N° DE CONTRATO : CIA MINERA KOLPA S.A ENCOTEC SUPERVISIÓN / SUPERVISION: MINERA KOLPA S.A A) B) H. Anterior / Previous H. Actual / Actual H. Acum. / Accumulated H. Anterior Acum. / Previous H. Actual / Actual H. Acum. Actual / Accumulated 1 Luminaria 00 0.0 0.0 0.0 1 0 0.0 0.0 0.0 2 01 7.0 1.0 8.0 2 1 120.0 10.0 130.0 3 01 7.0 1.0 8.0 3 1 70.0 10.0 80.0 4 02 7.0 1.0 8.0 2 190.0 20.0 210.0 5 Contenedor 00 0.0 0.0 0.0 Total / Total: 04 1 Supervisor / Supervisor 0 0.0 0.0 0.0 1 01 70.0 10.0 80.0 2 Técnico / Technician 0 0.0 0.0 0.0 2 01 70.0 10.0 80.0 3 0 0.0 0.0 0.0 3 01 70.0 10.0 80.0 0 0.0 0.0 0.0 4 01 70.0 10.0 80.0 Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 5 01 70.0 10.0 80.0 1 6 01 70.0 10.0 80.0 2 7 01 70.0 10.0 80.0 3 8 01 70.0 10.0 80.0 4 9 01 70.0 10.0 80.0 5 10 Cuponera 01 70.0 10.0 80.0 Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 700.0 100.0 800.0 1 14 2 Item 3 1 2 Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 3 1 4 2 5 Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 1 Unid. o Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 1 40.0 52.8 92.8 1 Lluvia 0.0 0.0 0.0 2 32.0 0.0 32.0 2 Nevada 0.0 0.0 0.0 3 1.0 0.0 1.0 3 Tormenta Eléctrica 0.0 0.0 0.0 4 Total 0.0 0.0 0.0 5 336.0 369.6 705.6 6 7 8 9 Directa / Direct: 2 190.0 20.0 210.0 10 Indirecta / Indirect: 0 0.0 0.0 0.0 11 G) 1.- 2.- 3.- 4.- 5.- H) 1.- 2.- 3.- 4.- 5.- J) 1.- 2.- 3.- K) 1.- 2.- 3.- L) CONTRATISTA / CONTRACTOR: HORARIO / WORKING HOURS 07:00 a 18:00 REPORTE DIARIO DE OBRA PROYECTO / PROJECT: REPARACIONES EN EL DEPOSITO DE RELAVES RUBLO DIQUE 1 FECHA / DATE: 24-04-15 PROPIETARIO / OWNER: TURNO / SHIFT: Día Horas Máquina / Machine Hours Directa / Direct: Supervisor Camioneta / Día Técnico Geosintéticos Generador / Dia MANO DE OBRA: EQUIPOS / MACHINES: Item Descripción / Descripción Cantidad / Quantity Horas Hombre / Man hours Item Descripción / Descripción Cantidad / Quantity Operador de Equipos Tensiómetro Total / Total: Leister Sistema de Control de Sub Drenaje Amoladora Operador de Equipos Motobomba / Dia Total / Total: Indirecta / Indirect: Soldadora de Extrusión Soldadora de Fusión Tubería HDPE Corrugada de 4" Perf. Herramientas Manuales, Cables Tubería HDPE Corrugada de 4" No Perf. Total / Total: Dique Principal Cota 4357 msnm Total Ind. / Total Ind. : Geotextil NT 200 GR/M2 Equipo de Prueba de Aire Tubería HDPE Corrugada de 6" Perf. Equipo de Prueba de Vacío Tubería HDPE Corrugada de 6" No Perf. Equipo de Prueba de Chispa Geomalla Uniaxial de 45 KN/M2 Luminaria 21 Total / Total: Luminaria 22 Geotextil NT 200 GR/M2 Total Equipos: Geotextil NT 300 GR/M3 H. Equipos / H. Machines: H. Inicio / Previous H. Termino / Previous Geocompuesto con Bentonita GCL Luminaria 25 Total / Total: REPORTE DE CLIMA ADVERSO QUE HAYA IMPEDIDO LOS TRABAJOS / ADVERSE WEATHER THAT PREVENTED PLANNED WORK TO BE DONE Vertedero de Demasías 2° Etapa Sistema de Impermeabilización Luminaria 23 Geomembrana LLPE 2.0 mm Luminaria 24 Cordón de Extrusión (Ml) Reparación con Extrusión (BEAD) Parches Menores a 60X60 Parches Mayores a 60X60 Geomembrana LLPE 2.0 mm (M2) TOTAL MANO DE OBRA / MANPOWER: Inserto de Geomembrana Delta Lock Item Descripción / Description Horas / Hours Total / Total: H. Anterior / Previous H. Actual / Actual H. Acum. / Accumulated Trabajos Adicionales PRINCIPALES ACTIVIDADES REALIZADAS EN EL TURNO: Continuamos con el cambio de los paneles en la relavera Rublo dique 1. Se cambiaron 12 paneles de las siguientes dimensiones 1 de (7 M X 4 M) 4 de (7 M X 5.2 M) y 7 de (7 M X 4 M) Item Descripción / Descripción Cantidad / Quantity Horas / Hours H. Anterior / Previous H. Actual / Actual H. Acum. / Accumulated NOTAS POR EL CONTRATISTA: Aspectos relevantes y/o críticos / NOTES BY THE CONTRACTOR: Relevant and/or critical aspects Realizamos 52.8 Ml de cordón por extrusión. PRINCIPALES ACTIVIDADES DE CONTROL DE CALIDAD (QC) / MAIN ACTIVITIES OF QUALITY CONTROL (QC): FIRMA CONTRATISTA / CONTRACTOR'S SIGNATURE CARGO / POSITION SEGURIDAD Y MEDIO AMBIENTE Se realizo la charla de seguridad antes de iniciar las labores RESPUESTA DE LA SUPERVISIÓN / SUPERVISION'S ANSWER: FIRMA SUPERVISION / SUPERVISION'S SIGNATURE: CARGO / POSITION

Reporte Diario Inst_tuberia

Embed Size (px)

DESCRIPTION

REPORTE DIARIO TRABAJO DE TERMOFUSION DE TUB

Citation preview

  • N DE CONTRATO : CIA MINERA KOLPA S.A

    ENCOTEC SUPERVISIN / SUPERVISION: MINERA KOLPA S.A

    A) B)

    H. Anterior /

    Previous

    H. Actual /

    Actual

    H. Acum. /

    Accumulated

    H. Anterior

    Acum. /

    Previous

    H. Actual /

    Actual

    H. Acum.

    Actual /

    Accumulated

    1 Luminaria 00 0.0 0.0 0.0

    1 0 0.0 0.0 0.0 2 01 7.0 1.0 8.0

    2 1 120.0 10.0 130.0 3 01 7.0 1.0 8.0

    3 1 70.0 10.0 80.0 4 02 7.0 1.0 8.0

    2 190.0 20.0 210.0 5 Contenedor 00 0.0 0.0 0.0

    Total / Total: 04

    1 Supervisor / Supervisor 0 0.0 0.0 0.0 1 01 70.0 10.0 80.0

    2 Tcnico / Technician 0 0.0 0.0 0.0 2 01 70.0 10.0 80.0

    3 0 0.0 0.0 0.0 3 01 70.0 10.0 80.0

    0 0.0 0.0 0.0 4 01 70.0 10.0 80.0

    Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 5 01 70.0 10.0 80.0

    1 6 01 70.0 10.0 80.0

    2 7 01 70.0 10.0 80.0

    3 8 01 70.0 10.0 80.0

    4 9 01 70.0 10.0 80.0

    5 10 Cuponera 01 70.0 10.0 80.0

    Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 700.0 100.0 800.0

    1 14

    2 Item

    3 1

    2

    Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 3

    1 4

    2 5

    Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu.

    1

    Unid. o Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu.

    1 40.0 52.8 92.8 1 Lluvia 0.0 0.0 0.0

    2 32.0 0.0 32.0 2 Nevada 0.0 0.0 0.0

    3 1.0 0.0 1.0 3 Tormenta Elctrica 0.0 0.0 0.0

    4 Total 0.0 0.0 0.0

    5 336.0 369.6 705.6

    6

    7

    8

    9 Directa / Direct: 2 190.0 20.0 210.0

    10 Indirecta / Indirect: 0 0.0 0.0 0.0

    11

    G)

    1.-

    2.-

    3.-

    4.-

    5.-

    H)

    1.-

    2.-

    3.-

    4.-

    5.-

    J)

    1.-

    2.-

    3.-

    K)

    1.-

    2.-

    3.-

    L)

    CONTRATISTA / CONTRACTOR: HORARIO /

    WORKING

    HOURS

    07:00 a 18:00

    REPORTE DIARIO DE OBRA

    PROYECTO / PROJECT: REPARACIONES EN EL DEPOSITO DE RELAVES RUBLO DIQUE 1FECHA / DATE: 24-04-15

    PROPIETARIO / OWNER:TURNO / SHIFT: Da

    Horas Mquina / Machine Hours

    Directa / Direct:

    Supervisor Camioneta / Da

    Tcnico Geosintticos Generador / Dia

    MANO DE OBRA: EQUIPOS / MACHINES:

    Item Descripcin / DescripcinCantidad /

    Quantity

    Horas Hombre / Man hours

    Item Descripcin / DescripcinCantidad /

    Quantity

    Operador de Equipos Tensimetro

    Total / Total: Leister

    Sistema de Control de Sub Drenaje Amoladora

    Operador de Equipos Motobomba / Dia

    Total / Total:

    Indirecta / Indirect:

    Soldadora de Extrusin

    Soldadora de Fusin

    Tubera HDPE Corrugada de 4" Perf. Herramientas Manuales, Cables

    Tubera HDPE Corrugada de 4" No Perf.

    Total / Total:

    Dique Principal Cota 4357 msnm Total Ind. / Total Ind. :

    Geotextil NT 200 GR/M2 Equipo de Prueba de Aire

    Tubera HDPE Corrugada de 6" Perf. Equipo de Prueba de Vaco

    Tubera HDPE Corrugada de 6" No Perf. Equipo de Prueba de Chispa

    Geomalla Uniaxial de 45 KN/M2 Luminaria 21

    Total / Total: Luminaria 22

    Geotextil NT 200 GR/M2 Total Equipos:

    Geotextil NT 300 GR/M3 H. Equipos / H. Machines: H. Inicio / Previous H. Termino / Previous

    Geocompuesto con Bentonita GCL Luminaria 25

    Total / Total: REPORTE DE CLIMA ADVERSO QUE HAYA IMPEDIDO LOS TRABAJOS / ADVERSE

    WEATHER THAT PREVENTED PLANNED WORK TO BE DONEVertedero de Demasas 2 Etapa

    Sistema de Impermeabilizacin Luminaria 23

    Geomembrana LLPE 2.0 mm Luminaria 24

    Cordn de Extrusin (Ml)

    Reparacin con Extrusin (BEAD)

    Parches Menores a 60X60

    Parches Mayores a 60X60

    Geomembrana LLPE 2.0 mm (M2) TOTAL MANO DE OBRA / MANPOWER:

    Inserto de Geomembrana Delta Lock

    Item Descripcin / Description

    Horas / Hours

    Total / Total: H. Anterior / Previous

    H. Actual /

    Actual

    H. Acum. /

    AccumulatedTrabajos Adicionales

    PRINCIPALES ACTIVIDADES REALIZADAS EN EL TURNO:

    Continuamos con el cambio de los paneles en la relavera Rublo dique 1.

    Se cambiaron 12 paneles de las siguientes dimensiones 1 de (7 M X 4 M) 4 de (7 M X 5.2 M) y 7 de (7 M X 4 M)

    Item Descripcin / DescripcinCantidad /

    Quantity

    Horas / Hours

    H. Anterior /

    Previous

    H. Actual /

    Actual

    H. Acum. /

    Accumulated

    NOTAS POR EL CONTRATISTA: Aspectos relevantes y/o crticos / NOTES BY THE CONTRACTOR: Relevant and/or critical aspects

    Realizamos 52.8 Ml de cordn por extrusin.

    PRINCIPALES ACTIVIDADES DE CONTROL DE CALIDAD (QC) / MAIN ACTIVITIES OF QUALITY CONTROL (QC):

    FIRMA CONTRATISTA / CONTRACTOR'S SIGNATURE CARGO / POSITION

    SEGURIDAD Y MEDIO AMBIENTE

    Se realizo la charla de seguridad antes de iniciar las labores

    RESPUESTA DE LA SUPERVISIN / SUPERVISION'S ANSWER:

    FIRMA SUPERVISION / SUPERVISION'S SIGNATURE: CARGO / POSITION