203 S202 100mm 5 4 Clean-Phase3 /Repair

52 118/119 S203 S204 225mm 1 4 Repair

54 120/121 S204 S205 300mm 1 4 Repair

55 123 S205.2 S205.1 450mm 1 4 Repair

56 124 S205 S206 450mm 3 1 Clean-Phase 2

57 126 S207 S210 450mm 1 4 Repair

58 127 S210 S211 450mm 5 4 Clean-Phase3/ Repair

59 128 S207A S207 300mm 1 4 Repair

60 129 S207B S207A 300mm 3 1 Clean-Phase 2

61 131 S209 S208 225mm 3 1 Clean-Phase 2

62 133 S214 S213 300mm 1 4 Repair

63 135 S227 S226 225mm 1 4 Repair

64 136 S226 S225 225mm 3 1 Clean-Phase 2

65 137 S225 S224 225mm 1 4 Repair

66 140 S36 S37 225mm 5 4 Clean-Phase 2/Repair

67 141/142 S39.3 S36 225mm 4 4 Clean-Phase 2/Repair

68 143 S39.1 S39.2 150mm 4 1 Clean-Phase 3

69 144 S218 S217 150mm 2 1 Remove Roots/Repair

70 145/147 S217 S215 150mm 5 4 Clean-Phase 3/Repair

71 146 S216 S215 150mm 3 1 Clean-Phase 2

72 149 S212 S211 400mm 5 1 Clean-Phase 3

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 9: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 9 of 16 DRAFT - Unchecked - May Be Incomplete

Number Dyno-Rod Report

Section No

USMH DSMH Diameter Service Grade

Structural Grade

Status

73 139/152 S42 S34 450mm 1 4 Clean-Phase 3/Repair

74 153 S34 S45 200mm 4 1 Clean-Phase 2/Remove

Roots

75 154 S28 S24 150mm 4 1 Clean-Phase 3

76 155 S77 S78 150mm 4 1 Clean-Phase 3

77 156 S81 S82 150mm 4 4 Repair

78 157 S80 S81 150mm 3 4 Repair

79 158 S82 S83 150mm 2 4 Repair

3.3 Phase 2

Phase 2 of the works was started in January 2020 and was completed in February 2020. This phase included the cleaning and resurveying of pipes with siltation levels of up to 15% cross-sectional area loss.

In total there were 43 No. lines identified for cleaning and resurveying as part of this phase.

Furthermore during this stage, previously inaccessible manholes on the network will be located or uncovered in order to provide the capability to fully complete the survey work for phase 3.

Following the cleaning works, a number of pipes listed in table 3.1 are now classified as grade 1-defect free. Table 3.2 lists the remaining pipes requiring attention following the completion of phase 2.

The results of the phase 2 cleaning and resurveying are included in Appendix B – Phase 2 CCTV Inspections.

Table 3.2 Summary of Remaining Defects Following Phase 2 Cleaning and Resurveying

Number Dyno-Rod Report Section No.

Phase1/Phase2

USMH DSMH Diameter Service Grade

Structural Grade

Status

1 8 S320A S320C 450mm 4 1 Clean-Phase 3

2 13 S318 S317 600mm 1 4 Repair

3 17/12 S51 S50 225mm 1 4 Repair

4 18/9 S50 S49 225mm 1 4 Repair

5 19/8 S49 S309 225mm 1 4 Repair

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 10: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 10 of 16 DRAFT - Unchecked - May Be Incomplete

6 20 S309 FwRT 225mm 2 1 Remove Roots

7 21 A310A S48 600mm 3 4 Clean-Phase 3/Repair

8 23/6 S54 S312A 600mm 1 4 Repair

9 24 S315 S54 600mm 4 1 Clean-Phase 3

10 30 S44 S308 600mm 4 1 Clean-Phase 3

11 31 S308 S308 600mm 3 1 Clean-Phase 3

12 38/41/3/14 S47 S43 375mm 1 4 Repair

13 39 S46 S47 375mm 5 1 Clean-Phase 3

14 40 S45 S47 250mm 3 1 Clean-Phase 3

15 42/17/18 S43 S308 375mm 1 2 Repair

16 68 S287 S286 150mm 5 1 Clean-Phase 3

17 70 S297 S296 225mm 3 1 Clean-Phase 3

18 71 S293 S296 225mm 2 1 Clean-Phase 3

19 73/74 S14 S13 150mm 1 5 Repair/Replace

20 78/45 S280.2 S280.1 150mm 2 1 Repair

21 96 S22 S24 150mm 5 1 Clean-Phase 3

22 97 S21 S22 150mm 5 1 Clean-Phase 3

23 98 S23 S22 150mm 5 1 Clean-Phase 3

24 99 S24.3 S25 375mm 1 4 Repair

25 113 S304 S303B 450mm 3 1 Clean-Phase 3

26 117 S203 S202 100mm 5 4 Clean-Phase 3/Repair

27 118/119 S203 S204 225mm 1 4 Repair

28 120/121 S204 S205 300mm 1 4 Repair

29 123 S205.2 S205.1 450mm 1 4 Repair

30 126 S207 S210 450mm 1 4 Repair

31 127 S210 S211 450mm 5 4 Clean-Phase3/ Repair

32 128 S207A S207 300mm 1 4 Repair

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 11: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 11 of 16 DRAFT - Unchecked - May Be Incomplete

33 133 S214 S213 300mm 1 4 Repair

34 135 S227 S226 225mm 1 4 Repair

35 137 S225 S224 225mm 1 4 Repair/Replace

36 140/22 S36 S37 225mm 1 4 Repair

37 141/142/23 S39.3 S36 225mm 1 4 Repair

38 143 S39.1 S39.2 150mm 4 1 Clean-Phase 3

39 144 S218 S217 150mm 2 1 Repair

40 145/147 S217 S215 150mm 5 4 Clean-Phase 3/

Repair

41 149 S212 S211 400mm 5 1 Clean-Phase 3

42 153/16 S34 S45 200mm 4 1 Clean-Phase 3/

Remove Roots

43 154 S28 S24 150mm 4 1 Clean-Phase 3

44 155 S77 S78 150mm 4 1 Clean-Phase 3

45 156 S81 S82 150mm 4 4 Repair

46 157 S80 S81 150mm 3 4 Repair

47 158 S82 S83 150mm 2 4 Repair

48 139/152 S42 S34 450mm 3 4 Clean-Phase3/ Repair

3.4 Phase 3

Phase 3 of the works is planned for February/March 2020. This phase will include the cleaning and resurveying of pipes with more than 15% siltation/deposits and the removal of obstructions in pipe inverts. Obstructions to be removed as identified in phase 1 include removal of bricks, rubble from pipe inverts and the removal of concrete cores deposited from improperly made lateral connections. In addition, the previously inaccessible drains as identified in phase 1 and located/made accessible in phase 2 will be surveyed and reported on.

In total there are xxx additional lines to be surveyed as part of phase 3. Table 3.3 lists the pipes identified as having structural defects following the completion of all survey and cleaning works.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 12: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 12 of 16 DRAFT - Unchecked - May Be Incomplete

Table 3.3 Summary of Pipes with Defects Requiring Repair

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 13: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 13 of 16 DRAFT - Unchecked - May Be Incomplete

4 Recommendations for Pipe Rehabilitation or Replacement

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 14: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 14 of 16 DRAFT - Unchecked - May Be Incomplete

The final results of the CCTV surveys incorporating the conclusion of all surveys is given in the attachments

DR_0075- 2019 Surface Water Drainage CCTV Inspections- Service Defect Gradings

DR_0076- 2019 Surface Water Drainage CCTV Inspections – Structural Defect Gradings

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 15: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 15 of 16 DRAFT - Unchecked - May Be Incomplete

Attachments

DR_0075 – 2019 Surface Water Drainage CCTV Inspections- Service Defect Gradings

DR_0076 - Surface Water Drainage CCTV Inspections – Structural Defect Gradings

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 16: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Rev: A

Sheet title: Surface Water Drainage Testing Record Sheet

Length Diameter

(U/S) (D/S) (m) (mm)

Dyno Rod

Survey No.

Phase 1

Dyno Rod

Survey No.

Phase 2

Test DateStruct

Grade

Service

Grade

Survey

No.Test Date

Struct

Grade

Service

Grade

MH S320L MH S320M 17.17 450 Concrete 1 20/08/2019 1 4Comment: Settled Deposits: 50%

Concrete Cores:incompleteRecommendation: remove concrete cores and complete survey General Feb 2020- Phase 3 Cleaning Scheduled

MH S320M MH S320C 3.89 600 Concrete 2 20/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S320C SUMP 17.82 600 Concrete 3 20/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S320M MH S320J 28.95 600 Concrete 4 20/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S320J MH S320K 59.9 600 Concrete 5 20/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S320D MH S320H 0.53 225 uPVC 6 20/08/2019 1 4Comment: Debris 50% cross-

sectional area loss

Recommendation: Clean manhole and line of silt and complete

surveyGeneral Feb 2020- Phase 3 Cleaning Scheduled

MH S320F MH S320E 4.53 225 Concrete 7 20/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S320A MH S320C 41 450 Concrete 8 21/08/2019 1 4Settled Desposits:35%: Concrete

coresRemove concrete cores and complete survey General Feb 2020- Phase 3 Cleaning Scheduled

MH S320K MH S320 14.97 600 Concrete 9 21/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S320 MH S319 10.17 600 Concrete 10 21/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S319 MH 318A 51.31 600 Concrete 11 10 21/08/2019 1 3 Settled Deposits:15% Clean and resurvey General Jan 2020- Phase 230/01/2020-Service Grade

1No Defects 1 1

MH S318A MH S318 41.34 600 Concrete 12 11 21/08/2019 1 3 Settled Deposits: 15% Clean and resurvey General Jan 2020- Phase 230/01/2020-Service Grade

1No Defects 1 1

MH S318 MH S317 17.21 600 Concrete 13 21/08/2019 4 1 Intruding Connection:15% Cut back connections and carry out top-hat repair Construction

MH S50A MH S318A 10.28 450 Concrete 14 21/08/2019 1 1 No CommeJ23:L24nt No Recommendation None No Defects 1 1

MH S333 S318A 42.12 450 Concrete 15 21/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S320E MH S51 16.81 225 Concrete 16 21/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S51 MH S50 56.87 225 Concrete 17 12 21/08/2019 4 5

Multiple Defects: defective

connections;settled

deposits:10%,roots intrusions

Clean and develop repair/replacement programme General/Construction30/01/220 - Service Grade

1Cleaned- Repairs Required 5 4

MH S50.1 MH S49 48.56 225 Concrete 18 9 21/08/2019 4 4Settled deposits:25% multiple

defective connectionsClean and develop repair/replacement programme Construction

30/01/2020-Service Grade

1Repairs Required 4 1

MH S49 MH S309 26.56 225 Concrete 19 8 21/08/2019 4 3Settled deposits:10% multiple

defective connectionsClean and develop repair/replacement programme Construction

30/01/2020-Service Grade

1Repairs Required 4 1

MH S309 FwRT 10.88 225 Concrete 20 21/08/2019 1 2 Fine roots intrusion Removal of roots and repair can be scheduled long term General Cleaning Scheduled

MH S310A MH S48 35.43 600 Concrete 21 21/08/2019 4 3

Multiple defective connnections,

infiltration, fine roots,settled

deposits:20%

Clean and develop repair/replacement programme Construction

MH S312A MH S310A 11.19 600 Concrete 22 21/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S54 MH S312A 17.03 600 Concrete 23 6 21/08/2019 4 4Settled deposits:10%,defective

connections, tap rootsClean and develop repair/replacement programme General/Construction Jan 2020- Phase 2

30/01/2020-Service Grade

1Repairs Required-check 4 1

MH S315 MH S54 0.92 600 Concrete 24 21/08/2019 1 4Debris 30% cross-sectional area

loss:large stoneClean and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

MH S313 MH S312A 34.77 450 Concrete 25 5 22/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 230/01/2020-Service Grade

1No Defects 1 1

MH S313B MH S313 11.21 450 Concrete 26 22/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S313A MH S313B 9.45 450 Concrete 27 22/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S329 MH S308 6.93 600 Concrete 28 22/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

Interceptor MH S329 2.94 600 Concrete 29 22/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S44 MH S308 0.67 600 Concrete 30 22/08/2019 1 4 Settled deposits:25% large stones Clean out stones and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

MH S308 MH S309 43.22 600 Concrete 31 22/08/2019 1 3 Settled deposits: 10% coarse Clean out and resurvey General Jan 2020- Phase 2 Cleaning Scheduled

MH S310 MH S309 40.91 600 Concrete 32 22/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S312B MH S310 13.56 600 Concrete 33 7 22/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 230/01/2020-Service Grade

1No Defects 1 1

MH S312B MH S316 53.53 600 Concrete 34 22/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S314 MH S313 28.3 450 Concrete 35 26/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S311 MH S310A 13.71 300 HDPE 36 26/08/2019 1 3 Settled deposits:15% Clean and resurvey General Jan 2020- Phase 2 Cleaning Scheduled

MH S311 MH S307 12.54 300 HDPE 37 4 26/08/2019 1 2 Attached Deposits:5% Clean and resurvey General Jan 2020- Phase 230/01/2020-Service Grade

1No Defects 1 1

MH S47 MH S43 3.97 375 Concrete 38 13/14 26/08/2019 1 4Settled Deposits: 50%:Stones and

GravelClean and resurvey General Jan 2020- Phase 2

31/01/2020-Service Grade

1

Cleaned- rubber seal

displaced- carry out patch

repair

4 1

MH S46 MH S47 0 250 Concrete 39 26/08/2019 1 5 90% loss: stones and gravel Clean and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

MH S45 MH S47 9.28 250 Concrete 40 26/08/2019 1 3 20% settled deposits Clean and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

MH S47 MH S43 33.3 375 Concrete 41 13/14 27/08/2019 4 3Settled Deposits: 50%:Stones and

Gravel:reverse survey of Section 38Clean and resurvey General Feb 2020- Phase 3

Cleaned- rubber seal

displaced- carry out patch

repair

4 1

MH S43 MH S308 24.59 375 Concrete 42 17/18 27/08/2019 2 2 Settled deposits:5% Clean and resurvey General Jan 2020- Phase 231/01/2020-Service Grade

1

Cleaned- some displaced

rubber seals- protruding

connction

2 1

MH S300 MH S327 28.16 600 Concrete 43 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S327 MH S301 23.23 600 Concrete 44 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S288.1 MH S300 13.6 600 Concrete 45 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S288 MH S288.1 35.9 600 Concrete 46 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S282 MH S288 21.51 600 Concrete 47 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S280.5 MH S282 14.78 600 Concrete 48 37 27/08/2019 1 2 Settled Deposits:5% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S280 Mh S280.5 8.94 600 Concrete 49 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S291 MH S13 13.02 450 Concrete 50 31 27/08/2019 1 2 Settled Desposits:5% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S13 MH S288.1 17.16 450 Concrete 51 32 27/08/2019 1 3 Settled Desposits: 10% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S294 MH S291 48.73 450 Concrete 52 33 27/08/2019 1 3 Settled Deposits:10% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S295 MH S294 11.03 450 Concrete 53 27/08/2019 1 1 No Comment No Recommendation General No Defects 1 1

MH S290 MH S291 32.45 450 Concrete 54 30 27/08/2019 1 2 Settled Desposits:5% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S284 MH S290 12.69 450 Concrete 55 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH 285 MH 284 9.42 450 Concrete 56 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH 286 MH 285 9.28 450 Concrete 57 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 287.5 MAIN 10.27 100 uPVC 58 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 287.4 MAIN 1.31 100 uPVC 59 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 283.3 MAIN 1.07 100 uPVC 60 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

Defect Grade:

1 = No Defects were detected

2 = Rehabilitation can be scheduled long term

3 = Rehabilitation is necessary medium term within 3 to 5 years

4 = Rehabilitation is urgent and has to be completed with 1 to 2 years

CCTV Inspection 2019 Phase 1,2,3 (Q22613)

5 = Rehabilitation iis urgent and short-term

Pipe Run

Client Project No: Aut. Chk: Richard Gorman

Calculations

Client: Irish Distillers Pernod Ricard

Project: Surface Water Drainage Inspections Date: 15/01/2020

PM Project No: IE0311192 Orig: Alan Marshall

Final Results CCTV Following Cleaning and/or

Repair

Material CommentRecommendation for Surface Drainage Cleaning/Repair as

part of contract

General Defect /

Construction Defect

Proposed Completion

Date Repair Performed Status

Cleaning and Phase 2

CCTV Performed/

Condition Grade following

Cleaning

Page 1 of 3

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 17: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Rev: A

Sheet title: Surface Water Drainage Testing Record Sheet

Length Diameter

(U/S) (D/S) (m) (mm)

Dyno Rod

Survey No.

Phase 1

Dyno Rod

Survey No.

Phase 2

Test DateStruct

Grade

Service

Grade

Survey

No.Test Date

Struct

Grade

Service

Grade

Defect Grade:

1 = No Defects were detected

2 = Rehabilitation can be scheduled long term

3 = Rehabilitation is necessary medium term within 3 to 5 years

4 = Rehabilitation is urgent and has to be completed with 1 to 2 years

CCTV Inspection 2019 Phase 1,2,3 (Q22613)

5 = Rehabilitation iis urgent and short-term

Pipe Run

Client Project No: Aut. Chk: Richard Gorman

Calculations

Client: Irish Distillers Pernod Ricard

Project: Surface Water Drainage Inspections Date: 15/01/2020

PM Project No: IE0311192 Orig: Alan Marshall

Final Results CCTV Following Cleaning and/or

Repair

Material CommentRecommendation for Surface Drainage Cleaning/Repair as

part of contract

General Defect /

Construction Defect

Proposed Completion

Date Repair Performed Status

Cleaning and Phase 2

CCTV Performed/

Condition Grade following

Cleaning

AJ 287.2 MAIN 1.34 100 uPVC 61 47 27/08/2019 1 3 Settled Deposits: 15% Clean and resurvey General Jan 2020- Phase 207/02/2020-Service Grade

1No Defects 1 1

AJ 287.1 MAIN 1.08 100 uPVC 62 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 294.1 MAIN 0.78 100 uPVC 63 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 294.2 MAIN 0.98 100 uPVC 64 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 294.3 MAIN 6.66 100 uPVC 65 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 294.4 MAIN 6.4 100 uPVC 66 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 294.5 MAIN 6.58 100 uPVC 67 27/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH 287 MH 286 10.02 150 uPVC 68 28/08/2019 1 5

Pipe Section in Invert:50% cross-

sectional area loss, settled

deposits:10%

Remove Obstacle, clean and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

AJ 294.4 MAIN 6.84 100 uPVC 69 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH 297 MH 296 20.07 225 uPVC 70 28/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 2 Cleaning Scheduled

MH 293 MH 296 36.48 225 uPVC 71 28/08/2019 1 2 Settled Deposits:5% Clean and resurvey General Jan 2020- Phase 2 Cleaning Scheduled

MH 296 MH 295 7.96 225 uPVC 72 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S14 MH S13 2.84 150 uPVC 73 28/08/2019 5 1 Large Displaced Joint Replace Pipe Section General

MH S14 MH S13 11.16 100 Vitrified Clay 74 28/08/2019 5 1 Large Displaced Joint Replace Pipe Section General

MH 283 MH 282 38.94 225 uPVC 75 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S63.1 MH S280.2 9.7 150 uPVC 76 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

S63 MH S63.1 16.65 100 uPVC 77 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MHS280.2 MH S280.1 14.21 150 uPVC 78 45 28/08/2019 1 3Settled Despoits 10%, open joint

(medium)Clean and resurvey General Jan 2020- Phase 2 07/02/2020-Serice Grade 2 Service Grade 2 1 2

MH S280.1 MH S280 1.76 150 uPVC 79 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S04 MH S280 6.75 450 Concrete 80 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MHS279.5 MH S280 17.85 450 Concrete 81 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S279 MH S279.5 27.7 450 Concrete 82 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MHS278A MH S279.5 42.22 450 Concrete 83 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S278 MH S278A 6.71 450 Concrete 84 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH 276 MH 277 15.9 450 Concrete 85 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH

S2771251MH S277A 5.93 450 Concrete 86 28/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 2

06/02/2020-Service Grade

1No Defects 1 1

MH S277A MH S278 37.78 450 Concrete 87 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S275 MH S276 20.88 250 uPVC 88 28/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S274 MH S276 26.13 250 Vitrified Clay 89 39 29/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S273 MH S274 22.28 300 Vitrified Clay 90 40 29/08/2019 1 2 Settled Deposits:5% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S200 MH S273 12.67 150 uPVC 91 46 29/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 207/02/2020-Service Grade

1No Defects 1 1

AJ 273.1 MAIN 1.51 100 uPVC 92 29/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 273.2 MAIN 1.63 100 uPVC 93 29/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 274.1 MAIN 2.16 100 uPVC 94 29/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 275.1 MAIN 2.98 100 uPVC 95 29/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S22 MH S24 23.42 150 Liner 96 29/08/2019 1 5 Plastic Sheets, High Water Level Clear plastic, clean and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

MH S21 MH S22 16.35 150 Liner 97 29/08/2019 1 5 Masonry block at pipe entrance Clear Obstacle General Feb 2020- Phase 3 Cleaning Scheduled

MH S23 MH S22 10.34 150 Liner 98 29/08/2019 1 5 Blocked: Masonry in pipe invert Clear Masonry, clean and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

MH S24.3 MH S25 20.46 375 uPVC 99 29/08/2019 4 1 Deformation:10% Clean and develop repair/replacement programme Structural

MH S24.2 MH S24.3 28.8 375 uPVC 100 21 29/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 204/02/2020-Service Grade

1No Defects 1 1

MH S24.1 MH S24.2 3.84 375 uPVC 101 20 29/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 204/02/2020-Service Grade

1No Defects 1 1

MH S24 MH S24.1 6.32 375 uPVC 102 29/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S25 MH S27 18.25 375 uPVC 103 29/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S27 MH S301 6.7 450 Concrete 104 27 29/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 204/02/2020-Service Grade

1No Defects 1 1

MH S301 MH S328 7.64 450 Concrete 105 28 29/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 204/02/2020-Service Grade

1No Defects 1 1

MH S328 Interceptor 2.15 450 Concrete 106 29/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S326 MH S302 5.04 450 Concrete 107 29/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S302 MH S27 9.7 450 Concrete 108 29 29/08/2019 1 3 Settled Deposits:5% Clean and resurvey General Jan 2020- Phase 204/02/2020-Service Grade

1No Defects 1 1

MH S326A MH S326 3.82 450 Concrete 109 26 29/08/2019 1 2 Settled Deposits:5% Clean and resurvey General Jan 2020- Phase 204/02/2020-Service Grade

1No Defects 1 1

MH S303A MH S326A 21.35 450 Concrete 110 24 29/08/2019 1 2 Settled Deposits:5% Clean and resurvey General Jan 2020- Phase 204/02/2020-Service Grade

1No Defects 1 1

MH S303A MH S303 3.66 450 Concrete 111 25 30/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 204/02/2020-Service Grade

1No Defects 1 1

MH 303B MH S303 0.65 450 Concrete 112 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S304 MH S303B 21.9 450 Concrete 113 30/08/2019 1 1 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 2 Cleaning Scheduled

AJ 304.1 MAIN 1.24 100 uPVC 114 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 303A.1 MAIN 5.71 100 uPVC 115 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

AJ 303A.2 MAIN 3.85 100 uPVC 116 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S203 MH S202 11.72 100 Concrete 117 30/08/2019 5 4

Settled Deposits, Defective

Connection, obstacle:50% cross-

sectional area loss.

Clean and develop repair/replacement programme Structural

MH S203 MH S204 15.09 225 Concrete 118/119 30/08/2019 4 1 Intruding Connections up to 50% Develop repair/replacement programme Structural

MH S204 MH S205 39.68 300 Concrete 120/121 30/08/2019 4 1 Intruding Connection: 20% Cut Back Intruding Lateral Connection and Resurvey Structural

MH S205.1 MH S205 6.76 450 Concrete 122 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S205.2 MAIN 29.91 450 Concrete 123 30/08/2019 4 1Multiple Intruding Connections and

Defective connectionDevelop repair/replacement programme Structural

MH S205 MH S206 19.05 450 Concrete 124 43 30/08/2019 1 3 Settled Deposits: 15% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S206 MH S207 10.5 450 Concrete 125 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S207 MH S210 12.92 450 Concrete 126 30/08/2019 4 1 Multiple Intrudinng Connections Cut Back Intruding Lateral Connections and Resurvey Structural

MH S211 MH S210 23.15 450 Concrete 127 30/08/2019 4 5 Intruding Connections , Blockage Clean and develop repair programme Structural

MH S207A MH S207 6.54 300 Concrete 128 30/08/2019 4 1 Intruding Connection: 50% Cut Back Intruding Connection Structural

Page 2 of 3

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 18: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Rev: A

Sheet title: Surface Water Drainage Testing Record Sheet

Length Diameter

(U/S) (D/S) (m) (mm)

Dyno Rod

Survey No.

Phase 1

Dyno Rod

Survey No.

Phase 2

Test DateStruct

Grade

Service

Grade

Survey

No.Test Date

Struct

Grade

Service

Grade

Defect Grade:

1 = No Defects were detected

2 = Rehabilitation can be scheduled long term

3 = Rehabilitation is necessary medium term within 3 to 5 years

4 = Rehabilitation is urgent and has to be completed with 1 to 2 years

CCTV Inspection 2019 Phase 1,2,3 (Q22613)

5 = Rehabilitation iis urgent and short-term

Pipe Run

Client Project No: Aut. Chk: Richard Gorman

Calculations

Client: Irish Distillers Pernod Ricard

Project: Surface Water Drainage Inspections Date: 15/01/2020

PM Project No: IE0311192 Orig: Alan Marshall

Final Results CCTV Following Cleaning and/or

Repair

Material CommentRecommendation for Surface Drainage Cleaning/Repair as

part of contract

General Defect /

Construction Defect

Proposed Completion

Date Repair Performed Status

Cleaning and Phase 2

CCTV Performed/

Condition Grade following

Cleaning

MH S207B MH S207A 11.2 300 Concrete 129 41 30/08/2019 1 3Grade reduced to 3: attached

depositsClean and Resurvey General Jan 2020- Phase 2

06/02/2020-Service Grade

1No Defects 1 1

MH S207C MH S207B 13.55 300 Concrete 130 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S209 MH S208 3.33 225 uPVC 131 42 30/08/2019 1 3 Settled deposits:10% Clean and resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S208 MH S207B 10.56 225 Concrete 132 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S214 MH S213 27.56 300 Concrete 133 30/08/2019 4 1 Intruding Connection:10% Cut back connection Construction

MH S213 MH S212 11.99 300 Concrete 134 30/08/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S227 MH S226 13.61 225 Concrete 135 02/09/2019 4 1 Defective Connections Repair Connections Construction

MH S226 MH S225 32.9 225 Concrete 136 48 02/09/2019 1 3 Settled deposits:10% Clean and Resurvey General Jan 2020- Phase 207/02/2020-Service Grade

1No Defects 1 1

MH S225 MH S224 19.88 225 Concrete 137 02/09/2019 4 1 Hole in drain, multiple cracks Develop repair/replacement programme Construction

MH S219 MH S42 11.33 450 Concrete 138 02/09/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S42 MH S34 32.01 450 Concrete 139/152 02/09/2019 4 3 High Water Level, Hole in line Clean and Resurvey, develop programme for repair None

MH S36 MH S37 40.32 225 Concrete 140 22 02/09/2019 4 5Defective and Intruding Connections

, obstacle lodgedDevelop repair/replacement programme General/Construction

04/02/2020-Service Grade

1Repairs Required 4 1

MH S39.3 MH S36 32.4 225 Concrete 141/142 23 02/09/2019 4 4Defective Connections, settled

depositsClean and Repair Connection General/Structural

04/02/2020-Service Grade

1Repairs Required 4 1

MH S39.1 MH S39.2 17.68 150 Concrete 143 02/09/2019 1 4 Settled deposits:25% Clean and Resurvey Feb 2020- Phase 3 Cleaning Scheduled

MH S218 MH S217 19.74 150 Concrete 144 04/09/2019 1 2 Fine roots intrusion Cut roots and carry out patch repair

MH S217 MH S215 16.84 150 Concrete 145/147 02/09/2019 4 5Defective Connections, settled

deposits: stoneClean and Repair Connection

MH S216 MH S215 16.61 150 uPVC 146 44 04/09/2019 1 3 Settled deposits:10% Clean and Resurvey General Jan 2020- Phase 206/02/2020-Service Grade

1No Defects 1 1

MH S215 MH S214 8.63 225 Concrete 148 04/09/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S212 MH S211 25.86 400 Concrete 149 04/09/2019 1 5Settled Deposits: Blockage;brick or

masonryClean and Remove Blockage General Feb 2020- Phase 3 Cleaning Scheduled

MH S211A MH S219A 11.27 450 Concrete 151 04/09/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S34 MH S45 11.73 200 Concrete 153 16 04/09/2019 1 4 Settled deposits 10%, fine roots Clean and Remove roots General Feb 2020- Phase 3 31/01/2020- Grade 4Cleaned- Fine Roots to be

removed (Phase 3)1 4

MH S28 MH S24 16.22 150 uPVC 154 04/09/2019 1 4 Settled Deposts:50% Clean and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

MH S77 MH S78 24.15 150 uPVC 155 04/09/2019 1 4 Settled deposiits:30% Clean and resurvey General Feb 2020- Phase 3 Cleaning Scheduled

MH S81 MH S82 33.31 150 Concrete 156 04/09/2019 4 4 Defective Connection Top Hat Repair Structural

MH S80 MH S81 39.8 150 Concrete 157 04/09/2019 4 3 Defective Connection Top Hat Repair Structural

MH S82 MH S83 31.13 150 Concrete 158 04/09/2019 4 2 Defective Connection., fine roots remove rppts and top-hat repair Structural

MH S84.2 MH S85.1 8.57 300 uPVC 159 04/09/2019 1 1 No Comment No Recommendation None No Defects 1 1

MH S87 MH S85.2 2.15 400 uPVC 160 04/09/2019 1 1 No Comment No Recommendation None No Defects 1 1

Page 3 of 3

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43

Page 19: Report on the CCTV Inspections of the Surface Water Drainage … · 2020-06-01 · 3 Drain Cleaning and CCTV Inspections 3.1 Overview The planning of the CCTV surveys was divided

Irish Distillers Pernod Ricard Site Projects 2013

IE0311192-30-RP-0010, Issue A

IE0311192-30-RP-0010_A_01.DOCX Page 16 of 16 DRAFT - Unchecked - May Be Incomplete

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 01-06-2020:04:25:43