PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH Request for Determination of Applicability June 23, 2020 Subject Property National Grid Commercial Point 220 Victory Road Boston, Massachusetts Applicant Boston Gas Company d/b/a National Grid New England South Division 100 East Ashland Street Brockton, MA 02302 LEC Environmental Consultants, Inc. 100 Grove Street Suite 302 Worcester, MA 01609 508-753-3077 508-753-3177 fax www.lecenvironmental.com

Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH

Request for Determination of Applicability

June 23, 2020

Subject Property

National Grid

Commercial Point

220 Victory Road

Boston, Massachusetts

Applicant

Boston Gas Company d/b/a National Grid

New England South Division

100 East Ashland Street

Brockton, MA 02302

LEC Environmental Consultants, Inc.

100 Grove Street

Suite 302

Worcester, MA 01609

508-753-3077

508-753-3177 fax

www.lecenvironmental.com

Page 2: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

June 23, 2020

Federal Express and Email ([email protected])

Boston Conservation Commission

City Hall

1 City Hall Square, Room 709

Boston, MA 02201

RE: Request for Determination of Applicability [LEC File #: PALInc\15-153.04]

Operations and Service Center Decommissioning

National Grid

Commercial Point

220 Victory Road

Boston, Massachusetts

Dear Members of the Commission:

On behalf of Boston Gas Company d/b/a National Grid (Applicant), LEC Environmental Consultants,

Inc. (LEC) respectfully submits the enclosed Request for Determination of Applicability (RDA) for work

associated with the decommissioning of the Operations and Service Center at National Grid’s

Commercial Point facility located at 220 Victory Road in the Dorchester neighborhood of Boston,

Massachusetts. This filing is submitted pursuant to the Massachusetts Wetlands Protection Act (Act,

M.G.L.c.131 § 40) and its implementing Regulations (Act Regulations, 310 CMR 10.00), and the City of Boston Wetlands Protection and Climate Change Adaptation Ordinance (Chapter 7-1.4, Ordinance).

The project area is located within the previously developed/disturbed 100-foot Buffer Zone and 25-foot

Waterfront Area to Coastal Beach/Coastal Bank, and/or Land Subject to Coastal Storm Flowage (Zone

VE) associated with the Neponset River. The Applicant proposes to implement an erosion control

program to protect the adjacent wetland resource areas during demolition activities, and the site will be

stabilized and restored to pre-existing conditions following said activities.

As required, enclosed are 2 copies of the RDA submission package:

DEP WPA Form 1-Request for Determination of Applicability and Abutter Notification

Documents (Appendix A);

USGS Topographic Map (Appendix B, Figure 1);

MassGIS Orthophoto & NHESP Estimated Habitat Map (Appendix B, Figure 2);

FEMA Flood Insurance Rate Map (Appendix B, Figure 3);

Site Photographs (Appendix B); and

Site Plan entitled, Site Demolition and Erosion Control Plan, National Grid, Commercial Point,

220 Victory Road, Boston, MA, prepared by Nitsch Engineering, Inc., June 24, 2020 (Appendix

C).

Page 3: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH

It is our understanding that the Conservation Commission will legally post the RDA application and

required public meeting so as to appear on the Conservation Commission’s July 8, 2020 agenda.

In conclusion, the proposed project fully complies with the governing regulations such that we

respectfully request the Commission to issue a Negative Determination of Applicability allowing the

work to proceed as described herein.

We trust that the information included herein is sufficient to facilitate your review. Should you have any

questions regarding this RDA or require additional information, please do not hesitate to contact me at

508-753-3077 or at [email protected]. Thank you for your consideration of this RDA, and

we look forward to the remote meeting with the Commission on July 8, 2020.

Sincerely,

LEC Environmental Consultants, Inc.

Andrea Kendall

Senior Environmental Scientist

cc: DEP, Northeast Region

Deborah Blanch, National Grid

Page 4: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Request for Determination of Applicability

National Grid – Commercial Point

220 Victory Road

Boston, Massachusetts

June 23, 2020

PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH

Page 5: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Request for Determination of Applicability National Grid-Commercial Point

220 Victory Road

Boston, Massachusetts

Page 1 of 5

PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH

1. Introduction

On behalf of the Applicant, Boston Gas Company d/b/a National Grid, LEC

Environmental Consultants, Inc. (LEC) is filing the enclosed Request for Determination

of Applicability (RDA) with the Boston Conservation Commission to decommission the

former Operations and Service Center located at National Grid’s Commercial Point

Facility located at 220 Victory Road in the Dorchester neighborhood of Boston,

Massachusetts. The project will occur, in part, within the previously developed/disturbed

100-foot Buffer Zone and 25-Waterfront Area to Coastal Beach/Coastal Bank, and/or Land Subject to Coastal Storm Flowage (Zone VE). These Wetland Resource Areas are

jurisdictional under the Massachusetts Wetlands Protection Act

(M.G.L. c. 131, s. 40, the Act) and implementing Regulations (310 CMR 10.00,

Regulations), and the City of Boston Wetlands Protection and Climate Adaptation

Ordinance (Chapter 7-1.4, Ordinance). Following decommissioning activities, existing

conditions (i.e., vegetation, crushed stone, and pre-existing elevations) will be restored

and the site will be stabilized.

2. General Site Conditions

National Grid’s Commercial Point Facility (Facility) is located within the southeastern

portion of Dorchester on the north side of Victory Road. The Facility is bound by Route

93 to the west, Morrissey Boulevard to the north, and the Neponset River to the east and

south (Appendix B, Figure 1). The Facility contains photovoltaic solar arrays,

operational buildings, a liquefied natural gas (LNG) tank, and associated infrastructure.

The Project Area is located within the southeast portion of the Facility, at the eastern

terminus of Victory Road, and includes the former Operations and Service Center; a

single-story modular office building, an outdoor gravel parking area, and a vehicle and

equipment storage area. The Project Area is level, contains paved, gravel, and vegetated

surfaces, and is bound by an 8-foot tall chain link security fence.

In 2019, the Operations and Service Center was relocated to another National Grid

facility. While various storage units, supplies, and vehicles were removed, miscellaneous

features remain, including, for example, the modular office building, a 10-foot wide

Page 6: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Request for Determination of Applicability National Grid-Commercial Point

220 Victory Road

Boston, Massachusetts

Page 2 of 5

PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH

2.1

2.2

Conex storage box, wooden shed, steel plates, and concrete blocks (Appendix B, Site

Photographs).

The Project Area is located, in part, within the previously developed/disturbed 100-foot

Buffer Zone and 25-foot Waterfront Area to Coastal Beach/Coastal Bank and Land

Subject to Coastal Storm Flowage (Zone VE) associated with the Neponset River.

Natural Heritage and Endangered Species Program Designation

According to the 14th edition of the Massachusetts Natural Heritage Atlas (effective

August 1, 2017) published by Natural Heritage & Endangered Species Program (NHESP)

and the MassGIS data layer, the Project Area is not located within areas of Estimated

Habitat of Rare Wildlife or Priority Habitat of Rare Species. In addition, no Certified

Vernal Pools (CVP) or Potential Vernal Pools (PVP) occur on or within the vicinity of

the Site (Appendix B, Figure 2).

Federal Emergency Management Agency Floodplain Designation

According to the Preliminary March 16, 2016 Federal Emergency Management Agency

Flood Insurance Rate Map for Suffolk County, Massachusetts (Community Panel

25025C0091J), no portion of the Project Area is contained within a Special Flood Hazard

Areas Subject to Inundation by the 1% Annual Chance Flood Zone AE, base flood areas

determined (NAVD 88’, EL 13’) –Area subject to flooding by the 1% annual chance

flood. The Project Area is located within Coastal High Hazard Area Zone VE, base flood

determined (NAVD ’88, EL 14’) - Areas along coasts subject to inundation by the 1-

percent-annual chance flood event with additional hazards due to storm-induced velocity

wave action. The remaining portion of the Project Area located above elevation 14’ is

located within Zone X-Areas determined to be outside the 0.2% annual chance flood.

(Appendix B, Figure 3).

3. Proposed Conditions

National Grid proposes to decommission the Operations and Service Center Facility by

removing all structures, storage units, and miscellaneous features (e.g., remnant fence

posts), disconnecting utilities, and conducting a general surficial clean-up of debris from

within the Project Area.

Page 7: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Request for Determination of Applicability National Grid-Commercial Point

220 Victory Road

Boston, Massachusetts

Page 3 of 5

PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH

Building Demolition and Removal of Storage Units

The modular office building will be dismantled in place and removed. Since the building

is elevated on concrete cinder blocks sitting on the ground surface, no excavations of

footings or foundations will be required and ground disturbing activities will thus be

minimized. It is anticipated that demolition and removal of the modular office building

will take roughly four (4) days. Following removal, dense-grade gravel will be placed

within the footprint of the building in order to provide a stable and uniform ground cover

consistent with the adjacent gravel parking area. The staging area for demolition

activities includes the existing gravel parking area. Any disturbed areas within the gravel

parking area resulting from tracked construction vehicles will be restored to existing

conditions.

A hazardous material building assessment was conducted by Tighe & Bond in March

2020 for the modular office building. Sampled materials (e.g., shingle, caulking,

insulation, wallboard, flooring, tile, adhesive) were negative for asbestos and as such, no

special management will be required. Universal waste items, such as mercury containing

light bulbs, batteries, light fixtures, fire extinguisher, heat/air conditioning units, etc. will

be removed by hand prior to demo activities.

The existing wooden sheds will be dismantled and removed. In addition, the metal

Conex box will be removed.

Utility Disconnection

Utilities, including water, sewer, gas, electric, and telecommunications, have been or will

be disconnected. The water service was terminated within the LNG Facility but the

terminus of the existing water line at the office building will be cut and capped flush to

grade. The sewer service will be terminated and capped at the existing belowground

sewer ejection pump housed within a 4’x4’x3’ wooden box located at the northwest

corner of the building. The wooden box will be removed and following the sewer cap,

the area will be filled with crushed stone to grade. Gas service will be terminated west of

the building within the LNG facility and will include a temporary excavation to access

and terminate the service. Excavated material will be replaced and surface stabilized

with asphalt to restore ground conditions. Overhead electric lines will be terminated on

the west side of the building and existing PVC surficial conduits extending from the

office building to the storage yard will be removed. Finally, telecommunication lines,

Page 8: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Request for Determination of Applicability National Grid-Commercial Point

220 Victory Road

Boston, Massachusetts

Page 4 of 5

PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH

located within belowground conduits and overhead attached to utility poles, will be

terminated. Access to belowground fibers will be made from existing manholes such that

no ground disturbing activities will be required.

Miscellaneous

Miscellaneous items will be removed from the site. Dilapidated chain link fence

segments and posts located within a vegetated area will be removed. As needed, holes

resulting from removal of fence posts will be leveled and area seeded. Concrete blocks

and other items will be removed. Finally, the area will be hand-cleaned of surficial

debris.

The southeast corner of the modular office building is located within the 100-foot Buffer

Zone while the staging area is located, in part, within the previously developed/disturbed

100-foot Buffer Zone, 25-foot Waterfront Area, and Land Subject to Coastal Storm

Flowage. Once activities are complete, pre-existing conditions (i.e., vegetation,

pavement, gravel, elevation and grades, etc.) will be restored and the site will be

stabilized. Following seeding of disturbed areas, straw mulch will be applied to conserve

moisture and minimize erosion.

Construction is targeted to start this August following procurement of all permits.

4. Mitigation Measures

The Applicant intends to implement erosion controls during construction activities, in

accordance with National Grid’s Environmental Guidance Document (EG303), to

mitigate for any potential impacts to Wetland Resource Areas during construction.

National Grid’s EG303 provides specifications on environmental procedures and best

management practices (BMPs) to be followed by National Grid personnel, consultants,

and contractors. A description of these mitigating measures is provided below.

4.1 Erosion and Sedimentation Control

The Applicant proposes to implement an erosion control program to protect the adjacent

Neponset River from sedimentation during construction activities. The plan for the

control of potential impacts to the adjacent Wetland Resource Area will be comprised of

erosion control barriers (e.g., silt soxx located on the eastern perimeter of the gravel

Page 9: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Request for Determination of Applicability National Grid-Commercial Point

220 Victory Road

Boston, Massachusetts

Page 5 of 5

PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH

parking area, Appendix D) and best management practices (e.g., site housekeeping).

Construction material storage and construction vehicles/activity will be confined to

within paved or gravel areas. All erosion control barriers will remain in place until

disturbed areas are stabilized by vegetation, gravel, and/or pavement. Finally, if required,

vehicle refueling will be located beyond the 100-foot Buffer Zone. As a result of these

construction level BMPs, the Neponset River and associated Coastal Beach/Coastal Bank

will be protected.

5. Summary

On behalf of the Applicant, Boston Gas Company d/b/a National Grid, LEC

Environmental Consultants, Inc. is filing this Request for Determination of Applicability

with the Boston Conservation Commission to decommission the former Operations and

Service Center at the Commercial Point Facility in Boston, Massachusetts. The project

will occur, in part, within the previously developed/disturbed 100-foot Buffer Zone and

25-foot Waterfront Area to Coastal Beach/Coastal Bank, and Land Subject to Coastal

Storm Flowage (Zone VE) associated with the Neponset River. In an effort to mitigate

for the proposed construction related activities, erosion control measures and best

management practices will be followed to protect adjacent Wetland Resource Areas.

The Applicant respectfully requests that the Commission issue a negative Determination

of Applicability allowing the work to proceed as described.

Page 10: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Appendix A

DEP WPA Form 1-Request for Determination of Applicability

Affidavit of Service

Abutter Letter

Abutter Notification

Abutters List

Page 11: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

wpaform1.doc

Page 1 of 4

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City of Boston Wetlands Protection and Climate Adaptation Ordinance

Boston City/Town

A. General Information

Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.

1. Applicant:

Boston Gas Company Name

[email protected] E-Mail Address

19 Phillips Road Mailing Address

Hanover City/Town

MA State

02339 Zip Code

617-908-8881 Phone Number

Fax Number (if applicable)

2. Representative (if any):

LEC Environmental Consultants, Inc. Firm

Andrea Kendall Contact Name

[email protected] E-Mail Address

100 Grove Street, Suite 302 Mailing Address

Worcester City/Town

MA State

01605 Zip Code

508-753-3077 Phone Number

508-753-3177 Fax Number (if applicable)

B. Determinations 1. I request the Boston

Conservation Commission make the following determination(s). Check any that apply:

a. whether the area depicted on plan(s) and/or map(s) referenced below is an area subject to

jurisdiction of the Wetlands Protection Act.

b. whether the boundaries of resource area(s) depicted on plan(s) and/or map(s) referenced below are accurately delineated.

c. whether the work depicted on plan(s) referenced below is subject to the Wetlands Protection Act.

d. whether the area and/or work depicted on plan(s) referenced below is subject to the jurisdiction

of any municipal wetlands ordinance or bylaw of:

Boston Name of Municipality

e. whether the following scope of alternatives is adequate for work in the Riverfront Area as depicted on referenced plan(s).

Page 12: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

wpaform1.doc

Page 2 of 4

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City of Boston Wetlands Protection and Climate Adaptation Ordinance

Boston City/Town

C. Project Description 1. a. Project Location (use maps and plans to identify the location of the area subject to this request):

220 Victory Road Street Address

Boston City/Town

Parcel ID: 1600230000 Assessors Map/Plat Number

Parcel/Lot Number

b. Area Description (use additional paper, if necessary):

National Grid’s Commercial Point Facility is located within the southeastern portion of Dorchester on the north side of Victory Road. The Site is bound by Route 93 to the west, Morrissey Boulevard to the north, and the Neponset River to the east and south. The National Grid Commercial Point Facility contains photovoltaic solar arrays, operational buildings, a liquefied natural gas tank, and associated infrastructure. The Project Area is located within the southeast portion of the Facility, at the eastern terminus of Victory Road, and includes the former Operations and Service Center; a single-story modular office building, an outdoor gravel parking area, and a vehicle and equipment storage area. The Project Area is level, contains paved, gravel, and vegetated surfaces, and is bound by an 8-foot tall chain link security fence. In 2019, the Operations and Service Center was relocated to another National Grid facility. While various storage units, supplies, and vehicles were removed, miscellaneous features remain, including, for example, the modular office building, a 10-foot wide Conex storage box, wooden shed, and concrete blocks The project area is located within the previously disturbed/developed 100-foot Buffer Zone and 25-foot Waterfront Area to Coastal Beach/Coastal Bank and Land Subject to Coastal Storm Flowage (Zone VE) associated with the Neponset River.

c. Plan and/or Map Reference(s):

Site Demolition & Erosion Control Plan, National Grid, Commercial Point, 220 Victory Road, Boston, MA, prepared by Nitsch Engineering Title

June 24, 2020 Date

Title

Date

Title

Date

2. a. Work Description (use additional paper and/or provide plan(s) of work, if necessary):

National Grid proposes to decommission the Operations and Service Center Facility by removing all structures, storage units, and miscellaneous features (e.g., remnant fence posts), disconnecting utilities, and conducting a general surficial clean-up of debris from within the Project Area.

The Applicant proposes to implement an erosion control program to protect the adjacent Neponset River from sedimentation during demolition activities. The plan for the control of potential impacts to the adjacent Wetland Resource Area will be comprised of erosion control barriers (e.g., silt soxx located on the eastern perimeter of the gravel parking area) and best management practices (e.g., site housekeeping).

Page 13: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

wpaform1.doc

Page 3 of 4

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City of Boston Wetlands Protection and Climate Adaptation Ordinance

Boston City/Town

C. Project Description (cont.) b. Identify provisions of the Wetlands Protection Act or regulations which may exempt the applicant

from having to file a Notice of Intent for all or part of the described work (use additional paper, if necessary).

No exemption is noted, however, this filing is submitted in accordance with 310 CMR 10.02(2)(b)(3): Activities within the buffer zone (and riverfront area per 10.02(2)(a)(1)) which do not meet the requirements of 310 CMR 10.02(2)(b)(1). and 2. are subject to preconstruction review through the filing of a Determination of Applicability to clarify jurisdiction.

3. a. If this application is a Request for Determination of Scope of Alternatives for work in the Riverfront Area, indicate the one classification below that best describes the project.

Single family house on a lot recorded on or before 8/1/96 Single family house on a lot recorded after 8/1/96 Expansion of an existing structure on a lot recorded after 8/1/96 Project, other than a single family house or public project, where the applicant owned the lot

before 8/7/96 New agriculture or aquaculture project Public project where funds were appropriated prior to 8/7/96 Project on a lot shown on an approved, definitive subdivision plan where there is a recorded deed

restriction limiting total alteration of the Riverfront Area for the entire subdivision Residential subdivision; institutional, industrial, or commercial project Municipal project District, county, state, or federal government project Project required to evaluate off-site alternatives in more than one municipality in an

Environmental Impact Report under MEPA or in an alternatives analysis pursuant to an application for a 404 permit from the U.S. Army Corps of Engineers or 401 Water Quality Certification from the Department of Environmental Protection.

b. Provide evidence (e.g., record of date subdivision lot was recorded) supporting the classification above (use additional paper and/or attach appropriate documents, if necessary.)

Page 14: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

wpaform1.doc

Page 4 of 4

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City of Boston Wetlands Protection and Climate Adaptation Ordinance

Boston City/Town

D. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Request for Determination of Applicability

and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I further certify that the property owner, if different from the applicant, and the appropriate DEP Regional Office were sent a complete copy of this Request (including all appropriate documentation) simultaneously with the submittal of this Request to the Conservation Commission. Failure by the applicant to send copies in a timely manner may result in dismissal of the Request for Determination of Applicability.

Name and address of the property owner:

National Grid Energy Service Name

40 Sylvan Raod Mailing Address

Waltham City/Town

MA State

02451 Zip Code

Signatures: I also understand that notification of this Request will be placed in a local newspaper at my expense in accordance with Section 10.05(3)(b)(1) of the Wetlands Protection Act regulations.

Signature of Applicant Deborah Blanch, Boston Gas Company

June 23, 2020 Date

Signature of Representative (if any) Andrea Kendall, LEC Environmental

June 23, 2020 Date

Consultants, Inc.

Page 15: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

AFFIDAVIT OF SERVICE

Under the Massachusetts Wetlands Protection Act

and Boston Wetlands Ordinance, City of Boston Code, Ordinances, Chapter 7-1.4

I, Sharon A. Sullivan, on behalf of Boston Gas Company d/b/a National Grid, hereby certify

under the pains and penalties of perjury that on June 24, 2020 I gave notification to abutters in

compliance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40

and 310 CMR 10.05 (4) (a) and Boston Wetlands Ordinance, City of Boston Code, Ordinances,

Chapter 7-1.4 in connection with the following matter:

A Request for Determination of Applicability filed under the Massachusetts

Wetlands Protection Act and the City of Boston Wetlands Ordinance by LEC

Environmental Consultants, Inc. on behalf of the Applicant, Boston Gas Company

d/b/a National Grid, with the City of Boston Conservation Commission on June

24, 2020 for property located at 220 Victory Road (Assessor’s Parcel ID:

160023000) in Boston, Massachusetts.

The form of notification, and a list of the abutters to whom it was given and their addresses, are

attached to this Affidavit of Service.

_________________________________________ 6/24/2020

Sharon A. Sullivan Date

Permitting Technician

Page 16: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

June 24, 2020

CERTIFICATE OF MAILING

«Name»

«Address»

«City», «State» «Zip»

Re: Notice of Intent Application [LEC File #: PALInc\15.153.04]

220 Victory Road

Assessor’s Parcel ID: 1600230000

Boston, Massachusetts

Dear Abutter:

On behalf of the Applicant, Boston Gas Company d/b/a National Grid, LEC Environmental Consultants,

Inc. (LEC) has filed a Request for Determination of Applicability for work associated with the

decommissioning of the Operations and Service Center at National Grid’s Commercial Point facility

located at 220 Victory Road in the Dorchester neighborhood of Boston. This filing is being submitted

pursuant to the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131, s. 40, as amended) and its

implementing Regulations (310 CMR 10.00), and the Boston Wetlands Ordinance, City of Boston Code,

Ordinances, Chapter 7-14.

The Request for Determination of Applicability and accompanying plans are available for review by the

public at the Boston Conservation Commission. The Public Hearing will be held at the Boston City Hall,

1 City Hall Square, Piemonte Room, 5th Floor on July 8, 2020 beginning at 6:00 p.m., in accordance with

the provisions of the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131, s. 40, as amended) and its

implementing Regulations (310 CMR 10.00), and the Boston Wetlands Ordinance, City of Boston Code,

Ordinances, Chapter 7-14. Further information regarding this application will be published at least five

(5) days in advance in The Boston Herald. Notice of the Public Hearing will also be posted at the Boston

City Hall at least 48 hours in advance. Confirmation of hearing date, time and agenda may be found at

https://boston.gov/public-notices.

Due to Governor Baker’s Covid-19 State of Emergency and further direction from the CDC, the Governor

has suspended certain provisions of the Massachusetts Open Meeting Law. Please check the

City/Conservation Commission website for information relative to remote viewing and/or participation in

the public hearing process.

Please do not hesitate to review the materials and/or attend the public hearing should you have questions

or concerns about the proposed project.

Sincerely,

LEC Environmental Consultants, Inc.

Andrea Kendall

Senior Environmental Scientist

Page 17: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Notification to Abutters Under the

Massachusetts Wetlands Protection Act

and the

City of Boston Code, Ordinances, Chapter 7-1.4

In accordance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, and

City of Boston Code, Ordinances, Chapter 7-1.4, you are hereby notified of the following:

A. The name of the Applicant is Boston Gas Company d/b/a National Grid, New England South

Division, 100 East Ashland Street, Brockton, Massachusetts.

B. The Applicant has filed a Request for Determination of Applicability with the Conservation

Commission for the municipality of Boston, Massachusetts for work associated with the

decommissioning of the Operations and Service Center pursuant to the Massachusetts Wetlands

Protection Act (General Laws Chapter 131, Section 40) and the City of Boston Wetlands Protection

and Climate Change Adaptation Ordinance (Chapter 7-1).

C. The activity is proposed on a lot located at 220 Victory Road (Assessor’s Parcel ID: 1600230000),

Boston, Massachusetts.

D. Copies of the Request for Determination of Applicability may be examined by contacting the Boston

Conservation Commission at (617) 635-3850.

For more information, call: LEC Environmental Consultants, Inc. (the applicant’s representative) at

(781) 245-2500.

E. Copies of the Request for Determination of Applicability may be obtained from LEC Environmental

Consultants, Inc. (the applicant’s representative) by calling (781) 245-2500 between the hours of 8:00

a.m. and 5:00 p.m., Monday through Friday. A fee may be charged for each copy requested.

F. Information regarding the public hearing may be obtained from the Boston Conservation Commission

(the regulatory agency) by calling (617) 635-3850 or at https://boston.gov/public-notices.

NOTE: Notice of the Public Hearing, including its date, time, and place, will be published at least five (5)

days in advance in The Boston Herald.

NOTE: Notice of the public hearing will also be posted at the Boston City Hall not less than 48 hours in

advance.

NOTE: You also may contact the nearest Department of Environmental Protection Regional Office for

more information about this application or the Wetlands Protection Act. To contact DEP, call:

Northeast Region: 978-694-3200

Page 18: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

650 700 WM T MORRISSEY BL

EXPRESSWAY MOTORS LLC

700 MORRISSEY BLVD

DORCHESTER, MA 02122

FREEPORT ST

COMMONWLTH OF MASS

FREEPORT

DORCHESTER, MA 02122

201 VICTORY RD

COMM OF MASS MDC

201 VICTORY RD

DORCHESTER, MA 02122

229 VICTORY RD

CITY OF BOSTON

229 VICTORY RD

DORCHESTER, MA 02122

235 VICTORY RD

OLD COLONY YACHT CLUB THE

235 VICTORY RD

DORCHESTER, MA 02122

VICTORY RD

COMM OF MASS DPW

VICTORY RD

DORCHESTER, MA 02122

FREEPORT ST

COMMWLTH OF MASS

FREEPORT

DORCHESTER, MA 02122

FREEPORT ST

COMMWLTH OF MASS

FREEPORT

DORCHESTER, MA 02122

Page 19: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Appendix B

Locus Maps & Site Photographs

Figure 1: USGS Topographic Map

Figure 2: MassGIS Orthophoto & NHESP Estimated Habitat Map

Figure 3: FEMA Flood Insurance Rate Map

Site Photographs

Page 20: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

<Double-click here to enter title>

Figure 1: USGS Topographic Map220 Victory RoadDorchester, MA

May 19, 2020

±0 500 Feet

Environmental Consultants, Inc.

Wakefield, MA

781.245.2500

www.lecenvironmental.com

Office of Geographic and Environmental Information(MassGIS), Commonwealth of Massachusetts

Executive Office of Environmental Affairs

1:25,000 USGS Topographic Images - April 2001

Page 21: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

<Double-click here to enter title>

Figure 2: MassGIS Orthophoto & NHESP Map220 Victory RoadDorchester, MA

May 19, 2020

VICTORY R

OAD

±0 200 Feet

NHESP Certified Vernal Pool

NHESP Potential Vernal Pool

NHESP Estimated Habitatsof Rare Wildlife (2017)

NHESP Priority Habitatsof Rare Species (2017)

k

k

Legend

Environmental Consultants, Inc.

Wakefield, MA

781.245.2500

www.lecenvironmental.com

Office of Geographic and Environmental Information

(MassGIS), Commonwealth of Massachusetts,

Executive Office of Environmental Affairs

MassGIS USGS Ortho Imagery (2019)

Page 22: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland
sharon
Typewritten Text
sharon
Typewritten Text
sharon
Typewritten Text
Figure 3: FEMA Flood Insurance Rate Map
Page 23: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland
sharon
Pencil
sharon
Pencil
sharon
Pencil
sharon
Pencil
Page 24: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

National Grid-Commercial Point 220 Victory Road

Boston, Massachusetts

Site Photographs

Views of modular office building (front) to be demolished on site and removed and adjacent gravel parking area to be used as staging area.

Page 25: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

National Grid-Commercial Point 220 Victory Road

Boston, Massachusetts

Site Photographs

View of modular office building sitting on concrete cinder blocks (no foundation). Dense graded crushed stone will be placed within the footprint of the building to provide a stable

and uniform ground cover consistent with the adjacent gravel parking area.

Southerly view of modular office building (rear) to be demolished on site and removed.

Page 26: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

National Grid-Commercial Point 220 Victory Road

Boston, Massachusetts

Site Photographs

Existing Conex metal storage container and miscellaneous items adjacent to modular office building to be removed and area cleaned of surficial debris.

View of wooden storage shed and miscellaneous items to be removed.

Page 27: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

National Grid-Commercial Point 220 Victory Road

Boston, Massachusetts

Site Photographs

Views of housing containing belowground sewer injection pump. Sewer line to be cut and capped in this location. Housing (and above fencing) to be removed and

area filled with crushed stone up to ground surface.

Page 28: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

National Grid-Commercial Point 220 Victory Road

Boston, Massachusetts

Site Photographs

Existing metal Conex storage container to be removed from within equipment and storage yard.

Overview former equipment and storage yard.

Page 29: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

National Grid-Commercial Point 220 Victory Road

Boston, Massachusetts

Site Photographs

Views of PVC electric conduit to be removed. Electric service already terminated.

Page 30: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

National Grid-Commercial Point 220 Victory Road

Boston, Massachusetts

Site Photographs

Views of miscellaneous items and debris to be removed from equipment and storage yard.

Page 31: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

National Grid-Commercial Point 220 Victory Road

Boston, Massachusetts

Site Photographs

Views of concrete blocks and miscellaneous items and debris to be removed from equipment and storage yard. Fence posts (top) to be removed. Any disturbed

areas will be seeded.

Page 32: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Appendix C

Plans entitled:

Site Demolition & Erosion Control Plan, National Grid, Commercial Point, 220 Victory Road, Boston MA

prepared by Nitsch Engineering, Inc., dated June 24, 2020

Page 33: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

VICTORY

ROAD

//

//

//

//

////

// // // // // //

//

SCALE:1" = 20'

20 10 0 20 40

FOR RDA PERMITTING ONLYNOT FOR CONSTRUCTION

NOTES

PREPARED FOR:

DRAFTED BY:

SCALE:

FILE:

NITSCH PROJECT #

DATE:

CHECKED BY:

PROJECT MANAGER:

SURVEYOR:

REV. COMMENTS

REVISIONS

DATE

8551.11

1"= 20'

JUNE 24, 2020

WRM

---

WRM

WRM

SITE DEMOLITION & EROSION CONTROL PLAN INATIONAL GRID, COMMERCIAL POINT

220 VICTORY ROAD, BOSTON, MASSACHUSETTS C-1SHEET: 1

OF 3 REV.

8551.11CLO.DWG

GENERAL NOTES:

ABBREVIATIONSPROPOSED LEGEND

Page 34: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

//

//

//

//

//

//

//

SCALE:1" = 20'

20 10 0 20 40

PREPARED FOR:

DRAFTED BY:

SCALE:

FILE:

NITSCH PROJECT #

DATE:

CHECKED BY:

PROJECT MANAGER:

SURVEYOR:

REV. COMMENTS

REVISIONS

DATE

8551.11

1"= 20'

JUNE 24, 2020

WRM

---

WRM

WRM

SITE DEMOLITION & EROSION CONTROL PLAN IINATIONAL GRID, COMMERCIAL POINT

220 VICTORY ROAD, BOSTON, MASSACHUSETTS C-2SHEET: 2

OF 3 REV.

8551.11CLO.DWG

FOR RDA PERMITTING ONLYNOT FOR CONSTRUCTION

NOTES

Page 35: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

CATCH BASIN W/ SILTATION SACKINLET PROTECTION

GRAVEL PARKING LOT DETAIL

··

COMPOST WATTLES - SLOPE PROTECTION DETAIL

SECTION PLAN

PREPARED FOR:

DRAFTED BY:

SCALE:

FILE:

NITSCH PROJECT #

DATE:

CHECKED BY:

PROJECT MANAGER:

SURVEYOR:

REV. COMMENTS

REVISIONS

DATE

2 Center Plaza, Suite 430Boston, MA 02108T: (617) 338-0063F: (617) 338-6472

Civil EngineeringLand SurveyingTransportation EngineeringStructural Engineering

PlanningGIS

Green Infrastructure

8551.11

AS NOTED

JUNE 24, 2020

WRM

---

WRM

WRM

EROSION CONTROL NOTES & DETAILSNATIONAL GRID, COMMERCIAL POINT

220 VICTORY ROAD, BOSTON, MASSACHUSETTS C-3SHEET: 3

OF 3 REV.

8551.11CDT.DWG

FOR RDA PERMITTING ONLYNOT FOR CONSTRUCTION

EROSION AND SEDIMENT CONTROL NOTES:

Page 36: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

Appendix D

Silt Soxx

Page 37: Request for Determination of Applicability...2020/07/15  · River from sedimentation during demolitionactivities. The p lan for the control of potential impacts to the adjacent Wetland

® ™

® ™

® SOXX™(12" TYPICAL)

® SOXX™ (12" TYPICAL)

ENVIRONMENTAL GUIDANCEDate

Doc. No. EG-303NE

08/08/12SUBJECT

Access, Maintenance and ConstructionBest Management Practices

ReferenceEP No. 3 - Natural ResourceProtection (Chapter 6)

BMP # 4SILT SOXX *

BMP DETAIL

BMP PICTURE

Page: 3-4 Rev. No. 0