CITY OF KINGSTON REPORT TO ARTS RECREATION & COMMUNITY POLICIES COMMITTEE Report No.: ARCP-13-007 TO: Chair and Members of Arts, Recreation and Community Policies Committee FROM: Lanie Hurdle, Commissioner, Community Services RESOURCE STAFF: Wally Ferris, Director, Recreation & Leisure Services DATE OF MEETING: May 23, 2013 SUBJECT: Breakwater Park Revitalization EXECUTIVE SUMMARY: In December of 2011, the City of Kingston partnered with public space planners, 8-80 Cities, to begin a community consultation process on Breakwater Park called ‘Make A Place for People’. In May of 2012, landscape architects, Claude Cormier + Associés, were engaged to develop a detailed revitalization plan for Breakwater Park. The design for the park is based on the findings of the 8-80 Cities community consultation process. This report describes the findings from the public consultation process, explains the Cormier park design and associated project costs. The proposed revitalization works include, but are not limited to, the construction of a 4.0 meter wide concrete promenade with pedestrian lights as well as implementation of shoreline improvements. Although not part of the original scope of the revitalization project, it became very clear that the public views the adjacent King Street Water Plant Dock Site as a park amenity. The dock area is viewed as a part of the ‘park’ by site users. A concept plan for improvements to the Utilities Kingston site was developed as part of an integrated approach to the Breakwater Park design. The proposed works include, but are not limited to, the construction of an upland sand beach area and pedestrian bridge to the dock and as well as shoreline and dock improvements. Utilities Kingston has been consulted and is in agreement with the proposed improvements to the site. The outside seawall of the wharf will preserved for safe refuge in emergency situations, if the condition of the wharf allows. The pedestrian bridge will be engineered so that it can be temporarily removed if required for event purposes. A very small section of the Breakwater Park site is owned by Queen’s University. The City has been in consultation with Queen’s University staff regarding the proposed improvements to the park on their lands. Although staff expects a positive outcome on this issue, at the time of writing 25

REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

CITY OF KINGSTON REPORT TO ARTS RECREATION & COMMUNITY POLICIES COMMITTEE

Report No.: ARCP-13-007

TO: Chair and Members of Arts, Recreation and Community Policies Committee FROM: Lanie Hurdle, Commissioner, Community Services RESOURCE STAFF: Wally Ferris, Director, Recreation & Leisure Services DATE OF MEETING: May 23, 2013 SUBJECT: Breakwater Park Revitalization EXECUTIVE SUMMARY: In December of 2011, the City of Kingston partnered with public space planners, 8-80 Cities, to begin a community consultation process on Breakwater Park called ‘Make A Place for People’. In May of 2012, landscape architects, Claude Cormier + Associés, were engaged to develop a detailed revitalization plan for Breakwater Park. The design for the park is based on the findings of the 8-80 Cities community consultation process. This report describes the findings from the public consultation process, explains the Cormier park design and associated project costs. The proposed revitalization works include, but are not limited to, the construction of a 4.0 meter wide concrete promenade with pedestrian lights as well as implementation of shoreline improvements. Although not part of the original scope of the revitalization project, it became very clear that the public views the adjacent King Street Water Plant Dock Site as a park amenity. The dock area is viewed as a part of the ‘park’ by site users. A concept plan for improvements to the Utilities Kingston site was developed as part of an integrated approach to the Breakwater Park design. The proposed works include, but are not limited to, the construction of an upland sand beach area and pedestrian bridge to the dock and as well as shoreline and dock improvements. Utilities Kingston has been consulted and is in agreement with the proposed improvements to the site. The outside seawall of the wharf will preserved for safe refuge in emergency situations, if the condition of the wharf allows. The pedestrian bridge will be engineered so that it can be temporarily removed if required for event purposes. A very small section of the Breakwater Park site is owned by Queen’s University. The City has been in consultation with Queen’s University staff regarding the proposed improvements to the park on their lands. Although staff expects a positive outcome on this issue, at the time of writing

25

Page 2: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

REPORT TO ARTS, RECREATION & COMMUNITY POLICIES COMMITTEE Report No.: ARCP-13-007

May 23, 2013 - Page 2 -

this report, formal approval from Queens on the minor pathway improvements had not yet been received. Total estimated cost for this project is $4,220,000 of which $2,000,000 is for the actual park revitalization, $530,000 for shoreline work and $1,690,000 for the revitalization of the King Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall project will be considered in future capital budgets. RECOMMENDATION: THAT the Arts, Recreation & Community Polices Committee recommend that Council approve the design for Breakwater Park; attached as Exhibit A to Report No.: ARCP-13-007; and THAT Council approve the design for the adjacent King Street Water Plant Dock Site, attached as Exhibit B to Report No.: ARCP-13-007; and THAT Council authorize the Mayor and Clerk to amend the current license agreement, if required, with Queen’s University for the pathway improvements and public access on their lands, in a form satisfactory to the Director of Legal Services.

26

Page 3: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

REPORT TO ARTS, RECREATION & COMMUNITY POLICIES COMMITTEE Report No.: ARCP-13-007

May 23, 2013 - Page 3 -

AUTHORIZING SIGNATURES: ________________________________________ Lanie Hurdle, Commissioner, Community Services _______________________________________ Gerard Hunt, Chief Administrative Officer

CONSULTATION WITH THE FOLLOWING COMMISSIONERS: Cynthia Beach, Sustainability & Growth Denis Leger, Transportation, Properties & Emergency Services

Jim Keech, President and CEO, Utilities Kingston (N/R indicates consultation not required)

27

mmichie
CAO
mmichie
Commissioner
mmichie
Check Mark
mmichie
Check Mark
mmichie
Check Mark
Page 4: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

REPORT TO ARTS, RECREATION & COMMUNITY POLICIES COMMITTEE Report No.: ARCP-13-007

May 23, 2013 - Page 4 -

OPTIONS/DISCUSSION: Background Breakwater Park is a key urban waterfront park destination in the City of Kingston. The park serves local residents, Queen’s University, the Kingston General Hospital, park users from across the City and regional visitors. With its parkway relationship to King Street, uninterrupted waterfront views, prominent public art installation and high park activity, the site serves as a gateway function for commuters and visitors to the downtown core. The consultation and design process for Breakwater Park was initiated to improve the waterfront experience, increase connectivity to the overall waterfront park system, to provide a safer and more accessible pedestrian experience in the park and to guide the replacement of aging infrastructure. The targeted improvement of waterfront parks is identified in recommendation 116 as a guiding principle in the 2010 Parks and Recreation Master Plan. Public Consultation Process through 8-80 Cities Grant Proposal 8-80 Cities, a non-profit organization, partnered with the Ontario Government and invited communities across Ontario to submit applications for a ‘Make a Place for People’ grant. The City partnered with KFLA Public Health and was notified in December 2011 that Breakwater Park was selected as one of six sites in Ontario to be awarded the grant. An extensive public consultation process followed under the guidance of 8-80’s Cities Director and internationally renowned public space planner, Gil Penalosa. Highly attended stakeholder sessions, public meetings and events in February and June of 2012 sought opinion from the community and culminated in the attached final report on ‘Make Place for People-Breakwater Park’ (Exhibit D). The 8-80’s Cities report captured a broad range of public feedback and desires for the park. The following are the primary recommendations for the park:

Improve access to the water’s edge. Improve and widen the multi-use pathway. Provide better pedestrian connections into the park and improve connections to adjacent

waterfront pathways and areas. Add pedestrian lighting along pathways. Improve seating opportunities in the shade. Allow for flexible open space areas. Create spaces that will lengthen the amount of time users spend in the park. Attract a diversity of age groups to the park. Provide bicycle parking and water fountains.

On page 47 of the report it states that “It’s also important to note that the area marked Utilities Kingston is not part of Breakwater Park and was not included in the original scope of the revitalization project. However, community members felt that if an agreement could be reached between the City and Utilities Kingston, it would be an excellent opportunity to improve recreational opportunities for the community and to enhance Kingston’s waterfront“. Data from the 8-80 Cities park user survey over the period of June 11 -16, 2012, showed that the King

28

Page 5: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

REPORT TO ARTS, RECREATION & COMMUNITY POLICIES COMMITTEE Report No.: ARCP-13-007

May 23, 2013 - Page 5 -

Street Water Plant Dock Site had the highest amount of park use in all time slots. This was particularly true for youth and young adults. Public feedback from the 8-80 Cities public consultation indicated a strong desire to improve pedestrian access to the park along and across King St. While the improvements to King St. are in the City’s long term plans, they are not currently forecast for implementation. Staff will continue to monitor and measure traffic and pedestrian volumes at intersections along the frontage of Breakwater Park to ascertain the possible need and suitable location for a future traffic signal. Short term consideration will also be given to use of driver feedback signs installed in each direction along King St to aid in traffic calming. Breakwater Park The landscape architecture firm of Claude Cormier + Associés was engaged to produce a detailed design for Breakwater Park that upgrades and improves the park based on the findings of the 8-80’s Cities public consultation. Claude Cormier + Associés are nationally recognized for their acclaimed waterfront park projects such as Sugar Beach in Toronto and Clock Tower Beach in Montreal. The Cormier design was developed in consultation with the public, special interest stakeholders and City staff and has been successfully received by all. Should the park construction be approved, Claude Cormier + Associés’ contractual obligations include the delivery of technical documentation for park construction procurement and contract administration. The key features of the Breakwater Park detailed design are:

Maintaining the double line of silver maple trees A 4m. wide concrete multiuse waterfront promenade A 2m. wide asphalt sidewalk along King Street Pedestrian lighting (LED) along waterfront promenade Terraced steps to the shoreline Benches and picnic tables Bike racks and water fountains Landscape planting New specimen trees on headlands The preservation of the existing ‘Time’ sculpture Shoreline protection beach cell improvements Improvements to the UK dock site

A small section of the Breakwater Park site is owned by Queen’s University. At the eastern limit of Breakwater Park there is approximately 0.2 hectares of open green space that is owned by the university. This land functions as an extension of the park site and accommodates the current waterfront pathway. The proposed design includes improvements to this pathway. There is an existing license agreement for this public use. The City has been in consultation with Queen’s University staff and, while they are still having internal discussions, it is expected that

29

Page 6: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

REPORT TO ARTS, RECREATION & COMMUNITY POLICIES COMMITTEE Report No.: ARCP-13-007

May 23, 2013 - Page 6 -

the outcome of those discussions will be supportive regarding the proposed path improvements. If required, the current license agreement would be updated to incorporate the path improvements to the satisfaction of both parties. In the event that an agreement with Queen’s is not achievable, then a minor modification to the eastern limit of the park path design would be required. Shoreline Protection Beach Cell Improvements As part of the site analysis requirements of the Breakwater Park design, Cormier and shoreline engineers, Coldwater Consulting Ltd., evaluated the condition of the shoreline and assessed the potential for erosion. It was determined that shoreline improvements are required to support and protect the park site. These works are estimated to cost $530,000 and are included in the scope of the proposed Breakwater Park improvements. Improvements to the King Street Water Plant Dock Site In August of 2012, Recreation and Leisure Services staff consulted with Utilities Kingston on the investigation of improvements to the King Street Water Plant Dock Site. Data from the 8-80 Cities report, along with significant public interest, guided staff to further investigate the site as a potential addition to the Breakwater Park revitalization project. Claude Cormier + Associés produced a conceptual design for the dock that was vetted by Utilities Kingston staff and approved subject to the addition of further security fencing of the water treatment plant. The additional security requirements of the water plant would limit pedestrian access to the west end of the dock. In an effort to render the dock a safe and accessible public space, a pedestrian bridge to the dock is proposed to be included in the design. The bridge feature was successfully received by stakeholders and the public. The pedestrian bridge will be engineered so that it can be temporarily removed if required for event purposes. The outside seawall of the wharf will preserved for safe refuge in emergency situations, if the condition of the wharf allows. Staff and the consultant met with local kite boarding enthusiasts who use the site as a launch area for their sport. The kite boarders had identified some concerns regarding the concept plan for the Utilities Kingston site that was presented publicly by Cormier at an October 2012 meeting. Staff and the consultant worked collaboratively with the kite boarders to adjust features in the plan to satisfy their on-site needs. Staff recommends that the improvements to Breakwater Park and the King Street Water Plant Dock Site be constructed simultaneously for logistical efficiencies and economies of scale. The cost estimate for this part of the proposed project assumes a simultaneous site implementation. Should the work be constructed separately, the estimated cost for the King Street Water Plant Dock Site is expected to be higher than the budget identified in the recommendation. The key features of the King Street Water Plant Dock Site concept are:

Upland sand beach area Pathway connection from Breakwater Park

30

Page 7: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

REPORT TO ARTS, RECREATION & COMMUNITY POLICIES COMMITTEE Report No.: ARCP-13-007

May 23, 2013 - Page 7 -

Pedestrian bridge Terraced waterfront steps Shade umbrellas (permanent) Seating / sunbathing platform Lighting Planting Improved security fencing of Utilities Kingston water treatment plant

Conclusion Through extensive consultation and feedback from the community, Recreation and Leisure staff with Claude Cormier + Associés, has developed an integrated detailed design for Breakwater Park and the King Street Water Plant Dock Site and is recommending approval to proceed with this project. The implementation of the proposed works are consistent with the priorities of Council to create and protect green space as well as the Parks and Recreation Master Plan that recommends targeting waterfront parks for improvement. EXISTING POLICY/BY LAW: N/A NOTICE PROVISIONS:

February 15, 16 and 17: Special interest group sessions with 8-80 Cities staff and City staff (kite boarders, Sydenham District Association, Seniors, Queen’s students, Municipal Accessibility Advisory Committee).

February 16, 2012: 8-80 Cities, What makes a Great Place/Ideas to make Breakwater Park a great people place? Gil Penalosa’s initial public session dialogue on ideas for the park.

June 13-16, 2012: Stakeholders sessions focusing on youth, activities and a fun in the park event on Saturday June 16th, and user surveys in the park over the five day period.

June 14, 2012: 8-80 Cities second public session, feedback and data summary focus on youth.

October 3, 2012: Public presentation by Claude Cormier + Associés on design for Breakwater Park including concept for King Street Water Plant Dock Site.

‘Your Opinion’ Survey October 3 to October 21, 2012, for public comment. One hundred and four (104) responses were received.

Public sessions were advertised twice in the Kingston Whig Standard and in Kingston This Week two weeks prior to the sessions noted above.

ACCESSIBILITY CONSIDERATIONS: Committee representatives from the Municipal Accessibility Advisory Committee have reviewed the design and have expressed support.

31

Page 8: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

REPORT TO ARTS, RECREATION & COMMUNITY POLICIES COMMITTEE Report No.: ARCP-13-007

May 23, 2013 - Page 8 -

FINANCIAL CONSIDERATIONS: Total estimated cost for this project is $4,220,000 of which $2,000,000 is for the actual park revitalization, $530,000 for shoreline work and $1,690,000 for the revitalization of the King Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall project will be considered in the future capital budgets. Public Works Department has been consulted and indicates that the future operational impact of the proposed park improvements will result in an estimated increase of about $20,000 to the current Public Works Department’s operational budget. CONTACTS: Lanie Hurdle, Commissioner, Community Services 613-546-4291 ext. 1231 Wally Ferris, Director, Recreation & Leisure Services 613-546-4291 ext. 1302 OTHER CITY OF KINGSTON STAFF CONSULTED: Neal Unsworth, Manager, Parks Development, Recreation & Leisure Services Department Kristine Hebert, Parks & Open Space Planning Coordinator, Recreation & Leisure Services Dept Jim Miller, Director, Utilities Engineering, Utilities Kingston Cherie Mills, Manager, Policy Planning, Planning & Development Department Colin Wiginton, Manager, Cultural Services Department Damon Wells, Director, Public Works Department Mark Van Buren, Director, Engineering Department Deanna Green, Manager, Traffic Division, Engineering Department Kim Brown, Manager, Infrastructure and Development, Engineering Department Sheila Kidd, Director, Transportation Services Department Speros Kanellos, Director, Real Estate and Construction Services Department Desiree Kennedy, Director, Financial Services and City Treasurer EXHIBITS ATTACHED: Exhibit A Breakwater Park Plan

Exhibit B Concept Plan for King Street Water Plant Dock Site Exhibit C Artist Renderings of Breakwater Park and King Street Water Plant Dock Site

Improvements Exhibit D 8-80 Cities Report ‘Make A Place for People – Breakwater Park’

32

Page 9: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

Exhibit A

33

Page 10: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

7

5

0

C

P

P

4

5

0

D

I

1

5

0

C

I

2

0

0

P

V

C

6

0

0

C

I

6

0

0

C

I

6

0

0

C

I

6

0

0

C

I

7

5

0

U

N

K

7

5

0

U

N

K

750 U

NK

7

5

0

U

N

K

7

5

0

U

N

K

7

5

0

U

N

K

7

5

0

U

N

K

7

5

0

U

N

K

7

5

0

U

N

K

7

5

0

U

N

K

750 UNK

7

5

0

U

N

K

1200 UNK

2

5

0

S

A

N

2

0

0

S

A

N

300 S

AN

150 S

AN

1

2

0

0

C

O

N

C

C

O

M

675 C

OM

1

2

0

0

C

O

N

C

C

O

M

14543

112.5

RW

B

BE

VE

RLE

Y S

TR

EE

T

76.40

76.20

76.30

76.20

76.00

76.00

76.00

76.00

75.80

75.60

75.40

4

3

4

76.10

76.00

30

emergency

access

gate

scope of w

ork B

reakw

ater P

ark

scope of w

ork W

ater T

reatm

ent P

lant

scope of w

ork W

ater T

reatm

ent P

lant

scope of w

ork W

ater T

reatm

ent P

lant

s

c

o

p

e

o

f w

o

r

k

W

a

te

r

T

r

e

a

tm

e

n

t P

la

n

t

concrete

sun b

ath

ing d

eck 3

0x3m

e

x

is

t

in

g

b

u

s

s

t

o

p

asphalt

reta

inin

g +

seating w

all

um

bre

llas

garbage

+ recycling

ivy

light

garb

age

concre

te s

teps

1m

concre

te s

trip

light

light

light

light

new

concre

te

surf

ace

handrail

fence

fence

fence

fence

fence

specimen trees

(new)

existing trees

existing trees

new tree

bench on

concrete pad

light

bollards

n

e

w

s

id

e

w

a

lk

a

lo

n

g

K

in

g

S

t

r

e

e

t

c

o

n

n

e

c

t

s

t

o

T

e

t

t

C

e

n

t

e

r

scope of work Breakwater Park

light

p

e

d

e

s

tria

n

b

rid

g

e

rescue ladder

rescue ladder

rescue ladder

rescue ladder

rescue ladder

rescue ladder

rescue ladder

rescue ladder

HEADLAND 6

SAND BEACH

PIER

BRIDGE

light

fence

specimen trees

(new)

space

for

future

vendor

(food)

garbage +

recycling

picnic

tables

sand beach

b

i

k

e

r

a

c

k

s

o

n

c

o

n

c

r

e

t

e

p

a

d

small trees

(approx. 3m)

small trees

(approx. 3m)

stone

terrace

steps

a

s

p

h

a

l

t

a

s

p

h

a

lt

35

light

18

76.75

76.75

76.75

76.00

76.00

76.05

25

20

Kingston UK SITEScale 1:200005-03-2013

Exhibit B

34

Page 11: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

View of UK Dock and links to Breakwater Park………………..

Exhibit C

35

Page 12: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

Make a Place for Peopleb r e a k w a t e r P a r k , k i n g s t o n

Exhibit D

36

Page 13: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

8-80 Cities is a non-profit organization based in Toronto, Canada. We are dedicated to contributing to the transformation of cities into places where people can walk, bike, access public transit and visit vibrant parks and public places. Our approach is to engage communities at all levels and across multiple sectors to inspire the creation of cities that are easily accessible, safe and enjoyable for everyone. We have working experience in urban areas across Canada, the United States, Latin America, Europe, Asia, Australia and New Zealand.

• 192 Spadina Ave. Suite 510 • M5T 2C2 CANADA •(416) 591- 7404 •www.8-80cities.org

• 8-80 cities reflect social equality in the public realm and promote people’s happiness.

• 8-80 cities nurture our need to be physically active by providing safe, accessible and enjoyable places for everyone to walk and bike as part of their daily routine.

• 8-80 cities recognize that people are social creatures and prioritize human interaction by fostering vibrant streets and great public places where people can rest, relax and play.

• 8-80 cities encourage sustainable and healthy lifestyles for people regardless of age, gender, ability, ethnicity or economic background.

We are convinced that if everything we did in our public spaces was great for everyone, from 8 to 80 years of age, we would end up with healthy and vi-brant communities for all.

Why 8-80? What is an 8-80 City?

wHo we are

Exhibit D

37

Page 14: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

The City has a work force of 900+ persons whose mission is to enhance the quality of life for all present and future generations by providing progressive, professional services and leadership that reflect the needs of those who work, live or play in the City of Kingston. Kingston has a population of 123,363.

Our Partners

This project is partially funded by the Ontario Government’s Healthy Communities Fund.

KFL&A Public Health is an accredited, local public health agency with over 200 staff and 150 volunteers who deliver public health programs and services to the people of the KFL&A area. The underlying goal of its services and programs-from immunization, healthy communities, nutritious eating, physical activity, active transportation, raising healthy babies and children, tobacco use reduction, and many other public health topics–is to promote and protect the health of the more than 180,000 residents of the Kingston, Frontenac and Lennox & Addington area.

The City of Kingston is an eclectic mix of old and new “where history and innovation thrive”. It is known for its heritage limestone buildings, access to waterways and post-secondary institutions.

Exhibit D

38

Page 15: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

How to use this report

Make a Place for People is a project based on the idea that community participation is key to the creation of vibrant and healthy public spaces.

The overall goal of the project is to inject new life into currently underperforming public spaces in order to encourage physical activity and promote mental health while also contributing to creating more sustainable and people-friendly communities.

By working closely with local partners in identifying community stakeholders, 8-80 Cities has endeavored to tap into the imagination of the diverse people who use or would like to use the space. This document is the culmination of those efforts.

The recommendations and visualizations are a representation of what we heard from the various stakeholders we engaged.

We see this report as a tool for community members, elected officials and public sector staff alike to generate action and to help sustain community participation in the space.

CITIES

FOR

PEOPLE

OF ALL

AGES

The Make a

Place for People Project

PURPOSE OF THE REPORT

Exhibit D

39

Page 16: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

What Is the Make a Place for People Project? Our PartnerBreakwater ParkProject Timeline

Putting the Public Back in ‘Public Space’ Making the Case for Parks Active Places, Healthy People The 8-80 Rule Keep it Simple: A Tool for Place Evaluation

Results overview Accessibility Software (Programming & Management)Hardware (Design & Infrastructure) Key Recommendations

COnTEnT

8-80 Cities Report ContributorsProject Manager: Emily MunroeProject Associate : Amanda O’RourkeResearcher & Data Analyst: Alyssa BirdUrban Designer & Graphic Designer: Katherine JarnoStrategic Advisor: Gil Penalosa

09

25

57

InTRODUCTIOn

PLACES FOR PEOPLE

RECOMMEnDATIOnS & RESULTS

TOOLKIT

01

Place SurveyPublic Space Observation TableAction Planning Share an IdeaSimple Site Evaluation ToolSoftware Program Calendar

Exhibit D

40

Page 17: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

1

This section of the report provides a description of the Make a Place for People project methodology as well as an overview of Breakwater Park and its neighbourhood.

1. InTRODUCTIOn

Exhibit D

41

Page 18: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

2

Exhibit D

42

Page 19: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

3

We know that parks and public spaces play a vital role in our communities--they create nodes where people meet, relax and play. But many parks and public spaces in Ontario are underperforming with very few uses or activities, and they lack funding, management and community participation.

The goal of the Make a Place for People project is to educate and empower communities across the province with the tools to transform underperforming parks and public spaces into vibrant and active destinations that promote social interaction, mental health and well being for all.

What is the Make a Place for People Project?

Our Goal is:To develop vibrant public spaces

that encourage physical activity

and promote mental health while

contributing to more sustainable

and people-friendly communities.

InTRODUCTIOn

Washington Sq., nYC

Thorncliffe Park, Toronto

Exhibit D

43

Page 20: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

4

8-80 Cities issued a call for partners in December 2011, to communities across Ontario to nominate currently underperforming public spaces to participate in the project. We received over 30 applications from communities from across Ontario and were delighted to receive an application from The City of Kingston and KFL&A Public Health for Breakwater Park in downtown Kingston.

From January to August 2012 8-80 Cities worked with the City of Kingston and KFL&A Public Health to develop a strategy for the design, programming and management of Breakwater Park through a process of community engagement.

Our Partner: The City of Kingston and KFL&A Public Health

“The City of Kingston has a strategic plan with sustainability as a primary objective. The principles of active healthy living are key to this plan. Creating vibrant, accessible and welcoming public space is critical to getting the community out, active and using active transportation.

Creating exciting and programmable destinations for the community is strongly endorsed by The City, KFL&A Public Health and local neighbourhood associations.”

- The City of Kingston

CommunityEmpowErmEntimaginationtransformation

Stephanie Sciberras, KFL&A Physical Activity Specialist, enjoys a sunny afternoon with project volunteers during the summer site assessment at Breakwater Park.

Exhibit D

44

Page 21: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

5

Breakwater ParkBreakwater Park is a waterfront park in the historical downtown of Kingston. It is located on King St., along Ontario’s Waterfront Trail, and boasts of a wonderful, unobstructed view of Lake Ontario and Wolfe Island. Breakwater Park also features a double row of century-old trees and an art installation entitled “Time” by artist Kosso Eloul that was installed in 1973.

Breakwater Park was named after Kingston’s original breakwater that can now be seen on the ground running parallel to the park’s paved recreational trail.

Built In honour of Kingston’s Tercentenary (300th birthday), Russian-born artist Kosso Eloul was commissioned to produce “Time” in 1973. Since it was erected, the meaning of the sculpture has been the subject of rumour. Many people believe that the sculpture was built on a fault line and that the two rectangles would eventually touch, which is not true.*

ABOUT THE PROJECT

*The Kingstonist, Time**KFL&A Health Unit, Health Profile June 2012

Exhibit D

45

Page 22: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

6

A neighbourhood and destination parkBreakwater Park has a wide range of current users. As Kingston General Hospital is located at the eastern end of the park, its patients, visitors and staff frequently visit the park. Queen’s University students enjoy warm spring days studying and relaxing by the water’s edge, and staff from the university enjoy a respite for lunch. The Sydenham District neighbourhood residents also make use of the space year-round for recreation.

In addition, Breakwater Park serves an important function for the greater Kingston area by providing incomparable access to the water within the City as well as a significant area of green space that can be harnessed for relaxation and physical activity. It functions as both a neighbourhood park as well as a destination park that is of interest and concern to residents across the city.

18.7% hAve high blood pRessuRe**

36.6% ARe not physiCAlly ACtive**

26.9% feel stRessed**

57.7% overweight or obese*

*The Kingstonist, Time**KFL&A Health Unit, Health Profile June 2012

Mum, infant and toddler enjoy a morning walk and take in the view of Lake Ontario and Wolfe Island’s wind farm.

57.7% ARe oveRweight oR obese**

How HEatlHy arE Kingstonians?

Exhibit D

46

Page 23: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

7

Photos exemplify community members’ key concerns: 01. Poor access to Breakwater Park within the park system as well as by road02. Difficult and unsafe access to the water03. Insufficient and poorly maintained pathway system

ABOUT THE PROJECT

‘“For me to go there, there would have to be an activity in the park like a BBQ or Tai Chi---whatever! It would be great to have more parks where we actually have things to do and make it a place where people will stay for a while.”

“The path isn’t wide enough and it’s in very bad shape.”

maKing tHE most of BrEaKwatEr parKBreakwater Park is a stunning exhibit of some of Ontario’s greatest natural gifts. Located at the mouth of the St. Lawrence River, Breakwater Park offers a wide view of Lake Ontario and the beginning of the 1000 Islands, which proves a stunning backdrop for what could be considered a world-class urban park. Unfortunately, the park isn’t living up to its potential as a centerpiece of Kingston’s waterfront, or as a hub of recreation and social interaction.

Current ProblemsYears of inadequate capital funding for maintenance is evidenced by the park’s deteriorating infrastructure. A lack of programming and activities does little to draw residents even at the height of the summer. Poor access to the water was a constant complaint among community members, and unsafe or inconvenient access for pedestrians and cyclists was cited as a reason people didn’t use the park.

In its current state, Breakwater Park simply doesn’t attract as many users as it should. It’s time to make the most of this precious resource and strengthen the role it can play in people’s health and well-being.

02

01

03“I don’t think it’s truly a kid-friendly park because they are going to want to use the water and it’s not entirely safe.”

Exhibit D

47

Page 24: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

8

building on existing strengths

Joyful participants of a mass swim show their support for access to Kingston’s waterfront.

Creating a strong sense of community ownership and stewardship is vital for the success of any public space. Breakwater Park has a base of community members and organizations concerned with this important waterfront park. Encouraging increasing and sustained community participation through partnership development is key to the success of Breakwater Park.

Community organizations Kingston has an active and engaged civil society. Community-based organization such as the Sydenham District Association, the Water Access Group, the Kingston Coalition for Active Transportation, and Kite Boarding Kingston have shown a strong interest in supporting and improving Breakwater Park. By developing partnerships between these groups and many others, the City of Kingston & KFL&A Public Health can begin to effectively animate and improve the park.

Community Members8-80 Cities was encouraged by the enthusiasm and generosity of community members who participated in the Make a Place for People project. Finding ways to harness this energy to build stewardship in the park will determine the long-term success of Breakwater Park.

Photos exemplify community members’ key concerns: 01. Poor access to Breakwater Park within the park system as well as by road02. Difficult and unsafe access to the water03. Insufficient and poorly maintained pathway system

Fig. 1. The Water Access Group shows their support for improving Kingston’s waterfront with a Mass Swim. Fig. 2. A group of Queen’s University students endure an afternoon of cold weather to share their ideas about how to improve Breakwater Park.

“Creating a health-promoting park system requires greater expertise and resources than any park agency can provide alone. What’s needed are partnerships with other public agencies, as well as with private foundations, corporations, citizens’ groups, and volunteers.” - Sustainable Cities Collective

01

02

Exhibit D

48

Page 25: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

9

The Make a Place for People process aims to tap into the imagination of the diverse people who use a public space in order to create a vision and cutivate a culture of community participation in the space. The process involves 3 phases:

ABOUT THE PROJECT

Data collection and analysis to inform the creation of the Make a Place for People report. Reporting and action planning synthesizes the data collected into a user-friendly format that reflects the community’s vision of the space.

3. vision development & Action planning

Assessments of the existing site including both “hardware” (physical infrastructure) and “software” (uses, activities and management). Community engagement with diverse stakeholders through a variety of activities such as workshops, focus groups, interviews and on-site conversations.

2. site Assessment & Community engagement

Working with the local project partner to identify stakeholders to be invovled in the project and develop a strategy for engagement.

1. participatory planning

A project volunteer enjoys a sunny afternoon measuring park activity during the summer site assessment.

z8-80 Cities and its project partners engaged the community with free snacks and activities such as hoola-hooping and bubble blowing while community members shared their ideas about transforming the park.

Exhibit D

49

Page 26: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

10

1st On-Site Visit- Winter site assessment- Community engagement sessions - Media engagment - Collection of data from community engagement sessions- Debrief of first onsite visit & planning for 2nd on-site visit

- Analysis of data and documentation of initial findings - Development of schedule and coordination of logisitcs for 2nd on-site visit- Outreach & promotion of events & activities for 2nd on-site visit- Development of content & materials for second on-site community engagement sessions based on 1st on-site visit .

Planning Vision & Action Plan Site Assessment & Community Engagement 2 3

2nd On-Site Visit- Summer site assessment- Community engagement sessions - Media Engagement - Review findings from previous on-site sessions & site assessment- Collection of data from community engagement sessions- Debrief of 2nd on-site visit

- Site selected through application process- Identification of stakeholders - Site research and context assessment- Development of schedule and coordination of events logistics for first on-site visit - Outreach and promotion of events and activities for first on-site visit- Development of content and materials for community engagement

- Analyze data and document findings from community engagment & site assessments- Develop initial vision and recommendations for site -Draft Report issued to local partner- Feedback incorporated into final report - Launch of final report

1Dundonald Park Project Time Line

JULYJUnEAPRILMARCHFEB MAY aUgJAn

Data annalysis & report development Feb. 15-18: Winter Community Engagement & Capacity Building , 160 Direct Participants

June 6 - 10: Summer Community Engagement, 220 Direct Participants

June 16: Pop-up Activities and community enagement at Breakwater Park

352 ideas collected

Ongoing communication and planning with the City of Kingston & KFL&A Public Health

Development of project reportFeb. 15, 17 & 18: Winter site assessment

8-80 Cities assesses Make a Place for People applications.

Exhibit D

50

Page 27: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

11

This section includes international research, evidence and tools to support the improvement of parks and public spaces in Ontario..

We hope the people of Breakwater Park Neighbourhood and beyond will be inspired to use this report to help “make the case” for improving parks, wsquares and streets so that we can create healthier, happier and more sustainable neighbourhoods.

2. THEORY

Exhibit D

51

Page 28: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

12

Exhibit D

52

Page 29: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

13

Parks and public spaces define our greatest cities and shape our most vibrant communities. Imagine Ottawa without the Rideau Canal, Montreal without the cobble stone streets of the Old Port, Toronto without the St. Lawrence Market, and Vancouver without the seawall at Stanley Park.

THEORY

Our experience shows that the best parks and public spaces have a high level of community involvement, foster a sense of stewardship and ownership, and are sensitive to the changing needs and desires of the community they serve.

1. The idea for nYC’s renounded Highline Park was originally conceived by two community members who objected to the destruction of the elevated rail bed where the park now stands.

2. While not technically a park, Guadalajara’s weekly open streets program Via Recreactiva was spearheaded by three successful business leaders now known as Guadalajara 20/20. Every week the program sees more than 300,000 people use the city streets to bike, run, walk and play.

3. Dufferine Grove Park in Toronto, is one of the city’s most unique and successful public spaces thanks the ongoing coordination and partnership between Friends of Dufferin Grove and the City of Toronto.

1. 2.

3.

Public spaces are our community’s most valuable assets, and they belong to all of us. We have a right and a responsibility to be involved in decisions related to their use, management and design. But in many cases the public has been left out of this decision-making process and we’ve stopped asking to be involved.

01

02

03

grEat plaCEsHEaltHy CommunitiEsHappy pEoplE, ViBrant CitiEs

Putting the public back in public

Exhibit D

53

Page 30: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

14

Engaging people in decisions related to their parks and public spaces is what 8-80 Cities strives to do. We never cease to be impressed by the creativity, knowledge and know-how community members possess about their communities. The great diversity of people and perspectives in any community is its greatest resource. Finding creative ways to “tap the collective brain” is the first step in creating public places that are people-focused and people-friendly.

By understanding what the community wants and needs, decision makers can work together to offer appropriate programming, infrastructure and design.

The most effective management of parks and public spaces involves what we call 'the three-legged stool'---a balanced combination of elected officials, public sector staff and the local community (including residents, business, non-profit organizations and community groups).

CHANGE

Elected

Officials

Community

Public Sector

Staff

8-80 Cities works to bridge the gap between these actors to facilitate a process of meaningful and successful change. We use reports like this one to articulate the community’s vision and work with decision makers to develop strategies for implementation.

the three-legged stool

tapping the Collective brain

Exhibit D

54

Page 31: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

15

Often it’s the people who have the most to gain from parks and public spaces that are the most removed from the decision making process. Children, older adults, newcomers and people of low-income often need to be given special attention in the engagement process.

While they may not be the loudest voice in the room, their opinions and ideas are no less valuable. We need to move beyond the idea that an evening public meeting hosted at the local city hall is sufficient public consultation---we need to be more creative!

THEORY

foCus on tHE most VulnEraBlE

- Use cameras to help youth show you what they like and don’t like in the park.

- Meet with a small group of newcomers and find out what they think makes a successful place.

- Use social media to connect with people in their living rooms.

- Host an idea-sharing session in a park. Free food always draws a crowd!

- Talk one-on-one with older adults about what they need in the park.

- Get kids to draw a picture of what they would like to do in their park.

How Can you EngagE tHE Community?

Exhibit D

55

Page 32: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

16

Engaging tHE Kingston C o m m u n i t y

Exhibit D

56

Page 33: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

17

THEORY

Too often our parks and public spaces are undervalued, and this is reflected in the state of many parks and public spaces across Ontario.

Did you know that according to a recent report by Parks and Recreation Ontario about the state of recreational facilities in Ontario, more than 50% of public recreation facilities in municipalities of all sizes are more than 50 years old? The vast majority of community recreation and sports facilities were built between 1956 and 1980, during a time when there was dedicated funding for municipal sport and recreation facilities.* This is reflected by the general state of parks and recreation services in Ontario---we have lost sight of the important role these public facilities play in our communities and they seem to be sliding farther down the political priorities list year after year.

We need to talk about how great places do more than just provide a nice place to spend a sunny afternoon; they play a vital role in the health of our economy, environment, society, our bodies and our minds.

aCCording to a study ConduCtEd By parKs and rECrEation ontario in 2009, 67% of ontarians would BE willing to pay morE for improVEd loCal sErViCEs.

*Parks and Recreation Ontario. Investing in Healthy and Active Ontarians through Recreation and Parks Infrastructure

Making the Case for Parks

Breakwater Park, Kingston

Berczy Park, Toronto

Flemingdon Park, Toronto

Exhibit D

57

Page 34: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

18

In Fort Worth, Texas, crime dropped 28% within a 1.6km radius of community centers with a midnight basketball program. During the same period, in areas around five other community centers where the programs were not offered, crime rose an average of 39% during the same period.****

* The New York Times. Taking a Stroll Along the Highline. November 28, 2008 ** The Trust for Public Land. The Health Benefits of Parks***The Trust for Public Land. Measuring the Economic Value of a City Park System**** The Trust for Public Land. The Benefits of Parks

did you Know?

new Yorks City’s Highline Park is predicted to bring $4 billion in private investment and $900 million in revenues to the city over the next 30 years. *

According to American Forests, trees in Atlanta remove 19 million pounds of pollutants annually, a service worth $47 million.**

In 2007, a study conducted in Philadelphia, where there are more than 100 “friends of parks groups”, estimated that the total value of volunteer hours donated to parks in the city was $8,6000,000.***

User fees and cost-recovery models at parks are like Robin Hood in reverse. Everyone pays for parks through taxes, but user fees make parks and recreation services inaccessible to the poor.

We need to realize that parks naturally pay us back through reduced health care cost, increased property values and cleaner air. Great parks are always worth the investment.

- Gil Penalosa, Executive Director 8-80 Cities

Union Sq., nYC

Exhibit D

58

Page 35: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

19

According to statistics Canada, obesity rates have increased dramatically in the past 25 years. The chart above represents results from the Canadian Community Health Survey (CCHS), which directly measured the height and weight of respondents**.

“HEALTH IS

MuCH MORE

THAn PATCHInG

uP PEOPLE OnCE

SOMETHInG HAS

GOnE WROnG.”

- The Drummond Report

* Commission on the Reform of Ontario’s Public Services, 2012**Statistics Canada. The Canadian Health Measures Survey, 2009

THEORY

Canadian Obesity Rates on the Rise

24%

21%

9%11%

9%

3%

12-17 25-34 75+0%

5%

10%

15%

20%

25%

30% 1978-792004

Bogota, Columbia

According to the 2012 Commission on the Reform of Ontario's Public Services known as the “Drummond Report”, Ontario's health care system needs to be dramatically reformed.

Health care is the Ontario government's single biggest spending program. In 2010-11, the province spent $44.77 billion on health. This is equivalent to 40.3 per cent of its total spending on programs, and health care costs are only projected to increase in the future.* nevertheless, even with massive investment in healthcare, Ontarians are only getting sicker. We are fatter, less active and more suseptible to chronic disease than ever before.*

Active Places, Healthy People

It is also important to note that as a nation we don’t seem to be spending our health care dollars very wisely. According to the Fraser Institute, Canada spends more on health care than any other industrialized country in the OECD save Iceland and Switzerland but ranks seventeenth in the percentage of total life expectancy that will be lived in full health. It is clear that we need a new approach to creating healthy communities that focuses on keeping people healthy, rather than fixing them after they are sick.

Exhibit D

59

Page 36: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

20

Improvements in neighbourhood design, combined with health promotion and programming, is gaining increasing traction internationally among health professionals and patients alike. In the U.S., health care providers have begun to partner with parks and are issuing “park prescriptions” to get people walking, biking, hiking and swimming in nature more often. These prescriptions are also combined with incentive programs that include lower recreation user fees, fitness classes, and guided walking tours.

The value of parks and quality public realm for physical activity is conclusive. Good quality public spaces encourage people to make short journeys on foot or by bike; they also encourage participation in physical activity and help to reduce stress.* A study by the UK organization CABE also showed that improving the quality of neighbourhood green spaces will encourage more active use and exercise. Overall, the study found that if parks were made more pleasant, people would use them more.*

Despite their extensive value, parks are often the first item on the chopping block when budget time comes. Short-sighted, siloed planning has relegated parks to a “nice-to-have” feature of communities rather than a must-have element of any healthy and sustainable community.

*CABE, Using Community Green Spaces to Tackle Inequality and Improve Health**The Economist. Mapping a Better World, 2009

parKs prEsCriptions proVidE pHysiCal aCtiVity & rEduCE strEss!

LOS AnGELES

STuDy: AREAS

WITH FEWER

PARKS (LIGHTER

GREEn) HAVE

HIGHER RATES

OF CHILDHOOD

OBESITy (LARGER

CIRCLES)**

Exhibit D

60

Page 37: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

21

aCtiVE plaCEs &HEaltHy pEoplE faCt sHEEt

* CABE, Using Community Green Spaces to Tackle Inequality and Improve Health

THEORY

** Mitchel & Popham, The Lancet. “Effect of exposure to natural environment on health inequalities: an observational population study”

*** The Trust for Public Land. Measuring the Economic Value of a City Park System

in large cities seem to benefit more from the presence of green areas in their living environment than any other group.*

“Health inequalities” refers to the general trend that people living in poorer areas are more likely to be unhealthy and die earlier. Researchers found that living near parks, woodland or other open spaces helps to reduce health inequalities.**

ELDERLy & yOuTH

=

Children with Attention Deficit Disorder can concentrate better than usual after taking part in activities in a green setting, such as walking or playing in a park.***

Research shows that residents of neighbourhoods with greenery in common spaces are more likely to enjoy stronger social ties than those who live surrounded by barren concrete.***

A study in Japan showed that seniors living in cities with access to walkable green spaces positively influenced them and helped them live longer regardless of socioeconomic status.*

8

Studies show that when people can’t access parks, they often go without physical activity. This is especially true of low-income people who often can’t afford gym memberships.***

Exhibit D

61

Page 38: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

22

“HAVE DOCTORS

ADDRESS DIET

AnD ExERCISE

ISSuES BEFORE

REACHInG FOR

THE PRESCRIPTIOn

PAD WHEn

DEALInG WITH

HEALTH ISSuES

SuCH AS

CARDIOVASCuLAR

DISEASE AnD

LATE-OnSET TyPE

2 DIABETES.”

- A RECOMMEnDATIOn FROM

THE DRuMMOnD REPORT

BrEaKwatEr parK supports HEaltHy l i f E s t y l E s

Exhibit D

62

Page 39: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

23

The most basic characteristic of any public space is that it is open and accessible to everyone regardless of their age, ability, background or social status. Public space design, management and programming should reflect this philosophy.

think of an older adult.

would you send them out together for a walk to the park?

THEORY

1

think of a child.2

8-80 CitiEs Has ComE up witH a simplE rulE to EValuatE puBliC spaCEs CallEd tHE “8-80 rulE”

3

if you wouldn’t,it needs to be improved.

if you would, it’s safe enough.

Exhibit D

63

Page 40: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

24

parKs & puBliC spaCEs arE symBols of dEmoCraCy & EqualityIts a common sight in Ontario's urban parks; October rolls around, washrooms and facilities are locked up, events and activities come to a halt, and walking paths fill with snow and ice.

Create Sparkle!

It’s easy to get people outside on a sunny summer day, but creating active public spaces in the colder months requires more creativity and ingenuity. In terms of heath, people tend to be less physically active in the winter and spend more time indoors. Vibrant public spaces can help to draw people out of their homes to exercise and interact with friends and neighbours.

‘The parks are unofficially closed in the winter’ - Park Employee from an Ontario municipality

Create HeatCreate Warmth

Create Excitement!

Create Energy !

tHE BEst puBliC spaCEs arE aCtiVE 365 days a yEar.

Exhibit D

64

Page 41: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

25

Great public spaces don’t have to be complicated. A fancy design cannot make up for a space that’s boring, inaccessible, uncared for or unsafe.

Keep it simple

Who takes care of this place?

How do I feel?

How did I get here?

What’s there to do?

What’s here?

When thinking about any park or public space from a small neighbourhood square to a large urban park, ask yourself the five basic questions below. By thinking carefully about how people will get to the place, what they’ll do when they will get there, what kind of infrastructure there is, and who manages or takes care of the space, you can start to assess what’s working, what’s not, and what could be improved.

Invest More in Management!

“about 80% of the success of any public space can be attributed to its management. no matter how good the design of a space is, it will never become a true place unless it is cared for well.”

- project for public spaces

THEORY

Exhibit D

65

Page 42: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

26

How did I get here? What’s here?

What’s there to do? Who takes care of this place?

Is the place visible from a distance?Is it accessible to wheelchairs and strollers?Can you easily walk or bike to the place? Is there bike parking? Is it close to transit? Are paths clear of snow, debris or water?Are there “desire lines” or beaten paths that should be formalized?

Is there a mix of stores and services nearby?Are there opportunities for people to be physically active?Are there inviting places for people to rest or relax?Is there a diversity of people?Are there activities for people of all ages? In all seasons?

Is there evidence of volunteerism?Do you see any maintenance workers or staff? Is there any contact information so you can reach someone in charge of the space?Is there an active or passive security presence?

Are there comfortable places to sit?Is there good, quality lighting at night?Is there a paved or gravel path? Are there public washrooms? Are they clean and inviting?Is there somewhere nearby to get a snack or drink?Is there evidence of history or identity?

How do I feel?

Do you feel safe and comfortable? Do you feel a sense of identity or history? Is there something that makes this place feel unique? Do you feel relaxed, energized or bored? Do you want to stay and linger?

Exhibit D

66

Page 43: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

27

This section includes a summary of the results of the site assessment as well as the ideas and recommendations generated by the community about how to improve Break Water Park. The visualizations in this section are used to help people re-imagine Breakwater Park and to highlight specific recommendations, programs or improvements.

In addition to countless focus groups, meetings, interviews and casual conversations with community members, more than 300 specific recommendations and ideas were collected during the project. Trends, priorities and compatible best practices are highlighted in this section. To find a complete list of results from the project, please visit:

3. RESULTS AnD RECOMMEnDATIOnS

www.8-80cities.org Resources 8-80 tools Community Reports

Exhibit D

67

Page 44: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

28

Exhibit D

68

Page 45: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

29

breakwater park site observationsWith the help of community volunteers, site observations were conducted at Breakwater Park in both the winter and summer, and more than 1100 users were recorded. A simple social observation chart (which is available in the Toolbox section of this report) was used to record who uses the park, how they use it and when.

During the site assessments, 8-80 Cities estimated the age of park users. Compared with demographic data from the neighbourhood, the most underrepresented user group is older adults. While people 50 and older make up aproximately 34% of the population, they only represent 5% of users at Breakwater Park.

users

if you don’t Count, you don’t Count!

“In God we trust; all others bring data”- One of nYC Mayor Bloomberg’s favorite phrases

Collecting information about how public spaces are used is critical to their improvement. Understanding who is using the space and often more importantly, who’s not using the space, helps to shed light on what improvements need to be made. Data helps to build the case for why investment and improvements need to be made and creates a “baseline” of information from which you can measure your success.

RESULTS & RECOMMEnDATIOnS

5%

0

50

100

150

200

250

300

350

400

450

500

Ages 0-6 Ages 7-12 Ages 13-18 Ages 19-34 Ages 35-50

Ages 51-65 Ages 65+64 +0-6 7-12 13-18 19-34 35-50 51-64

8% 7%2% 1%

4%

28%

49%

Users of BreakwaterPark by Approximate Age

Age

num

ber o

f Use

rs

Results Overview

Exhibit D

69

Page 46: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

30

49.7%

Average percent of men andwomen at Breakwater Park

50.3%

37%

Did you know...In NYC’s Bryant Park, staff takes a daily count of park users. If they observe less than 50% females, they take action. Some strategies used to attract women include offering immaculate public washrooms with fresh cut flowers, yoga classes and knitting classes.

women are an “indicator species”When it comes to assessing public spaces, women are an excellent indicator of how well a place is working. Women tend to be more discriminating and have a lower level of tolerance for spaces that are disorderly, dirty or unsafe.

At Breakwater Park, we observed a balanced proportion of men and women, indicating that the space is generally percieved as safe by both genders. Continued monitoring of the age and gender user share is an important tool for measuring the success of a space and any future changes that should be made to the site.

tHE laCK of oldEr adults and CHildrEn at BrEaKwatEr parK is EVidEnCE tHat tHE parK nEEds to BE improVEd.

Bryant Park, nYC

Exhibit D

70

Page 47: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

31

RESULTS & RECOMMEnDATIOnS

observed ActivitiesFocusing on activities and infrastructure that invite and entice new people into the park will help improve usage and bring vibrancy to the park. Additional seating, such as benches and picnic tables that are closer to the water will also help satisfy the demand for more formal seating.

time spent in breakwater park Our observations showed that walking through the park is the most popular activity in both the summer and winter.

61% fElt BrEaKwatEr parK was not aCtiVE in tHE wintEr*

Significantly more staying activity was recorded in the summer, and there was a greater diversity of activities; however, the overall user count per hour in the remained low, and the winter user count was dismal, even though the weather was mild.

147 users per hour wErE oBsErVEd during tHE summEr

11 users per hour wErE oBsErVEd during tHE wintEr

Exhibit D

71

Page 48: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

32

* Percent of 142 people surveyed Time spent in Breakwater Park in Winter

1 to 5 mins85%

6-10 mins6%

11-15 mins3% 16-20 mins

6%

21-25 mins0%

26-30 mins0%

Average

5 mins

Time spent in Breakwater Park in Summer

Average

35 mins

1 to 5 mins21%

6-10 mins7%

10-20 mins12%

20-30 mins19%

30-45 mins13%

+ 1 hour28%

* Percent of 1161 people surveyed

6%Sitting on abench

7%At water’s edge

45%Walking

7%Cycling

13%Sitting on informal seating

In the water1%

6%Sitting on informal seating

48%Walking through the Park

3%Cycling

34%Running

Activities observed in Dundonald Park in winter

Activities observed in Breakwater Park in summer

Exhibit D

72

Page 49: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

33

Recommendations and ideas were collected from community members through mapping activities, facilitated group conversations, interviews and idea-sharing activities. 8-80 Cities recorded and analyzed the data in order to create the summary of the findings that are presented below.

The chart below is based on 352 specific ideas or recommendations collected by 8-80 Cities through the process of community engagement. The chart indicates trends in themes related to the recommendations in order to help identify and set community priorities. priorities.

Ideas & Recommendations

RESULTS & RECOMMEnDATIOnS

Recommendations by themes

Community events & Activities

infrastructure & facilities

Accessibility & Connectivity

safety

10%

5% 8%18%

59%

Ideas related to the development of activities, programmes and events to engage communities members in the park

Ideas related to improving pedestrian and bicycle access to the parkIdeas related to the addition

or improvement of physical infrastructure or facilities

Ideas specificially related to interventions to improve safety in the park such as improved lighting or interventions to reduce injury

Communication & engagementIdeas related specifically to improving communication and engagement with the public in relation to Breakwater Park (such as an im a community board, or a Breakwater Park website)

Exhibit D

73

Page 50: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

34

spECifiC typEs of rECommEndations stood out in tHE data, suCH as tHosE rElatEd to improVing tHE aEstHEtiCs of tHE parK, CrEating BEttEr walKing & CyCling Conditions, and improVing aCCEss to tHE parK By road and witHin tHE parK systEm.

Improved Facilities for Pedestrians & Cyclistis

18%

Ideas related to improving or adding infrasture to improve conditions for pedestrians, cyclists and transit users such as increasing the path width, adding bicycle parking and improving transit shelters

Beautification & Maintenance

11%

Suggestions related to improving the aesthetics of the park through improved maintenance and greenery

Improved access to the park Ideas related to getting people comfortably and safely to the park

9%

Exhibit D

74

Page 51: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

35

ConnECting to tHE watErThe waterfront is part of Kingston’s identity. It is part of why residents take great pride in their city and why tourists flock to it. The waterfront adds to Kingstonian’s quality of life, and it should be celebrated and invested in. While Breakwater Park provides a beautiful vista of the Lake Ontario, it fails to really connect people to the water.

Of the total recommendations collected for Breakwater Park, more than 16% were related specifically to improving people’s access or connection to the water. This desire to connect with the water was reiterated in conversations with community members of all ages as well as current park users and potential park users.

Research relating to “blue space” (places with lakes, rivers, pools or fountains) also shows that waterfronts provide important mental health benefits such a stress reduction and a feeling of restoration and peacefulness.

RESULTS & RECOMMEnDATIOnS

of all ideas were related to connecting to the water.16%

“When I first came to Kingston, I drove by Breakwater Park and thought it was so beautiful and would be a great place to take the kids for a day at the beach. One weekend, we got everyone ready, went down to the park and when we got there, realized there was no way to get in the water.” - Participant in Newcomer Focus Group

Exhibit D

75

Page 52: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

36

By focusing on improving the three sensory experiences below, Breakwater Park can truly become a place that indulges our natural instinct to connect with water.

touCHProviding safe access to the water should be a priority of any re-design or investment at Breakwater Park. Currently, touching or entering the water is difficult and potentially unsafe due to sharp rocks and uneven surfaces. Community members expressed a very strong desire to improve access to the water by creating safe, comfortable access points along the water’s edge.

sigHtConversations with community members, as well the site assessments, showed that people wanted to sit closer to the water. Additional seating close to the water’s edge will help to accommodate this experience. Additional design elements should also be sensitive to preserving the view of the water.

HEarThe sound of water is soothing and relaxing. Getting people closer to the water with seating and safer access points will allow people to enjoy the water with all of their senses. The sound of the water is also one of the few features of the park which is enhanced at night.

indulgE our dEsirE to touCH

Exhibit D

76

Page 53: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

37

aCCEssiBility

RESULTS & RECOMMEnDATIOnS

Pedestrian, cycling and transit access to Breakwater Park is a crucial issue. Improvements to design and programming within Breakwater Park should be undertaken in tandem with access improvements or the success of these projects may be jeopardized. Breakwater Park is a walkable and bikeable distance from downtown Kingston, as well as many residential neighbourhoods. Currently, there are three key access problems that need to be addressed:

NTS

Exhibit D

77

Page 54: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

38

1. road aCCEss for pEdEstrians & CyClistsThe west end of Breakwater Park is a gateway into downtown Kingston. The presence of Kingston General Hospital, the Cancer Centre, Queen’s University residents, as well as residential homes, justifies the need for slower speeds along King St. and a high-quality pedestrian environment.• Signalized crossings should be installed to improve pedestrian and cycling access across King St. at both the west and east ends of the park.

• Traffic-calming measures should be used to reduce traffic speeds on King St. such bump-outs, speed humps and visual cues such as attractive pavement resurfacing.

2. ConnECtiVity & aCCEss witHin tHE parK systEm, EspECially along tHE watErfront Breakwater Park is part of the waterfront trail and is adjacent to McDonald Park; unfortunately, there is very poor connectivity between the chain of green spaces along Kingston’s waterfront and the opportunity to create a magnificent connected waterfront system has yet to be capitalized on. • In the short-term connectivity with McDonald Park along the waterfront should be improved, and the water pooling problem by the helicopter pad should be addressed. The experience for park users can be improved by implementing low-cost improvement such as colorful planters and surface improvements along the connecting pathway system.

• In the longer term, creating a seamless, connected waterfront greenway system would be of incomparable value for the city. Expanding and improving the green space connection between Breakwater Park and McDonald Park will be an important step in this process.

3. transit aCCEss The current bus rider experience to access Breakwater Park is extremely poor. In order to provide current riders with a safe and positive user experience and to encourage transit use, significant improvements at the transit stops must be made. • Create a high-quality, dignified transit user experience by installing attractive, comfortable and well maintained transit shelters.

• Locate these transit stops at new signalized crossings ,and connect transit shelters with paved path system.

Exhibit D

78

Page 55: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

39

Parks can be so much more than just pretty places, they can actually help individuals and communities be healthier and happier. Unfortunately, many of our parks are under-used and not living up to their potential. How can we do better? It turns out that research suggests that aside from proximity, having activities is one of the greatest predictors of park use.*

That is why when evaluating and planning for parks and public spaces, it is important to not only focus on the physical qualities of the space; afterall a great park is so much more than the, grass, trees, benches and other features it may contain. Looking beyond the “hardware” and focusing also on the “software” of the place---the uses, activities, and unique character are equally and in some cases even more important for creating a vibrant and healthy park.

Software

RESULTS & RECOMMEnDATIOnS

uses, Activities & Identity

wHEn it ComEs to softwarE, asK yoursElf...

By determining and understanding the types of activities that people would like to do in the park, you can then start to think of the specific infrastructure that can support those functions, and not the other way around. This is the difference between creating a great park versus a great design.

What do people want to do in the park?

What makes this park unique?

What kind of local cultural activities could be supported in the space?

What kind of social capital is or could be harnessed in the park?

Are there different things to do throughout the day? Week? Year?

Are there events & activities that will attract people of different ages, ethnicities and income levels?

* Cohen, Marsh, Williamson, Derose, Martinez, Setodji & Thom McKenzie. “Parks and physical activity: Why are some parks used more than others?”

Exhibit D

79

Page 56: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

40

What do people want to do in the park?

What do people want to do in the park?

What do people want to do in the park?

Sometimes it’s easier to find the millions to build the park, than it is to find the thousands you need to make it a great place - funding for programming and managment.

- Gil Penalosa, Executive Director 8-80 Cities

Bryant Park in new york City is the most meticulously managed park in the world. The “software” at Bryant Park provides endless activities and experience for people of all ages, morning, noon and night. Activities range from chess and ping-pong, to knitting, yoga, language classes, juggling and much more.

Enless activities: Bryant Park

Exhibit D

80

Page 57: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

41

RESULTS & RECOMMEnDATIOnS

February March April May JuneJanuary

Celebrating Canadian

Climate by offering a wide

range of winter’s activities &

events would ensure usage

of Breakwater park all year

around.W

inter

festivals

Ou

tdo

or C

afe

Temporary Art

InstallationE

nte

rta

inm

en

tS

tew

ard

sh

ip

De

ve

lop

me

nt

Sp

on

tane

ou

s

Activitie

sF

orm

al

Activitie

s

Bin

ocu

lars

Celeb

rate sprin

g!

Hom

ework in the P

ark

Nig

ht W

alks

Sn

owm

an m

aking

Wa

te

r W

atc

hin

g

En

joyin

gS

pr

ing

Flo

we

rs

ba

rb

ec

uin

gSw

imm

ing

Natural Science Class

TA

I-CH

I

& C

an

tee

n

Co

mm

un

ityC

lean-u

p Picnic!

Festivities

“It’s a shame there isn’t anywhere

you can get a hot cup of coffee - if

you have a mobility issues, you get

cold very quickly. It’d be nice to be

able to grab a hot drink or some

food, nothing fancy.” Community

Member

“Games or sports that

everyone can play like

shuffle board or bocce ball - because even if

you’re in a wheel chair

you can still participate.”

Accessibility Committee

Focus Group

breakwater park software program CalendarBased on ideas from the community, this conceptual calendar uses images from around the world to exemplify the different layers of activity that can take place at Breakwater Park throughout the year.

Exhibit D

81

Page 58: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

42June July August September October november December

Music

in the park!

PlayB

occe!

Horseshoe &

Yo

ga

in th

e Park

Kayak Lesson

Swim

ming lessons

outdoor

classroom

Kite

Bo

ard

ing

Sn

ow

sh

oe

L

es

so

n

Hooping

Lessons

Dragon Boat R

acingC

om

mu

nity

Gard

enin

g

71% felt Breakwater park was not well programmed.(% of 130 people surveyed)

people tend to be less physically and socially active in the winter. parks need to offer something fantastic to get people off of their couches and out of the houses!

FRee w

IFI

breakwater park software program CalendarBased on ideas from the community, this conceptual calendar uses images from around the world to exemplify the different layers of activity that can take place at Breakwater Park throughout the year.

Exhibit D

82

Page 59: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

43

step 3. Develop an implementation & funding strategy

step 5. Advertise & promote the activities to the public.

RESULTS & RECOMMEnDATIOnS

Creating a doable plan is the key to turning an idea into reality. 8-80 Cities uses a simple community action planning framework to help community members focus on one idea and brainstorm a plan for implementation. The idea highlighted below was developed as a way to encourage partnership at Breakwater Park. Other ideas from the action planning process, such as improved water access, a wider multi-use path, and the promotion of slower speeds on King St., have been incorporated directly into the report

step 1. Who should be involved?Arts council, the Downtown BIA, Post Secondary Institutions, The City of Kingston

Community Action planning

Incorporate flexible and mulit-purpose infrastructure for arts, culture and culinary groups in order to increase vibrancy and

animate Breakwater Park.

THE IDEA:

step 2. Engage the arts community test the appetite for the idea.

step 4. Connect the users with the available infrastructure and manage programming and activities.

Exhibit D

83

Page 60: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

44

Exhibit D

84

Page 61: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

45

HardwareDesign & Physical Infrastructure

Great parks offer a balance of natural “green infrastructure” that allows people to absorb natural beauty and tranquility while also providing the infrastructure to support a variety of uses that serve the needs and desires of the community.

- Are there some basic amenities? ( e.g washrooms, water fountains etc.)

RESULTS & RECOMMEnDATIOnS

Well maintained infrastructure or “hardware” that supports a park’s uses and activities is an important component of creating a successful and well-used park.

- Is there infrastructure to support activities by all ages?

- Are there attractive places to sit and stay?

- Are there flexible and adaptable spaces and features that can support a variety of activities throughout the day/seasons?

- Is there good lighting?

somE quEstions to ConsidEr wHEn tHinKing of HardwarE...

Exhibit D

85

Page 62: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

46

- Is there good lighting?

“it is so clear that parks provide amazing benefits to everyone; the young, the old, the rich, the poor, but nevertheless, funding for parks keeps getting cut.

why is it that if a playground is broken, the community is asked to go do some fundraising, but if there is a pothole on the road, it gets fixed? is the pothole more important than the playground?”

- gil penalosa, Executive director 8-80 Cities

somE quEstions to ConsidEr wHEn tHinKing of HardwarE...

Exhibit D

86

Page 63: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

47

Zones, improvements & Additions 59% of the total recommendations and ideas collected for Breakwater were related to the addition or improvement of physical infrastructure and facilities.

The multi-use pathway and the waterfront zone were two key areas of concern for participants. For additional information about improvements to these areas, please see pages 49-52.

It’s also important to note that the area marked “Utilities Kingston” is not part of Breakwater Park. However, many community members did not differentiate between the two spaces. Community members felt that if an agreement could be reached between The City and Utilities Kingston, it would be an excellent opportunity to improve recreational opportunities for the community and to enhance Kingston’s waterfront.

RESULTS & RECOMMEnDATIOnS

“What if near the hospital there was a quiet place, a designated quiet place...where you can read a book and haven’t got children running around. It’s so much space, I’m sure that would be do-able, and it would draw a certain amount of people there that want to just quietly sit by the water and read.” - Seniors Focus Group Participant

Bicycle racks at each access point of the park

Additional lighting along the path

Secondarypedestrian crossing

Large multi-usepathway

Slow speed zone

NTS

uT

ILIT

IES

KIn

GS

TO

n

Primary pedestrian crossing

Transit stops

Primary pedestrian crossing

Exhibit D

87

Page 64: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

48

MuLTI-uSE PATHWAy

The multi-use pathway is one of the key design features and the most used facility in the park. It is well used by walkers, runners, pedestrians, people in wheelchairs, as well as roller bladers and people with strollers.

- Widen Path- Improve surface - Signage on pavement and at entry points indicating that it is a shared space

- flowers & plants - Improved maintenance - Improved lighting

Additional facilities:- Washrooms - Children’s play area and structure- Fitness equipment

PuP-uP ACTIVITy SPACE

The Pop-up activities zone is considered as a flexible zone capable of accommodating a wide range of activities such as yoga, frizbee, relaxing, and picknicking.

- Replacement of damaged plaque - Enhanced experience of viewing sculpture through design features (i.e. strategic seating or pathways)

TIME ZOnE

The Time zone is the area that is most influenced by ‘Time’, the large sculpture on the central headland

- Improved access to water

WATERFROnT ZOnE

The Waterfront zone extends along the length of the park and is the area that directly connects people to the water.

TREE ZOnE

The Tree Zone is the area between and around the double row of trees. It can be used for barbeques and recreational games such as bocce ball and horseshoes. It is also the most shaded area of the park and should have ample and diverse seating options.

These two areas very important for the sport of kiteboarding in Kingston They are the only areas in the park that can be used for safe landing and need to remain free of obstructions (such as sign posts and seating) in order to keep the sport alive in Kingston.

QuIET ZOnE

The Quiet zone is located close to the hospital and is a place for rest and relaxation.

- Additional tables and seating for people in groups- Improved and additional barbecues

- Flowers & plants - Signage indicating it is a “quite zone” - Seating

- Bicycle Parking- Improve lighting- Improved maintenance - Improve connections to MacDonald Park and to road crossings

- Additional seating- Improved maintenance - Improved lighting- Additional shade

- Improved maintenance - Improved lighting

- Improved maintenance - Improved lighting

KITE BOARDInG

Exhibit D

88

Page 65: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

49

tHrougH a CHild’s EyEs

8-80 Cities worked with non-profit organization Focus on nature to get children’s perspectives of Breakwater Park. We used cameras and drawing activities to help the grade 6 students from Central Public School tell us about what they liked, didn’t like, and would like to see improved at the park. The photographs and illustrations to the right were all created by students. Three resounding themes emerged from the session:

The students’ lenses told the story of being fascinated by the natural world. Every tiny flower, insect and animal was photographed. The students felt the park would be enhanced with more flowers and plants and an active preservation and encouragement of wildlife.

The water was a natural draw for the students. As soon as they got their cameras, they made off for the water’s edge; unfortunately they didn’t think it was very safe for swimming or playing.

The students found that there were very few things for kids to do at the park. Almost all the students were interested in a play structure, sandbox or swing set. Other ideas included food vendors, a newspaper or library stand and publicly available sports equipment.

1. More things to do!

2. More flowers and greenery!

3. Safer access to the water!

RESULTS & RECOMMEnDATIOnS

Exhibit D

89

Page 66: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

50

Exhibit D

90

Page 67: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

51

RESULTS & RECOMMEnDATIOnS

imaginE BrEaKwatEr parK....

1

2

3

4

6

Exhibit D

91

Page 68: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

52

Breakwater Park is one of Kingston’s greatest opportunities to connect with the water and should be a place that is safe, enjoyable, interesting and accessible for people of all ages and abilities.

A variety of flowers, grasses and plantings would add a layer of rich texture and colour to the park. Partnerships with community groups could be established to help maintain the plantings and build a sense of stewardship.

1 A rich, colourful experience

Bringing people closer to the water with a variety of seating options will do much to improve the sensory experiences of being in the park, playing on people’s desire to see and hear the water close-up.

2 water’s edge seating

Breakwater Park should have at least one excellent beach access point to the water. Sharp stones should be removed and replaced with a comfortable alternative such as smooth gravel or pebbles.

3 safe and inviting beach access

as a plaCE to ConnECt witH watEr in downtown Kingston

The water should be accessible for people of all abilities. The Kingston Accessibility Committee should be consulted to determine a suitable option to help people with mobility challenges safely access the water.

4 Accessible water ramp

Many community members expressed an interest in exploring food and drink opportunities at the park. A small coffee kiosk or healthy snack car creates an additional layer of activity, and a reason for people to meet and stay at the park.

5 food & drink

A sandbox is a natural fit for Breakwater Park and was a popular idea among community members. David Rockwell, founder of the Imagination Playground, says that the simple combination of sand and water are “like magic” for children.

6 sand & water

5

Exhibit D

92

Page 69: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

53

The pathway system at Breakwater Park was a key area of concern for community members---currently, it is too narrow and in a state of disrepair. A wider pathway with a high-quality surface that can adequately accommodate pedestrians and cyclists would greatly enhance the recreational and aesthetic qualities of the park.

1 Multi-use pathway

5 improved lighting

RESULTS & RECOMMEnDATIOnS

2 pathway signage

3 Connections to roadway

4 bicycle parking

A multi-use trail should include signage that indicates appropriate behaviour on the path. Signage should be welcoming and positive while clearly indicating that it is a shared space for cyclists and pedestrians and that people on wheels should be mindful of their speed.

Connections to pedestrian crossings and transit stops along King St. should invite people into the park with attractive signage and plantings. Entrance points should be easy to navigate with a stroller, wheelchair or bike and provide a direct connection to the pathway system.

As indicated in the access map on page 35, Breakwater Park is a short bike ride from many destinations and neighbourhoods in Kingston. Ample, well located, high quality bicycle parking should be available at all entrance points to encourage this healthy and sustainable form of transportation.

High-quality, sensitive and attractive lighting can unlock a new dimension of the park, adding to the ambiance and making it an enjoyable destination in the evenings, especially in the short days of the winter.

3

imaginE BrEaKwatEr parK....

Exhibit D

93

Page 70: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

54

1

5

2

4

By carefully balancing the natural gifts of the park with physical improvements as well as creative programming and activities, Breakwater Park can truly become a hub of recreation, healthy living, social interaction and sustainable lifestyles.

a plaCE for ConnECting witH Community and CrEating HEaltHy lifEstylEs

Exhibit D

94

Page 71: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

55

it’s BEEn donE BEforE!ExamplEs for BrEaKwatEr parK

Many patients and visitors from Kingston General Hospital and the Cancer Centre find respite at Breakwater Park. Community members suggested creating a designated “Quiet Zone” like Strawberry Fields at new York’s Central Park. Strawberry Fields, which is a living memorial to John Lennon, is an area for quiet rest and reflection and prohibits amplified music, bikes, rollerblades, skateboards, as well as organized recreation and sports (fig.1).

1. Community bake oven, Dufferin Grove Park, Toronto.2. Outdoor exercise equipment, Huntingdonshire, UK. 3.Bienenstock Playground, McLeary Playground, Toronto4.Imagination Playground, NYC.5.Wayfinding Signage, XXX6.Signage at Carl Schurz Park, NYC7.Sign at Union Square subway station, NYC.8. Waterfront Lighting, Misson Creek Park, San Fransisco9.Fruixi Food Cart, Montreal .

Food is an excellent way to bring the community together and draw people to the park. Montreal has recently undertaken a pilot project that helps to bring healthy food to downtown residents. Bike-mounted carts, designed by a Université de Montréal student, deliver locally grown organic produce to parks, as well as local hospitals, which often have limited healthy food choices. These carts could also be adapted to have hot and cold beverages, which was a suggestion among community members (fig. 9).

A Place for Active Play

Creating a “Quiet Zone”

Building community with food

Outdoor exercise equipment

Building a connection to the community

Playgrounds have come a long way from the traditional plastic slide and swings set. Playgrounds that use natural materials and reflect the natural environment help kids connect with nature while participating in active play (fig. 3 & 4).

Gaining popularity in parks across north American, the presence of outdoor fitness equipment is an easy way for cities to promote physical activity that is accessible and affordable. According to the Trust for Public Land, locating the equipment near playgrounds is a great way to encourage physical activity among parents. Providing basic signage about the benefits of physical activity and how to use the equipment will also encourage use (fig.2).

Could the City of Kingston learn from this example at the new York City Subway? (fig.7) Knowing that their passengers are the most in-touch with daily issues on the subway, nYC has taken a zealous approach to connecting with their users in order to provide a higher level of service and care. The nYC Parks Department is also highly aware of the importance of positively communicating with the public about appropriate conduct and usage in parks (fig. 6).

2

RESULTS & RECOMMEnDATIOnS

Wayfinding SignageSignage is an excellent way to improve the connections between Breakwater Park and other recreation areas or services in Kingston. Signage can also be used to encourage physical activity through activity prompts (i.e. 15mins of walking burns XX number of calories), which can be implemented in partnership with health organizations such as KFL&A Public Health (fig. 5).

A new experience illuminated Sensitive, thoughtful lighting can be used to provide a new user experience. In Mission Creek Park in San Francisco low-level lighting is used to draw people to the waterfront while not obscuring the view of the water (fig. 8).

Exhibit D

95

Page 72: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

56

1 32 3

4 5 6

7 8 9

Exhibit D

96

Page 73: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

57

KEy rECommEndations

The opportunity to safely and comfortably connect people with the water should be capitalized on. Breakwater is the longest waterfront park in downtown Kingston and represents an unparalleled opportunity to provide a safe, comfortable connection to the water for both locals and visitors.

improve water access 1

The City of Kingston should make it easier for community members to do programming that encourages physical activity and community building in the park by:

• Making the permitting process more accessible, affordable and streamlined. • Actively seeking out and partnering with community groups and service providers such as KFL&A Public Health to help animate the park.

programming2

implement design improvements in tandem with access improvements3

Establish a Breakwater Park Working Group that has representation from the City of Kingston, KFL& A Public Health, community-based organizations and other interested groups with the purpose of working collaboratively to implement the community-led recommendations, actions and visions of this report.

working group4

Few other cities boast such extensive publicly owned waterfronts. Leverage successful design and programming initiatives at Breakwater Park to continue investment and improvement along Kingston’s waterfront system. Work to create an interconnected, high-quality blue and green edge that functions as a recreation and active transportation corridor.

Continue investing in the waterfront5

RESULTS & RECOMMEnDATIOnS

The success of Breakwater Park is dependent on safe, comfortable and inviting access, both by road and from within the park system. Work with relevant departments and partners to create safe crossings along King St. and an improved user experience between MacDonald Park and Breakwater Park.

Exhibit D

97

Page 74: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

58

At 8-80 Cities, we couldn’t tell you the number of times we’ve heard the phrase “we’re worried about raising expectations”. And, our response usually is “well, that’s the whole idea”. If we continue to have low expectations for our parks and public spaces, we will continue to have public spaces that are poorly managed, underfunded and underused.

It’s time to raise expectations

Exhibit D

98

Page 75: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

59

This section contains a variety of simple tools that can be used by the community to continue assessing and improving Breakwater Park.

We also hope the Make a Place for People Project at Breakwater Park will inspire other communities to use these tools to undertake developing community-led improvement strategies at other parks and public spaces accross the province.

3.PLACE MAKInGTOOLS

Exhibit D

99

Page 76: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

60

Exhibit D

100

Page 77: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

61

Please circle the answer that best describes you.

1. Parks and public spaces contribute to my overall

Physical health

strongly agree somewhat agree somewhat disagree strongly disagree

Mentalhealth

strongly agree somewhat agree somewhat disagree strongly disagree

2. I visit this place…

Never once a year 2-5 times a year

More than 5 times a year

on a weekly basis

every day

If you answered “never” skip to question 4.

3. This place is…

safe strongly agree somewhat agree somewhat disagree strongly disagree

comfortable strongly agree somewhat agree somewhat disagree strongly disagree

well used strongly agree somewhat agree somewhat disagree strongly disagree

accessible strongly agree somewhat agree somewhat disagree strongly disagree

wellprogrammed (with events/activities)

strongly agree somewhat agree somewhat disagree strongly disagree

active in the winter strongly agree somewhat agree somewhat disagree strongly disagree

4. Gender: Male female

5. Age: 0-12 13-18 19-34 35-50 51-65 65+

Site:

Place Survey

PLACE MAKInG TOOL

Exhibit D

101

Page 78: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

62

Public Space Observation TableThis tool can be used to assess the people and activities at any park or public space. By analyzing the data, you

can begin to identify trends and build a picture of how the space is working.

User # Male fem 0-6 7-12 13-18 19-34 35-50 51-65 65+ethnicity

othercodes

timespentatpublicspace

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

time of departuretime of arrival

site target area/sub Unit

Directions: each oberservation recording session should be no less than 1hr long. sessions should be conducted in the morning, afternoon, evening and night on both a weekday(s) or weekend. if the site is too large or too busy to observe effectively, the site should be broken into smaller sub-units. if people are in groups, fill in the user information individually then circle the members of the group. feel free to add new codes in the 'other codes' section if you feel it is important.

Ethnicity Codes: B = black, w = white, a=asian, sa = south asian, l=latino U= undetermined

Other Codes: Homeless = H, disabled = d

CodesGender Activity Age

Name

date

weather

1

Exhibit D

102

Page 79: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

63

Place Survey

Action Planning Instructions Creating a doable plan is the key to turning an idea into reality.

In your group come up with a plan for how your idea can be

implemented within the next year or two.

The majority of your planning time should be spent on the

HOW? question.

1. What? In the space below briefly explain what your idea is.

2. Why?Briefly explain why your idea is important.

4. When?When will it be implemented? When will it be used?

How frequently? What season? What day of the week? What hours?

5. Where?On the map provided indicate where your idea will take place/be

located.

6. How?Without writing anything down, take a few minutes to dis-

cuss as agroup what needs to be done to implement your

idea. After you have discussed your plan, try to break it

down into manageable steps. It might be easiest to think

in chunks of time, but it is up to you. you can add more

steps if necessary, but try to limit yourselves to no

more than 6 steps.

STEP 1

STEP 2

STEP 3

3. Who?Who needs to be involved in the project? What partnerships need

to be established for it to be successful?

PLACE MAKInG TOOL

Exhibit D

103

Page 80: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

64

Share an Idea

Share an Idea

Share an Idea

Share an Idea

Share an Idea One of the simplest ways to collect information about a park or public space is by asking community members to “share an idea”.

Provide small sheets of paper and a bunch of colourful markers and let the ideas flow!

Exhibit D

104

Page 81: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

65

How did i get Here?

wHat’s Here?wHat’s tHere to do?

wHo takes care of tHis place?

Is the place visible from a distance?

Is it accessible to wheelchairs and strollers?

Can you easily walk or bike to the place?

Is there a paved path?

Is the path clear of snow, debris or water?

Are there ‘desire line’” or beaten paths?

Is there a mix of stores and services nearby?

Are there opportunities for people to be physically active?

Are there inviting places for people to rest or relax?

Is there a diversity of people?

Are there activities for people of all ages?

Is there evidence of volunteerism?

Do you see any maintenance workers or staff?

Is there any contact information, so you can reach someone in

charge of the space?

Is there an active or passive security presence?

Are there comfortable places to sit?

What kind of lighting is there?

Is there a paved or gravel path?

Are there public washrooms? Are they clean and inviting?

Is there somewhere to get a snack or drink?

When thinking about any park or public space, from a small neighbourhood square to a large urban park, ask yourself the questions

below. By thinking carefully about how people will get to the place, what they’ll do when they will get there, what kind of infrastructure

is, and who manages or takes care of the space, you can start to assess what’s working, what’s not, and what could be improved.

Simple Site Evaluation Tool

PLACE MAKInG TOOL

Exhibit D

105

Page 82: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

66

ent

erta

inm

ent

com

mun

ity b

uild

ing

spo

ntan

eous

a

ctiv

ities

for

mal

a

ctiv

ities

Software Program Calendaruse this template to plan an effective range of activities, events and programming for your public space throughout the year.

Exhibit D

106

Page 83: REPORT TO ARTS RECREATION & COMMUNITY POLICIES …€¦ · Street Water Plant Dock Site. $2,000,000 for this project was included in previous capital budget forecasts. The overall

67

8-80 Cities is a non-profit organization based in Toronto, Canada. We are dedicated to contributing to the transformation of cities into places where people can walk, bike, access public transit and visit vibrant parks and public places.

Our approach is to engage communities at all levels and across multiple sectors to inspire the creation of cities that are easily accessible, safe and enjoyable for all.

ContACt us8-80 CITIES192 Spadina Ave., Suite 510Toronto, Ontario M5T 2C2CAnADA [email protected] (416) 591 – 7404

Exhibit D

107